Successfully reported this slideshow.

Cv

12 Aufrufe

Veröffentlicht am

Highly skilled QC/MC Multipurpose technical inspector with 19 years of hands experience in advanced inspection and Project engineering as per industry standards.

Veröffentlicht in: Ingenieurwesen
  • Als Erste(r) kommentieren

  • Gehören Sie zu den Ersten, denen das gefällt!

Cv

  1. 1. PERSONAL DATA Name: Behrang Moeini Date of the birth: 08.11.1973 Residency: Norway Gender: Male SUMMERY Highly skilled QC/MC Multipurpose technical inspector with 19 years of hands experience in advanced inspection and Project engineering as per industry standards. Summary of Qualifications • Multi purpose technical inspection. QA/QC/QS Inspection in : • Structural - Fabrication/Construction Civil Testing. • Piping - Fabrication/Construction/NDT/ Hydro test /Commissioning. • Welding - WPS/PQR/NDT Procedures/Spec./Drawings /Review/Visual/Witness/NDT Inspection. Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P1/7 RESUME (CV) BEHRANG MOEINI
  2. 2. • Outfitting - Platform Access for Tank & Deck/ Living Quarters outfitting/Insulation Works. • Buoyancy modules, Topsides terminations, Subsea termination interface Topsides hang off assemblies, dynamic bend stiffeners and other subsea equipment • HAVC - Fans & Ducting Installation/ Commissioning. • Tubing - Hydraulic/Pneumatic/ Instrumentation. • Mechanical - Marine/ Drilling Equipment’s Installation/Alignment/Preservation/NDT/MC/Commissioning. • NDT - UT/RT/MT/PT witness/Radiographic Interpretation. • Quality Control , Quality Surveillance and Mechanical completion of On/Off shore & Subsea Equipment. • All kind of Coating ,Cladding (FBE, Bitumen Membrane, Volcanized ,IMPP, Cement Coating,…). Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P2/7 RESUME (CV) BEHRANG MOEINI
  3. 3. • Painting, Cathodic Protection asset integrity and corrosion. • Sand, Shut &Hydro blasting Onshore/off shore Specialist In/External areas of pipes & subsea structures. • Working on ‘new build’ marine vessels and various pipeline projects Set up and operation of refrigerant and desiccant dehumidifiers. • General arrangements, P & IDs, Piping isometrics, structural drawings Critical inspection procedures. • Electro/Mechanical /HVAC PLC Visual and dimensional & FAT. LV& MV Cabinet test. • Writing inspection project specifications and procedures working in large scale hazardous environments. • Good Knowledge in all of kind of Painting in Steel Structure, Ducts & Pipes. • Coordinate with project management team for new construction projects. Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P3/7 RESUME (CV) BEHRANG MOEINI
  4. 4. • Update material control charts for several projects EDUCATION 09.2005-06.2007 M.Sc. in Mechanical Engineering (Sharif University of technology-Tehran/Iran) 09.1993-03.1997 B.Sc. in Industrial Applied Chemistry Engineering (Azad University-Tehran/Iran) CERTIFICATE: 2006 International Welding Engineer Diploma -International Institute of welding (IIW) 2012 Subsea Equipment Intensive Course Diploma (Subsea 1) 2006 CIP-Level III –Coating Inspector (NACE) 2016 HSE, Safety and preparedness for work in Nexans (Nexans) 2017 IECex 000-001 Apply basic principles of protection in explosive atmospheres(CT) Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P4/7 RESUME (CV) BEHRANG MOEINI
  5. 5. RELATED EXPERIENCES: 07.2011-Present …………… Copmany: B & Y Norge / Norway and EU Zone POSITION: Managing Director /Client Technical Inspector & Coordinator Services: Multi purpose Technical Inspection , Mechanical Completion & QC/QS Subsea Engineering and Expedition. Projects : Vigdis ,ENI Longhorn: Subsea Equipment/LRP, X-Mass Tree-EDP-SFT-Umbilical, Riser (Marathon Oil /Aker solutions ) : Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P5/7 RESUME (CV) BEHRANG MOEINI
  6. 6. Julia : Flowmeters- Venturi (Exxon Mobile –One subsea) Kizomba Phase 1,2: IMPP Coating for Bends , Venturi Hub/pup welding (Exxon -GE- Bredero Shaw-Norway) Jumilar : Subsea Equipment Check Design-Assembly-Fat-FI-EAB Subsea Industries (Chevron-Apache-GE) Mafoumeira Sul: External Volcanized Coating of Risers &painting inspection of Storage Tanks (Chevron-Trelleborg)) Lianzi : Valve ,Hub-Pup WeldingSubsea Sampling System (Chevron) Jack & St Malo : Electrical/ Hydraulically Flying Leads-Siemens/FMCTI/MPM Kongsberg (Chevron) TOI Chevron Drillship : Chemical Injection Packages (Chevron)……………………………………… Emerson : Emerson Level Safety Transmitter Mechanical running test turbine including API running test and borescope test (Siemens Industrial Turbomachinery AB Finspong Sweden) Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P6/7 RESUME (CV) BEHRANG MOEINI
  7. 7. Vesterled : Mariner Tie-In Production and Test (Total –Aker solutions) Kaombo Block 32: Turbo Generator Packages (Total-Eni Saipem-Dresser Rand) Kaombo Block 32:Valve Panels for Water Mist System (Total-Eni Saipem- Frank Mohn Flatoy AS) Kaombo: Sea water treatment unit & Ultrafiltration Pressure Vessels (Total-Eni Saipem-Siemens) KaomboPhase 2: Topside Modules Supports /Pot Bearing for bridge (Total-Eni Saipem -Spen Technic) Kaombo block 32: Water injection pumps Performance Test (Total-Eni Saipem-Flowserve) Kaombo block 32: Fire Products /Hydrants & Pressures Controle Valves-FAT(FPE AS Stavanger) Kaombo block 32: Fire Test for Large Bore Nozzle (FPE AS Stavanger) KaomboPhase 2: Power Cables and Subsea Cable Trenching (Total-ENi Saipem Etterstad-Norway) Kaombo Phase2 : Subsea Differential pressure sensors hereafter /Subsea dP-Sensors W/Remote Seal (Total-FMC)… Brunei Champion 7 Petroleum : Gas turbine Mechanical Drive Package – (Shell-BP- Dresser Rand-Norway)…… Hejre Development / Platform EPC: IMPP COATING FOR PIPELINE RISERS- Low/High-pressure wellhead housing Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P7/7 RESUME (CV) BEHRANG MOEINI
  8. 8. Casing hangers.(DSME-Technip) Atwood Archer #3 & #4 :Electro-Instrumental Mechanical VFD Drilling Switchboard &Cooling skids/Siemens (DSME) Atwood Archer #3 : FAT Software Tests/Kongsberg Maritime (DSME) Atwood Admiral Archer: BOP Handling tool , Drilling Fluid Control System & CRI Control System. (DSME) Maersk Drilling Jack-up Rig : Air Handling Units (AHU) and Chilled Water Pumps Local Control Panels (DSME) Maersk Drilling Jack-up Rig : LCP for AHU’s & Chilled Water Pumps (DSME) Maresk CJ 70 Drilling : Electromechanical HIL testing of the Power Management System(K-Chief 700)&ESD(DSME) Sonangol Libongos: Mud Control System /Electrical Panels & Software (DSME) Enochdhu : Subsea High Performance Electrical Connector /Cathodic Protection/Notodden/Norway (Conoco Philips) Erha North Phase 2 Project :Electrical /Instrumental Cable/ NEXANS -FRANCE (Subsea 7) Baobab Phase 2 : Producing of Induction Bends /Niras-Telemark/Noway (Subsea 7) Baobab Phase 2 :Volcanized Coating of Pipe and Induction Bends /Trelleborg-Norway (Subsea 7) Baobab Phase 2: Starting casing head , Intermediate casing spools ,Slip casing hanger and seal ,Tubing spool (Sebsea 7) Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P8/7 RESUME (CV) BEHRANG MOEINI
  9. 9. EPC FOR RUMAITHA/SHANAYEL FACILITIES - PHASE III ADCO Contract No. : 15678.01 / EC 10884 ADCO Project No. : P44010 Motor: Datasheet - Closed Drain Pump - 30-78-PM-6793 1 25-May-16 O. Linder M. Laurer P. Schmid Issue for Final D 13-May-16 O. Linder M. Laurer P. Schmid Issued for Approval C 14-Apr-16 O. Linder M. Laurer P. Schmid Issued for Approval B 24-Jul-15 O. Linder M. Laurer P. Schmid Issued for Approval A 08-May-15 O. Linder M. Laurer P. Schmid Issused for Review REV. DATE ORIGINATOR REVIEWED APPROVED DESCRIPTION THIS DOCUMENT IS INTENDED FOR USE BY ADCO AND ITS NOMINATED CONSULTANTS, CONTRACTORS, MANUFACTURERS AND SUPPLIERS. EQUIPMENT / ITEM NO.:30-78-PM-6793 CONTRACTOR: THE CONSORTIUM OF VENDOR: FLOWSERVE (AUSTRIA) GMBH ADCO DOC. No. 30.78.54.6602 PAGE 1 of 6 ORIGINATOR No. G215033MD ADCO Project No. P44010 Rev. 1 Date : 25-May-16 C O D E D E S C R IP T I O N & IN S T R U C T I O N S S I G N D A T E 1 A P P R O V E D W IT H O U T C O M M E N T S V E N D O R T O S U B M I T F O R F IN A L 2 A P P R O V E D W IT H C O M M E N T S V E N D O R T O A M E N D A N D S U B M I T F O R F I N A L 3 A P P R O V E D W IT H C O M M E N T S V E N D O R T O A M E N D A N D R E - S U B M I T F O R A P P R O V A L 4 N O T R E V I E W E D /C O N S I D E R E D U N A C C E P T A B L E Q U A L IT Y V E N D O R T O R E - S U B M IT F O R A P P R O V A L BP Thunder horse : Subsea water Injection sensors / Siemens Rubbestadneset /Norway (BP/FMCTI) BP Thunder horse : Balance FAS Panels/Fire Alarm System FAT(Autronica Fire and Security(Trondheim Norway) ENI Jankrik: Soft Landing Sylinder /EAB Hamar/Norway (FMCTI / ENI) Anadarko Lucius/ FMCTI/PPI Cardno : Subsea Multi Phase meters and Spools / (MPM /Kongsberg / Norway ) BP Thunder horse : Direct Electrical Heating Riser Cable & Umbilicals (Nexans /Halden) Forthills:Profile Probe/Flushing Skid/Interface Level Meter,Water Cut Analyzer/Analyzer Cabinet(Sentech As/Norway) No. Q'ty Start Time 1 1 09:00 2 3 CONTACT POINTS Note) Supplier shall provide at least a ten (10) working days advance notification for all " Witness" and "Hold" Points at oversea area. HSFC-Q630-2011 Inspection Point (as per ITP) Duration of test ITP Ref No. for "W" & " H" Point 17.06.2016 Kinds of inspection Description / Tag No. Project Name Supplier Name EUREKA PUMPS 1Q24 / QE546BCQ24 INSPECTION / FAT Notification Page 1 of 1 RFQ No./ PO No. Submission Date Baronia-IN-1Q24-0015 Notification No. Baronia CPP-B Equipment Description CTR (HHI) / CPY Inspec /FAT Date Seawater Lift Pump (1Q24) VERIFIED BY SIGNATURE COMPANY CA or TPI DATE HHI NAME Address of Inspection location : Industrivegen 22, NO-1920 Sørumsand E-Mail : NA FAX NO. COMPANY CA or TPI HHI * Relevant documents : Please list and attached the relevant documents for the inspection with revisition and approval status. Vendor/HHI/CPY Act.11.3: I/W/(R/W)1 day SUBMITTED TO thhwang@hhi.co.kr 24.06.2016 DBB-BNCPP-B-M-V07- 0037 Rev.4, Code: 1. Act.11.3 P-4010 A/B/C/D - el. motors - pumps - NRV and cone assemblies - risers and cone risers - hypochlorite hoses - hypochlorite distribution ring - clamps - centralizers - bolts and nuts - o-rings - header tanks P&ID Telephone number : NA Person in charge : NA Sub-Supplier Name ( If applicable) : NA E-Mail : stine.trefall@eureka.no Telephone number : 0047 97161397 Person in charge : Stine Trefall Supplier Name : Eureka Pumps Baronia CPP-B -Seawater Lift Pump Header Tank & Power JB With support FAT –(Eureka Pump –Suremsond) NASR PKG2 :Survival Craft & Fast Rescue Craft Mechanical FAT –(Norsafe As–Arendal- Norway) NASR PKG2 : TKRA 145 kV 3x1x1000 mm2 KQ Cable Type test and FAT (Nexans-Trondheim-Norway) NASR PKG2: RTCC / IS BARRIER PANEL (ABB-Bergen/Norway) Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P9/7 RESUME (CV) BEHRANG MOEINI No. Q'ty Start Time 1 1 09:00 2 3 CONTACT POINTS Note) Supplier shall provide at least a ten (10) working days advance notification for all " Witness" and "Hold" Points at oversea area. HSFC-Q630-2011 Inspection Point (as per ITP) Duration of test ITP Ref No. for "W" & " H" Point 17.06.2016 Kinds of inspection Description / Tag No. Project Name Supplier Name EUREKA PUMPS 1Q24 / QE546BCQ24 INSPECTION / FAT Notification Page 1 of 1 RFQ No./ PO No. Submission Date Baronia-IN-1Q24-0015 Notification No. Baronia CPP-B Equipment Description CTR (HHI) / CPY Inspec /FAT Date Seawater Lift Pump (1Q24) VERIFIED BY SIGNATURE COMPANY CA or TPI DATE HHI NAME Address of Inspection location : Industrivegen 22, NO-1920 Sørumsand E-Mail : NA FAX NO. COMPANY CA or TPI HHI * Relevant documents : Please list and attached the relevant documents for the inspection with revisition and approval status. Vendor/HHI/CPY Act.11.3: I/W/(R/W)1 day SUBMITTED TO thhwang@hhi.co.kr 24.06.2016 DBB-BNCPP-B-M-V07- 0037 Rev.4, Code: 1. Act.11.3 P-4010 A/B/C/D - el. motors - pumps - NRV and cone assemblies - risers and cone risers - hypochlorite hoses - hypochlorite distribution ring - clamps - centralizers - bolts and nuts - o-rings - header tanks P&ID Telephone number : NA Person in charge : NA Sub-Supplier Name ( If applicable) : NA E-Mail : stine.trefall@eureka.no Telephone number : 0047 97161397 Person in charge : Stine Trefall Supplier Name : Eureka Pumps
  10. 10. NASR PKG2: Subsea Cable & Accessories Package - SINTEF ENGERGY LAB (Nexans -Trondheim-Norway) NASR PKG2: 132 kV 400 mm2 Underground Cable Type Test & FAT(Nexans-Halden-Norway) ADMA OPCO- Bu Haseer Field Development Project :Power Subsea Distribution boards FAT & Final (Bartec Technor-Sandnes-Norway ) NASR PKG2: MANIFOLDS TOWER PLATFORM PIG Detectors Ex d & Ex ia (ClampOn AS-Bergen-Norway) RUMAITHA/SHANAYEL FACILITIES/PHASE III:Closed Drain Pump and Cabinet(ABB/Helsinki Vassa–Finland) NASR PK2 :RTCC/IS Barrier Panel & Transformer FAT (ABB-Bergen/Norway) Eni Angola Olombendo FPSO : Visual/DI /NDT/Certificate /Packing and shipment for Control system and Piping equipment. (Freudenberg Drammen Norway ) ENI Angola Block 15/06 East Hub Development: VT/DI/DR/FAT and Hydro test Special Piping Equipment (Willmax,Drammen,Norway) Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P10/7 RESUME (CV) BEHRANG MOEINI
  11. 11. Angola Olombendo FPSO :Glycol Contactor FAT/Hydro test and Pneumatic test (Midsund Br.AS, Midsund ,Norway) Iraq Crude Oil Export Expansion Project Phase1/Leighton offshore: Submarine cable& Umbilical(Nexans/Halden-Norway) Mitsubishi Hitachi Power Systems :Steam Generator Boiler & Steam Turbine Generator FAT –(Naestved –Denmark) SOUTH PARS GAS FIELD DEVELOPMENT PHASES 20&21:Double Wall LPG storage tanks &Lightings(Glamox-Norway) TechnipFMC-CNOOC -WENCHANG Gas Fields Development Project: Subsea Production Systems-Wellhead, Christmas trees ,control equipment (TechnipFMC-Kongsberg-Norway) TechnipFMC-CNOOC -WENCHANG Gas Fields Development Project: FAT of Subsea Control Module(SCM)/ (TechnipFMC- Kongsberg-Norway) Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P11/7 RESUME (CV) BEHRANG MOEINI
  12. 12. TechnipFMC-CNOOC -WENCHANG Gas Fields Development Project: Hydraulic Flying Lead(TESS SubseaLier –Norway) Zohr Field Development Project/FPSO:Subsea Outboard Connector for flexible lines from SDU to MSS3(Unitech/Begen/Norway) 6.2010-6.2011 COMPANY:EXXONMOBILE-Elf-Total-Agip-NNPC Consortium POSITION: QC/MC Multipurpose Inspector /Coordinator PROJECT: Nigeria Oil & Gas Upstream Projects Package (Port Hacourt /Nigeria) Main job: Quality Surveillance as representative of client Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P12/7 RESUME (CV) BEHRANG MOEINI
  13. 13. Project Description: The multinational oil companies operate in partnership with NNPC under Joint Operating Agreements (JOAs) or Production Sharing Contracts (PSCs). Others, especially the indigenous oil companies, operate in partnership with international companies under sole risk or as independents. Nigeria's petroleum industry is well grounded in successful exploration, beginning with the first commercially viable discovery at Oloibiri in the Niger Delta in 1956, with a modest production rate of 5,100 barrels per day. ■Weld Inspection ■General Nondestructive Tests (RT, UT, PT,MT) ■Static Equipment Inspection ■Documentation of Technical Data and information ■Material selection & Identification ■Paint and Coating Inspection ■Inspection of above ground atmospheric Oil storage tank ■Wellhead(Starting casing head, Intermediate casing spools, Slip casing hanger and seal, Tubing spool) Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P13/7 RESUME (CV) BEHRANG MOEINI
  14. 14. ■Corrosion Control & Monitoring ■Pipe and fitting test inspection ■Preparation and Review of QCP and ITP ■ Preparation and Review of WPS and PQR ■Subsea Mechanical Completion and Quality Surveillance of Subsea product (XMT, LWRP,SFT…) Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P14/7 RESUME (CV) BEHRANG MOEINI
  15. 15. Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P15/7 RESUME (CV) BEHRANG MOEINI
  16. 16. 3.2008 - 6.2010 COMPANY: PEDEC / NIOC (National Iranian oil Company) POSITION: Technical Inspection Manager and Piping & Pipeline & Corrosion Specialist/ Designer PROJECT: Kish Gas Field Development/Tehran/Kish Island/Iran Project Description :Engineering services as well as supervision of refinery facilities and gas transmission pipelines Well Clusters and wellhead (Onshore/Off shore). The aforementioned project is made up of two parts: 1-Wellhead facilities on Kish Island as well as offshore platforms for gas production 2- Onshore refinery facilities at Gorzeh region in Hormozgan province 3-Transfer of 3 billion cubic feet a day of gas to Kish Gas Field by constructing onshore and offshore pipelines 4-Transfer of sour gas to the refineries located in the mainland 5-Sour gas processing at the refineries located in the mainland to produce 2700 million cubic feet of-light gas for domestic consumption and 45 thousand barrels of condensate Main job: •Coordinated with Field Engineers and interpreted drawings, monitored piping and installation process. Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P16/7 RESUME (CV) BEHRANG MOEINI
  17. 17. •Prepared material lists for material requisitions for both temporary and permanent piping materials. •Developed pressure test packages and documented procedures of tests conducted. •Compilation of piping scope activities including MTO’s, drawings, and project activity durations. •Responsible for development of equipment & piping layouts •Coordinate with project management team for new construction projects •Develop accurate PID & isometric drawings applying practical design knowledge •Assist designers and the project leader in budget estimation of construction projects •Update material control charts for several projects •Prioritized scope activities to most efficiently meet project schedule requirements. •Ensuring implementation and adherence to project specifications and procedures. • Responsibility for monitored piping designer’s quality and taking necessary actions to maintain satisfactory standards. •Continuously updated project drawings and documents to final As-built status. •Ensuring implementation and adherence to project specifications and procedures. •Remarkable experience with piping and pipe support installation and inspection 3.2003–3.2008 COMPANY: Iran Engineering & Inspection Co (I.E.I) Accredited By (DNV) Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P17/7 RESUME (CV) BEHRANG MOEINI
  18. 18. POSITION: Multipurpose Technical MC/QC Inspector /Coordinator Main job: 1-Rendering technical inspection services during manufacturing, production, installation, start-up, service and overhaul of industrial equipment. 2-Controlling the quality and conducting inspection during the production of industrial materials and products . 3-Rendering engineering and consultation services on quality engineering and technical inspection . 4-Carrying out periodical inspections for industrial equipment in order to make sure of their due functioning . 5-Issuing different kinds of inspection certificates for industrial equipment . 6-Rendering engineering and consultation services on corrosion and protection of Industrial equipment, and estimating the remaining life span . 7-Carrying out non-destructive tests. 8- With17200 hour inspection in oil & gas and petrochemical, energy, steel , construction Project ,Wellhead systems differ by well location (Subsea wellhead systems, Jackup & Platform) Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P18/7 RESUME (CV) BEHRANG MOEINI
  19. 19. 2.1998 – 3.2003 COMPANY: Idro – Eni– Stat oil –Total (South Pars Gas Field Development/IRAN Phase1 (Idro - Daelim Consortium ) Phase 2&3 (Petropars–Total- Petronas -Gazprom Consortium) Phase 4& 5 (Eni-Hyundai Consortium) – Phase 6,7& 8 (TIJD- Statoil Consortium Phase) (Onshore/Offshore) Project Description :South Pars Gas field is The biggest independent gas reserve in the world, South Pars is shared by Iran and Qatar. The field is 105 kilometers away from the Pars Special Economic Energy Zone. The reservoir measures 9,700 square kilometers in total with 3,700 square kilometers owned by Iran. According to latest figures, the field contains more than 14 trillion cubic meters of natural gas and over 18 billion barrels of gas condensates. TOGETHER C2+Recovery&Fractionation Plant Pipeline of Pars Petrochemical Co POSITION: Site QC Inspector /Coordinator Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P19/7 RESUME (CV) BEHRANG MOEINI
  20. 20. Duties and Responsibilities not limited to: * Implement the QA/QC management system at site * Coordinate with quality inspections with all the site sub contractors and vendors coordinate all NDT in site. *Coordinate with project sites to monitor Mechanical engineering activities for analysis and improvements *Meet clients to obtain feedback on QPM’s design and construction management methodologies and outcomes and use the same to make appropriate adjustment. * Distribute relevant QA/QC documentation to site subcontractors * Verify that the quality related site activities are in accordance with the applicable codes and standards * Participate in the site internal and external site audits * Coordinate all the quality site inspections through the site QC inspectors * Ensure all quality control documentation is complied and competed for as-built hand over * Control all non-conformance reports and undertake remedial action * Compete site quality control instructions and action remedial responses * Monitor the implementation of the approved site QC Plan * Complete and coordinate the approval of the sites QC technical submittals to the Client * Coordinate with the site construction manager on all quality issues Coordinate and chair the QA/QC site weekly meetings with the projects subcontractors QC personnel Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P20/7 RESUME (CV) BEHRANG MOEINI
  21. 21. *Coordinate with QA and HSE teams to ensure compliance of all discipline engineering design with all Quality and HSE requirements *Assess risks related to the site activities and provide input to the risk register maintained by project manager * Elaborating inspection and test programs * Ensure the safety is adhered to at site * Assure all technical documents relative to site quality control are current status Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P21/7 RESUME (CV) BEHRANG MOEINI
  22. 22. OTHER CERTIFICATE: 2009 WPS & PQR Preparation According to ASME & AWS CODES Certificate (I.E.I) 2007 ASME Sec VIII Certificate of reactors and pressure vessel inspection (RW-TÜV) 2010 Plant Design Management System(PDMS) Certificate of training (AVEVA) GENERAL SKILLS: -Member of Nanotechnology and Corrosion Committee / Nace International -Materials Selection and Corrosion Control in the Mineral Processing Industries/ Nace International -Familiar with Microsoft Office 8 (Word, Excel , Access, Power point, Outlook) -Familiar with Design and Management Technical Engineering Program : PDMS ,CAD ,PROCOSYS ,SAP ,FAT - Familiar with Engineering Standards (API-ASME-DIN-AWS-ASTM-BSI –DNV-NORSOK,…) -Familiarity with API 17E, DNVRP B401, API RP 17I and API 17D -Supplying of Inspectional prescriptions . Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P22/7 RESUME (CV) BEHRANG MOEINI
  23. 23. -Progress report of tender awards & Engineering report and technical procedure, good supply . -Driving License.(Class B) LANGUAGE: PERSIAN: NATIVE GERMAN: BEGINNER NORWEGIAN: GOOD ENGLISH: FLUENT ARTICLE: 1. Fusion bonded epoxy, The millennium coating for pipes (Event Nuclear Power Plant Coatings (Symposium NACE)&(The best article for 1st Iranian Pipe and Pipeline Conference-Tehran/ Iran -2008) 2.What can cause disbandment in three-layer pipe coating systems 3.Galvanic CP for pipe protection (Cathodic Protection)(Chemical Engineering Conference- Tehran2009) 4.The most common type of corrosion in gas pipelines in Iran ,NIOC Magazine Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P23/7 RESUME (CV) BEHRANG MOEINI
  24. 24. 5. Sigma phase on pitting corrosion. (Nace International Magazine( Adderes: Hans Nordahls Gate 90-PC:0485 –Oslo/Norway Mobile: +47-96975464 E-mail: Behrrang@gmail.com Web: www.Bandynorge.com P24/7 RESUME (CV) BEHRANG MOEINI

×