SlideShare a Scribd company logo
1 of 65
“Activity Based Costing as a measure of improving the cost structure at Akash
                                   industries”

                                   INDEX
Sr.No.    CONTENTS                                                  Page No.
1         Executive summary                                         1-2
2         Industry Profile                                          3-5
3         Organization profile                                      6-8
4         History of Akash Industries                               9-12
5         Company at a glance                                       13-18
6         Research Methodology                                      19-21
7         Data Collection                                           22-23
8         Conceptual Framework                                      24-33
10        Analysis                                                  34-57
11        Findings                                                  58-59
12        Suggestions                                               60-61
13        Conclusion                                                62-63
14        Bibliography                                              64-65




                       Babasabpatilfreeppt.com                         1
“Activity Based Costing as a measure of improving the cost structure at Akash
                                    industries”




        EXECUTIVE SUMMARY




                            EXECUTIVE SUMMARY



A study report on “ACTIVITY BASED COSTING AS A MEASURE OF IMPROVING
THE COST STRUCTURE OF AKASH INDUSTRIES”, a project undertaken at AKASH
INDUSTRIES BELGAUM.



                        Babasabpatilfreeppt.com                         2
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
Activity-Based Costing (ABC) represents an alternative paradigm to traditional cost
accounting system and it often provides more accurate cost information for decision making
such as product pricing, product mix, and make-or buy decisions. ABC models the causal
relationships between products and the resources used in their production and traces the cost
of products according to the activities through the use of appropriate cost drivers.


               In this project, the costing system followed by Akash Industries is compared
with ABC in terms of the effects on the product costs that are carried out to highlight the
difference between two costing methodologies. By using this methodology, a valuable
insight into the factors that cause the cost is provided, helping to better manage the activities
of the company.


             According to the study, Akash Industries follows traditional method for costing
that assigns overheads directly to the product. Cost of the product UC Range series 4 end
cover is found out by Activity Based costing and is compared with the traditional method
followed by Akash Industries to arrive at the cost of the above product. The study states that
the product is being over cost by the company.

               Akash Industries should go for Activity Based costing as it understands true
profitability of the customers, products, or services and also helps in identifying areas where
the cost can be reduced or efficiencies can be increased.




                             Babasabpatilfreeppt.com                               3
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”




              INDUSTRY PROFILE




                                INDUSTRY PROFILE
                                Manufacturing Industry


Manufacturing industry refers to those industries which involve in the manufacturing and
processing of items and indulge in either creation of new commodities or in value addition.


                           Babasabpatilfreeppt.com                            4
“Activity Based Costing as a measure of improving the cost structure at Akash
                                      industries”
The manufacturing industry accounts for a significant share of the industrial sector in
developed countries. The final products can either serve as a finished good for sale to
customers or as intermediate goods used in the production process.


Manufacturing industries are the chief wealth producing sectors of an economy. These
industries use various technologies and methods widely known as manufacturing process
management. Manufacturing industries are broadly categorized into engineering industries,
construction industries, electronics industries, chemical industries, energy industries, textile
industries, food and beverage industries, metalworking industries, plastic industries, etc.


Manufacturing industries are important for an economy as they employ a huge share of the
labor force and produce materials required by sectors of strategic importance such as
national infrastructure and defense. However, not all manufacturing industries are beneficial
to the nation as some of them generate negative externalities with huge social costs. The cost
of letting such industries flourish may even exceed the benefits generated by them.


India’s manufacturing base, which is the fourth-largest among emerging economies, is
among the fastest growing and has seen more investments as a proportion of gross domestic
product than any country except China. Employment opportunities in the manufacturing
industry have declined comparatively. Manufacturing industry analysis also suggests that in
some countries like China, technological know how has to be developed. Despite the fact
that China is ranked fourth in the manufacturing productivity, due to technological lacunae,
it is not being able to compete in the world market. Also needed are professionals well
versed in the technological know how.




The Government has taken several initiatives to accelerate growth in this sector and improve
competitiveness of Indian industry in general and manufacturing in particular.
• Technology up gradation schemes for various sectors such as small scale industries,
textiles, food processing etc.;
• Industrial infrastructure up gradation programmes on cluster basis;


                             Babasabpatilfreeppt.com                               5
“Activity Based Costing as a measure of improving the cost structure at Akash
                                      industries”
• Easier access to inputs at competitive prices and rationalization and reduction in   duty
rates.
•   Encouragement to foreign technology collaborations and liberalization of FDI in
manufacturing activities.




                            Babasabpatilfreeppt.com                            6
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”




      ORGANIZATION PROFILE




                             ORGANIZATIONAL PROFILE


Akash Industries, a pioneer in the manufacture of sheet metal pressed components was
established in the year 1977. Ever since, it has grown into a big organization with a focus in
quality in everything.




                            Babasabpatilfreeppt.com                              7
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
       An ISO 9001-2000 Company with a good customer base in the domestic as well as the
International market activities of Akash Industries include tool design also with a highly
skilled & professional work force, tools is designed for the components as per the customer
requirements. Their specialty being the deep drawn components, they cater the electrical,
elevator, home appliances automobile industry and the defense.

       Akash Industries are in it for a long haul with a focus on continual improvement. They
are having mechanical presses ranging from 10T to 80T capacity & hydraulic presses
ranging from 10T to 250T capacity, out of which 50T, 80T, 160T & 250T hydraulic presses
are double acting presses to carry out deep drawing operations. They also use triple acting
arrangement for some of these machines to carryout more precision items & to make
multiple operations at a time.

       Apart from this, shearing machine of capacity 3.0mm x 2500mm & 10mm x 2000mm
both hydraulically operated are installed for better cutting accuracy. The other relevant
machineries such as welding transformers, spot welding, grinding, and circle cutting
machines are installed to support our manufacturing activity with maximum productivity.
The two material handling equipments for loading & unloading of tools are in place to make
setting faster and easier. The separate tool maintenance area to carry out maintenance of tool
is provided with surface grinding & drilling machines to attend immediate rectification, such
as sharpening of punches & dies. They are equipped with 62 KVA generators to overcome
power failure. The painting facility with 7 tank process of components before painting is
available. The painting booth & drier for quick drying is also installed to give our customers
a complete satisfaction by supplying ready for fitment components.




Akash Industry have the pride to have clients from various industries many of them are well
- known in the global industrial community. Some of our esteemed clients are as under:-
   •    Cummins Generator Technologies
   •    OTIS Elevator (I) Ltd.
   •    Trident Power craft Pvt. Ltd.
   •    Crompton Greaves Ltd



                            Babasabpatilfreeppt.com                              8
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”
•   Kaytee Switch Gears Ltd.
•   IFB India




                       Babasabpatilfreeppt.com                       9
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”




        HISTORY OF AKASH
           INDUSTRIES




                 HISTORY OF AKASH INDUSTRIES
                            Akash Industries
                           M-15, Industrial Estate,
                       Udyambag, Belgaum – 590 008




                     Babasabpatilfreeppt.com                         10
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
Mr. Sadanand T Macha completed his DIPLOMA IN TOOL AND DIE MAKING from
NETTUR TECHNICAL TRAINING FOUNDATION, DHARWAR (NTTF). Then he
served at Hyderabad Tool Pvt. Ltd, Hyderabad, as a highly skilled Mechanic for a period of
one and half years. Because of the climatic conditions he left Hyderabad and came back to
Belgaum and joined M/s. Pusalkar Engineers, Belgaum. He started working under Mr. V B
Inamdar (Present Partner). It was here that he learnt i.e., from Purchases, Production,
Inspection and Despatch, Etc for a period of one and half yeaRs. In M/s Pusalkar Engineers
he came in contact with M/s Kirloskar Electric Co. Ltd. Bangalore & Hubli. Having gained
the experience and he left M/s Pusalkar Engineers, Belgaum and was idle for 2 to 3 months.
Meanwhile Shri V B Inamdar also left M/s Pusalkar Engineers and they both decided to start
their own business.


In the year 1977, they both started their own business in the name of M/s Akash Industries.
They had neither place nor financial support. With a mere Rs. 3000/- they went on to
purchase a wielding machine and started in their own garage at Angol ‘C’ scheme. Initially it
was only fabrication work that they used to carry out. But with this type of work it was
impossible for both of them to meet their ends. By this time 6 months had passed. They
really had a tough time and a tougher time to Mr. Inamdar who was married and had 3
childrens. Meanwhile, they felt that they should better join any service. Even to approach
somebody for work, they didn’t had the requisite finance. With the help of Mr. Inamdar’s,
brother in law, who was working in West Coast Paper Mills Limited Dandeli, they could get
an entry. Initially, they gave them maintenance jobs, which they used to get the things from
their fellow industrialists and supply the same. Months passed by and they felt that how they
can ever survive with this little earning. It was even difficult for them to go by bus and many
a times they used to travel by truck to Dandeli, finish their work and again return back to
Belgaum, by some means with hardly a few chips in their pockets. This continued for a year
and half. It was at this time that Shri A G Tembe, of M/s Ohm Electricals, gave them shelter
in his shed at Industrial estate. Here they prolonged their business for 2 years supplying
maintenance jobs. Doing fabrication work and even if necessary they used to carry the
wielding machine to customers place and carry out the work.
Their major problem was finance and how to expand their engineering activities was a big
question mark for them. But since they had no shed or own machinery they could not
approach the engineering companies.


                            Babasabpatilfreeppt.com                               11
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”


However, in the year 1979, they got an Industrial Plot of 10 Guntas from KSSIDC LTD,
through the help of Late Shri N A Hanamannavar, the then Chairman of the City
Improvement Board. They approached State Bank Of India for financial assistance and it
was at this juncture that they really helped them to construct their own shed and purchase of
machinery. Their Working capital of Rs. 10,000 was also sanctioned. With the vast
experience of Mr. V B Inamdar, I.e of more than 15 years and his previous contacts. They
approached M/s KIRLOSKAR ELECTRIC COMPANY LIMITED. BANGALORE and M/s
LARSEN & TOUBRO LTD. BANGALORE. Since, their line of activity was only Sheet
Metal Components, they could get a good amount of workload. They proved themselves by
quality and delivery. More and more work started coming in and somehow they had to meet
their urgency with having only few machines. Having got confidence, they expanded their
own shed and added few more machines of a higher capacity. They approached M/s
CROMPTON GREAVES LTD. AHMEDNAGAR, AUTOMOBILE CORPORATION OF
GOA LTD. KIRLOSKAR ELECTRIC CO. HBL PEENYA & PUNE. In a span of two to
three years their business increased multifold. Capacity reached a saturated point and they
were not in position to meet their high demands and they had to add some higher capacity of
Hydraulic Presses converting the same into double acting and triple acting. This increased
their supply position.


In the year 1984, they started another partnership concern in the name of M/S
KARNATAKA METAL PRESSING just near to their existing concern taking Mr. P A
Bagewadi and Mr. S K Yatgeri as additional partners. Here their basic activity was only to
manufacture Pole bricks of different capacities for alternators. At present their turnover
stands at Rs 45 Lakh per month.


In the year 1988, they got an order from M/s AMMUNITION FACTORY, PUNE for
supplying of Aluminum Cartridge cases purely an import substitute. For this special purpose
machines were acquired with the most accurate toolings and precious inspection equipments
to meet their highest accuracy and quality. These cartridge cases are used to make Anti Riot
Rubber Bullets, which are used by the Police Department during Anti Riots. This was their
biggest achievement that they had in their last 29 years.




                            Babasabpatilfreeppt.com                             12
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
AKASH INDUSTRIES major activities are manufacturing of Sheet Metal Pressed
Components for Alternator, Motor, Automobile Parts and items required by customers to
their required specifications.


In the words of Mr. S T Macha “This is all due to hard and sincere work and the backing of
our fellow industrialists who have supported us in all our difficult times”.


“Our aim is to do sincere and hard work giving more attention to quality and delivery. This
is what every one wants in this world of competition”.




                             Babasabpatilfreeppt.com                           13
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”




             COMPANY PROFILE




                              COMPANY PROFILE


Name of the Organization          : Akash Industries
Type of Industry                  : Manufacturing Industry.
Address                            : Akash Industries
                                     M-15, Industrial Estate,
                                     Udyambag, Belgaum – 590 008



                           Babasabpatilfreeppt.com                       14
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
Partners                            : S.T Macha
                                        V.B Inamdar
                                        M.V Inamdar
                                        A.S Macha


Established                          : 1977


Size and nature of the company      :


Sales
FY08-09                             : Rs48,333,876.81


Employees                           : 50




QUALITY POLICY AT AKASH INDUSTRIES


   1. To meet customers requirement and strive to exceed customer expectations.
   2. Manage all activities and related resources as a process.
   3. Create and maintain an environment in which personnel are fully involved in
        achieving organization objectives so as to ensure continual improvement and growth.
   4. Take decisions and implement necessary actions based upon analysis of data and
        information.




                            Babasabpatilfreeppt.com                            15
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”
5. Involve all our suppliers in quality improvement process as to ensure mutually
   beneficial and long time relationship.




                           ORGANIZATION CHART




                        Babasabpatilfreeppt.com                      16
“Activity Based Costing as a measure of improving the cost structure at Akash
                                        industries”


     Managing partner 1                                          Managing partner 2




      In charge                         Shop                             Chief
       QA/QC                          Incharge                         Accountant




                                                      Incharge     Incharge
                                                       Excise      Sales Tax
                                                                                     Cashier
 Management
Representative




   Deputy
 Management
Representative



                                                                         Plant
    Plant                                                             supervisor 2
 Supervisor 1




       In charge                                                 Workers
         stores




   PRODUCTS MANUFACTURED BY AKASH INDUSTRIES




                            Babasabpatilfreeppt.com                            17
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
Components are manufactured as per the customer requirements. They are catering at
present the industries like electrical, elevators & home appliances, specialization being deep
drawn components using C.R. & H.R. as the raw material, with thickness of material varying
from 1 mm CRCA to 8mm H.R.




                                 LIST OF CUSTOMERS



                            Babasabpatilfreeppt.com                              18
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”
 Cummins Generator Technologies, India
 Motorsense, U.K
 Cummins Generator Technologies, Mexico
 Fasco Motors, USA
 ABB Ltd, Bangalore
 OITS Elevator company, India
 Trident Power craft Pvt.Ltd, Hubli
 Kirloskar Electric co. Hubli
 Mallik Engineering , Bangalore
 Telco Construction Equipment, Dharwad




                       Babasabpatilfreeppt.com                       19
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”




    RESEARCH METHODOLOGY




                    RESEARCH METHODOLOGY



                     Babasabpatilfreeppt.com                         20
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
The Study:
The present study is an attempt to understand and ascertain the costing method followed in
Akash Industries and to compare it with the costing method Activity Based Costing.


Objectives of the study:
   •   To study the functions and operations of the organization
   •   To know and understand the existing costing method followed by Akash Industries.
   •   To identify activities involved in manufacturing of UC Range series 4 end cover.
   •   To identify cost of the activities involved in manufacturing the product UC Range
       series 4 end cover.
   •   To allocate the cost for the activities.
   •   To find the cost per unit of the product UC Range series 4 end cover.
   •   To compare existing costing method followed by Akash Industries with Activity
       Based Costing.


Scope of the study:
The scope of this study is to know and understanding the various processes and activities
involved in manufacturing Industries especially in AKASH INDUSTRIES. It involves
finding out the cost per unit of the product UC Range series 4 end cover by following
Activity based Costing.



Need for the study:

The theoretical aspects of ACTIVITY BASED COSTING provide the framework of the
study. A conceptual and the practical approach is the need of the hour. Hence the field study
becomes as essential part of the curriculum. Thus this project study conducted to integrate
theoretical and practical aspects of Activity based costing in the organization.




                                 DATA COLLECTION



                             Babasabpatilfreeppt.com                               21
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
   •    Primary Data

       Following are the sources of primary data collected.

         Much of the information was collected from the cost accountant of Akash
              Industries (Mr.Sunil Kundap) .

         Frequent discussions were made with other employees of the company.

         Met few senior level executive of the firm.



   •    Secondary Data


         Secondary data was collected through last year’s balance sheet of Akash
              Industries.
         Books on cost accounting were referred.
         Company website




Limitations of the study:

          •    The study is limited to AKASH INDUSTRIES only.

          •    In order to maintain confidentiality some information could not be disclosed by
               Akash Industries.




                              Babasabpatilfreeppt.com                            22
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”




CONCEPTUAL FRAMEWORK




                       ACTIVITY BASED COSTING




                     Babasabpatilfreeppt.com                         23
“Activity Based Costing as a measure of improving the cost structure at Akash
                                        industries”
Activity Based Costing (ABC) is an accounting technique that allows an organization to
determine the actual cost associated with each product and service produced by the
organization without regard to the organizational structure. It is developed to provide more-
accurate ways of assigning the costs of indirect and support resources to activities, business
processes, products, services, and customers. ABC systems recognize that many
organizational resources are required not for physical production of units of product but to
provide a broad array of support activities that enable a variety of products and services to be
produced for a diverse group of customers. The goal of ABC is not to allocate common costs
to products. The goal is to measure and then price out all the resources used for activities
that support the production and delivery of products and services to customers.

Concept of Activity-Based-Costing:

An organization performs activities to do its business. These activities define the kind of
business you are in: a ship owner has an activity to unpack boats; an accounting firm
prepares tax returns; a manufacturer produces products; a council delivers services; a
university teaches students. All activities consume resources. It is the consumption of these
resources that adds to overhead costs.

The basis of Activity Based Costing is look at the activities required to produce the cost of
the product or service. The activities consume resources and the cost of these can be
calculated. The amount of activity required for each product and service is determined,
hence the real cost can be determined.




What's what in ABC?

   •     The activity is the work that is done.



                              Babasabpatilfreeppt.com                              24
“Activity Based Costing as a measure of improving the cost structure at Akash
                                        industries”
   •     The resource is what the activity uses to do the work e.g. people, equipment, and
         services. Resources cost money.
   •     The cost of the activity depends on the quantity of resources used to accomplish the
         activity.
   •     The cost driver for an activity is the factor that influences the amount of the resources
         that will be consumed by this activity.

         Example: the activity is delivering goods. The costs of this activity include the truck
         drivers' wages, fuel, depreciation of the truck, insurance, etc. The quantities of the
         resources that will be consumed by this activity are influenced by the number of
         deliveries made per year. Hence the cost driver could be the number of deliveries. A
         cost driver is designed to allocate the delivery activity cost pool to the cost objects.

   •     The activity driver measures how much of the activity is used by the cost object.
         Example: Product A is delivered once a month, whereas product B is delivered once
         a week. Products A and B require a different number of deliveries, hence the cost of
         the delivery activity should be assigned to each product on the basis of the number of
         deliveries each uses.
   •     The cost object is whatever it is you wish to cost. It could be a product, service,
         process, job or customer.

While traditional costing arbitrarily allocates overhead costs, ABC traces overhead costs by
looking at the activities that each product and service calls upon. With ABC the products
consume the activities. It is the activities that cost money.




Why use Activity-Based-Costing?


                                 Babasabpatilfreeppt.com                              25
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
Activity-Based-Costing is necessary for the following reasons.

            Understand true profitability of your customers, products, or services
            Quantify the cost of non-value added activities such as errors and reworks


            Identify opportunities to reduce costs and/or increase efficiency


            Obtain actionable information to negotiate price increases for unprofitable
              clients

            Stratify overhead costs so they can be managed more effectively.




The ABC framework

                           Babasabpatilfreeppt.com                               26
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
Activity based costing has been claimed as a method of arriving at more accurate costs, often
in order to set selling prices. In a market economy, the idea of selling prices based on costs is
dangerous, with serious consequences for a business competitive stance. With the variety of
conventions and concepts used in cost determination, there are no absolutes in determining
product costs, hence the objective of accurate costs is diluted. However, the technique of
ABC is being seen more as a cost-distortion alarm; more as an attention directing tool; more
as a cost management tool.


Activity Based Costing is a methodology for understanding the activities, processes, services
and products of a business; understanding what drives the cost of these activities and
processes; and thus reducing the non-value-adding activities/processes.


The Elements of ABC can be described in the following model:


The ABC CROSS:
COST
ASSIGNMENT
                                         VIEW

                                      RESOURCES                     RESOURCE
                                                                    DRIVERS


               COST                   ACTIVITIES                    PERFORMANCE
               DRIVERS                                              MEASURES


               ACTIVITY               OBJECTS
               DRIVERS                OF WORK




                             Babasabpatilfreeppt.com                               27
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
Resource Drivers are the link between resources and activities assigning cost form the
financial statements.


Activity Driver is the factor used to assign cost from an activity to a object of work, for
instance, if making a sales call is the activity then the frequency of sales calls to a specific
customer/client would be the activity driver.


Object of Work is the specific objective at the end of a process, for instance, a product, a
satisfied customer/client.


Cost Drivers are factors that cause changes in the performance of activities and create
increased consumption of resource. Fundamentally there are two types of Cost Drivers. The
Structural Cost Drivers are viz. Scale, Scope, Experience, Technology and Complexity. The
Exceptional Cost Drivers are viz. Work Force Involvement, Total Quality Management,
Capacity Utilization, Plant Layout, Electricity, Product Configuration and Exploiting Value
Chain Linkages.


Activities comprise of units or work or task. For example purchase of raw materials,
activities involved in manufacturing etc.




                             Babasabpatilfreeppt.com                               28
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
ABC categorizes the activities into:
Unit level activities:
      Performed each time a unit is produced.
      Consumed in direct proportion to the number of units produced.
      E.g. Direct materials, Energy costs, direct labour, etc.


Batch related activities:
      Performed each time a batch of goods is produced.
      Consumed in direct proportion the number of batches produced.
      Fixed for all units within a batch.
      E.g. set up resources, purchasing resources.


Product sustaining activities:
      Performed to support and sustain different products/services on the product life
       cycle.
      Consumption varies with the variety of products/services and the stage of the Product
       Life Cycle the products/services are in.
      E.g. designing the product.


Facility sustaining activities:
      Performed for supporting the happening of the above three types of activities and
       providing the platform/infrastructure.
      These are generally fixed for a certain scale/scope of operations over a period of
       time.
      E.g. Administration, plant maintenance, accounting, etc.
      These costs are deducted lump sum from operating margins of all product lines.




                            Babasabpatilfreeppt.com                            29
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
ABC establishes inputs and outputs to and from each activity, Inputs to one activity may be
outputs from another and there could also be interactive relationships among activities.
Hierarchy of Activities and Activity based profitability analysis
Sales Revenue
Less: Unit-level products cost
     (Material, Power Costs, Other identifiable costs)
=      unit level contribution
Less: Batch related costs
     (Sets-ups, material movements, purchase orders, inspection)
=      batch – level contribution
Less: Product line costs
     (Process engineering, product specifications, order change notices)
=      product line contribution
Less: Consumer and market related costs
=      customer level contribution
Less: Facility sustaining cost
       (Plant management , rent , rates, and taxes, etc.,)
=      net profit


Note: Unit level and batch contribution analysis facilitate short-term decision relating to
products and complexity analysis. Product line contribution helps in product line decisions.
Customer level contribution helps in customer and market related decisions. Facility
sustaining cost are period cost are period which are fixed in nature.




                            Babasabpatilfreeppt.com                              30
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”

   STAGES OR STEPS INVOLVED IN ACTIVITY BASED COSTING.

Step 1: Identify the various activities within the organization. Activities comprise of units of
work or task. For example purchase of material is an activity consisting of series of task like
purchase requisition, advertisement, inviting quotations, identification of suppliers, issuing
purchase orders, follow up etc.


Step 2: Relate the overheads to the activity using resource cost drivers
     a) Over heads will be related to support and primary activities.
     b) For this purpose, resource cost drivers will be used.
     c) All costs will be identified under the activities, thus creating activity cost pools.


Step 3: Apportion the cost to support activities over the primary activities on suitable basis.
     a) This is very much like reapportionment of service department expenses to
         production departments.
     b) Cost of support activities are spread over to primary activities to collect costs only
         under them.
     c) The base is the cost driver which is the measure of how the support activities are
         used.


Step 4: Determine the activity cost drivers for activity/cost pools.
      a) Activity cost drivers used to relate the overheads collected in the cost pools to cost
          objects should be determined.
      b) This is based on the factor that drives the consumption of the activity.
      c) For example, in production scheduling, the driver will be the number of batches
          ordered.




                             Babasabpatilfreeppt.com                                31
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
Step 5: Calculate Activity cost driver rate = Total cost of activity
                                               Activity cost driver
       a) Activity cost driver rates are computed for each activity.
       b) The rates will be multiplied by the different amounts of each activity that each
           product/other cost object consumes so as to ascertain its cost.
       c) This rate can be used to ascertain cost of the product (as in traditional absorption
           costing) and to ascertain cost of other cost objects such as customers/customer
           segments and distribution channels.




                             Babasabpatilfreeppt.com                             32
“Activity Based Costing as a measure of improving the cost structure at Akash
                                       industries”

ACTIVITY BASED COSTING ADVANTAGES
  •     More accurate costing of products/services, customers, distribution channels.
  •     Better understanding overheads.
  •     Easier to understand for everyone.
  •     Utilizes unit cost rather than just total cost.
  •     Integrates well with Six Sigma and other continuous improvement programs.
  •     Makes visible waste and non-value added.
  •     Enables costing of processes, supply chains, and value streams
  •     Activity Based Costing mirrors way work is done
  •     Facilitates benchmarking.


ACTIVITY BASED COSTING DISADVANTAGES

  •     More time consuming to collect data.
  •     Cost of buying, implementing and maintaining activity based system.

  •     Makes waste visible which some executives and managers don't want their boss to
        see.




                              Babasabpatilfreeppt.com                            33
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”

    How does Activity Based Costing differ from traditional cost accounting
                                             systems?

Most traditional costing systems utilize a single basis, (e.g. direct labor) to distribute the
indirect costs to all products and services. This method of allocating indirect costs
commonly results in erroneous cost data. Often products which have high volume (and high
labor cost) are over costed. Likewise, the cost of lower volume products are often
understated, and many of the indirect costs of these products are overlooked.
Rather than relying on a single basis to distribute costs, ABC assigns costs to activities and
products based on how the costs (resources) are actually consumed by the process or
product. By moving away from traditional cost allocation methods and using improved ABC
methods of tracing and assignment, ABC provides managers with a clearer picture of cost of
processes and the profitability of customers and products.




                            Babasabpatilfreeppt.com                              34
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”




                       ANALYSIS




                    DETAILS OF THE PRODUCT

                     Babasabpatilfreeppt.com                         35
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”


Product name: UC Range series 4 end cover


Raw Material Requirements for the product


          1) Metal sheet of length 1250*2500*1.2mm
          2) Weight of the sheet is 30kg
          3) 21 Covers can be prepared from one metal sheet.
          4) Sheets required to prepare 1000 units is 48sheets.
          5) Cost of sheet metal per kg 37Rs.
          6) Weight of a Cover               = 30kg/21
                                             =1.42kg
          7) Gross Material cost per unit    = 1.42 x Rs55
                                             = Rs78.1/Cover
          8) Process Generated Scrap         =0.65 kgs
          9) Scrap rate                       =Rs12/kg
          10) Revenue generated from scrap = 0.65 x 10
                                              = Rs 6.5
          11) Net material cost              = 78.1– 6.5
                                             = Rs71.6




                COSTING FOLLOWED BY THE COMPANY
                        Product: UC Range series 4 end cover
                     Number of units produced = 300000 Covers p.a


                          Babasabpatilfreeppt.com                        36
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”

      Particulars                                    Total       Cost/unit
                                                   cost(in Rs)     (in Rs)




                     Babasabpatilfreeppt.com                         37
“Activity Based Costing as a measure of improving the cost structure at Akash
                                          industries”
DIRECT COST
Direct Material (Raw Material Consumed)                     3,05,73,918
Direct Wages                                                 18,93,573
Direct Expenses                                              45,65,266
Prime Cost                                                  3,70,32,757      123.4
FACTORY OVERHEADS
fuel oil & lubricant                            1,58,029
Depreciation on machinery                       8,04,853
Repairs and maintenance                         3,91,235
Insurance                                        56,147
Rates and Taxes                                 2,61,532
Indirect material                              14,73,273
Factory cost                                                31,45,069        10.48
ADMINISTRATIVE OVERHEADS
Printing and stationary                          69,255
Postage and telegram                             18,929
Newspapers and magazines                          5,964
Professional charges                             27,619
Office furniture                                  5,646
Leave with wages                                  7,095
Telephone expenses                              1,75,338
Salary to partners                             14,60,000
Vehicle maintenance                              72,347
Sundry expenses                                  84,809
Salary to staff                                 2,59,203
Cost Of Goods Sold                                          21,86,205        7.28
SELLING AND DISTRIBUTION
Advertisement expenses                           3,410
Traveling expenses                             1,82,480
Sales Promotion expenses                         5,500
Packing charges                                4,97,360      6,88,750
Cost Of Sales                                               4,30,52,78      143.50
                                                                 1
PROFIT                                                      52,81,095        17.6

SALES                                                       4,83,33,87       161.1
                                                                6

          CALCULATION OF COST PER UNIT BY ACTIVITY BASED
                            COSTING
    1) Purchase of Raw material



                              Babasabpatilfreeppt.com                         38
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”


 a) Raw material transport charges :
   Weight of the goods 5000kgs (for the specified component) of sheet metal
 Delivered from R.C Nagar Belgaum to Akash industries Belgaum = Rs.600.00
Activity                      Sub Activity                  Cost Driver
Purchase                      Raw material transport        Weight of product
                              Loading and unloading         Weight of product
                              Storage                       Weight of product
                              Material cost                 Weight of product


 Therefore charges per unit                  = Rs600/5000kgs
                                              = Rs0.12/kg
 Cost of per cover                            =1.42kg x Rs0.12
                                              =Rs0.1704/cover


 b) Loading and unloading Charges            = Rs300.00/ton


     5 Ton x Rs300                           = Rs1500.00
     Therefore charges for per unit          = Rs1500/5000kgs
                                             = Rs0.20/kg
     Cost per cover                          =1.42 x Rs0.20
                                             =Rs0.284/cover




 c) Storage charges                          = space required 10 x 5ft
     Rent 20000/month
     Building area                           = 10000sq ft
     Storage Cost                            =50sq ft x Rs2.00
                                             =Rs100.00/- p.m
     Storage cost per day                    =Rs100/26Days


                            Babasabpatilfreeppt.com                             39
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
                                         =Rs3.84/day
     Storage cost per Cover              =Rs3.84/1000Covers
                                         =Rs0.00384/cover


 d) Material cost                        = 5000kgs x Rs 71.28 (exclusive of
                                            transport and loading and unloading
                                            charges)
                                         = Rs3,56,400
                                         =5000kgs/1.42wt per kg
                                         =3521 Covers
                                         =Rs3,56,400/3521 Covers
                                         =Rs101.22 – scrap
                                         =Rs101.22– Rs6.5
                                         =Rs94.72/cover




Total cost incurred for purchase of raw material


         Activity                   Sub Activity                        Cost
         Purchase               Raw material transport             Rs0.1704/cover
                                Loading and unloading               Rs0.284/cover
                                       Storage                    Rs0.00384/cover
                                    Material cost                  Rs 94.72/cover
                                                   Total              Rs95.17



2) Manufacturing cost




                          Babasabpatilfreeppt.com                             40
“Activity Based Costing as a measure of improving the cost structure at Akash
                                    industries”




Process     labor   Wages      Hours   Number       Cost of    Hp per Space         Cost
        Activity                  Sub Activity                Activity Driver
                    per day                  of     Machine machine man and
                                                        Combination of occupie      per sq
    Manufacturing                     Shearing
                                          Covers        machine hour d by the       ft
                                                        Combination of man and
                                  Circleper 8 hrs
                                         cutting                       machine
Shearing        3   300/wor       8       1000      500000
                                                        machine hour 100 sq ft
                                                                5                   Rs2
                                                        Combination of man and
                     ker          Deep drawing
                                                        machine hour
 Circle         1    150          8       800       100000     0.5     50 sq ft     Rs 2
                                                        Combination of man and
                                    Trimming
 cutting                                                machine hour
                                                        Combination of man and
 Deep           2    150          8 Piercing
                                          800       800000
                                                        machine hour 100sq ft
                                                                7                   Rs 2
drawing              &135
                                                                         80sq ft    Rs 2
Trimming        1    150          8        500      300000       3

Piercing        1    150          8        900      400000       3       50 sq ft   Rs 2




                                  COST OF EACH PROCESS


  1) Shearing


             a) Man cover rate:            = wages/number of Covers
                                           = Rs900/1000Covers
                                           = 0.9/Cover rate


             b) Machine cover rate         =cost of machine x depreciation
                                           =Rs500000 x 10% depreciation
                                           =Rs50000 p.a
                                           =Rs50000/300days
                                           = Rs166.6per day

                           Babasabpatilfreeppt.com                           41
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”
                                         =Rs166.6/1000Covers
                                         =Rs0.17/Cover


         c) Space occupied by            = 100 Sq ft x Rs 2 per sq ft
             the machine
                                         = Rs200 p.m
                                         = Rs200/26days
                                         =Rs7.69/day
                                         =Rs7.69/1000Covers
                                         =Rs 0.00769/Cover


         d) calculation of electricity
             Monthly electricity bill       = 31,266
             Monthly power consumption = 45hp
             Therefore,
             Rs31,266/45hp = Rs694.8 per hp/ month




         Power Consumption               = 5hp
         For 5hp = Rs694.8 x 5hp         = Rs3,474
         Electricity bill per month      = Rs3474.00
                                         = Rs3474/26days
                                         =133.61/day
                                         =133.61/1000
                                         =Rs0.1336/Cover


          Fuel oil & lubricants          = Rs1,58,028 p.a
                                         = Rs 158028/ 300days
                                         = Rs 526.76/day
                                         = Rs 526.76/25machines
                                         =Rs21.07/machine


                      Babasabpatilfreeppt.com                           42
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
                                             =21.07/1000Covers
                                            =0.021/Cover




Total Cost of shearing activity


         Activity                     Sub Activity                       Cost
         Shearing                    Man cover rate                    Rs0.9/cover
                                   Machine cover rate                Rs0.17/cover
                                  Space occupied by the             Rs0.00769/cover
                                          machine
                                         electricity                  Rs0.1336/cover
                                    Fuel oil & lubricants             Rs0.021/cover
                                                       Total          Rs 1.232/cover




   2. Circle cutting


                a) Man cover rate                  =wages/number of Covers
                                                   = Rs150/800Covers
                                                   =Rs0.1875/Cover


                b) Machine cover rate              =Rs100000 x 10% depreciation
                                                   =Rs10000 p.a
                                                   =Rs 10000/300days
                                                   =Rs33.33/per day
                                                   =Rs33.33/800Covers
                                                   =Rs0.0416/Cover


                c) Space occupied by              = 50Sq ft x Rs 2 per sq ft
                    the machine
                                                  = Rs100 p.m


                           Babasabpatilfreeppt.com                             43
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”
                                              = Rs100/26days
                                              =Rs3.84/day
                                              =Rs3.84/800Covers
                                              =Rs 0.0048/Cover


         e) calculation of electricity
             Monthly electricity bill      = Rs31,266
             Monthly power consumption = 45hp
             Therefore,
             Rs31,266/45hp = Rs694.8 per hp/ month




         Power Consumption                  = 0.5hp
         For 0.5hp = Rs694.8 x 0.5hp        = Rs347.4
         Electricity bill per month      = Rs347.4
                                         = Rs347.4/26days
                                         =13.36/day
                                         =13.36/800Covers
                                         =Rs0.0167/Cover


          Fuel oil & lubricants          = Rs1,58,028 p.a
                                         = Rs 158028/ 300days
                                         = Rs 526.76/day
                                         = Rs 526.76/25machines
                                         =Rs21.07/machine
                                         =21.07/800Covers
                                         =0.026/Cover




                      Babasabpatilfreeppt.com                        44
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”


Total Cost of circle cutting activity


         Activity                       Sub Activity                       Cost
       Circle cutting                  Man cover rate                  Rs0.1875/cover
                                     Machine cover rate               Rs0.0416/cover
                                    Space occupied by the             Rs0.0048/cover
                                          machine
                                         electricity                  Rs0.0167/cover
                                    Fuel oil & lubricants             Rs0.026/cover
                                                       Total          Rs0.2766/cover




3. Deep drawing


                 a) Man hour rate                   =wages/number of Covers
                                                    = Rs285/800Covers
                                                    =Rs0.3562/Cover


                 b) Machine hour rate               =Cost of machine x Depreciation
                                                   =Rs800000 x 10% depreciation
                                                    =Rs80000 p.a
                                                    = Rs80000/300days
                                                    =Rs266.67/per day
                                                    =Rs266.67/800Covers
                                                    =Rs0.333/Cover


                  c) Space occupied by             = 100Sq ft x Rs 2 per sq ft
                   the machine
                                                  = Rs200 p.m
                                                  = Rs200/26days
                                                  =Rs7.69/day
                                                  =Rs7.69/800Covers


                            Babasabpatilfreeppt.com                              45
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
                                                    =Rs0.0096/Cover


               d) calculation of electricity
                 Monthly electricity bill        = Rs31,266
                 Monthly power consumption = 45hp
                 Therefore,
                 Rs31,266/45hp = Rs694.8 per hp/ month




             Power Consumption                 = 7hp
             For 7hp = Rs694.8 x 7hp           = Rs4863.6
             Electricity bill per month        = Rs4863.6
                                               = Rs4863.6/26days
                                               =187.06/day
                                               =187.06/800Covers
                                               =Rs0.233/Cover


              Fuel oil & lubricants            = Rs1,58,028 p.a
                                               = Rs 158028/ 300days
                                               = Rs 526.76/day
                                               = Rs 526.76/25machines
                                               =Rs21.07/machine
                                               =21.07/800Covers
                                               =0.026/Cover




Total Cost of deep drawing activity


        Activity                      Sub Activity                          Cost
      Deep Drawing                    Man cover rate                    Rs0.3562/cover

                          Babasabpatilfreeppt.com                               46
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”
                                  Machine cover rate               Rs0.333/cover
                                 Space occupied by the             Rs0.0096/cover
                                        machine
                                       electricity                 Rs0.233/cover
                                  Fuel oil & lubricants            Rs0.026/cover
                                                     Total        Rs 0.9578/cover




4. Trimming


              a) Man hour rate                   =Wages/number of Covers
                                                 = Rs150/500Covers
                                                 =Rs0.3/Cover


              b) Machine hour rate               =Cost of machine x depreciation
                                                 =Rs300000 x 10% depreciation
                                                 =Rs30000 p.a
                                                 = Rs30000/300days
                                                 =Rs100/per day
                                                 =Rs100/500Covers
                                                 =Rs0.2/Cover


              c) Space occupied by              = 80Sq ft x Rs 2 per sq ft
                the machine
                                                = Rs160 p.m
                                               = Rs160/26days
                                               =Rs6.15/day
                                               =Rs6.15/500Covers
                                               =Rs 0.012/Cover


              d) calculation of electricity


                         Babasabpatilfreeppt.com                             47
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
                 Monthly electricity bill          = Rs31,266
                 Monthly power consumption         = 45hp
                 Therefore,
                  Rs31,266/45hp = Rs694.8 per hp/ month




              Power Consumption              = 3hp
              For 3hp = Rs694.8 x 3hp       = Rs2084.4
            Electricity bill per month      = Rs2084.4
                                            = Rs2084.4/26days
                                            =80.16/day
                                            =80.16/500Covers
                                            =Rs0.16/Cover


              Fuel oil & lubricants         = Rs1,58,028 p.a
                                            = Rs 158028/ 300days
                                            = Rs 526.76/day
                                            = Rs 526.76/25machines
                                            =Rs21.07/machine
                                             =21.07/500Covers
                                            =0.042/Cover


Total Cost of trimming activity


          Activity                    Sub Activity                       Cost
         Trimming                    Man cover rate                    Rs0.3/cover
                                   Machine cover rate                Rs0.125/cover
                                  Space occupied by the              Rs0.012/cover
                                          machine
                                         electricity                 Rs0.16/cover


                          Babasabpatilfreeppt.com                            48
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”
                                  Fuel oil & lubricants              Rs0.042/cover

                                                     Total          Rs 0.639/cover




5. Piercing


              a) Man hour rate
                                                  =Rs 150/900Covers
                                                  =0.166/Cover


              b) Machine hour rate                =400000 x 10% depreciation
                                                  =40000 p.a
                                                  = 40000/300days
                                                  =133.33/per day
                                                  =133.33/900Covers
                                                  =0.148/Cover


              c) Space occupied by               = 50Sq ft x Rs 2 per sq ft
                the machine
                                                 = Rs100 p.m
                                                = Rs100/26days
                                                =Rs3.84/day
                                                =Rs3.84/900Covers
                                                =Rs 0.0042/Cover


              d) calculation of electricity
               Monthly electricity bill       = Rs31,266
               Monthly power consumption = 45hp
               Therefore,

                         Babasabpatilfreeppt.com                              49
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
                     Rs31,266/45hp = Rs694.8 per hp/ month




              Power Consumption              = 3hp
              For 3hp = Rs694.8 x 3hp       = Rs2084.4
             Electricity bill per month     = Rs2084.4
                                            = Rs2084.4/26days
                                            =80.16/day
                                            =80.16/900Covers
                                            =Rs0.089/Cover


               Fuel oil & lubricants        = Rs1,58,028 p.a
                                            = Rs 158028/ 300days
                                            = Rs 526.76/day
                                            = Rs 526.76/25machines
                                            =Rs21.07/machine
                                             =21.07/900Covers
                                            =0.023/Cover


Total Cost of piercing activity


          Activity                     Sub Activity                      Cost
          Piercing                    Man cover rate                  Rs0.166/cover
                                    Machine cover rate               Rs0.148/cover
                                   Space occupied by the             Rs0.042/cover
                                          machine
                                         electricity                 Rs0.089/cover
                                    Fuel oil & lubricants            Rs0.023/cover
                                                       Total         Rs0.468/cover



                            Babasabpatilfreeppt.com                          50
“Activity Based Costing as a measure of improving the cost structure at Akash
                                    industries”




       Activity                Sub Activity                    Cost

     Manufacturing               Shearing                  Rs1.232/cover
                               Circle cutting             Rs0.2766/cover
                               Deep drawing               Rs 0.9578/cover
                                Trimming                  Rs 0.639/cover
                                 Piercing                  Rs0.468/cover
                                                Total     Rs3.5734/cover


Total Cost of the processes




                        Babasabpatilfreeppt.com                         51
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
3) Inspection


Inspection rate 10% of number of units produced per day
1000Covers x 10% = 100Covers to be inspected


                1) Salary of the inspector           = Rs8000/month
                   Time required to inspect          = 1 hour
                   Per day salary                     = Rs8000/26days
                                                     =Rs307.69/day
                   Per hour salary                   =Rs 307.69/8hRs
                                                    = Rs 38.46/hr
                  Wages to the inspector            = 1hr x Rs38.46
                                                    = Rs38.46/hr




            2) Cost of instruments required to inspect = Rs 8500
                 Expected life of instrument is one year
                 Instruments charges per month             = Rs8500/12months
                                                           = Rs708.33/month
                Per day charges                            = Rs708.33/26 days
                                                           = Rs 27.24/day
                Per hour charges                           = Rs27.24/8hrs
                                                           = Rs3.4/hr




                            Babasabpatilfreeppt.com                             52
“Activity Based Costing as a measure of improving the cost structure at Akash
                                      industries”


           3) Calibration charges per year        = Rs900
               Per month charges                  = Rs900/12months
                                                  = Rs75/month
               Per day charges                    = Rs75/26days
                                                  = Rs3/day
               Per hour charges                   = Rs3/8hr
                                                  =Rs0.375/hr


 Total of inspection activity


          Activity                      Sub Activity                      Cost
         Inspection                Salary of the inspector              Rs38.46/hr
                                   instruments required to
                                                                        Rs3.4/hr
                                         inspect
                                        Calibration                    Rs0.375/hr
                                                      Total            Rs42.23/hr
                                         Cost of Per Cover           Rs 0.0422/cover




4) Painting
.

                            Babasabpatilfreeppt.com                           53
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”
         1) Cost of paint and thinner
            Paint Rs250/ltr
            Thinner Rs150/ltr
            Divided in the ratio of 75:25
            Cost of Paint            = Rs250 x 75/100
                                      =Rs 187.5
            Cost of Thinner          = Rs150 x 25/100
                                      =Rs 37.5
            Cost of mixture total     = Rs187.5 + Rs37.5
                                      = Rs225
      Total Area of component covered by the mixture is 45 sq ft
     Area of the a component        = 1.72 sq ft
     Covers that can be painted = 45sq ft/1.72sq ft
                                = 26Covers
     Cost of paint per cover    =Rs225/ 26Covers
                                = Rs8.6/Cover


          2) Labour cost
            People required for painting      =2
            Wages per day                     = Rs 320
            Covers painted in one day        = 200 Covers
            Cost per cover                   = Rs320/200covers
                                            =Rs1.6/cover




         3) Paint booth operation cost       = Rs300000


            Deprecation               = 20% of the cost


                     Babasabpatilfreeppt.com                         54
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”
                                   =Rs 300000 x 20%
                                   = Rs60000p.a
           Per month               = Rs60000/12months
                                   =Rs5000p.m
           Per day                 = Rs5000/26days
                                   = Rs192.3/day
           Cost of per covers      =Rs 192.3/200Covers
                                   =Rs0.961/Cover


          4) Power charges Rs 5500/month
            Total Power consumption         =20hp
             Therefore,
             Rs5500/20hp                    =Rs275per hp/month
            Power consumption               =5hp
            For 5hp                          =5hp x Rs275
            Electricity bill per month for 5hp =Rs1375
             Per day charges                 = Rs1375/26days
                                             = Rs53/day
             Per cover charges               =Rs53/200Covers
                                             =Rs0.265/Cover




           5) Area of painting booth        = 60 x 20ft
                Rent                        = 20000 p.m
                Built area                  = 10000sq ft


                       Babasabpatilfreeppt.com                       55
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
                     Rent per sq ft                     = Rs30000/10000sq ft
                                                        = Rs3/sq ft/month
                     Cost of area                       = 1200sq ft x Rs3
                                                        = Rs 3600
                     Per day charges                    =Rs3600/26
                                                        = Rs138.46/day
                     Per cover                          =Rs138.46/200Covers
                                                        = Rs0.692/Cover


                Area of the Cover = 1.72sq ft
                Cost of per cover = Rs12.11 x 1.72sq ft
                                      = Rs20.82/cover




Total cost of painting activity


         Activity                        Sub Activity                         Cost
         Painting                 Cost of paint and thinner                   Rs8.6
                                          Labour cost                        Rs1.6
                                  Paint booth operation cost                Rs0.961
                                        Power charges                       Rs0.265
                                   Area of painting booth                   Rs0.692
                                                        Total             Rs12.11/sq ft
                                           Cost of Per Cover              Rs20.82/cover




5) Dispatching


            1) Packing charges :
               Packing material required: ---
               Cost of wooden box = Rs 3000 (inclusive transportation cost, taxes)
                Cost of plastic wire = Re 1.50/Cover
                Cost of paper = Re1.00/Cover


                           Babasabpatilfreeppt.com                                56
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
                Number of Covers packed per box = 200 covers
                Rs3000 + (Re1.50 x 200) + (Re1.00 x 200) = Rs3500


            2) labour
              People required = 3
              5 boxes packed per day
              Wages                 = Rs200 + Rs150 + Rs150
                                    = Rs500/day
               Wages per box        = Rs500/5boxes
                                    = Rs100/box
                Total               =Rs 3500 + Rs100
                                    = Rs 3600
                Per Cover           = Rs3600/200Cover
                                    =Rs18/Cover




Total of dispatching Activity


         Activity                      Sub Activity                    Cost
        Despatching                   Packing charges                 Rs3500
                                          labour                      Rs100
                                                        Total       Rs3600/box
                                                                    Rs18/Cover
                                           Cost Per Cover


                        COST PER UNIT OF THE PRODUCT




                            Babasabpatilfreeppt.com                       57
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”

                                               Amount      COST/COVER
                   ACTIVITIES
                                                 in Rs       Amt in Rs
1      PURCHASE OF RAW MATERIALS                              95.017
2      MANUFACTURING
       Shearing                                  1.232
       Circle cutting                           0.2766
       Deep drawing                             0.9578
       Trimming                                  0.639
       Piercing                                  0.468
                                                Total          3.5734
3      INSPECTION                                              0.0422
4      PAINTING                                                 19.90
5      DESPATCHING                                              18.00
                                       GRAND TOTAL             136.68




                     Babasabpatilfreeppt.com                         58
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”




                          FINDINGS




                                   FINDINGS


1. Akash Industries are specialized in deep drawn components that cater the electrical,

   elevator, home appliances automobile industry and the defense.

2. Akash Industries follows traditional method of costing.

3. The product UC Range series 4 end cover is over costed.



                       Babasabpatilfreeppt.com                            59
“Activity Based Costing as a measure of improving the cost structure at Akash
                                  industries”
4. According to traditional costing the cost of the cover is Rs.143.50

5. According to Activity Based costing the cost of the cover is Rs136.68

6. According to costing followed by Akash Industries they first identify the cost then

   they go for producing the product rather than identifying the activities first.

7. Appropriate variable overheads are identified to individual products through ABC.

8. All levels of activities in the manufacturing cost hierarchy viz unit level, batch level,

   product level and facility level have been identified.

9. Cost drivers for the activities have been identified.

10. Akash Industries relates overheads to cost centers which are not realistic to the

   behavior of costs.

11. To get a realistic analysis of cost behavior, the overheads have been properly related

   to cost drivers.




                         Babasabpatilfreeppt.com                               60
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”




                  SUGGESTIONS




                                 SUGGESTIONS

1. Akash Industries should adopt Activity Based costing in their organization.

2. As ABC integrates well with Six Sigma and continuous improvement programs the

   company can achieve minimum rejection rate.

3. To arrive at the actual cost of the product, overheads should not be directly assigned

   to the cost center which is basically done in traditional costing.

4. Instead of focusing more on cost reduction they should focus more on cost control.


                        Babasabpatilfreeppt.com                             61
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”
5. Akash Industries can adopt cost control strategy where in the company can begin by

   evaluating non-labor expenses which can be controlled.

6. Labor and employment costs are a source of considerable expense and should be

   constantly monitored.

7. If it is possible to amalgamate two jobs into one, make some jobs part time, use

   temporary contract labor, outsourcing to specialists, consider if some other choice of

   labor cost saving is available.

8. Akash Industries should follow an open style with clear and concise objective for the

   successful implementation of ABC.

9. Organization-wide awareness should be extended to convince the participants to

   change, as well as effecting the change.

10. Overheads are part of running a business but can be controlled. Everything from

   cleaning materials to the cost of vehicle operation , machine maintenance,

   consumable materials and staff employment costs can, and must be kept as low as

   possible.




                        Babasabpatilfreeppt.com                             62
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”




                        CONCLUSION




                                    CONCLUSION

ABC utilizes the activity concept and by using the activities, ABC can successfully link the
product costs to production knowledge. How a product is produced, how much time is
needed to perform an activity and finally how much money is absorbed by performing this
task are answered by the help of ABC studies. This method is a dynamic tool for continuous
improvement. With ABC to its benefit, any enterprise will have a built in competitive cost
advantage and can continuously add value to both its stakeholders and customers.




                           Babasabpatilfreeppt.com                             63
“Activity Based Costing as a measure of improving the cost structure at Akash
                                     industries”
Therefore, Activity-Based Costing measures the costs and profits of an organization based
on the activities performed within that organization. By focusing on processes that contribute
to revenues and business operations, ABC can accurately determine how each process relates
back to specific products, customers, or services. This can make a big difference after
considering warehouse, sales, customer service, administration and other costs that are often
applied at a standard rate, if at all. With ABC you can drill into profitability and performance
by almost any factor you can think of.




                                    BIBLOGRAPHY
                             Babasabpatilfreeppt.com                               64
“Activity Based Costing as a measure of improving the cost structure at Akash
                                 industries”




                              BIBLOGRAPHY



      Books        :     1) COST ACCOUNTING for BUSINESS
                             MANAGERS by Asish K Bhatacharyya.

                          2) COST ACCOUNTING by I M Pandey


        Websites :         babasabpatilfreeppt.com


                        Babasabpatilfreeppt.com                      65

More Related Content

What's hot

Activity base costing.pptx presentation
Activity base costing.pptx presentationActivity base costing.pptx presentation
Activity base costing.pptx presentation
Tanweer Sudhan
 
Activity Based Costing System
Activity Based Costing SystemActivity Based Costing System
Activity Based Costing System
Amar Keshari
 
Comparative study of customer satisfaction toward performance of hero honda ...
Comparative study of customer satisfaction toward performance of hero honda  ...Comparative study of customer satisfaction toward performance of hero honda  ...
Comparative study of customer satisfaction toward performance of hero honda ...
Tripurary Mishra
 

What's hot (20)

ACTIVITY BASED COSTING
ACTIVITY BASED COSTINGACTIVITY BASED COSTING
ACTIVITY BASED COSTING
 
Strategic Cost Management
Strategic Cost ManagementStrategic Cost Management
Strategic Cost Management
 
Method of costing
Method of costingMethod of costing
Method of costing
 
Strategic Cost Management
Strategic Cost ManagementStrategic Cost Management
Strategic Cost Management
 
Case study on Cost Accounting
Case study on Cost AccountingCase study on Cost Accounting
Case study on Cost Accounting
 
Marginal Costing
Marginal CostingMarginal Costing
Marginal Costing
 
Budgetory control
Budgetory control Budgetory control
Budgetory control
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Activity base costing.pptx presentation
Activity base costing.pptx presentationActivity base costing.pptx presentation
Activity base costing.pptx presentation
 
Activity Based Costing System
Activity Based Costing SystemActivity Based Costing System
Activity Based Costing System
 
Tools and techniques of cost reduction
Tools and techniques of cost reductionTools and techniques of cost reduction
Tools and techniques of cost reduction
 
Ratio analysis project
Ratio analysis project Ratio analysis project
Ratio analysis project
 
Budgetary control final ppt
Budgetary control  final pptBudgetary control  final ppt
Budgetary control final ppt
 
Idbi bank
Idbi bankIdbi bank
Idbi bank
 
A Study of business analysis oil & Natural Gas Corporation RJ Capital Oversea...
A Study of business analysis oil & Natural Gas Corporation RJ Capital Oversea...A Study of business analysis oil & Natural Gas Corporation RJ Capital Oversea...
A Study of business analysis oil & Natural Gas Corporation RJ Capital Oversea...
 
Comparative study of customer satisfaction toward performance of hero honda ...
Comparative study of customer satisfaction toward performance of hero honda  ...Comparative study of customer satisfaction toward performance of hero honda  ...
Comparative study of customer satisfaction toward performance of hero honda ...
 
Activity-Based Costing System
Activity-Based Costing SystemActivity-Based Costing System
Activity-Based Costing System
 
PROJECT ON WORKING CAPITAL MANAGEMENT
PROJECT ON WORKING CAPITAL MANAGEMENTPROJECT ON WORKING CAPITAL MANAGEMENT
PROJECT ON WORKING CAPITAL MANAGEMENT
 
Target Costing
Target CostingTarget Costing
Target Costing
 
Job costing 3 a
Job costing 3 aJob costing 3 a
Job costing 3 a
 

Similar to A project report on activity based costing as a measure of improving the cost structure

Responsive supply chin_a_competitive_stategy_in_a_networked_economy(1)
Responsive supply chin_a_competitive_stategy_in_a_networked_economy(1)Responsive supply chin_a_competitive_stategy_in_a_networked_economy(1)
Responsive supply chin_a_competitive_stategy_in_a_networked_economy(1)
Dr Lendy Spires
 
Responsive supply chin_a_competitive_stategy_in_a_networked_economy
Responsive supply chin_a_competitive_stategy_in_a_networked_economyResponsive supply chin_a_competitive_stategy_in_a_networked_economy
Responsive supply chin_a_competitive_stategy_in_a_networked_economy
Dr Lendy Spires
 
A04010 02 0107
A04010 02 0107A04010 02 0107
A04010 02 0107
IJMER
 

Similar to A project report on activity based costing as a measure of improving the cost structure (20)

Gis on vikash industry
Gis on  vikash industryGis on  vikash industry
Gis on vikash industry
 
Review on Smart Supply Chain Management
Review on Smart Supply Chain ManagementReview on Smart Supply Chain Management
Review on Smart Supply Chain Management
 
Ksb
KsbKsb
Ksb
 
D04942231
D04942231D04942231
D04942231
 
ARC's Sal Spada Packaging Machinery Presentation @ ARC Industry Forum 2010
ARC's Sal Spada Packaging Machinery Presentation @ ARC Industry Forum 2010ARC's Sal Spada Packaging Machinery Presentation @ ARC Industry Forum 2010
ARC's Sal Spada Packaging Machinery Presentation @ ARC Industry Forum 2010
 
Apec
ApecApec
Apec
 
ARC Operational Excellence Forum in Orlando Highlights
ARC Operational Excellence Forum in Orlando HighlightsARC Operational Excellence Forum in Orlando Highlights
ARC Operational Excellence Forum in Orlando Highlights
 
Saurabh kumar 03 scm presentation
Saurabh kumar 03 scm presentationSaurabh kumar 03 scm presentation
Saurabh kumar 03 scm presentation
 
Asset-as-a-Service: Transforming Industry 4.0
Asset-as-a-Service: Transforming Industry 4.0Asset-as-a-Service: Transforming Industry 4.0
Asset-as-a-Service: Transforming Industry 4.0
 
Abb
AbbAbb
Abb
 
Auto Industry Leverages OAGi Integration Standards
Auto Industry Leverages OAGi Integration StandardsAuto Industry Leverages OAGi Integration Standards
Auto Industry Leverages OAGi Integration Standards
 
Responsive supply chin_a_competitive_stategy_in_a_networked_economy(1)
Responsive supply chin_a_competitive_stategy_in_a_networked_economy(1)Responsive supply chin_a_competitive_stategy_in_a_networked_economy(1)
Responsive supply chin_a_competitive_stategy_in_a_networked_economy(1)
 
Responsive supply chin_a_competitive_stategy_in_a_networked_economy
Responsive supply chin_a_competitive_stategy_in_a_networked_economyResponsive supply chin_a_competitive_stategy_in_a_networked_economy
Responsive supply chin_a_competitive_stategy_in_a_networked_economy
 
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
 
TCIOceania15 Advanced Manufacturing - Opportunities and Risks
TCIOceania15 Advanced Manufacturing - Opportunities and RisksTCIOceania15 Advanced Manufacturing - Opportunities and Risks
TCIOceania15 Advanced Manufacturing - Opportunities and Risks
 
An Experimental Investigation of Capacity Utilization in Manufacturing Indus...
An Experimental Investigation of Capacity Utilization in  Manufacturing Indus...An Experimental Investigation of Capacity Utilization in  Manufacturing Indus...
An Experimental Investigation of Capacity Utilization in Manufacturing Indus...
 
Make in India- Whitepaper, ANSYS
Make in India- Whitepaper, ANSYSMake in India- Whitepaper, ANSYS
Make in India- Whitepaper, ANSYS
 
Heavy Asset Supply Chain Management
Heavy Asset Supply Chain ManagementHeavy Asset Supply Chain Management
Heavy Asset Supply Chain Management
 
A04010 02 0107
A04010 02 0107A04010 02 0107
A04010 02 0107
 
sampurna enterprises ppt (3).pptx
sampurna enterprises ppt (3).pptxsampurna enterprises ppt (3).pptx
sampurna enterprises ppt (3).pptx
 

More from Babasab Patil

Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Babasab Patil
 
Marketing management module 4 measuring andforecasting demand mba 1st sem by...
Marketing management module 4  measuring andforecasting demand mba 1st sem by...Marketing management module 4  measuring andforecasting demand mba 1st sem by...
Marketing management module 4 measuring andforecasting demand mba 1st sem by...
Babasab Patil
 
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Babasab Patil
 
Notes managerial communication 3 business correspondence and report writing ...
Notes managerial communication  3 business correspondence and report writing ...Notes managerial communication  3 business correspondence and report writing ...
Notes managerial communication 3 business correspondence and report writing ...
Babasab Patil
 
Notes managerial communication mod 2 basic communication skills mba 1st sem ...
Notes managerial communication mod 2  basic communication skills mba 1st sem ...Notes managerial communication mod 2  basic communication skills mba 1st sem ...
Notes managerial communication mod 2 basic communication skills mba 1st sem ...
Babasab Patil
 
Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...
Babasab Patil
 
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...
Babasab Patil
 
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)
Babasab Patil
 
Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)
Babasab Patil
 
Marketing management module 1 important questions of marketing mba 1st sem...
Marketing management module 1  important questions of marketing   mba 1st sem...Marketing management module 1  important questions of marketing   mba 1st sem...
Marketing management module 1 important questions of marketing mba 1st sem...
Babasab Patil
 

More from Babasab Patil (20)

Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
Segmentation module 4  mba 1st sem by babasab patil (karrisatte)Segmentation module 4  mba 1st sem by babasab patil (karrisatte)
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
 
Marketing management module 1 core concepts of marketing mba 1st sem by baba...
Marketing management module 1 core concepts of marketing  mba 1st sem by baba...Marketing management module 1 core concepts of marketing  mba 1st sem by baba...
Marketing management module 1 core concepts of marketing mba 1st sem by baba...
 
Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...
 
Marketing management module 4 measuring andforecasting demand mba 1st sem by...
Marketing management module 4  measuring andforecasting demand mba 1st sem by...Marketing management module 4  measuring andforecasting demand mba 1st sem by...
Marketing management module 4 measuring andforecasting demand mba 1st sem by...
 
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
 
Notes managerial communication 3 business correspondence and report writing ...
Notes managerial communication  3 business correspondence and report writing ...Notes managerial communication  3 business correspondence and report writing ...
Notes managerial communication 3 business correspondence and report writing ...
 
Notes managerial communication mod 2 basic communication skills mba 1st sem ...
Notes managerial communication mod 2  basic communication skills mba 1st sem ...Notes managerial communication mod 2  basic communication skills mba 1st sem ...
Notes managerial communication mod 2 basic communication skills mba 1st sem ...
 
Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...
 
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...
 
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)
 
Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)
 
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
Segmentation module 4  mba 1st sem by babasab patil (karrisatte)Segmentation module 4  mba 1st sem by babasab patil (karrisatte)
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
 
Marketing management module 1 important questions of marketing mba 1st sem...
Marketing management module 1  important questions of marketing   mba 1st sem...Marketing management module 1  important questions of marketing   mba 1st sem...
Marketing management module 1 important questions of marketing mba 1st sem...
 
Discovery shuttle processing NASA before launching the rocket by babasab ...
Discovery shuttle processing  NASA   before  launching the rocket by babasab ...Discovery shuttle processing  NASA   before  launching the rocket by babasab ...
Discovery shuttle processing NASA before launching the rocket by babasab ...
 
Corporate lessons from__iim__calcutta by babasab patil
Corporate lessons from__iim__calcutta by babasab patil Corporate lessons from__iim__calcutta by babasab patil
Corporate lessons from__iim__calcutta by babasab patil
 
Communication problems between men and women by babasab patil
Communication problems between men and women by babasab patil Communication problems between men and women by babasab patil
Communication problems between men and women by babasab patil
 
Brasil waterfall byy babasab patil
Brasil waterfall  byy babasab patil Brasil waterfall  byy babasab patil
Brasil waterfall byy babasab patil
 
Best aviation photography_ever__bar_none by babasab patil
Best aviation photography_ever__bar_none by babasab patil Best aviation photography_ever__bar_none by babasab patil
Best aviation photography_ever__bar_none by babasab patil
 
Attitude stone cutter
Attitude stone cutterAttitude stone cutter
Attitude stone cutter
 
Attitude stone cutter
Attitude stone cutterAttitude stone cutter
Attitude stone cutter
 

Recently uploaded

Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Recently uploaded (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 

A project report on activity based costing as a measure of improving the cost structure

  • 1. “Activity Based Costing as a measure of improving the cost structure at Akash industries” INDEX Sr.No. CONTENTS Page No. 1 Executive summary 1-2 2 Industry Profile 3-5 3 Organization profile 6-8 4 History of Akash Industries 9-12 5 Company at a glance 13-18 6 Research Methodology 19-21 7 Data Collection 22-23 8 Conceptual Framework 24-33 10 Analysis 34-57 11 Findings 58-59 12 Suggestions 60-61 13 Conclusion 62-63 14 Bibliography 64-65 Babasabpatilfreeppt.com 1
  • 2. “Activity Based Costing as a measure of improving the cost structure at Akash industries” EXECUTIVE SUMMARY EXECUTIVE SUMMARY A study report on “ACTIVITY BASED COSTING AS A MEASURE OF IMPROVING THE COST STRUCTURE OF AKASH INDUSTRIES”, a project undertaken at AKASH INDUSTRIES BELGAUM. Babasabpatilfreeppt.com 2
  • 3. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Activity-Based Costing (ABC) represents an alternative paradigm to traditional cost accounting system and it often provides more accurate cost information for decision making such as product pricing, product mix, and make-or buy decisions. ABC models the causal relationships between products and the resources used in their production and traces the cost of products according to the activities through the use of appropriate cost drivers. In this project, the costing system followed by Akash Industries is compared with ABC in terms of the effects on the product costs that are carried out to highlight the difference between two costing methodologies. By using this methodology, a valuable insight into the factors that cause the cost is provided, helping to better manage the activities of the company. According to the study, Akash Industries follows traditional method for costing that assigns overheads directly to the product. Cost of the product UC Range series 4 end cover is found out by Activity Based costing and is compared with the traditional method followed by Akash Industries to arrive at the cost of the above product. The study states that the product is being over cost by the company. Akash Industries should go for Activity Based costing as it understands true profitability of the customers, products, or services and also helps in identifying areas where the cost can be reduced or efficiencies can be increased. Babasabpatilfreeppt.com 3
  • 4. “Activity Based Costing as a measure of improving the cost structure at Akash industries” INDUSTRY PROFILE INDUSTRY PROFILE Manufacturing Industry Manufacturing industry refers to those industries which involve in the manufacturing and processing of items and indulge in either creation of new commodities or in value addition. Babasabpatilfreeppt.com 4
  • 5. “Activity Based Costing as a measure of improving the cost structure at Akash industries” The manufacturing industry accounts for a significant share of the industrial sector in developed countries. The final products can either serve as a finished good for sale to customers or as intermediate goods used in the production process. Manufacturing industries are the chief wealth producing sectors of an economy. These industries use various technologies and methods widely known as manufacturing process management. Manufacturing industries are broadly categorized into engineering industries, construction industries, electronics industries, chemical industries, energy industries, textile industries, food and beverage industries, metalworking industries, plastic industries, etc. Manufacturing industries are important for an economy as they employ a huge share of the labor force and produce materials required by sectors of strategic importance such as national infrastructure and defense. However, not all manufacturing industries are beneficial to the nation as some of them generate negative externalities with huge social costs. The cost of letting such industries flourish may even exceed the benefits generated by them. India’s manufacturing base, which is the fourth-largest among emerging economies, is among the fastest growing and has seen more investments as a proportion of gross domestic product than any country except China. Employment opportunities in the manufacturing industry have declined comparatively. Manufacturing industry analysis also suggests that in some countries like China, technological know how has to be developed. Despite the fact that China is ranked fourth in the manufacturing productivity, due to technological lacunae, it is not being able to compete in the world market. Also needed are professionals well versed in the technological know how. The Government has taken several initiatives to accelerate growth in this sector and improve competitiveness of Indian industry in general and manufacturing in particular. • Technology up gradation schemes for various sectors such as small scale industries, textiles, food processing etc.; • Industrial infrastructure up gradation programmes on cluster basis; Babasabpatilfreeppt.com 5
  • 6. “Activity Based Costing as a measure of improving the cost structure at Akash industries” • Easier access to inputs at competitive prices and rationalization and reduction in duty rates. • Encouragement to foreign technology collaborations and liberalization of FDI in manufacturing activities. Babasabpatilfreeppt.com 6
  • 7. “Activity Based Costing as a measure of improving the cost structure at Akash industries” ORGANIZATION PROFILE ORGANIZATIONAL PROFILE Akash Industries, a pioneer in the manufacture of sheet metal pressed components was established in the year 1977. Ever since, it has grown into a big organization with a focus in quality in everything. Babasabpatilfreeppt.com 7
  • 8. “Activity Based Costing as a measure of improving the cost structure at Akash industries” An ISO 9001-2000 Company with a good customer base in the domestic as well as the International market activities of Akash Industries include tool design also with a highly skilled & professional work force, tools is designed for the components as per the customer requirements. Their specialty being the deep drawn components, they cater the electrical, elevator, home appliances automobile industry and the defense. Akash Industries are in it for a long haul with a focus on continual improvement. They are having mechanical presses ranging from 10T to 80T capacity & hydraulic presses ranging from 10T to 250T capacity, out of which 50T, 80T, 160T & 250T hydraulic presses are double acting presses to carry out deep drawing operations. They also use triple acting arrangement for some of these machines to carryout more precision items & to make multiple operations at a time. Apart from this, shearing machine of capacity 3.0mm x 2500mm & 10mm x 2000mm both hydraulically operated are installed for better cutting accuracy. The other relevant machineries such as welding transformers, spot welding, grinding, and circle cutting machines are installed to support our manufacturing activity with maximum productivity. The two material handling equipments for loading & unloading of tools are in place to make setting faster and easier. The separate tool maintenance area to carry out maintenance of tool is provided with surface grinding & drilling machines to attend immediate rectification, such as sharpening of punches & dies. They are equipped with 62 KVA generators to overcome power failure. The painting facility with 7 tank process of components before painting is available. The painting booth & drier for quick drying is also installed to give our customers a complete satisfaction by supplying ready for fitment components. Akash Industry have the pride to have clients from various industries many of them are well - known in the global industrial community. Some of our esteemed clients are as under:- • Cummins Generator Technologies • OTIS Elevator (I) Ltd. • Trident Power craft Pvt. Ltd. • Crompton Greaves Ltd Babasabpatilfreeppt.com 8
  • 9. “Activity Based Costing as a measure of improving the cost structure at Akash industries” • Kaytee Switch Gears Ltd. • IFB India Babasabpatilfreeppt.com 9
  • 10. “Activity Based Costing as a measure of improving the cost structure at Akash industries” HISTORY OF AKASH INDUSTRIES HISTORY OF AKASH INDUSTRIES Akash Industries M-15, Industrial Estate, Udyambag, Belgaum – 590 008 Babasabpatilfreeppt.com 10
  • 11. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Mr. Sadanand T Macha completed his DIPLOMA IN TOOL AND DIE MAKING from NETTUR TECHNICAL TRAINING FOUNDATION, DHARWAR (NTTF). Then he served at Hyderabad Tool Pvt. Ltd, Hyderabad, as a highly skilled Mechanic for a period of one and half years. Because of the climatic conditions he left Hyderabad and came back to Belgaum and joined M/s. Pusalkar Engineers, Belgaum. He started working under Mr. V B Inamdar (Present Partner). It was here that he learnt i.e., from Purchases, Production, Inspection and Despatch, Etc for a period of one and half yeaRs. In M/s Pusalkar Engineers he came in contact with M/s Kirloskar Electric Co. Ltd. Bangalore & Hubli. Having gained the experience and he left M/s Pusalkar Engineers, Belgaum and was idle for 2 to 3 months. Meanwhile Shri V B Inamdar also left M/s Pusalkar Engineers and they both decided to start their own business. In the year 1977, they both started their own business in the name of M/s Akash Industries. They had neither place nor financial support. With a mere Rs. 3000/- they went on to purchase a wielding machine and started in their own garage at Angol ‘C’ scheme. Initially it was only fabrication work that they used to carry out. But with this type of work it was impossible for both of them to meet their ends. By this time 6 months had passed. They really had a tough time and a tougher time to Mr. Inamdar who was married and had 3 childrens. Meanwhile, they felt that they should better join any service. Even to approach somebody for work, they didn’t had the requisite finance. With the help of Mr. Inamdar’s, brother in law, who was working in West Coast Paper Mills Limited Dandeli, they could get an entry. Initially, they gave them maintenance jobs, which they used to get the things from their fellow industrialists and supply the same. Months passed by and they felt that how they can ever survive with this little earning. It was even difficult for them to go by bus and many a times they used to travel by truck to Dandeli, finish their work and again return back to Belgaum, by some means with hardly a few chips in their pockets. This continued for a year and half. It was at this time that Shri A G Tembe, of M/s Ohm Electricals, gave them shelter in his shed at Industrial estate. Here they prolonged their business for 2 years supplying maintenance jobs. Doing fabrication work and even if necessary they used to carry the wielding machine to customers place and carry out the work. Their major problem was finance and how to expand their engineering activities was a big question mark for them. But since they had no shed or own machinery they could not approach the engineering companies. Babasabpatilfreeppt.com 11
  • 12. “Activity Based Costing as a measure of improving the cost structure at Akash industries” However, in the year 1979, they got an Industrial Plot of 10 Guntas from KSSIDC LTD, through the help of Late Shri N A Hanamannavar, the then Chairman of the City Improvement Board. They approached State Bank Of India for financial assistance and it was at this juncture that they really helped them to construct their own shed and purchase of machinery. Their Working capital of Rs. 10,000 was also sanctioned. With the vast experience of Mr. V B Inamdar, I.e of more than 15 years and his previous contacts. They approached M/s KIRLOSKAR ELECTRIC COMPANY LIMITED. BANGALORE and M/s LARSEN & TOUBRO LTD. BANGALORE. Since, their line of activity was only Sheet Metal Components, they could get a good amount of workload. They proved themselves by quality and delivery. More and more work started coming in and somehow they had to meet their urgency with having only few machines. Having got confidence, they expanded their own shed and added few more machines of a higher capacity. They approached M/s CROMPTON GREAVES LTD. AHMEDNAGAR, AUTOMOBILE CORPORATION OF GOA LTD. KIRLOSKAR ELECTRIC CO. HBL PEENYA & PUNE. In a span of two to three years their business increased multifold. Capacity reached a saturated point and they were not in position to meet their high demands and they had to add some higher capacity of Hydraulic Presses converting the same into double acting and triple acting. This increased their supply position. In the year 1984, they started another partnership concern in the name of M/S KARNATAKA METAL PRESSING just near to their existing concern taking Mr. P A Bagewadi and Mr. S K Yatgeri as additional partners. Here their basic activity was only to manufacture Pole bricks of different capacities for alternators. At present their turnover stands at Rs 45 Lakh per month. In the year 1988, they got an order from M/s AMMUNITION FACTORY, PUNE for supplying of Aluminum Cartridge cases purely an import substitute. For this special purpose machines were acquired with the most accurate toolings and precious inspection equipments to meet their highest accuracy and quality. These cartridge cases are used to make Anti Riot Rubber Bullets, which are used by the Police Department during Anti Riots. This was their biggest achievement that they had in their last 29 years. Babasabpatilfreeppt.com 12
  • 13. “Activity Based Costing as a measure of improving the cost structure at Akash industries” AKASH INDUSTRIES major activities are manufacturing of Sheet Metal Pressed Components for Alternator, Motor, Automobile Parts and items required by customers to their required specifications. In the words of Mr. S T Macha “This is all due to hard and sincere work and the backing of our fellow industrialists who have supported us in all our difficult times”. “Our aim is to do sincere and hard work giving more attention to quality and delivery. This is what every one wants in this world of competition”. Babasabpatilfreeppt.com 13
  • 14. “Activity Based Costing as a measure of improving the cost structure at Akash industries” COMPANY PROFILE COMPANY PROFILE Name of the Organization : Akash Industries Type of Industry : Manufacturing Industry. Address : Akash Industries M-15, Industrial Estate, Udyambag, Belgaum – 590 008 Babasabpatilfreeppt.com 14
  • 15. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Partners : S.T Macha V.B Inamdar M.V Inamdar A.S Macha Established : 1977 Size and nature of the company : Sales FY08-09 : Rs48,333,876.81 Employees : 50 QUALITY POLICY AT AKASH INDUSTRIES 1. To meet customers requirement and strive to exceed customer expectations. 2. Manage all activities and related resources as a process. 3. Create and maintain an environment in which personnel are fully involved in achieving organization objectives so as to ensure continual improvement and growth. 4. Take decisions and implement necessary actions based upon analysis of data and information. Babasabpatilfreeppt.com 15
  • 16. “Activity Based Costing as a measure of improving the cost structure at Akash industries” 5. Involve all our suppliers in quality improvement process as to ensure mutually beneficial and long time relationship. ORGANIZATION CHART Babasabpatilfreeppt.com 16
  • 17. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Managing partner 1 Managing partner 2 In charge Shop Chief QA/QC Incharge Accountant Incharge Incharge Excise Sales Tax Cashier Management Representative Deputy Management Representative Plant Plant supervisor 2 Supervisor 1 In charge Workers stores PRODUCTS MANUFACTURED BY AKASH INDUSTRIES Babasabpatilfreeppt.com 17
  • 18. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Components are manufactured as per the customer requirements. They are catering at present the industries like electrical, elevators & home appliances, specialization being deep drawn components using C.R. & H.R. as the raw material, with thickness of material varying from 1 mm CRCA to 8mm H.R. LIST OF CUSTOMERS Babasabpatilfreeppt.com 18
  • 19. “Activity Based Costing as a measure of improving the cost structure at Akash industries”  Cummins Generator Technologies, India  Motorsense, U.K  Cummins Generator Technologies, Mexico  Fasco Motors, USA  ABB Ltd, Bangalore  OITS Elevator company, India  Trident Power craft Pvt.Ltd, Hubli  Kirloskar Electric co. Hubli  Mallik Engineering , Bangalore  Telco Construction Equipment, Dharwad Babasabpatilfreeppt.com 19
  • 20. “Activity Based Costing as a measure of improving the cost structure at Akash industries” RESEARCH METHODOLOGY RESEARCH METHODOLOGY Babasabpatilfreeppt.com 20
  • 21. “Activity Based Costing as a measure of improving the cost structure at Akash industries” The Study: The present study is an attempt to understand and ascertain the costing method followed in Akash Industries and to compare it with the costing method Activity Based Costing. Objectives of the study: • To study the functions and operations of the organization • To know and understand the existing costing method followed by Akash Industries. • To identify activities involved in manufacturing of UC Range series 4 end cover. • To identify cost of the activities involved in manufacturing the product UC Range series 4 end cover. • To allocate the cost for the activities. • To find the cost per unit of the product UC Range series 4 end cover. • To compare existing costing method followed by Akash Industries with Activity Based Costing. Scope of the study: The scope of this study is to know and understanding the various processes and activities involved in manufacturing Industries especially in AKASH INDUSTRIES. It involves finding out the cost per unit of the product UC Range series 4 end cover by following Activity based Costing. Need for the study: The theoretical aspects of ACTIVITY BASED COSTING provide the framework of the study. A conceptual and the practical approach is the need of the hour. Hence the field study becomes as essential part of the curriculum. Thus this project study conducted to integrate theoretical and practical aspects of Activity based costing in the organization. DATA COLLECTION Babasabpatilfreeppt.com 21
  • 22. “Activity Based Costing as a measure of improving the cost structure at Akash industries” • Primary Data Following are the sources of primary data collected.  Much of the information was collected from the cost accountant of Akash Industries (Mr.Sunil Kundap) .  Frequent discussions were made with other employees of the company.  Met few senior level executive of the firm. • Secondary Data  Secondary data was collected through last year’s balance sheet of Akash Industries.  Books on cost accounting were referred.  Company website Limitations of the study: • The study is limited to AKASH INDUSTRIES only. • In order to maintain confidentiality some information could not be disclosed by Akash Industries. Babasabpatilfreeppt.com 22
  • 23. “Activity Based Costing as a measure of improving the cost structure at Akash industries” CONCEPTUAL FRAMEWORK ACTIVITY BASED COSTING Babasabpatilfreeppt.com 23
  • 24. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Activity Based Costing (ABC) is an accounting technique that allows an organization to determine the actual cost associated with each product and service produced by the organization without regard to the organizational structure. It is developed to provide more- accurate ways of assigning the costs of indirect and support resources to activities, business processes, products, services, and customers. ABC systems recognize that many organizational resources are required not for physical production of units of product but to provide a broad array of support activities that enable a variety of products and services to be produced for a diverse group of customers. The goal of ABC is not to allocate common costs to products. The goal is to measure and then price out all the resources used for activities that support the production and delivery of products and services to customers. Concept of Activity-Based-Costing: An organization performs activities to do its business. These activities define the kind of business you are in: a ship owner has an activity to unpack boats; an accounting firm prepares tax returns; a manufacturer produces products; a council delivers services; a university teaches students. All activities consume resources. It is the consumption of these resources that adds to overhead costs. The basis of Activity Based Costing is look at the activities required to produce the cost of the product or service. The activities consume resources and the cost of these can be calculated. The amount of activity required for each product and service is determined, hence the real cost can be determined. What's what in ABC? • The activity is the work that is done. Babasabpatilfreeppt.com 24
  • 25. “Activity Based Costing as a measure of improving the cost structure at Akash industries” • The resource is what the activity uses to do the work e.g. people, equipment, and services. Resources cost money. • The cost of the activity depends on the quantity of resources used to accomplish the activity. • The cost driver for an activity is the factor that influences the amount of the resources that will be consumed by this activity. Example: the activity is delivering goods. The costs of this activity include the truck drivers' wages, fuel, depreciation of the truck, insurance, etc. The quantities of the resources that will be consumed by this activity are influenced by the number of deliveries made per year. Hence the cost driver could be the number of deliveries. A cost driver is designed to allocate the delivery activity cost pool to the cost objects. • The activity driver measures how much of the activity is used by the cost object. Example: Product A is delivered once a month, whereas product B is delivered once a week. Products A and B require a different number of deliveries, hence the cost of the delivery activity should be assigned to each product on the basis of the number of deliveries each uses. • The cost object is whatever it is you wish to cost. It could be a product, service, process, job or customer. While traditional costing arbitrarily allocates overhead costs, ABC traces overhead costs by looking at the activities that each product and service calls upon. With ABC the products consume the activities. It is the activities that cost money. Why use Activity-Based-Costing? Babasabpatilfreeppt.com 25
  • 26. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Activity-Based-Costing is necessary for the following reasons.  Understand true profitability of your customers, products, or services  Quantify the cost of non-value added activities such as errors and reworks  Identify opportunities to reduce costs and/or increase efficiency  Obtain actionable information to negotiate price increases for unprofitable clients  Stratify overhead costs so they can be managed more effectively. The ABC framework Babasabpatilfreeppt.com 26
  • 27. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Activity based costing has been claimed as a method of arriving at more accurate costs, often in order to set selling prices. In a market economy, the idea of selling prices based on costs is dangerous, with serious consequences for a business competitive stance. With the variety of conventions and concepts used in cost determination, there are no absolutes in determining product costs, hence the objective of accurate costs is diluted. However, the technique of ABC is being seen more as a cost-distortion alarm; more as an attention directing tool; more as a cost management tool. Activity Based Costing is a methodology for understanding the activities, processes, services and products of a business; understanding what drives the cost of these activities and processes; and thus reducing the non-value-adding activities/processes. The Elements of ABC can be described in the following model: The ABC CROSS: COST ASSIGNMENT VIEW RESOURCES RESOURCE DRIVERS COST ACTIVITIES PERFORMANCE DRIVERS MEASURES ACTIVITY OBJECTS DRIVERS OF WORK Babasabpatilfreeppt.com 27
  • 28. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Resource Drivers are the link between resources and activities assigning cost form the financial statements. Activity Driver is the factor used to assign cost from an activity to a object of work, for instance, if making a sales call is the activity then the frequency of sales calls to a specific customer/client would be the activity driver. Object of Work is the specific objective at the end of a process, for instance, a product, a satisfied customer/client. Cost Drivers are factors that cause changes in the performance of activities and create increased consumption of resource. Fundamentally there are two types of Cost Drivers. The Structural Cost Drivers are viz. Scale, Scope, Experience, Technology and Complexity. The Exceptional Cost Drivers are viz. Work Force Involvement, Total Quality Management, Capacity Utilization, Plant Layout, Electricity, Product Configuration and Exploiting Value Chain Linkages. Activities comprise of units or work or task. For example purchase of raw materials, activities involved in manufacturing etc. Babasabpatilfreeppt.com 28
  • 29. “Activity Based Costing as a measure of improving the cost structure at Akash industries” ABC categorizes the activities into: Unit level activities:  Performed each time a unit is produced.  Consumed in direct proportion to the number of units produced.  E.g. Direct materials, Energy costs, direct labour, etc. Batch related activities:  Performed each time a batch of goods is produced.  Consumed in direct proportion the number of batches produced.  Fixed for all units within a batch.  E.g. set up resources, purchasing resources. Product sustaining activities:  Performed to support and sustain different products/services on the product life cycle.  Consumption varies with the variety of products/services and the stage of the Product Life Cycle the products/services are in.  E.g. designing the product. Facility sustaining activities:  Performed for supporting the happening of the above three types of activities and providing the platform/infrastructure.  These are generally fixed for a certain scale/scope of operations over a period of time.  E.g. Administration, plant maintenance, accounting, etc.  These costs are deducted lump sum from operating margins of all product lines. Babasabpatilfreeppt.com 29
  • 30. “Activity Based Costing as a measure of improving the cost structure at Akash industries” ABC establishes inputs and outputs to and from each activity, Inputs to one activity may be outputs from another and there could also be interactive relationships among activities. Hierarchy of Activities and Activity based profitability analysis Sales Revenue Less: Unit-level products cost (Material, Power Costs, Other identifiable costs) = unit level contribution Less: Batch related costs (Sets-ups, material movements, purchase orders, inspection) = batch – level contribution Less: Product line costs (Process engineering, product specifications, order change notices) = product line contribution Less: Consumer and market related costs = customer level contribution Less: Facility sustaining cost (Plant management , rent , rates, and taxes, etc.,) = net profit Note: Unit level and batch contribution analysis facilitate short-term decision relating to products and complexity analysis. Product line contribution helps in product line decisions. Customer level contribution helps in customer and market related decisions. Facility sustaining cost are period cost are period which are fixed in nature. Babasabpatilfreeppt.com 30
  • 31. “Activity Based Costing as a measure of improving the cost structure at Akash industries” STAGES OR STEPS INVOLVED IN ACTIVITY BASED COSTING. Step 1: Identify the various activities within the organization. Activities comprise of units of work or task. For example purchase of material is an activity consisting of series of task like purchase requisition, advertisement, inviting quotations, identification of suppliers, issuing purchase orders, follow up etc. Step 2: Relate the overheads to the activity using resource cost drivers a) Over heads will be related to support and primary activities. b) For this purpose, resource cost drivers will be used. c) All costs will be identified under the activities, thus creating activity cost pools. Step 3: Apportion the cost to support activities over the primary activities on suitable basis. a) This is very much like reapportionment of service department expenses to production departments. b) Cost of support activities are spread over to primary activities to collect costs only under them. c) The base is the cost driver which is the measure of how the support activities are used. Step 4: Determine the activity cost drivers for activity/cost pools. a) Activity cost drivers used to relate the overheads collected in the cost pools to cost objects should be determined. b) This is based on the factor that drives the consumption of the activity. c) For example, in production scheduling, the driver will be the number of batches ordered. Babasabpatilfreeppt.com 31
  • 32. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Step 5: Calculate Activity cost driver rate = Total cost of activity Activity cost driver a) Activity cost driver rates are computed for each activity. b) The rates will be multiplied by the different amounts of each activity that each product/other cost object consumes so as to ascertain its cost. c) This rate can be used to ascertain cost of the product (as in traditional absorption costing) and to ascertain cost of other cost objects such as customers/customer segments and distribution channels. Babasabpatilfreeppt.com 32
  • 33. “Activity Based Costing as a measure of improving the cost structure at Akash industries” ACTIVITY BASED COSTING ADVANTAGES • More accurate costing of products/services, customers, distribution channels. • Better understanding overheads. • Easier to understand for everyone. • Utilizes unit cost rather than just total cost. • Integrates well with Six Sigma and other continuous improvement programs. • Makes visible waste and non-value added. • Enables costing of processes, supply chains, and value streams • Activity Based Costing mirrors way work is done • Facilitates benchmarking. ACTIVITY BASED COSTING DISADVANTAGES • More time consuming to collect data. • Cost of buying, implementing and maintaining activity based system. • Makes waste visible which some executives and managers don't want their boss to see. Babasabpatilfreeppt.com 33
  • 34. “Activity Based Costing as a measure of improving the cost structure at Akash industries” How does Activity Based Costing differ from traditional cost accounting systems? Most traditional costing systems utilize a single basis, (e.g. direct labor) to distribute the indirect costs to all products and services. This method of allocating indirect costs commonly results in erroneous cost data. Often products which have high volume (and high labor cost) are over costed. Likewise, the cost of lower volume products are often understated, and many of the indirect costs of these products are overlooked. Rather than relying on a single basis to distribute costs, ABC assigns costs to activities and products based on how the costs (resources) are actually consumed by the process or product. By moving away from traditional cost allocation methods and using improved ABC methods of tracing and assignment, ABC provides managers with a clearer picture of cost of processes and the profitability of customers and products. Babasabpatilfreeppt.com 34
  • 35. “Activity Based Costing as a measure of improving the cost structure at Akash industries” ANALYSIS DETAILS OF THE PRODUCT Babasabpatilfreeppt.com 35
  • 36. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Product name: UC Range series 4 end cover Raw Material Requirements for the product 1) Metal sheet of length 1250*2500*1.2mm 2) Weight of the sheet is 30kg 3) 21 Covers can be prepared from one metal sheet. 4) Sheets required to prepare 1000 units is 48sheets. 5) Cost of sheet metal per kg 37Rs. 6) Weight of a Cover = 30kg/21 =1.42kg 7) Gross Material cost per unit = 1.42 x Rs55 = Rs78.1/Cover 8) Process Generated Scrap =0.65 kgs 9) Scrap rate =Rs12/kg 10) Revenue generated from scrap = 0.65 x 10 = Rs 6.5 11) Net material cost = 78.1– 6.5 = Rs71.6 COSTING FOLLOWED BY THE COMPANY Product: UC Range series 4 end cover Number of units produced = 300000 Covers p.a Babasabpatilfreeppt.com 36
  • 37. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Particulars Total Cost/unit cost(in Rs) (in Rs) Babasabpatilfreeppt.com 37
  • 38. “Activity Based Costing as a measure of improving the cost structure at Akash industries” DIRECT COST Direct Material (Raw Material Consumed) 3,05,73,918 Direct Wages 18,93,573 Direct Expenses 45,65,266 Prime Cost 3,70,32,757 123.4 FACTORY OVERHEADS fuel oil & lubricant 1,58,029 Depreciation on machinery 8,04,853 Repairs and maintenance 3,91,235 Insurance 56,147 Rates and Taxes 2,61,532 Indirect material 14,73,273 Factory cost 31,45,069 10.48 ADMINISTRATIVE OVERHEADS Printing and stationary 69,255 Postage and telegram 18,929 Newspapers and magazines 5,964 Professional charges 27,619 Office furniture 5,646 Leave with wages 7,095 Telephone expenses 1,75,338 Salary to partners 14,60,000 Vehicle maintenance 72,347 Sundry expenses 84,809 Salary to staff 2,59,203 Cost Of Goods Sold 21,86,205 7.28 SELLING AND DISTRIBUTION Advertisement expenses 3,410 Traveling expenses 1,82,480 Sales Promotion expenses 5,500 Packing charges 4,97,360 6,88,750 Cost Of Sales 4,30,52,78 143.50 1 PROFIT 52,81,095 17.6 SALES 4,83,33,87 161.1 6 CALCULATION OF COST PER UNIT BY ACTIVITY BASED COSTING 1) Purchase of Raw material Babasabpatilfreeppt.com 38
  • 39. “Activity Based Costing as a measure of improving the cost structure at Akash industries” a) Raw material transport charges : Weight of the goods 5000kgs (for the specified component) of sheet metal Delivered from R.C Nagar Belgaum to Akash industries Belgaum = Rs.600.00 Activity Sub Activity Cost Driver Purchase Raw material transport Weight of product Loading and unloading Weight of product Storage Weight of product Material cost Weight of product Therefore charges per unit = Rs600/5000kgs = Rs0.12/kg Cost of per cover =1.42kg x Rs0.12 =Rs0.1704/cover b) Loading and unloading Charges = Rs300.00/ton 5 Ton x Rs300 = Rs1500.00 Therefore charges for per unit = Rs1500/5000kgs = Rs0.20/kg Cost per cover =1.42 x Rs0.20 =Rs0.284/cover c) Storage charges = space required 10 x 5ft Rent 20000/month Building area = 10000sq ft Storage Cost =50sq ft x Rs2.00 =Rs100.00/- p.m Storage cost per day =Rs100/26Days Babasabpatilfreeppt.com 39
  • 40. “Activity Based Costing as a measure of improving the cost structure at Akash industries” =Rs3.84/day Storage cost per Cover =Rs3.84/1000Covers =Rs0.00384/cover d) Material cost = 5000kgs x Rs 71.28 (exclusive of transport and loading and unloading charges) = Rs3,56,400 =5000kgs/1.42wt per kg =3521 Covers =Rs3,56,400/3521 Covers =Rs101.22 – scrap =Rs101.22– Rs6.5 =Rs94.72/cover Total cost incurred for purchase of raw material Activity Sub Activity Cost Purchase Raw material transport Rs0.1704/cover Loading and unloading Rs0.284/cover Storage Rs0.00384/cover Material cost Rs 94.72/cover Total Rs95.17 2) Manufacturing cost Babasabpatilfreeppt.com 40
  • 41. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Process labor Wages Hours Number Cost of Hp per Space Cost Activity Sub Activity Activity Driver per day of Machine machine man and Combination of occupie per sq Manufacturing Shearing Covers machine hour d by the ft Combination of man and Circleper 8 hrs cutting machine Shearing 3 300/wor 8 1000 500000 machine hour 100 sq ft 5 Rs2 Combination of man and ker Deep drawing machine hour Circle 1 150 8 800 100000 0.5 50 sq ft Rs 2 Combination of man and Trimming cutting machine hour Combination of man and Deep 2 150 8 Piercing 800 800000 machine hour 100sq ft 7 Rs 2 drawing &135 80sq ft Rs 2 Trimming 1 150 8 500 300000 3 Piercing 1 150 8 900 400000 3 50 sq ft Rs 2 COST OF EACH PROCESS 1) Shearing a) Man cover rate: = wages/number of Covers = Rs900/1000Covers = 0.9/Cover rate b) Machine cover rate =cost of machine x depreciation =Rs500000 x 10% depreciation =Rs50000 p.a =Rs50000/300days = Rs166.6per day Babasabpatilfreeppt.com 41
  • 42. “Activity Based Costing as a measure of improving the cost structure at Akash industries” =Rs166.6/1000Covers =Rs0.17/Cover c) Space occupied by = 100 Sq ft x Rs 2 per sq ft the machine = Rs200 p.m = Rs200/26days =Rs7.69/day =Rs7.69/1000Covers =Rs 0.00769/Cover d) calculation of electricity Monthly electricity bill = 31,266 Monthly power consumption = 45hp Therefore, Rs31,266/45hp = Rs694.8 per hp/ month Power Consumption = 5hp For 5hp = Rs694.8 x 5hp = Rs3,474 Electricity bill per month = Rs3474.00 = Rs3474/26days =133.61/day =133.61/1000 =Rs0.1336/Cover Fuel oil & lubricants = Rs1,58,028 p.a = Rs 158028/ 300days = Rs 526.76/day = Rs 526.76/25machines =Rs21.07/machine Babasabpatilfreeppt.com 42
  • 43. “Activity Based Costing as a measure of improving the cost structure at Akash industries” =21.07/1000Covers =0.021/Cover Total Cost of shearing activity Activity Sub Activity Cost Shearing Man cover rate Rs0.9/cover Machine cover rate Rs0.17/cover Space occupied by the Rs0.00769/cover machine electricity Rs0.1336/cover Fuel oil & lubricants Rs0.021/cover Total Rs 1.232/cover 2. Circle cutting a) Man cover rate =wages/number of Covers = Rs150/800Covers =Rs0.1875/Cover b) Machine cover rate =Rs100000 x 10% depreciation =Rs10000 p.a =Rs 10000/300days =Rs33.33/per day =Rs33.33/800Covers =Rs0.0416/Cover c) Space occupied by = 50Sq ft x Rs 2 per sq ft the machine = Rs100 p.m Babasabpatilfreeppt.com 43
  • 44. “Activity Based Costing as a measure of improving the cost structure at Akash industries” = Rs100/26days =Rs3.84/day =Rs3.84/800Covers =Rs 0.0048/Cover e) calculation of electricity Monthly electricity bill = Rs31,266 Monthly power consumption = 45hp Therefore, Rs31,266/45hp = Rs694.8 per hp/ month Power Consumption = 0.5hp For 0.5hp = Rs694.8 x 0.5hp = Rs347.4 Electricity bill per month = Rs347.4 = Rs347.4/26days =13.36/day =13.36/800Covers =Rs0.0167/Cover Fuel oil & lubricants = Rs1,58,028 p.a = Rs 158028/ 300days = Rs 526.76/day = Rs 526.76/25machines =Rs21.07/machine =21.07/800Covers =0.026/Cover Babasabpatilfreeppt.com 44
  • 45. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Total Cost of circle cutting activity Activity Sub Activity Cost Circle cutting Man cover rate Rs0.1875/cover Machine cover rate Rs0.0416/cover Space occupied by the Rs0.0048/cover machine electricity Rs0.0167/cover Fuel oil & lubricants Rs0.026/cover Total Rs0.2766/cover 3. Deep drawing a) Man hour rate =wages/number of Covers = Rs285/800Covers =Rs0.3562/Cover b) Machine hour rate =Cost of machine x Depreciation =Rs800000 x 10% depreciation =Rs80000 p.a = Rs80000/300days =Rs266.67/per day =Rs266.67/800Covers =Rs0.333/Cover c) Space occupied by = 100Sq ft x Rs 2 per sq ft the machine = Rs200 p.m = Rs200/26days =Rs7.69/day =Rs7.69/800Covers Babasabpatilfreeppt.com 45
  • 46. “Activity Based Costing as a measure of improving the cost structure at Akash industries” =Rs0.0096/Cover d) calculation of electricity Monthly electricity bill = Rs31,266 Monthly power consumption = 45hp Therefore, Rs31,266/45hp = Rs694.8 per hp/ month Power Consumption = 7hp For 7hp = Rs694.8 x 7hp = Rs4863.6 Electricity bill per month = Rs4863.6 = Rs4863.6/26days =187.06/day =187.06/800Covers =Rs0.233/Cover Fuel oil & lubricants = Rs1,58,028 p.a = Rs 158028/ 300days = Rs 526.76/day = Rs 526.76/25machines =Rs21.07/machine =21.07/800Covers =0.026/Cover Total Cost of deep drawing activity Activity Sub Activity Cost Deep Drawing Man cover rate Rs0.3562/cover Babasabpatilfreeppt.com 46
  • 47. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Machine cover rate Rs0.333/cover Space occupied by the Rs0.0096/cover machine electricity Rs0.233/cover Fuel oil & lubricants Rs0.026/cover Total Rs 0.9578/cover 4. Trimming a) Man hour rate =Wages/number of Covers = Rs150/500Covers =Rs0.3/Cover b) Machine hour rate =Cost of machine x depreciation =Rs300000 x 10% depreciation =Rs30000 p.a = Rs30000/300days =Rs100/per day =Rs100/500Covers =Rs0.2/Cover c) Space occupied by = 80Sq ft x Rs 2 per sq ft the machine = Rs160 p.m = Rs160/26days =Rs6.15/day =Rs6.15/500Covers =Rs 0.012/Cover d) calculation of electricity Babasabpatilfreeppt.com 47
  • 48. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Monthly electricity bill = Rs31,266 Monthly power consumption = 45hp Therefore, Rs31,266/45hp = Rs694.8 per hp/ month Power Consumption = 3hp For 3hp = Rs694.8 x 3hp = Rs2084.4 Electricity bill per month = Rs2084.4 = Rs2084.4/26days =80.16/day =80.16/500Covers =Rs0.16/Cover Fuel oil & lubricants = Rs1,58,028 p.a = Rs 158028/ 300days = Rs 526.76/day = Rs 526.76/25machines =Rs21.07/machine =21.07/500Covers =0.042/Cover Total Cost of trimming activity Activity Sub Activity Cost Trimming Man cover rate Rs0.3/cover Machine cover rate Rs0.125/cover Space occupied by the Rs0.012/cover machine electricity Rs0.16/cover Babasabpatilfreeppt.com 48
  • 49. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Fuel oil & lubricants Rs0.042/cover Total Rs 0.639/cover 5. Piercing a) Man hour rate =Rs 150/900Covers =0.166/Cover b) Machine hour rate =400000 x 10% depreciation =40000 p.a = 40000/300days =133.33/per day =133.33/900Covers =0.148/Cover c) Space occupied by = 50Sq ft x Rs 2 per sq ft the machine = Rs100 p.m = Rs100/26days =Rs3.84/day =Rs3.84/900Covers =Rs 0.0042/Cover d) calculation of electricity Monthly electricity bill = Rs31,266 Monthly power consumption = 45hp Therefore, Babasabpatilfreeppt.com 49
  • 50. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Rs31,266/45hp = Rs694.8 per hp/ month Power Consumption = 3hp For 3hp = Rs694.8 x 3hp = Rs2084.4 Electricity bill per month = Rs2084.4 = Rs2084.4/26days =80.16/day =80.16/900Covers =Rs0.089/Cover Fuel oil & lubricants = Rs1,58,028 p.a = Rs 158028/ 300days = Rs 526.76/day = Rs 526.76/25machines =Rs21.07/machine =21.07/900Covers =0.023/Cover Total Cost of piercing activity Activity Sub Activity Cost Piercing Man cover rate Rs0.166/cover Machine cover rate Rs0.148/cover Space occupied by the Rs0.042/cover machine electricity Rs0.089/cover Fuel oil & lubricants Rs0.023/cover Total Rs0.468/cover Babasabpatilfreeppt.com 50
  • 51. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Activity Sub Activity Cost Manufacturing Shearing Rs1.232/cover Circle cutting Rs0.2766/cover Deep drawing Rs 0.9578/cover Trimming Rs 0.639/cover Piercing Rs0.468/cover Total Rs3.5734/cover Total Cost of the processes Babasabpatilfreeppt.com 51
  • 52. “Activity Based Costing as a measure of improving the cost structure at Akash industries” 3) Inspection Inspection rate 10% of number of units produced per day 1000Covers x 10% = 100Covers to be inspected 1) Salary of the inspector = Rs8000/month Time required to inspect = 1 hour Per day salary = Rs8000/26days =Rs307.69/day Per hour salary =Rs 307.69/8hRs = Rs 38.46/hr Wages to the inspector = 1hr x Rs38.46 = Rs38.46/hr 2) Cost of instruments required to inspect = Rs 8500 Expected life of instrument is one year Instruments charges per month = Rs8500/12months = Rs708.33/month Per day charges = Rs708.33/26 days = Rs 27.24/day Per hour charges = Rs27.24/8hrs = Rs3.4/hr Babasabpatilfreeppt.com 52
  • 53. “Activity Based Costing as a measure of improving the cost structure at Akash industries” 3) Calibration charges per year = Rs900 Per month charges = Rs900/12months = Rs75/month Per day charges = Rs75/26days = Rs3/day Per hour charges = Rs3/8hr =Rs0.375/hr Total of inspection activity Activity Sub Activity Cost Inspection Salary of the inspector Rs38.46/hr instruments required to Rs3.4/hr inspect Calibration Rs0.375/hr Total Rs42.23/hr Cost of Per Cover Rs 0.0422/cover 4) Painting . Babasabpatilfreeppt.com 53
  • 54. “Activity Based Costing as a measure of improving the cost structure at Akash industries” 1) Cost of paint and thinner Paint Rs250/ltr Thinner Rs150/ltr Divided in the ratio of 75:25 Cost of Paint = Rs250 x 75/100 =Rs 187.5 Cost of Thinner = Rs150 x 25/100 =Rs 37.5 Cost of mixture total = Rs187.5 + Rs37.5 = Rs225 Total Area of component covered by the mixture is 45 sq ft Area of the a component = 1.72 sq ft Covers that can be painted = 45sq ft/1.72sq ft = 26Covers Cost of paint per cover =Rs225/ 26Covers = Rs8.6/Cover 2) Labour cost People required for painting =2 Wages per day = Rs 320 Covers painted in one day = 200 Covers Cost per cover = Rs320/200covers =Rs1.6/cover 3) Paint booth operation cost = Rs300000 Deprecation = 20% of the cost Babasabpatilfreeppt.com 54
  • 55. “Activity Based Costing as a measure of improving the cost structure at Akash industries” =Rs 300000 x 20% = Rs60000p.a Per month = Rs60000/12months =Rs5000p.m Per day = Rs5000/26days = Rs192.3/day Cost of per covers =Rs 192.3/200Covers =Rs0.961/Cover 4) Power charges Rs 5500/month Total Power consumption =20hp Therefore, Rs5500/20hp =Rs275per hp/month Power consumption =5hp For 5hp =5hp x Rs275 Electricity bill per month for 5hp =Rs1375 Per day charges = Rs1375/26days = Rs53/day Per cover charges =Rs53/200Covers =Rs0.265/Cover 5) Area of painting booth = 60 x 20ft Rent = 20000 p.m Built area = 10000sq ft Babasabpatilfreeppt.com 55
  • 56. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Rent per sq ft = Rs30000/10000sq ft = Rs3/sq ft/month Cost of area = 1200sq ft x Rs3 = Rs 3600 Per day charges =Rs3600/26 = Rs138.46/day Per cover =Rs138.46/200Covers = Rs0.692/Cover Area of the Cover = 1.72sq ft Cost of per cover = Rs12.11 x 1.72sq ft = Rs20.82/cover Total cost of painting activity Activity Sub Activity Cost Painting Cost of paint and thinner Rs8.6 Labour cost Rs1.6 Paint booth operation cost Rs0.961 Power charges Rs0.265 Area of painting booth Rs0.692 Total Rs12.11/sq ft Cost of Per Cover Rs20.82/cover 5) Dispatching 1) Packing charges : Packing material required: --- Cost of wooden box = Rs 3000 (inclusive transportation cost, taxes) Cost of plastic wire = Re 1.50/Cover Cost of paper = Re1.00/Cover Babasabpatilfreeppt.com 56
  • 57. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Number of Covers packed per box = 200 covers Rs3000 + (Re1.50 x 200) + (Re1.00 x 200) = Rs3500 2) labour People required = 3 5 boxes packed per day Wages = Rs200 + Rs150 + Rs150 = Rs500/day Wages per box = Rs500/5boxes = Rs100/box Total =Rs 3500 + Rs100 = Rs 3600 Per Cover = Rs3600/200Cover =Rs18/Cover Total of dispatching Activity Activity Sub Activity Cost Despatching Packing charges Rs3500 labour Rs100 Total Rs3600/box Rs18/Cover Cost Per Cover COST PER UNIT OF THE PRODUCT Babasabpatilfreeppt.com 57
  • 58. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Amount COST/COVER ACTIVITIES in Rs Amt in Rs 1 PURCHASE OF RAW MATERIALS 95.017 2 MANUFACTURING Shearing 1.232 Circle cutting 0.2766 Deep drawing 0.9578 Trimming 0.639 Piercing 0.468 Total 3.5734 3 INSPECTION 0.0422 4 PAINTING 19.90 5 DESPATCHING 18.00 GRAND TOTAL 136.68 Babasabpatilfreeppt.com 58
  • 59. “Activity Based Costing as a measure of improving the cost structure at Akash industries” FINDINGS FINDINGS 1. Akash Industries are specialized in deep drawn components that cater the electrical, elevator, home appliances automobile industry and the defense. 2. Akash Industries follows traditional method of costing. 3. The product UC Range series 4 end cover is over costed. Babasabpatilfreeppt.com 59
  • 60. “Activity Based Costing as a measure of improving the cost structure at Akash industries” 4. According to traditional costing the cost of the cover is Rs.143.50 5. According to Activity Based costing the cost of the cover is Rs136.68 6. According to costing followed by Akash Industries they first identify the cost then they go for producing the product rather than identifying the activities first. 7. Appropriate variable overheads are identified to individual products through ABC. 8. All levels of activities in the manufacturing cost hierarchy viz unit level, batch level, product level and facility level have been identified. 9. Cost drivers for the activities have been identified. 10. Akash Industries relates overheads to cost centers which are not realistic to the behavior of costs. 11. To get a realistic analysis of cost behavior, the overheads have been properly related to cost drivers. Babasabpatilfreeppt.com 60
  • 61. “Activity Based Costing as a measure of improving the cost structure at Akash industries” SUGGESTIONS SUGGESTIONS 1. Akash Industries should adopt Activity Based costing in their organization. 2. As ABC integrates well with Six Sigma and continuous improvement programs the company can achieve minimum rejection rate. 3. To arrive at the actual cost of the product, overheads should not be directly assigned to the cost center which is basically done in traditional costing. 4. Instead of focusing more on cost reduction they should focus more on cost control. Babasabpatilfreeppt.com 61
  • 62. “Activity Based Costing as a measure of improving the cost structure at Akash industries” 5. Akash Industries can adopt cost control strategy where in the company can begin by evaluating non-labor expenses which can be controlled. 6. Labor and employment costs are a source of considerable expense and should be constantly monitored. 7. If it is possible to amalgamate two jobs into one, make some jobs part time, use temporary contract labor, outsourcing to specialists, consider if some other choice of labor cost saving is available. 8. Akash Industries should follow an open style with clear and concise objective for the successful implementation of ABC. 9. Organization-wide awareness should be extended to convince the participants to change, as well as effecting the change. 10. Overheads are part of running a business but can be controlled. Everything from cleaning materials to the cost of vehicle operation , machine maintenance, consumable materials and staff employment costs can, and must be kept as low as possible. Babasabpatilfreeppt.com 62
  • 63. “Activity Based Costing as a measure of improving the cost structure at Akash industries” CONCLUSION CONCLUSION ABC utilizes the activity concept and by using the activities, ABC can successfully link the product costs to production knowledge. How a product is produced, how much time is needed to perform an activity and finally how much money is absorbed by performing this task are answered by the help of ABC studies. This method is a dynamic tool for continuous improvement. With ABC to its benefit, any enterprise will have a built in competitive cost advantage and can continuously add value to both its stakeholders and customers. Babasabpatilfreeppt.com 63
  • 64. “Activity Based Costing as a measure of improving the cost structure at Akash industries” Therefore, Activity-Based Costing measures the costs and profits of an organization based on the activities performed within that organization. By focusing on processes that contribute to revenues and business operations, ABC can accurately determine how each process relates back to specific products, customers, or services. This can make a big difference after considering warehouse, sales, customer service, administration and other costs that are often applied at a standard rate, if at all. With ABC you can drill into profitability and performance by almost any factor you can think of. BIBLOGRAPHY Babasabpatilfreeppt.com 64
  • 65. “Activity Based Costing as a measure of improving the cost structure at Akash industries” BIBLOGRAPHY  Books : 1) COST ACCOUNTING for BUSINESS MANAGERS by Asish K Bhatacharyya. 2) COST ACCOUNTING by I M Pandey  Websites : babasabpatilfreeppt.com Babasabpatilfreeppt.com 65