Operating Rules for Crane Operators

1. The crane should be centered over the load before starting the hoist to avoid swinging of the load
   as lifting starts. Load should not be swung by cranes to reach areas not under or within reach of
   crane.

2. Crane should be operated smoothly to avoid jerk & abrupt movements of the load. Slack must be
   taken from the sling & hoisting ropes before the load is lifted.

3. The crane hoisting ropes should be kept vertical. Crane must not be used for side pulls.

4. The area should be clear and all persons in the area aware when load is lifted. This is to be ensured
   by a warning signal while lifting, lowering & while moving. Additional warning signal to be used
   in high traffic density area.

5. The load should be checked to be certain that it is lifted high enough to clear all obstructions and
   personnel when moving.

6. Loads must not be carried over people, especially loads carried by magnets. Load or part of loads,
   held magnetically may drop. Failure in power to magnets will result in dropping of the load unless
   back up power supply is furnished.

7. Lifts should not be attempted beyond the rated load capacity of the crane, sling ropes chains etc.

8. On all capacity or near capacity loads, the hoist brakes should be tested by returning the motor
   switch or push button to the OFF position after raising the load a few inches off the floor. If the
   hoist brakes do not hold the load should be set on the floor and the crane not further operated. The
   defect should be reported immediately to the supervisor.

9. Before moving a load, load slings, load chains or other load lifting devices must be fully seated on
   the saddle of the hook.

10. The block should never be lowered below the point where less than two full wraps of the rope
    remain on the drum. Should all the rope get unwrapped from the drum, it should be rewound in
    the drum groove in the correct direction and seated properly in the groove otherwise the rope may
    get damaged and the hoist limit switch will not operate to stop the hoist in the high position

11. At no time a load should be held suspended from the crane with the power "ON" unless the
   operator is at the operator's switch. Under this condition the load should be kept as close as
   possible to the floor to minimize the possibility of an injury if the load should drop.

12. When a hitcher is used, it is the joint responsibility of the crane operator and the hitcher to see that
    hitches are secure and that all loose materials has been removed from the load before starting a
    lift.

13. Sling hooks hanging loose should not be used to lift loads (if slings hooks are not needed, they
    should be properly stored).

14. All slings or ropes should be removed from the crane hooks when not in use (Dangling slings or
    hooks hung in sling rings can inadvertently snag other objects when moving the crane).

15. The crane should not be operated if limit switches are out of order or if ropes show defects or
    wear.

16. Crane operators should not use limit switches to stop the hoist under normal operating conditions.
(These are emergency device and should not be used as operating controls).

17. Limit switch should not be blocked adjusted or disconnected in order to go higher than what
    switch will allow.

18. Electrical limit switches or warning devices should never be by passed.

19. Upper limit switches and lower limit switches should be tested in stopping the hoist at the
    beginning of each shift or as frequently as may be directed.

20. Load limit switch or overload devices must not be used to measure loads being lifted. This is an
    emergency switching device and is not to be used as a production operating control.

21. A crane should never move or bump another crane that has a warning signal displayed.

22. Contact with runway stops or other cranes shall be made with extreme caution. The operator must
    take particular care for the safety of persons on or below the crane and only after making certain
    that persons on the other cranes are aware of what is being done.

23. If plugging protector is not provided, the controller must always be stopped momentarily in OFF
     position before reversing (A slight pause is necessary to give the braking mechanism time to
     operate).

24. In case of an emergency or swing inspection, repairing, cleaning or lubricating a warning sign or
    signal should be displayed and the main switch should be locked in OFF position.

25. An attempt should never be made to close a switch that has an OUT OF ORDER or DO NOT
     OPERATE card on it. It is necessary to make a careful check to determine that no one else is
     working on crane, before removing the card.

26. If the electrical power is disrupted, the controllers must be placed in OFF position and kept there
     until power is again available.

27. Before closing main or emergency switches, all controllers must be in OFF position before
     reversing except to avoid accidents (a slight pause is necessary to give the braking mechanism
     time to operate)

28. Before leaving the crane the operator should perform the following:

a. Raise all hooks to an intermediate position.

b. Spot the crane at an approved designated location

c.   Place all controls in OFF position.

d.   Open the main switch to the OFF position,.

e. Make visual check before leaving the crane.

More Related Content

What's hot

Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
Lifting plan
Lifting planLifting plan
Lifting plantnsv22
 
LOTO Training
LOTO TrainingLOTO Training
LOTO TrainingCM Tiwari
 
Check list for conveyor belt inspection
Check list for conveyor belt inspectionCheck list for conveyor belt inspection
Check list for conveyor belt inspectionBimal Chandra Das
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting OperationsJames McCann
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Trainingedale07
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsAlan Bassett
 
Lifting & procedure
Lifting & procedureLifting & procedure
Lifting & procedurePavan Noel
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifWessam Atif
 
Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of RiggerMajid Hussain
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpointJomish John
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hightGaurav Singh Rajput
 

What's hot (20)

Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Lifting plan
Lifting planLifting plan
Lifting plan
 
LOTO Training
LOTO TrainingLOTO Training
LOTO Training
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
Check list for conveyor belt inspection
Check list for conveyor belt inspectionCheck list for conveyor belt inspection
Check list for conveyor belt inspection
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting Operations
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Training
 
Chain sling
Chain slingChain sling
Chain sling
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operations
 
Lifting plan template
Lifting plan templateLifting plan template
Lifting plan template
 
Lifting & procedure
Lifting & procedureLifting & procedure
Lifting & procedure
 
Work safe with grinder
Work safe with grinderWork safe with grinder
Work safe with grinder
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam Atif
 
Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of Rigger
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpoint
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hight
 

Similar to Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs) , By B C Das

1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha classBill Brown
 
WINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdfWINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdfssuser54b5c5
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptNeerajTiwari965955
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptGeneralCommunication1
 
Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training  Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training BILL Bill Brown
 
Crane operator safety procedure
Crane operator safety procedureCrane operator safety procedure
Crane operator safety procedureAbdul Shukur
 
Mining Accident alerts 2016 Safety Training
Mining Accident alerts 2016 Safety TrainingMining Accident alerts 2016 Safety Training
Mining Accident alerts 2016 Safety TrainingKevin Zahner
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...AhmedAliKhan38
 
Safe lifting practices
Safe lifting practicesSafe lifting practices
Safe lifting practicesViktor Bily
 
Mechanical Handling updated.ppt
Mechanical Handling updated.pptMechanical Handling updated.ppt
Mechanical Handling updated.pptCheDillon1
 
Aerial_Lift_1.ppt
Aerial_Lift_1.pptAerial_Lift_1.ppt
Aerial_Lift_1.pptWaqasSidhu4
 
Overhead-Cranes safety training.ppt
Overhead-Cranes safety training.pptOverhead-Cranes safety training.ppt
Overhead-Cranes safety training.pptRazFazwan
 
New holland d255 crawler dozer service repair manual
New holland d255 crawler dozer service repair manualNew holland d255 crawler dozer service repair manual
New holland d255 crawler dozer service repair manualdueikdkmem
 
Truck crane training bill brown
Truck crane training bill brownTruck crane training bill brown
Truck crane training bill brownBill Brown
 
S ky jack_scissorlift_manlift
S ky jack_scissorlift_manliftS ky jack_scissorlift_manlift
S ky jack_scissorlift_manliftPunya Benja
 

Similar to Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs) , By B C Das (20)

1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha class
 
WINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdfWINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdf
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training  Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training
 
Crane operator safety procedure
Crane operator safety procedureCrane operator safety procedure
Crane operator safety procedure
 
Mining Accident alerts 2016 Safety Training
Mining Accident alerts 2016 Safety TrainingMining Accident alerts 2016 Safety Training
Mining Accident alerts 2016 Safety Training
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
Loading and unloading white
Loading and unloading whiteLoading and unloading white
Loading and unloading white
 
Safe lifting practices
Safe lifting practicesSafe lifting practices
Safe lifting practices
 
Cranes hoists 2010
Cranes  hoists 2010Cranes  hoists 2010
Cranes hoists 2010
 
Mechanical Handling updated.ppt
Mechanical Handling updated.pptMechanical Handling updated.ppt
Mechanical Handling updated.ppt
 
Aerial_Lift_1.ppt
Aerial_Lift_1.pptAerial_Lift_1.ppt
Aerial_Lift_1.ppt
 
Overhead-Cranes safety training.ppt
Overhead-Cranes safety training.pptOverhead-Cranes safety training.ppt
Overhead-Cranes safety training.ppt
 
New holland d255 crawler dozer service repair manual
New holland d255 crawler dozer service repair manualNew holland d255 crawler dozer service repair manual
New holland d255 crawler dozer service repair manual
 
Truck crane training bill brown
Truck crane training bill brownTruck crane training bill brown
Truck crane training bill brown
 
ESF1 Piling Vibrator - Operating instructions
ESF1 Piling Vibrator - Operating instructionsESF1 Piling Vibrator - Operating instructions
ESF1 Piling Vibrator - Operating instructions
 
Operating Instruction for THE ESF03 Piling Vibrator
Operating Instruction for THE ESF03 Piling VibratorOperating Instruction for THE ESF03 Piling Vibrator
Operating Instruction for THE ESF03 Piling Vibrator
 
safe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUESsafe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUES
 
S ky jack_scissorlift_manlift
S ky jack_scissorlift_manliftS ky jack_scissorlift_manlift
S ky jack_scissorlift_manlift
 

More from Bimal Chandra Das

More from Bimal Chandra Das (20)

EMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdfEMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdf
 
construction macheinery Safety.pdf
construction macheinery Safety.pdfconstruction macheinery Safety.pdf
construction macheinery Safety.pdf
 
INTRODUCTION TO SAFETY.pdf
INTRODUCTION TO SAFETY.pdfINTRODUCTION TO SAFETY.pdf
INTRODUCTION TO SAFETY.pdf
 
IS 14489 Q.doc
IS 14489 Q.docIS 14489 Q.doc
IS 14489 Q.doc
 
Safety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.pptSafety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.ppt
 
Indian Electricity Act 1910.pdf
Indian  Electricity  Act 1910.pdfIndian  Electricity  Act 1910.pdf
Indian Electricity Act 1910.pdf
 
Indian electricity IE RULES 1956.pdf
Indian electricity  IE RULES 1956.pdfIndian electricity  IE RULES 1956.pdf
Indian electricity IE RULES 1956.pdf
 
ACT&RULE West Bengal.ppt
ACT&RULE West Bengal.pptACT&RULE West Bengal.ppt
ACT&RULE West Bengal.ppt
 
Factories -ACT & RULE.ppt
Factories -ACT &  RULE.pptFactories -ACT &  RULE.ppt
Factories -ACT & RULE.ppt
 
Contractor's _obligation.ppt
Contractor's _obligation.pptContractor's _obligation.ppt
Contractor's _obligation.ppt
 
SAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdfSAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdf
 
LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
 
Check List for Crane Inspection.pdf
Check List for Crane Inspection.pdfCheck List for Crane Inspection.pdf
Check List for Crane Inspection.pdf
 
COST OF ACCIDENT.ppt
COST OF ACCIDENT.pptCOST OF ACCIDENT.ppt
COST OF ACCIDENT.ppt
 
Plant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffoldPlant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffold
 
Safety in use of ladder
Safety in use of ladderSafety in use of ladder
Safety in use of ladder
 
Selection of safety appliances
Selection of safety appliancesSelection of safety appliances
Selection of safety appliances
 
Risk
RiskRisk
Risk
 
Safety education and training
Safety education and trainingSafety education and training
Safety education and training
 
Use of PPEs
Use of PPEsUse of PPEs
Use of PPEs
 

Recently uploaded

Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 

Recently uploaded (20)

Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 

Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs) , By B C Das

  • 1. SOP & SMP Operating Rules for Crane Operators 1. The crane should be centered over the load before starting the hoist to avoid swinging of the load as lifting starts. Load should not be swung by cranes to reach areas not under or within reach of crane. 2. Crane should be operated smoothly to avoid jerk & abrupt movements of the load. Slack must be taken from the sling & hoisting ropes before the load is lifted. 3. The crane hoisting ropes should be kept vertical. Crane must not be used for side pulls. 4. The area should be clear and all persons in the area aware when load is lifted. This is to be ensured by a warning signal while lifting, lowering & while moving. Additional warning signal to be used in high traffic density area. 5. The load should be checked to be certain that it is lifted high enough to clear all obstructions and personnel when moving. 6. Loads must not be carried over people, especially loads carried by magnets. Load or part of loads, held magnetically may drop. Failure in power to magnets will result in dropping of the load unless back up power supply is furnished. 7. Lifts should not be attempted beyond the rated load capacity of the crane, sling ropes chains etc. 8. On all capacity or near capacity loads, the hoist brakes should be tested by returning the motor switch or push button to the OFF position after raising the load a few inches off the floor. If the hoist brakes do not hold the load should be set on the floor and the crane not further operated. The defect should be reported immediately to the supervisor. 9. Before moving a load, load slings, load chains or other load lifting devices must be fully seated on the saddle of the hook. 10. The block should never be lowered below the point where less than two full wraps of the rope remain on the drum. Should all the rope get unwrapped from the drum, it should be rewound in the drum groove in the correct direction and seated properly in the groove otherwise the rope may get damaged and the hoist limit switch will not operate to stop the hoist in the high position 11. At no time a load should be held suspended from the crane with the power "ON" unless the operator is at the operator's switch. Under this condition the load should be kept as close as possible to the floor to minimize the possibility of an injury if the load should drop. 12. When a hitcher is used, it is the joint responsibility of the crane operator and the hitcher to see that hitches are secure and that all loose materials has been removed from the load before starting a lift. 13. Sling hooks hanging loose should not be used to lift loads (if slings hooks are not needed, they should be properly stored). 14. All slings or ropes should be removed from the crane hooks when not in use (Dangling slings or hooks hung in sling rings can inadvertently snag other objects when moving the crane). 15. The crane should not be operated if limit switches are out of order or if ropes show defects or wear. 16. Crane operators should not use limit switches to stop the hoist under normal operating conditions.
  • 2. (These are emergency device and should not be used as operating controls). 17. Limit switch should not be blocked adjusted or disconnected in order to go higher than what switch will allow. 18. Electrical limit switches or warning devices should never be by passed. 19. Upper limit switches and lower limit switches should be tested in stopping the hoist at the beginning of each shift or as frequently as may be directed. 20. Load limit switch or overload devices must not be used to measure loads being lifted. This is an emergency switching device and is not to be used as a production operating control. 21. A crane should never move or bump another crane that has a warning signal displayed. 22. Contact with runway stops or other cranes shall be made with extreme caution. The operator must take particular care for the safety of persons on or below the crane and only after making certain that persons on the other cranes are aware of what is being done. 23. If plugging protector is not provided, the controller must always be stopped momentarily in OFF position before reversing (A slight pause is necessary to give the braking mechanism time to operate). 24. In case of an emergency or swing inspection, repairing, cleaning or lubricating a warning sign or signal should be displayed and the main switch should be locked in OFF position. 25. An attempt should never be made to close a switch that has an OUT OF ORDER or DO NOT OPERATE card on it. It is necessary to make a careful check to determine that no one else is working on crane, before removing the card. 26. If the electrical power is disrupted, the controllers must be placed in OFF position and kept there until power is again available. 27. Before closing main or emergency switches, all controllers must be in OFF position before reversing except to avoid accidents (a slight pause is necessary to give the braking mechanism time to operate) 28. Before leaving the crane the operator should perform the following: a. Raise all hooks to an intermediate position. b. Spot the crane at an approved designated location c. Place all controls in OFF position. d. Open the main switch to the OFF position,. e. Make visual check before leaving the crane.