SlideShare a Scribd company logo
1 of 9
Underground Rain Water
     Tank System
     Authors :
     • K.B.A.T.R Balasooriya
     • K.K.D Preadarshani
     • R.M Rubsinghe
     • A.G.P.V Tharangi
     • M.W.C.S Maharambe
Without water what will happen?
Because of Water
 Floods & Drainage Problem.

 Deceases.
 Rajarata area people face for a major issue….

                     What?


              Kidney Problem
So, Why We Waste Rain Water
Current Sri Lankan Solution

 Pumpkin Rain Water Tank
How to Build the URT System

•   Firstly should determine the catchment surface.
•   Attach gutters along the border of the catchment surface to
    catch run-off water.
•   Select a location for the storage tank.
•   Attach down spouts to the walls of the building using
    appropriate size fasteners.
•   Attach an on-demand water pump as close to the tank as
    possible.
A Great Solution
 Under Ground Rain Water Tank.
Thank You.

More Related Content

Viewers also liked

Modeling composites in ansys workbench
Modeling composites in ansys workbenchModeling composites in ansys workbench
Modeling composites in ansys workbench
Franklin Nagao
 
Base isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structuresBase isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structures
vaignan
 
Microsoft Word - BASE ISOLATION
Microsoft Word - BASE ISOLATIONMicrosoft Word - BASE ISOLATION
Microsoft Word - BASE ISOLATION
Sumit Srivastav
 
Pile foundation design
Pile foundation designPile foundation design
Pile foundation design
UTHM
 

Viewers also liked (20)

ELASTOMERIC BASE ISOLATION SYSTEM FOR SEISMIC MITIGATION OF LOW-RISE STRUCTURES
ELASTOMERIC BASE ISOLATION SYSTEM FOR SEISMIC MITIGATION OF LOW-RISE STRUCTURESELASTOMERIC BASE ISOLATION SYSTEM FOR SEISMIC MITIGATION OF LOW-RISE STRUCTURES
ELASTOMERIC BASE ISOLATION SYSTEM FOR SEISMIC MITIGATION OF LOW-RISE STRUCTURES
 
Base isolation for Engineers
Base isolation for EngineersBase isolation for Engineers
Base isolation for Engineers
 
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
 
Modeling of underground horizontal composite tank
Modeling of underground horizontal composite tankModeling of underground horizontal composite tank
Modeling of underground horizontal composite tank
 
Plantz, Gina, Haley Aldrich, Importance of Understanding Potential Background...
Plantz, Gina, Haley Aldrich, Importance of Understanding Potential Background...Plantz, Gina, Haley Aldrich, Importance of Understanding Potential Background...
Plantz, Gina, Haley Aldrich, Importance of Understanding Potential Background...
 
How to execute the base isolation system?
How to execute the base isolation system?How to execute the base isolation system?
How to execute the base isolation system?
 
Pile foundation
Pile foundation Pile foundation
Pile foundation
 
Heather Peters, Missouri DNR, Proposed Underground Storage Tank Rule Changes,...
Heather Peters, Missouri DNR, Proposed Underground Storage Tank Rule Changes,...Heather Peters, Missouri DNR, Proposed Underground Storage Tank Rule Changes,...
Heather Peters, Missouri DNR, Proposed Underground Storage Tank Rule Changes,...
 
Best numerical problem group pile capacity (usefulsearch.org) (useful search)
Best numerical problem group pile capacity (usefulsearch.org) (useful search)Best numerical problem group pile capacity (usefulsearch.org) (useful search)
Best numerical problem group pile capacity (usefulsearch.org) (useful search)
 
Modeling composites in ansys workbench
Modeling composites in ansys workbenchModeling composites in ansys workbench
Modeling composites in ansys workbench
 
Base isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structuresBase isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structures
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
BASE ISOLATION SYSTEM
BASE ISOLATION SYSTEMBASE ISOLATION SYSTEM
BASE ISOLATION SYSTEM
 
Microsoft Word - BASE ISOLATION
Microsoft Word - BASE ISOLATIONMicrosoft Word - BASE ISOLATION
Microsoft Word - BASE ISOLATION
 
Bse isolation and-seismic-consideration-in-civil-engineering
Bse isolation and-seismic-consideration-in-civil-engineeringBse isolation and-seismic-consideration-in-civil-engineering
Bse isolation and-seismic-consideration-in-civil-engineering
 
PILE FOUNDATION (basics)
PILE FOUNDATION (basics)PILE FOUNDATION (basics)
PILE FOUNDATION (basics)
 
Underground Storage Tanks
Underground Storage TanksUnderground Storage Tanks
Underground Storage Tanks
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Pile foundation design
Pile foundation designPile foundation design
Pile foundation design
 
Under Ground water tank design including estimation and costing
Under Ground  water tank design including estimation and costingUnder Ground  water tank design including estimation and costing
Under Ground water tank design including estimation and costing
 

Similar to Underground Rain Water Tank

presentation3-161025132139.pdf
presentation3-161025132139.pdfpresentation3-161025132139.pdf
presentation3-161025132139.pdf
sakshivaswani2
 

Similar to Underground Rain Water Tank (20)

Sources and de mand and water supply
Sources and de mand and water supplySources and de mand and water supply
Sources and de mand and water supply
 
Water Management
Water ManagementWater Management
Water Management
 
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdfCROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
 
Cross drainage work
Cross drainage work Cross drainage work
Cross drainage work
 
Cross Drainage Works
Cross Drainage WorksCross Drainage Works
Cross Drainage Works
 
Groundwater recharge techniques
Groundwater recharge techniquesGroundwater recharge techniques
Groundwater recharge techniques
 
Dams
DamsDams
Dams
 
India waters - a partial story
India waters   - a partial storyIndia waters   - a partial story
India waters - a partial story
 
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
 
Disposal of excreta
Disposal of excretaDisposal of excreta
Disposal of excreta
 
presentation : cross drainage work
presentation : cross drainage workpresentation : cross drainage work
presentation : cross drainage work
 
minor and micro irrigation
 minor and micro irrigation minor and micro irrigation
minor and micro irrigation
 
Artificial recharge
Artificial rechargeArtificial recharge
Artificial recharge
 
Dams by muhammad ahsan riaz
Dams by muhammad ahsan riazDams by muhammad ahsan riaz
Dams by muhammad ahsan riaz
 
Layout_English.pdf
Layout_English.pdfLayout_English.pdf
Layout_English.pdf
 
Plumbing
PlumbingPlumbing
Plumbing
 
presentation3-161025132139.pdf
presentation3-161025132139.pdfpresentation3-161025132139.pdf
presentation3-161025132139.pdf
 
Cross drainage works irrigation engineering
Cross drainage works irrigation engineeringCross drainage works irrigation engineering
Cross drainage works irrigation engineering
 
water.pptx
 water.pptx water.pptx
water.pptx
 
dams
damsdams
dams
 

More from BcomBT

Latest trends in database management
Latest trends in database managementLatest trends in database management
Latest trends in database management
BcomBT
 
Monorail ppt
Monorail pptMonorail ppt
Monorail ppt
BcomBT
 
Innovation & technology management
Innovation & technology managementInnovation & technology management
Innovation & technology management
BcomBT
 
Solar power buses
Solar power busesSolar power buses
Solar power buses
BcomBT
 
Vending machine technology the silent salesmen of new
Vending  machine technology                the  silent  salesmen of   newVending  machine technology                the  silent  salesmen of   new
Vending machine technology the silent salesmen of new
BcomBT
 
Wireless reataurants
Wireless reataurantsWireless reataurants
Wireless reataurants
BcomBT
 
Smartphone to the insurance industry 1 ppt
Smartphone to the insurance industry 1 pptSmartphone to the insurance industry 1 ppt
Smartphone to the insurance industry 1 ppt
BcomBT
 
Turny evo system presentation (2)
Turny evo system presentation (2)Turny evo system presentation (2)
Turny evo system presentation (2)
BcomBT
 
Garabage
GarabageGarabage
Garabage
BcomBT
 
Pavegen
PavegenPavegen
Pavegen
BcomBT
 
Green IT
Green ITGreen IT
Green IT
BcomBT
 

More from BcomBT (17)

YBTER2014
YBTER2014YBTER2014
YBTER2014
 
YBTER 2013
YBTER 2013YBTER 2013
YBTER 2013
 
Latest trends in database management
Latest trends in database managementLatest trends in database management
Latest trends in database management
 
Monorail ppt
Monorail pptMonorail ppt
Monorail ppt
 
Innovation & technology management
Innovation & technology managementInnovation & technology management
Innovation & technology management
 
Solar power buses
Solar power busesSolar power buses
Solar power buses
 
Vending machine technology the silent salesmen of new
Vending  machine technology                the  silent  salesmen of   newVending  machine technology                the  silent  salesmen of   new
Vending machine technology the silent salesmen of new
 
Wireless reataurants
Wireless reataurantsWireless reataurants
Wireless reataurants
 
Smartphone to the insurance industry 1 ppt
Smartphone to the insurance industry 1 pptSmartphone to the insurance industry 1 ppt
Smartphone to the insurance industry 1 ppt
 
Turny evo system presentation (2)
Turny evo system presentation (2)Turny evo system presentation (2)
Turny evo system presentation (2)
 
Garabage
GarabageGarabage
Garabage
 
E cig
E cigE cig
E cig
 
Pavegen
PavegenPavegen
Pavegen
 
Green IT
Green ITGreen IT
Green IT
 
Young Business Technology & Entrepreneurial Researchers Congress Proceedings ...
Young Business Technology & Entrepreneurial Researchers Congress Proceedings ...Young Business Technology & Entrepreneurial Researchers Congress Proceedings ...
Young Business Technology & Entrepreneurial Researchers Congress Proceedings ...
 
HYBRID TRAINS TO SRI LANKA
HYBRID  TRAINS TO SRI LANKAHYBRID  TRAINS TO SRI LANKA
HYBRID TRAINS TO SRI LANKA
 
Electronic Reference Ticket
Electronic Reference Ticket Electronic Reference Ticket
Electronic Reference Ticket
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 

Underground Rain Water Tank

  • 1. Underground Rain Water Tank System Authors : • K.B.A.T.R Balasooriya • K.K.D Preadarshani • R.M Rubsinghe • A.G.P.V Tharangi • M.W.C.S Maharambe
  • 2. Without water what will happen?
  • 3. Because of Water  Floods & Drainage Problem.  Deceases.
  • 4.  Rajarata area people face for a major issue…. What? Kidney Problem
  • 5. So, Why We Waste Rain Water
  • 6. Current Sri Lankan Solution  Pumpkin Rain Water Tank
  • 7. How to Build the URT System • Firstly should determine the catchment surface. • Attach gutters along the border of the catchment surface to catch run-off water. • Select a location for the storage tank. • Attach down spouts to the walls of the building using appropriate size fasteners. • Attach an on-demand water pump as close to the tank as possible.
  • 8. A Great Solution  Under Ground Rain Water Tank.

Editor's Notes

  1. This template can be used as a starter file to give updates for project milestones.SectionsRight-click on a slide to add sections. Sections can help to organize your slides or facilitate collaboration between multiple authors.NotesUse the Notes section for delivery notes or to provide additional details for the audience. View these notes in Presentation View during your presentation. Keep in mind the font size (important for accessibility, visibility, videotaping, and online production)Coordinated colors Pay particular attention to the graphs, charts, and text boxes.Consider that attendees will print in black and white or grayscale. Run a test print to make sure your colors work when printed in pure black and white and grayscale.Graphics, tables, and graphsKeep it simple: If possible, use consistent, non-distracting styles and colors.Label all graphs and tables.
  2. What is the project about?Define the goal of this projectIs it similar to projects in the past or is it a new effort?Define the scope of this projectIs it an independent project or is it related to other projects?* Note that this slide is not necessary for weekly status meetings
  3. Duplicate this slide as necessary if there is more than one issue.This and related slides can be moved to the appendix or hidden if necessary.
  4. * If any of these issues caused a schedule delay or need to be discussed further, include details in next slide.
  5. The following slides show several examples of timelines using SmartArt graphics.Include a timeline for the project, clearly marking milestones, important dates, and highlight where the project is now.
  6. Prepare slides for the appendix in the event that more details or supplemental slides are needed. The appendix is also useful if the presentation is distributed later.