World Oil / MAY 2014 43
CollaborationdeliversfirstLowerTertiary
smartcompletionsystem
INTELLIGENT WELL COMPLETIONS
All three lower-completion intervals in the well were stimulated
successfully with the MST system, one of the deepest, multi-zone
sand-control completions in the industry.
Petrobras and Baker Hughes collaborated to
accomplish the industry’s first intelligent well
completion in the deepwater Lower Tertiary
Wilcox formation under HPHT (>250°F and
>19,000 psi) conditions at a water depth
exceeding 8,200 ft and a 26,000-ft TVD.
ŝŝ FERNANDOGAMA,FLAVIODEMORAES,ZIADHADDAD,OSWALDO
MOREIRA,andSCOTTOGIER,Petrobras;KEVINJOSEPH,RONNIE
MOOREandWAYNEWELCH,BakerHughes.
The Lower Tertiary play in the Gulf of Mexico (GOM) is a
proving ground for E&P technologies capable of withstanding
harshHPHTconditions.Thevastultra-deepwaterplayisanoil-
bearing reservoir with 1,200-ft gross sand thickness. At water
depths ranging from 8,200 ft to 8,900 ft, the reservoir depths are
greater than 26,000 ft TVD, with reservoir temperatures greater
than 250°F and pressures exceeding 19,000 psi. The formation
is composed of stacked thin beds of sand and fine-grained silt-
stone intervals that have, effectively, no vertical permeability
and an occasional cap of thick salt/sediment layers. The region
also provides an opportunity to achieve industry firsts by apply-
ing advanced technologies at record depths.
Since the start of production from its Lower-Tertiary Cascade
and Chinook (C&C) fields in 2012, Petrobras has relied con-
sistently on advanced technology applications. Located in the
Walker Ridge area, 180 mi off the Louisiana coast, the fields are
tied to the GOM’s first floating production, storage and offload-
ing(FPSO)vessel.Thesefieldsrepresenttheouterlimitsofultra-
deepwater development, Fig. 1.
Bytheendof2013,Petrobrascompletedfivewells(threewells
in Cascade and two in Chinook), each of them producing from
two separate pay intervals—an upper interval known as Wilcox 1
and a lower interval called Wilcox 2. While these wells have been
producingasexpected,theircompletiondesignshavenotafforded
Petrobras the opportunity to accurately measure the production
contribution from each individual interval. The operator has re-
lied on the use of tracers to qualitatively measure production from
all of the zones, and on multiphase flowmeters at the wellhead to
monitor the total, commingled production from each well.
This limitation, and the need for more quantitative measure-
ments of each interval’s flow characteristics, prompted Petrobras’
reservoir group to call for the development of an intelligent well
completion. Such a system, the first of its kind in the Lower Ter-
tiary, would allow for a more quantitative understanding of each
pay interval’s contribution to the overall production, while pro-
viding greater zonal control.
COMPREHENSIVE COLLABORATION
Petrobras selected the new Cascade 6 well as its candidate
for the first intelligent well system (IWS), and tapped Baker
Hughes to develop the necessary completion technologies. The
well, a subsea completion with an 8,211-ft water depth and total
well depth of approximately 27,000 ft, required a comprehen-
sive completion package specifically tailored to the challenges
encountered in producing from the two zones. Both companies
had collaborated successfully on the previous completions in the
C&C project, and built on that collaboration to develop the IWS
for Cascade 6.
The collaboration began with upfront planning meetings, in
which representatives from each company discussed the produc-
tion and operational goals for the well. This team then jointly de-
veloped the final completion design that would meet Petrobras’
goals and minimize the need for complex, costly and invasive
interventions. Petrobras carried this collaborative team philoso-
phy throughout the project. Rather than make decisions behind
closed doors and then give Baker Hughes direction, both com-
panies discussed each phase of the well completion development
and design. Similarly, the completion equipment design, manu-
facturing and quality processes were a collaborative effort. This
open process of information sharing and decision-making helped
streamline development and planning, and minimized the risk of
any unforeseen surprises that might delay the project.
Originally appeared in World Oil
®
MAY 2014 issue, pgs 43-48. Posted with permission.
44 MAY 2014 / WorldOil.com
INTELLIGENT WELL COMPLETIONS
FINAL DESIGN WITH MANY FIRSTS
The final design for the Cascade 6 well consisted of an up-
per and lower completion, which would isolate the upper pay
zones (two hydraulically fractured intervals from the Wilcox 1
interval) from the lower zone (one hydraulically fractured inter-
val from the Wilcox 2) and allow for selective production from
each zone, if required, Fig. 2.
The major components in the upper completion include:
•	Seven downhole pressure/temperature gauges, which
besides monitoring the downhole temperature and the
pressure of the production intervals, are used to infer the
water cut (fluid density) and the flowrate from Wilcox 2
with a Venturi flowmeter. The gauges also provide infor-
mation to assist casing pressure (Annulus A) verification
throughout the production life of the well.
•	 A 4½-in. hydraulic sliding sleeve (DHFC downhole flow
control valve), rated to 12,000 psi differential pressure
and used to control production from Wilcox 1, Fig. 3.
This is the highest pressure-rated system of its kind de-
signed and installed, to date, by Baker Hughes.
•	A 3½-in. shrouded hydraulic sliding sleeve (DHFC
valve), also rated to 12,000 psi differential pressure and
used to control production from Wilcox 2.
•	Two separate chemical injection systems, one for par-
affin inhibitor and one for scale inhibitor. The paraffin
injection system injects treatment chemicals above the
retrievable production packer, while the scale inhibi-
tor injection system includes a line that carries scale in-
hibitor into the shroud of the 3½-in. DHFC valve. This
unique design allows scale inhibitor treatment into the
tubing for both zones through only one chemical injec-
tion valve, regardless of the position of the hydraulic slid-
ing sleeves.
•	 A feed-through packer with six ¼-in. control line feed-
through ports.
•	 Three flat packs that contain three ¼-in. hydraulic con-
trol lines for the DHFCs, two ¼-in. hydraulic control
Fig. 1. Petrobras’ Cascade and Chinook fields are at the outer
limits of the current developments in the deepwater Lower
Tertiary trend.
Fig. 2. Completion
schematic showing
the upper and
lower portions.
Fig. 3. The system’s
hydraulic sliding
sleeve valves are
rated to 12,000 psi.
46 MAY 2014 / WorldOil.com
INTELLIGENT WELL COMPLETIONS
lines for the safety valve, two ⅜-in. lines for chemical in-
jection and one ¼-in. TEC line for the gauges.
•	A Venturi flowmeter to measure production from the
Wilcox 2 zone. While Venturi meters have been deployed
in other subsea assemblies, this marked the deepest in-
stallation to date. The use of this flowmeter answered
the operator’s need to more accurately estimate the pro-
duction contribution from each zone. With the Wilcox
2 production measured with the Venturi device and the
total commingled output available from the multiphase
flowmeter at the wellhead, the production from Wilcox
1 can be calculated with ease.
•	A next-generation Neptune EP safety valve, which in-
cludes design upgrades for improved operational effi-
ciency and reliability. This marked the first Baker Hughes
installation of this upgraded Neptune valve design.
•	 The TORRENT multi-zone, single-trip (MST) system
to stimulate the three zones (two in Wilcox 1, one in Wil-
cox 2) as an alternative to a conventional stack frac-pack
operation. Petrobras had experience using the MST on
previous C&C wells, but this well represented the first
deployment of the MST system with an intelligent well
system (IWS) completion and also the first time that the
same service tools were used throughout the hydraulic
fracturing operations.
BakerHughesalsoprovidedare-closeableannularflowvalve
with a 50-ft tieback receptacle, which is part of the isolation as-
sembly and was used as a mechanical barrier throughout the
upper completion deployment and commissioning operations.
PUTTING CONTINGENCIES IN PLACE
Given the well’s depth and high upfront capital expense,
coupled with the objective to design and construct a completion
to withstand production for 20 years or longer, Petrobras devel-
oped an enhanced well design to minimize the risk of equipment
failure and interventions. To that end, both companies worked
together to include multiple contingencies into the design, that
would keep production flowing from each zone, if the primary
equipment would fail.
Such contingencies include the capability to install one sin-
gle-scale inhibitor injection point, to be able to treat the entire
production string down to the lowest hydraulic sliding sleeve,
even in the event that the valve is shifted closed. Among other
flow assurance concerns, the scale inhibitor is designed to avoid
buildup along the moving parts of the hydraulic sliding sleeves
that might prevent their normal operation. This was considered a
much more cost-effective measure, compared to installing a sec-
ond scale inhibitor injection point (one below each valve), with
implications not only to the well design (additional ⅜-in. control
line), but also to the subsea tree system.
A 4½-in. mechanical sliding sleeve was installed above the
4½-in. DHFC valve (upper) as another contingency. The slid-
ing sleeve is kept in the closed position during normal well op-
erations. If the upper DHFC valve should fail (e.g., in case a plug
in the control line prevents its normal hydraulic operation or any
attempt to mechanically override it), then the mechanical sliding
sleeve can be opened to allow production from Wilcox 1 to reach
the surface. Conversely, if the 4½-in. DHFC valve is stuck open
and production from Wilcox 1 needs to be shut off, a fit-for-pur-
pose separation sleeve could be installed to straddle the DHFC
ports, effectively shutting off production from Wilcox 1, while al-
lowing continued production from Wilcox 2.
Contingencies also exist, in the event that production from
Wilcox2needstobeshutoff.Ifthe3½-in.shroudedDHFCvalve
(which controls Wilcox 2 flow) cannot be closed hydraulically or
mechanically, the valve includes a sealbore nipple profile above
its ports. A plug can be installed in this nipple profile to shut off
production from Wilcox 2. In the event that the shrouded valve is
stuck in the closed position, production from Wilcox 2 can be re-
stored by pulling the plug used to divert the flow into the shroud
housing. With the plug removed, Wilcox 2 production flows
straight up the tubing, rather than perforating the sliding sleeve.
PRE-PLANNING PAYS OFF
One of the keys to success on both the upper and lower com-
pletions, and ultimately, the entire installation, was the significant
amount of planning, collaboration and preparation that took
place from the completion design conceptual phase, through the
procedure elaboration and peer review meetings. This involved
not only Petrobras and Baker Hughes, but all the main contrac-
tors, to plan the equipment make-ups prior to going offshore and
final deployment. To minimize rig time, subassemblies were built
on land, function-tested and then shipped offshore.
For example, the MST subassemblies were made up and
spaced out to match the perforation intervals provided by
Petrobras. Once the perforations were finalized, they were laid
out with the MST system to ensure a proper space-out, using
Baker Hughes’ real-time tool position, visualization and design
software. Because the MST system uses multiple shifters, it was
also verified in the design software that shifting one sleeve did
not inadvertently shift another sleeve. Once the space-out was
set, Baker Hughes technicians built the equipment, and loaded
it to go offshore.
The upper completion was planned, and the equipment was
built to minimize rig time. This was accomplished by building
up subassemblies and pre-installing the majority of the hydrau-
lic lines prior to going offshore. The lines were passed through
the feed-through packer, routed and terminated throughout the
subassembly. These were tested onshore and shipped ready to
run downhole.
The onshore testing protocol included numerous pressure
andcommunicationtestsoneachsub-assemblytoensurereliable
Fig. 4. Make-up of the intelligent well system assembly in
preparation for hydro testing.
48 MAY 2014 / WorldOil.com
INTELLIGENT WELL COMPLETIONS
operation prior to moving offshore. Twenty full hydro-tests were
performed on the individual sub-assemblies, and 46 strip chart
tests were conducted on the fittings for the control lines routed
through the sub-assemblies, Fig. 4. Petrobras representatives
were present for all tests, and witnessed, first-hand, the operation
and testing protocol.
The preplanning process onshore provided a valuable lesson
in the importance of making up and testing the sub-assemblies as
early as possible. The completion team uncovered some configu-
ration issues during make-up that required minor modifications
totheequipment.Becausetheseissueswereidentifiedwellbefore
the IWS was shipped to the rig, the changes were conducted in a
methodical manner, without impacting the operation schedule.
Once the sub-assemblies arrived offshore, a joint Baker
Hughes-Petrobras team, along with other key contractors,
worked together to prepare the sub-assemblies and deploy them
downhole. This deployment was highly efficient and safe, thanks
largely to the fact that the same joint team had worked together
onpreviouscompletions.Thefamiliarityofthedeploymentcrew
benefitted all of the rig operations, from picking up tools to test-
ing and deployment.
Due to the importance of this IWS completion, and the fact
that it had never been installed at these depths and pressures, the
operator allowed for as much time as required to test the sliding
sleeves. The information from these tests will be used in the fu-
ture as a baseline to evaluate the shifting of the sleeves.
SUCCESSFUL RESULTS
All three lower-completion intervals in the well were stim-
ulated successfully with the MST system, one of the deep-
est, multi-zone sand-control completions in the industry, by
pumping more than 1 million lb of proppant across all three
zones in one trip, Fig. 5. The entire stimulation job was com-
pleted in nine days, a savings of 12 days of rig time. The IWS
upper completion installation for Cascade 6 was run in 12
days, which is three to four days under what could be expect-
ed. The well has been on production since early-January 2014
without an incident. The IWS completion that was created
and successfully installed for Petrobras can now be used as a
base model for other IWS systems going forward. Petrobras
is now planning to use this same IWS design for its next well,
Chinook 6.
REFERENCES
1.	Haddad, Z., M. B. Smith and F. D. De Moraes, “Designing multistage frac packs in the Lower Tertiary
formation—Cascade and Chinook project,” SPE Drilling & Completions, Vol. 27, No. 1, 2012, pp 50-
64, based on SPE paper 140498.
2.	Haddad, Z., N. B. Smith, F. D. De Moraes and O. Moreira, “The design and execution of frac jobs in
the ultra-deepwater Lower Tertiary Wilcox formation,” SPE paper 147237, presented at the SPE An-
nual Technical Conference and Exhibition, Denver, Colo., USA, Oct. 30–Nov. 2, 2011.
3.	Moraes, F.D., O. Moreira, S. Ogier, Z. Haddad and J. Shipley, “Well completion operations in Cascade
and Chinook fields—ultra deepwater challenges in the Gulf of Mexico,” IBP paper 3310, presented at
the Rio Oil & Gas Expo and Conference, Rio de Janeiro, Brazil, Sept. 13-16, 2010.
4.	Ogier, K.S., Z. Haddad, O. Moreira, F. D. De Moraes and J. Shipley, “The world’s deepest frac-pack
completions using a single-trip multi-zone system: A Gulf of Mexico case study in the Lower Tertiary
formation,” SPE paper 147313, presented at the SPE Annual Technical Conference and Exhibition,
New Orleans, La., Oct. 30–Nov. 2, 2013.
FERNANDO GAMA is the well engineering manager at Petrobras
America, responsible for well operations and engineering of the
operated and non-operated assets in the ultra-deepwater Gulf of Mexico.
His diverse work experience includes both operational and managerial
positions in project management, logistics, and merger and acquisition.
Mr. Gama holds several engineering degrees, including petroleum and
telecommunications engineering.
FLAVIO D. DE MORAES is a senior well engineer at Petrobras with
extensive experience in ultra-deepwater well drilling, and completion
design and operations, responsible for the Cascade and Chinook well
designs. Dr. De Moraes holds a PhD in petroleum engineering from the
University of Tulsa.
ZIAD HADDAD founded FOI Technologies in 2010 as a deepwater
consulting company. Mr. Haddad has been working with Petrobras
on developing its ultra-deepwater Cascade and Chinook project. He
previously worked for Pennzoil and Devon Energy as a well engineering
advisor on all aspects of well completions, with emphasis on hydraulic
fracturing. Mr. Haddad holds a BS degree in petroleum and natural gas
engineering from Pennsylvania State University.
OSWALDO M. MOREIRA is a senior completions engineer for Petrobras
with over 18 years of experience in the upstream sector. Mr. Oswaldo
holds an MS degree in business administration from Rice University and
a BS degree in mechanical engineering from Rio de Janeiro Federal
University. He has been working for Petrobras since 2006 in the
Integrated Project team, responsible for planning, implementing and
coordinating the completion design for Cascade and Chinook fields.
K. SCOTT OGIER is a consulting completion engineer focused on
deepwater Gulf of Mexico projects for the past 10 years, including seven
years working on the Cascade and Chinook project with Petrobras. For
the previous 19 years, Mr. Ogier has held various petroleum engineering
positions in the Gulf of Mexico and Pennsylvania. He holds a BS degree
in petroleum engineering from Texas A&M University and an MBA from
St. Bonaventure University.
KEVIN JOSEPH is an engineer on the Gulf of Mexico operations team
at Baker Hughes. Mr. Joseph’s expertise includes sand control, project
management, hydraulic fracturing completions, horizontal reservoirs,
deepwater operations, multi-zone single trip systems, multi-stage
fracturing completions and tight gas reservoirs. He holds a BS degree in
petroleum engineering and an MBA.
Fig. 5. The TORRENT multi-zone single-trip (MST) system was
used to stimulate the Wilcox 1 and Wilcox 2 formations.
Article copyright © 2014 by Gulf Publishing Company. All rights reserved. Printed in U.S.A.
Not to be distributed in electronic or printed form, or posted on a website, without express written permission of copyright holder.

Weitere ähnliche Inhalte

Was ist angesagt?

Intelligent well completio nm
Intelligent well completio nmIntelligent well completio nm
Intelligent well completio nmbasil_c
 
Global Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea TechnologyGlobal Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea TechnologyConference_Presentations
 
The Right Tray for your distillation processes
The Right Tray  for your distillation processesThe Right Tray  for your distillation processes
The Right Tray for your distillation processesWei Chiao Kuo
 
InterMoor Installation of Subsea Pile and Manifold at AC24
InterMoor Installation of Subsea Pile and Manifold at AC24InterMoor Installation of Subsea Pile and Manifold at AC24
InterMoor Installation of Subsea Pile and Manifold at AC24jonathonmiller2008
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-finalJohn Grover
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)nguyen_uptorcem
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15John Grover
 
Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5Statoil
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing SystempetroEDGE
 
Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production SystemspetroEDGE
 
Fpso – general overview of conversion & topside process description -abstract
Fpso – general overview of conversion & topside process description -abstractFpso – general overview of conversion & topside process description -abstract
Fpso – general overview of conversion & topside process description -abstractAnoop Rajendran Nair
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO RedeploymentDan Benson
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24Jean-Francois Saint-Marcoux
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsJean-Francois Saint-Marcoux
 

Was ist angesagt? (20)

Intelligent well completio nm
Intelligent well completio nmIntelligent well completio nm
Intelligent well completio nm
 
Global Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea TechnologyGlobal Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea Technology
 
The Right Tray for your distillation processes
The Right Tray  for your distillation processesThe Right Tray  for your distillation processes
The Right Tray for your distillation processes
 
InterMoor Installation of Subsea Pile and Manifold at AC24
InterMoor Installation of Subsea Pile and Manifold at AC24InterMoor Installation of Subsea Pile and Manifold at AC24
InterMoor Installation of Subsea Pile and Manifold at AC24
 
ANSYS oil&gas seminar 2013
ANSYS oil&gas seminar 2013ANSYS oil&gas seminar 2013
ANSYS oil&gas seminar 2013
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 
Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5
 
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
 
Floting Production Storage and Offloading
Floting Production Storage  and OffloadingFloting Production Storage  and Offloading
Floting Production Storage and Offloading
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing System
 
Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production Systems
 
Fpso – general overview of conversion & topside process description -abstract
Fpso – general overview of conversion & topside process description -abstractFpso – general overview of conversion & topside process description -abstract
Fpso – general overview of conversion & topside process description -abstract
 
MinDOC Photo
MinDOC PhotoMinDOC Photo
MinDOC Photo
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
 
apl-brochure
apl-brochureapl-brochure
apl-brochure
 

Ähnlich wie Collaboration delivers first Lower Tertiary smart completion system

Anchois 1- Oil&Gas Field
Anchois 1- Oil&Gas FieldAnchois 1- Oil&Gas Field
Anchois 1- Oil&Gas FieldJose V.Taboada
 
Subsea field development
Subsea field developmentSubsea field development
Subsea field developmentHamid S
 
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...How Chevron saved an average of 18 days per well on three deepwater Gulf of M...
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...Jason Hardin
 
SPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdfSPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdfJalal Neshat
 
Roxar Downhole Brochure
Roxar Downhole BrochureRoxar Downhole Brochure
Roxar Downhole BrochureAmérico Dias
 
Underbalance drilling equipment
Underbalance  drilling equipmentUnderbalance  drilling equipment
Underbalance drilling equipmentshivan abdalrahman
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overviewminh nguyễn
 
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-XAquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-XDarren Hull
 
Methodology for optimum deepwater safety system selection
Methodology for optimum deepwater safety system selectionMethodology for optimum deepwater safety system selection
Methodology for optimum deepwater safety system selectionamrhaggag
 
Aqua-Barrier Pipeline Literature
Aqua-Barrier Pipeline LiteratureAqua-Barrier Pipeline Literature
Aqua-Barrier Pipeline LiteratureDarren Miller
 
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...SubseaTechnology
 
Intelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field DevelopmentIntelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field Developmentfhmutairi
 
Aerzener Maschinenfabrik Customer Journal Page 4
Aerzener Maschinenfabrik Customer Journal Page 4Aerzener Maschinenfabrik Customer Journal Page 4
Aerzener Maschinenfabrik Customer Journal Page 4Ümit Akbaş
 
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementReport on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementSujit Tharakan
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draftJohn Grover
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...John Grover
 
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRS
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRSUNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRS
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRSiQHub
 

Ähnlich wie Collaboration delivers first Lower Tertiary smart completion system (20)

Anchois 1- Oil&Gas Field
Anchois 1- Oil&Gas FieldAnchois 1- Oil&Gas Field
Anchois 1- Oil&Gas Field
 
Subsea field development
Subsea field developmentSubsea field development
Subsea field development
 
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...How Chevron saved an average of 18 days per well on three deepwater Gulf of M...
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...
 
SPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdfSPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdf
 
Roxar Downhole Brochure
Roxar Downhole BrochureRoxar Downhole Brochure
Roxar Downhole Brochure
 
Intelligent well completions
Intelligent well completionsIntelligent well completions
Intelligent well completions
 
Underbalance drilling equipment
Underbalance  drilling equipmentUnderbalance  drilling equipment
Underbalance drilling equipment
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-XAquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
Aquaurethane Extreme - Regulation 31 Approved Polyurea by LINE-X
 
Methodology for optimum deepwater safety system selection
Methodology for optimum deepwater safety system selectionMethodology for optimum deepwater safety system selection
Methodology for optimum deepwater safety system selection
 
Aqua-Barrier Pipeline Literature
Aqua-Barrier Pipeline LiteratureAqua-Barrier Pipeline Literature
Aqua-Barrier Pipeline Literature
 
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...
 
OC Brochure
OC BrochureOC Brochure
OC Brochure
 
Intelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field DevelopmentIntelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field Development
 
Aerzener Maschinenfabrik Customer Journal Page 4
Aerzener Maschinenfabrik Customer Journal Page 4Aerzener Maschinenfabrik Customer Journal Page 4
Aerzener Maschinenfabrik Customer Journal Page 4
 
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementReport on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
 
Article_Proof
Article_ProofArticle_Proof
Article_Proof
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
 
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRS
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRSUNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRS
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRS
 

Mehr von Baker Hughes

Ultra-HPHT perforating system opens access to untapped reservoirs
Ultra-HPHT perforating system opens access to untapped reservoirs Ultra-HPHT perforating system opens access to untapped reservoirs
Ultra-HPHT perforating system opens access to untapped reservoirs Baker Hughes
 
Frac-Pack Solution
Frac-Pack SolutionFrac-Pack Solution
Frac-Pack SolutionBaker Hughes
 
Fracture-Analysis Service
Fracture-Analysis ServiceFracture-Analysis Service
Fracture-Analysis ServiceBaker Hughes
 
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow  in Steam-Assisted Gravity Drainage WellsControlling Post-Completion Flow  in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage WellsBaker Hughes
 
Expandable liner hanger and packer exceed expectations for first deepwater we...
Expandable liner hanger and packer exceed expectations for first deepwater we...Expandable liner hanger and packer exceed expectations for first deepwater we...
Expandable liner hanger and packer exceed expectations for first deepwater we...Baker Hughes
 
Baker Hughes introduces next-generation stimulation vessel
Baker Hughes introduces next-generation stimulation vesselBaker Hughes introduces next-generation stimulation vessel
Baker Hughes introduces next-generation stimulation vesselBaker Hughes
 
Baker Hughes introduces the Cut-and-Pull Spear technology as featured in the ...
Baker Hughes introduces the Cut-and-Pull Spear technology as featured in the ...Baker Hughes introduces the Cut-and-Pull Spear technology as featured in the ...
Baker Hughes introduces the Cut-and-Pull Spear technology as featured in the ...Baker Hughes
 
Baker Hughes introduces the Hughes Christensen IRev infinite-revolution bit a...
Baker Hughes introduces the Hughes Christensen IRev infinite-revolution bit a...Baker Hughes introduces the Hughes Christensen IRev infinite-revolution bit a...
Baker Hughes introduces the Hughes Christensen IRev infinite-revolution bit a...Baker Hughes
 
January 2014 Journal of Petroleum Technology Article: Electrical Submersible ...
January 2014 Journal of Petroleum Technology Article: Electrical Submersible ...January 2014 Journal of Petroleum Technology Article: Electrical Submersible ...
January 2014 Journal of Petroleum Technology Article: Electrical Submersible ...Baker Hughes
 
March 2014 World Oil: Greener completions advance in the Marcellus
March 2014 World Oil: Greener completions advance in the MarcellusMarch 2014 World Oil: Greener completions advance in the Marcellus
March 2014 World Oil: Greener completions advance in the MarcellusBaker Hughes
 

Mehr von Baker Hughes (10)

Ultra-HPHT perforating system opens access to untapped reservoirs
Ultra-HPHT perforating system opens access to untapped reservoirs Ultra-HPHT perforating system opens access to untapped reservoirs
Ultra-HPHT perforating system opens access to untapped reservoirs
 
Frac-Pack Solution
Frac-Pack SolutionFrac-Pack Solution
Frac-Pack Solution
 
Fracture-Analysis Service
Fracture-Analysis ServiceFracture-Analysis Service
Fracture-Analysis Service
 
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow  in Steam-Assisted Gravity Drainage WellsControlling Post-Completion Flow  in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
 
Expandable liner hanger and packer exceed expectations for first deepwater we...
Expandable liner hanger and packer exceed expectations for first deepwater we...Expandable liner hanger and packer exceed expectations for first deepwater we...
Expandable liner hanger and packer exceed expectations for first deepwater we...
 
Baker Hughes introduces next-generation stimulation vessel
Baker Hughes introduces next-generation stimulation vesselBaker Hughes introduces next-generation stimulation vessel
Baker Hughes introduces next-generation stimulation vessel
 
Baker Hughes introduces the Cut-and-Pull Spear technology as featured in the ...
Baker Hughes introduces the Cut-and-Pull Spear technology as featured in the ...Baker Hughes introduces the Cut-and-Pull Spear technology as featured in the ...
Baker Hughes introduces the Cut-and-Pull Spear technology as featured in the ...
 
Baker Hughes introduces the Hughes Christensen IRev infinite-revolution bit a...
Baker Hughes introduces the Hughes Christensen IRev infinite-revolution bit a...Baker Hughes introduces the Hughes Christensen IRev infinite-revolution bit a...
Baker Hughes introduces the Hughes Christensen IRev infinite-revolution bit a...
 
January 2014 Journal of Petroleum Technology Article: Electrical Submersible ...
January 2014 Journal of Petroleum Technology Article: Electrical Submersible ...January 2014 Journal of Petroleum Technology Article: Electrical Submersible ...
January 2014 Journal of Petroleum Technology Article: Electrical Submersible ...
 
March 2014 World Oil: Greener completions advance in the Marcellus
March 2014 World Oil: Greener completions advance in the MarcellusMarch 2014 World Oil: Greener completions advance in the Marcellus
March 2014 World Oil: Greener completions advance in the Marcellus
 

Kürzlich hochgeladen

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 

Kürzlich hochgeladen (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 

Collaboration delivers first Lower Tertiary smart completion system

  • 1. World Oil / MAY 2014 43 CollaborationdeliversfirstLowerTertiary smartcompletionsystem INTELLIGENT WELL COMPLETIONS All three lower-completion intervals in the well were stimulated successfully with the MST system, one of the deepest, multi-zone sand-control completions in the industry. Petrobras and Baker Hughes collaborated to accomplish the industry’s first intelligent well completion in the deepwater Lower Tertiary Wilcox formation under HPHT (>250°F and >19,000 psi) conditions at a water depth exceeding 8,200 ft and a 26,000-ft TVD. ŝŝ FERNANDOGAMA,FLAVIODEMORAES,ZIADHADDAD,OSWALDO MOREIRA,andSCOTTOGIER,Petrobras;KEVINJOSEPH,RONNIE MOOREandWAYNEWELCH,BakerHughes. The Lower Tertiary play in the Gulf of Mexico (GOM) is a proving ground for E&P technologies capable of withstanding harshHPHTconditions.Thevastultra-deepwaterplayisanoil- bearing reservoir with 1,200-ft gross sand thickness. At water depths ranging from 8,200 ft to 8,900 ft, the reservoir depths are greater than 26,000 ft TVD, with reservoir temperatures greater than 250°F and pressures exceeding 19,000 psi. The formation is composed of stacked thin beds of sand and fine-grained silt- stone intervals that have, effectively, no vertical permeability and an occasional cap of thick salt/sediment layers. The region also provides an opportunity to achieve industry firsts by apply- ing advanced technologies at record depths. Since the start of production from its Lower-Tertiary Cascade and Chinook (C&C) fields in 2012, Petrobras has relied con- sistently on advanced technology applications. Located in the Walker Ridge area, 180 mi off the Louisiana coast, the fields are tied to the GOM’s first floating production, storage and offload- ing(FPSO)vessel.Thesefieldsrepresenttheouterlimitsofultra- deepwater development, Fig. 1. Bytheendof2013,Petrobrascompletedfivewells(threewells in Cascade and two in Chinook), each of them producing from two separate pay intervals—an upper interval known as Wilcox 1 and a lower interval called Wilcox 2. While these wells have been producingasexpected,theircompletiondesignshavenotafforded Petrobras the opportunity to accurately measure the production contribution from each individual interval. The operator has re- lied on the use of tracers to qualitatively measure production from all of the zones, and on multiphase flowmeters at the wellhead to monitor the total, commingled production from each well. This limitation, and the need for more quantitative measure- ments of each interval’s flow characteristics, prompted Petrobras’ reservoir group to call for the development of an intelligent well completion. Such a system, the first of its kind in the Lower Ter- tiary, would allow for a more quantitative understanding of each pay interval’s contribution to the overall production, while pro- viding greater zonal control. COMPREHENSIVE COLLABORATION Petrobras selected the new Cascade 6 well as its candidate for the first intelligent well system (IWS), and tapped Baker Hughes to develop the necessary completion technologies. The well, a subsea completion with an 8,211-ft water depth and total well depth of approximately 27,000 ft, required a comprehen- sive completion package specifically tailored to the challenges encountered in producing from the two zones. Both companies had collaborated successfully on the previous completions in the C&C project, and built on that collaboration to develop the IWS for Cascade 6. The collaboration began with upfront planning meetings, in which representatives from each company discussed the produc- tion and operational goals for the well. This team then jointly de- veloped the final completion design that would meet Petrobras’ goals and minimize the need for complex, costly and invasive interventions. Petrobras carried this collaborative team philoso- phy throughout the project. Rather than make decisions behind closed doors and then give Baker Hughes direction, both com- panies discussed each phase of the well completion development and design. Similarly, the completion equipment design, manu- facturing and quality processes were a collaborative effort. This open process of information sharing and decision-making helped streamline development and planning, and minimized the risk of any unforeseen surprises that might delay the project. Originally appeared in World Oil ® MAY 2014 issue, pgs 43-48. Posted with permission.
  • 2. 44 MAY 2014 / WorldOil.com INTELLIGENT WELL COMPLETIONS FINAL DESIGN WITH MANY FIRSTS The final design for the Cascade 6 well consisted of an up- per and lower completion, which would isolate the upper pay zones (two hydraulically fractured intervals from the Wilcox 1 interval) from the lower zone (one hydraulically fractured inter- val from the Wilcox 2) and allow for selective production from each zone, if required, Fig. 2. The major components in the upper completion include: • Seven downhole pressure/temperature gauges, which besides monitoring the downhole temperature and the pressure of the production intervals, are used to infer the water cut (fluid density) and the flowrate from Wilcox 2 with a Venturi flowmeter. The gauges also provide infor- mation to assist casing pressure (Annulus A) verification throughout the production life of the well. • A 4½-in. hydraulic sliding sleeve (DHFC downhole flow control valve), rated to 12,000 psi differential pressure and used to control production from Wilcox 1, Fig. 3. This is the highest pressure-rated system of its kind de- signed and installed, to date, by Baker Hughes. • A 3½-in. shrouded hydraulic sliding sleeve (DHFC valve), also rated to 12,000 psi differential pressure and used to control production from Wilcox 2. • Two separate chemical injection systems, one for par- affin inhibitor and one for scale inhibitor. The paraffin injection system injects treatment chemicals above the retrievable production packer, while the scale inhibi- tor injection system includes a line that carries scale in- hibitor into the shroud of the 3½-in. DHFC valve. This unique design allows scale inhibitor treatment into the tubing for both zones through only one chemical injec- tion valve, regardless of the position of the hydraulic slid- ing sleeves. • A feed-through packer with six ¼-in. control line feed- through ports. • Three flat packs that contain three ¼-in. hydraulic con- trol lines for the DHFCs, two ¼-in. hydraulic control Fig. 1. Petrobras’ Cascade and Chinook fields are at the outer limits of the current developments in the deepwater Lower Tertiary trend. Fig. 2. Completion schematic showing the upper and lower portions. Fig. 3. The system’s hydraulic sliding sleeve valves are rated to 12,000 psi.
  • 3. 46 MAY 2014 / WorldOil.com INTELLIGENT WELL COMPLETIONS lines for the safety valve, two ⅜-in. lines for chemical in- jection and one ¼-in. TEC line for the gauges. • A Venturi flowmeter to measure production from the Wilcox 2 zone. While Venturi meters have been deployed in other subsea assemblies, this marked the deepest in- stallation to date. The use of this flowmeter answered the operator’s need to more accurately estimate the pro- duction contribution from each zone. With the Wilcox 2 production measured with the Venturi device and the total commingled output available from the multiphase flowmeter at the wellhead, the production from Wilcox 1 can be calculated with ease. • A next-generation Neptune EP safety valve, which in- cludes design upgrades for improved operational effi- ciency and reliability. This marked the first Baker Hughes installation of this upgraded Neptune valve design. • The TORRENT multi-zone, single-trip (MST) system to stimulate the three zones (two in Wilcox 1, one in Wil- cox 2) as an alternative to a conventional stack frac-pack operation. Petrobras had experience using the MST on previous C&C wells, but this well represented the first deployment of the MST system with an intelligent well system (IWS) completion and also the first time that the same service tools were used throughout the hydraulic fracturing operations. BakerHughesalsoprovidedare-closeableannularflowvalve with a 50-ft tieback receptacle, which is part of the isolation as- sembly and was used as a mechanical barrier throughout the upper completion deployment and commissioning operations. PUTTING CONTINGENCIES IN PLACE Given the well’s depth and high upfront capital expense, coupled with the objective to design and construct a completion to withstand production for 20 years or longer, Petrobras devel- oped an enhanced well design to minimize the risk of equipment failure and interventions. To that end, both companies worked together to include multiple contingencies into the design, that would keep production flowing from each zone, if the primary equipment would fail. Such contingencies include the capability to install one sin- gle-scale inhibitor injection point, to be able to treat the entire production string down to the lowest hydraulic sliding sleeve, even in the event that the valve is shifted closed. Among other flow assurance concerns, the scale inhibitor is designed to avoid buildup along the moving parts of the hydraulic sliding sleeves that might prevent their normal operation. This was considered a much more cost-effective measure, compared to installing a sec- ond scale inhibitor injection point (one below each valve), with implications not only to the well design (additional ⅜-in. control line), but also to the subsea tree system. A 4½-in. mechanical sliding sleeve was installed above the 4½-in. DHFC valve (upper) as another contingency. The slid- ing sleeve is kept in the closed position during normal well op- erations. If the upper DHFC valve should fail (e.g., in case a plug in the control line prevents its normal hydraulic operation or any attempt to mechanically override it), then the mechanical sliding sleeve can be opened to allow production from Wilcox 1 to reach the surface. Conversely, if the 4½-in. DHFC valve is stuck open and production from Wilcox 1 needs to be shut off, a fit-for-pur- pose separation sleeve could be installed to straddle the DHFC ports, effectively shutting off production from Wilcox 1, while al- lowing continued production from Wilcox 2. Contingencies also exist, in the event that production from Wilcox2needstobeshutoff.Ifthe3½-in.shroudedDHFCvalve (which controls Wilcox 2 flow) cannot be closed hydraulically or mechanically, the valve includes a sealbore nipple profile above its ports. A plug can be installed in this nipple profile to shut off production from Wilcox 2. In the event that the shrouded valve is stuck in the closed position, production from Wilcox 2 can be re- stored by pulling the plug used to divert the flow into the shroud housing. With the plug removed, Wilcox 2 production flows straight up the tubing, rather than perforating the sliding sleeve. PRE-PLANNING PAYS OFF One of the keys to success on both the upper and lower com- pletions, and ultimately, the entire installation, was the significant amount of planning, collaboration and preparation that took place from the completion design conceptual phase, through the procedure elaboration and peer review meetings. This involved not only Petrobras and Baker Hughes, but all the main contrac- tors, to plan the equipment make-ups prior to going offshore and final deployment. To minimize rig time, subassemblies were built on land, function-tested and then shipped offshore. For example, the MST subassemblies were made up and spaced out to match the perforation intervals provided by Petrobras. Once the perforations were finalized, they were laid out with the MST system to ensure a proper space-out, using Baker Hughes’ real-time tool position, visualization and design software. Because the MST system uses multiple shifters, it was also verified in the design software that shifting one sleeve did not inadvertently shift another sleeve. Once the space-out was set, Baker Hughes technicians built the equipment, and loaded it to go offshore. The upper completion was planned, and the equipment was built to minimize rig time. This was accomplished by building up subassemblies and pre-installing the majority of the hydrau- lic lines prior to going offshore. The lines were passed through the feed-through packer, routed and terminated throughout the subassembly. These were tested onshore and shipped ready to run downhole. The onshore testing protocol included numerous pressure andcommunicationtestsoneachsub-assemblytoensurereliable Fig. 4. Make-up of the intelligent well system assembly in preparation for hydro testing.
  • 4. 48 MAY 2014 / WorldOil.com INTELLIGENT WELL COMPLETIONS operation prior to moving offshore. Twenty full hydro-tests were performed on the individual sub-assemblies, and 46 strip chart tests were conducted on the fittings for the control lines routed through the sub-assemblies, Fig. 4. Petrobras representatives were present for all tests, and witnessed, first-hand, the operation and testing protocol. The preplanning process onshore provided a valuable lesson in the importance of making up and testing the sub-assemblies as early as possible. The completion team uncovered some configu- ration issues during make-up that required minor modifications totheequipment.Becausetheseissueswereidentifiedwellbefore the IWS was shipped to the rig, the changes were conducted in a methodical manner, without impacting the operation schedule. Once the sub-assemblies arrived offshore, a joint Baker Hughes-Petrobras team, along with other key contractors, worked together to prepare the sub-assemblies and deploy them downhole. This deployment was highly efficient and safe, thanks largely to the fact that the same joint team had worked together onpreviouscompletions.Thefamiliarityofthedeploymentcrew benefitted all of the rig operations, from picking up tools to test- ing and deployment. Due to the importance of this IWS completion, and the fact that it had never been installed at these depths and pressures, the operator allowed for as much time as required to test the sliding sleeves. The information from these tests will be used in the fu- ture as a baseline to evaluate the shifting of the sleeves. SUCCESSFUL RESULTS All three lower-completion intervals in the well were stim- ulated successfully with the MST system, one of the deep- est, multi-zone sand-control completions in the industry, by pumping more than 1 million lb of proppant across all three zones in one trip, Fig. 5. The entire stimulation job was com- pleted in nine days, a savings of 12 days of rig time. The IWS upper completion installation for Cascade 6 was run in 12 days, which is three to four days under what could be expect- ed. The well has been on production since early-January 2014 without an incident. The IWS completion that was created and successfully installed for Petrobras can now be used as a base model for other IWS systems going forward. Petrobras is now planning to use this same IWS design for its next well, Chinook 6. REFERENCES 1. Haddad, Z., M. B. Smith and F. D. De Moraes, “Designing multistage frac packs in the Lower Tertiary formation—Cascade and Chinook project,” SPE Drilling & Completions, Vol. 27, No. 1, 2012, pp 50- 64, based on SPE paper 140498. 2. Haddad, Z., N. B. Smith, F. D. De Moraes and O. Moreira, “The design and execution of frac jobs in the ultra-deepwater Lower Tertiary Wilcox formation,” SPE paper 147237, presented at the SPE An- nual Technical Conference and Exhibition, Denver, Colo., USA, Oct. 30–Nov. 2, 2011. 3. Moraes, F.D., O. Moreira, S. Ogier, Z. Haddad and J. Shipley, “Well completion operations in Cascade and Chinook fields—ultra deepwater challenges in the Gulf of Mexico,” IBP paper 3310, presented at the Rio Oil & Gas Expo and Conference, Rio de Janeiro, Brazil, Sept. 13-16, 2010. 4. Ogier, K.S., Z. Haddad, O. Moreira, F. D. De Moraes and J. Shipley, “The world’s deepest frac-pack completions using a single-trip multi-zone system: A Gulf of Mexico case study in the Lower Tertiary formation,” SPE paper 147313, presented at the SPE Annual Technical Conference and Exhibition, New Orleans, La., Oct. 30–Nov. 2, 2013. FERNANDO GAMA is the well engineering manager at Petrobras America, responsible for well operations and engineering of the operated and non-operated assets in the ultra-deepwater Gulf of Mexico. His diverse work experience includes both operational and managerial positions in project management, logistics, and merger and acquisition. Mr. Gama holds several engineering degrees, including petroleum and telecommunications engineering. FLAVIO D. DE MORAES is a senior well engineer at Petrobras with extensive experience in ultra-deepwater well drilling, and completion design and operations, responsible for the Cascade and Chinook well designs. Dr. De Moraes holds a PhD in petroleum engineering from the University of Tulsa. ZIAD HADDAD founded FOI Technologies in 2010 as a deepwater consulting company. Mr. Haddad has been working with Petrobras on developing its ultra-deepwater Cascade and Chinook project. He previously worked for Pennzoil and Devon Energy as a well engineering advisor on all aspects of well completions, with emphasis on hydraulic fracturing. Mr. Haddad holds a BS degree in petroleum and natural gas engineering from Pennsylvania State University. OSWALDO M. MOREIRA is a senior completions engineer for Petrobras with over 18 years of experience in the upstream sector. Mr. Oswaldo holds an MS degree in business administration from Rice University and a BS degree in mechanical engineering from Rio de Janeiro Federal University. He has been working for Petrobras since 2006 in the Integrated Project team, responsible for planning, implementing and coordinating the completion design for Cascade and Chinook fields. K. SCOTT OGIER is a consulting completion engineer focused on deepwater Gulf of Mexico projects for the past 10 years, including seven years working on the Cascade and Chinook project with Petrobras. For the previous 19 years, Mr. Ogier has held various petroleum engineering positions in the Gulf of Mexico and Pennsylvania. He holds a BS degree in petroleum engineering from Texas A&M University and an MBA from St. Bonaventure University. KEVIN JOSEPH is an engineer on the Gulf of Mexico operations team at Baker Hughes. Mr. Joseph’s expertise includes sand control, project management, hydraulic fracturing completions, horizontal reservoirs, deepwater operations, multi-zone single trip systems, multi-stage fracturing completions and tight gas reservoirs. He holds a BS degree in petroleum engineering and an MBA. Fig. 5. The TORRENT multi-zone single-trip (MST) system was used to stimulate the Wilcox 1 and Wilcox 2 formations. Article copyright © 2014 by Gulf Publishing Company. All rights reserved. Printed in U.S.A. Not to be distributed in electronic or printed form, or posted on a website, without express written permission of copyright holder.