Case Study – Lean Implementation


        Company Background
        This case study is based on work carried out at a manufacturing and assembly company based in
        the North West of England with 70 employees. The manufacturing area was organised with
        common services (Goods In, Paint Shop and Dispatch) and three dedicated production areas for
        various product lines. Previous Lean/CI activity had included 5s audit display boards, workplace
        flow paths, introduction of kanban totes and some line balancing activity. Much of this previous
        work had not been sustained.


        The BIUK Approach
        A decision was made to carry out an in-depth Lean Diagnostic to identify current status and
        indicate areas for improvement. A summary of the scores is shown below:



                                                         Lean Manufacturing Summary
                                        Quality                                                                     Cost                                                                     Delivery
        5




        4




        3
Score




        2




        1




        0
                                                                                                                                                       Order Levelling




                                                                                                                                                                                                 Flow Manufacturing
                                                           Training




                                                                                      Quick Changeover
                                          Organisation




                                                                                                                                                                         Material Movement
            Quality




                                                                                                              TPM




                                                                                                                                       OVERALL COST
                                                                      QUALITY SCORE
                      Visual Controls




                                                                                                                                                                                                                      DELIVERY SCORE
                                                                                                                           Team Work
                                           Workplace




                                                                        OVERALL




                                                                                                                                          SCORE




                                                                                                                                                                                                                          OVERALL




                                                                                                         Lean Element




                                                                                                                                                      Improvement Through People
An overall score of 51% was achieved against the fifty-five criteria with Quality and Cost scores
being below average while Delivery was above average.

When the above results were combined with detailed area-by-area observation, the following
recommendations were made:

‱   re-instatement of the 5s programme with regular audits and responsibilities
‱   review of line side stock levels to create better flow and space utilisation
‱   consideration of the use of dedicated tool sets for assembly stations rather than several large
    tool boxes
‱   enhancement of the visual display/information available across all production areas,
    including real time performance display
‱   analysis of selected processes in terms of ‘muda’ (the seven wastes)
‱   more involvement of all process personnel in improvement suggestions and actions (the
    ‘eighth’ waste)
‱   consideration of area requirements in terms of storage and visual control of stock
‱   use of basic SMED principles to reduce changeover times in the Paint Shop
‱   consideration of the calculation and use of takt time to balance and create flow where
    appropriate


Implementation and Results
Many of the recommendations above were implemented as part of a Business Improvement
Techniques programme, with a substantial percentage of the workforce taking part. This resulted
in many improvements that impacted on Quality, Cost and Delivery performance.

The BIT programme having established a solid foundation for Continuous Improvement, BIUK
consultants worked with the company to identify further improvement opportunities, two of
which are outlined below.

Order Entry Process
A process mapping exercise identified major errors in the order entry process. These errors often
resulted in lack of validation of customer required dates and impacted on production, delivery and
work in process levels. A new procedure was developed that correctly validated customer delivery
dates resulting in substantial savings on costs and improved customer service.

Build to Order
Analysis of current stock quantities revealed that many product lines were built in advance of
customer orders. This resulted in a huge stock of kitted product that took up an entire storage
unit. The solution was to identify and create Min/Max levels for key subassemblies and smaller
unique parts. This resulted in customer orders being kitted within one day of receipt and the
storage unit being surplus to requirements.




                                                                          Improvement Through People

Weitere Àhnliche Inhalte

Ähnlich wie Case Study - Lean Implementation (Manufacturing)

Supply Chain Agility
Supply Chain AgilitySupply Chain Agility
Supply Chain AgilityPhilippeLux
 
Interactive Quality on the Shop Floor
Interactive Quality on the Shop Floor Interactive Quality on the Shop Floor
Interactive Quality on the Shop Floor IBS America
 
Historical Perspective of the SCOR Model
Historical Perspective of the SCOR ModelHistorical Perspective of the SCOR Model
Historical Perspective of the SCOR Modelmeasuredperformance
 
Kaizen
KaizenKaizen
Kaizenjegosss
 
Call Center Best Pratices Linkage
Call Center Best Pratices LinkageCall Center Best Pratices Linkage
Call Center Best Pratices LinkageBrian Hughes
 
Hr Transformation Overview
Hr Transformation OverviewHr Transformation Overview
Hr Transformation OverviewMark Gavora
 
Overview of CMMI and Software Process Improvement
Overview of CMMI and Software Process ImprovementOverview of CMMI and Software Process Improvement
Overview of CMMI and Software Process ImprovementNelson Piedra
 
Yan Guo Financial Analyst
Yan Guo Financial AnalystYan Guo Financial Analyst
Yan Guo Financial Analystguoyanwithu
 
Heizer om10 ch06-managing quality
Heizer om10 ch06-managing qualityHeizer om10 ch06-managing quality
Heizer om10 ch06-managing qualityRozaimi Mohd Saad
 
Public schools presentation
Public schools presentationPublic schools presentation
Public schools presentationJoseph Hudson
 
Cost Of Quality QPSP
Cost Of Quality QPSPCost Of Quality QPSP
Cost Of Quality QPSPKASHIF BUTT
 
Turnaround_Keynotes
Turnaround_KeynotesTurnaround_Keynotes
Turnaround_KeynotesErik Van Rompay
 
Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Chris Colson
 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Beth Perez
 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Beth Perez
 
Automate your way to agility
Automate your way to agilityAutomate your way to agility
Automate your way to agilityYuval Yeret
 
BSC - HR
BSC - HRBSC - HR
BSC - HRRegentIGS
 
CMMI Process Adherence Levels
CMMI Process Adherence LevelsCMMI Process Adherence Levels
CMMI Process Adherence LevelsNicol Pinilla
 
Value Flow Science - Fitter lifecycles from lean balanced scorecards (2011)
Value Flow Science - Fitter lifecycles from lean balanced scorecards  (2011)Value Flow Science - Fitter lifecycles from lean balanced scorecards  (2011)
Value Flow Science - Fitter lifecycles from lean balanced scorecards (2011)Neil Thompson
 

Ähnlich wie Case Study - Lean Implementation (Manufacturing) (20)

Supply Chain Agility
Supply Chain AgilitySupply Chain Agility
Supply Chain Agility
 
Lean Logistics Operations Process Map
Lean Logistics Operations Process MapLean Logistics Operations Process Map
Lean Logistics Operations Process Map
 
Interactive Quality on the Shop Floor
Interactive Quality on the Shop Floor Interactive Quality on the Shop Floor
Interactive Quality on the Shop Floor
 
Historical Perspective of the SCOR Model
Historical Perspective of the SCOR ModelHistorical Perspective of the SCOR Model
Historical Perspective of the SCOR Model
 
Kaizen
KaizenKaizen
Kaizen
 
Call Center Best Pratices Linkage
Call Center Best Pratices LinkageCall Center Best Pratices Linkage
Call Center Best Pratices Linkage
 
Hr Transformation Overview
Hr Transformation OverviewHr Transformation Overview
Hr Transformation Overview
 
Overview of CMMI and Software Process Improvement
Overview of CMMI and Software Process ImprovementOverview of CMMI and Software Process Improvement
Overview of CMMI and Software Process Improvement
 
Yan Guo Financial Analyst
Yan Guo Financial AnalystYan Guo Financial Analyst
Yan Guo Financial Analyst
 
Heizer om10 ch06-managing quality
Heizer om10 ch06-managing qualityHeizer om10 ch06-managing quality
Heizer om10 ch06-managing quality
 
Public schools presentation
Public schools presentationPublic schools presentation
Public schools presentation
 
Cost Of Quality QPSP
Cost Of Quality QPSPCost Of Quality QPSP
Cost Of Quality QPSP
 
Turnaround_Keynotes
Turnaround_KeynotesTurnaround_Keynotes
Turnaround_Keynotes
 
Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)
 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)
 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)
 
Automate your way to agility
Automate your way to agilityAutomate your way to agility
Automate your way to agility
 
BSC - HR
BSC - HRBSC - HR
BSC - HR
 
CMMI Process Adherence Levels
CMMI Process Adherence LevelsCMMI Process Adherence Levels
CMMI Process Adherence Levels
 
Value Flow Science - Fitter lifecycles from lean balanced scorecards (2011)
Value Flow Science - Fitter lifecycles from lean balanced scorecards  (2011)Value Flow Science - Fitter lifecycles from lean balanced scorecards  (2011)
Value Flow Science - Fitter lifecycles from lean balanced scorecards (2011)
 

Mehr von Business Impact UK Ltd

Mehr von Business Impact UK Ltd (8)

Skills portfolio 2012 13
Skills portfolio 2012 13Skills portfolio 2012 13
Skills portfolio 2012 13
 
Management Apprenticeship Frameworks
Management Apprenticeship FrameworksManagement Apprenticeship Frameworks
Management Apprenticeship Frameworks
 
NVQ Portfolio 2011-12
NVQ Portfolio 2011-12NVQ Portfolio 2011-12
NVQ Portfolio 2011-12
 
South Lean Academy Event 290611
South Lean Academy Event 290611South Lean Academy Event 290611
South Lean Academy Event 290611
 
South Lean Academy Event 290611
South Lean Academy Event 290611South Lean Academy Event 290611
South Lean Academy Event 290611
 
Lean Academy Workshops
Lean Academy WorkshopsLean Academy Workshops
Lean Academy Workshops
 
Case Study - 5S (Engineering)
Case Study - 5S (Engineering)Case Study - 5S (Engineering)
Case Study - 5S (Engineering)
 
Case Study - 5S (Printing)
Case Study - 5S (Printing)Case Study - 5S (Printing)
Case Study - 5S (Printing)
 

KĂŒrzlich hochgeladen

Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)lakshayb543
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 

KĂŒrzlich hochgeladen (20)

Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 

Case Study - Lean Implementation (Manufacturing)

  • 1. Case Study – Lean Implementation Company Background This case study is based on work carried out at a manufacturing and assembly company based in the North West of England with 70 employees. The manufacturing area was organised with common services (Goods In, Paint Shop and Dispatch) and three dedicated production areas for various product lines. Previous Lean/CI activity had included 5s audit display boards, workplace flow paths, introduction of kanban totes and some line balancing activity. Much of this previous work had not been sustained. The BIUK Approach A decision was made to carry out an in-depth Lean Diagnostic to identify current status and indicate areas for improvement. A summary of the scores is shown below: Lean Manufacturing Summary Quality Cost Delivery 5 4 3 Score 2 1 0 Order Levelling Flow Manufacturing Training Quick Changeover Organisation Material Movement Quality TPM OVERALL COST QUALITY SCORE Visual Controls DELIVERY SCORE Team Work Workplace OVERALL SCORE OVERALL Lean Element Improvement Through People
  • 2. An overall score of 51% was achieved against the fifty-five criteria with Quality and Cost scores being below average while Delivery was above average. When the above results were combined with detailed area-by-area observation, the following recommendations were made: ‱ re-instatement of the 5s programme with regular audits and responsibilities ‱ review of line side stock levels to create better flow and space utilisation ‱ consideration of the use of dedicated tool sets for assembly stations rather than several large tool boxes ‱ enhancement of the visual display/information available across all production areas, including real time performance display ‱ analysis of selected processes in terms of ‘muda’ (the seven wastes) ‱ more involvement of all process personnel in improvement suggestions and actions (the ‘eighth’ waste) ‱ consideration of area requirements in terms of storage and visual control of stock ‱ use of basic SMED principles to reduce changeover times in the Paint Shop ‱ consideration of the calculation and use of takt time to balance and create flow where appropriate Implementation and Results Many of the recommendations above were implemented as part of a Business Improvement Techniques programme, with a substantial percentage of the workforce taking part. This resulted in many improvements that impacted on Quality, Cost and Delivery performance. The BIT programme having established a solid foundation for Continuous Improvement, BIUK consultants worked with the company to identify further improvement opportunities, two of which are outlined below. Order Entry Process A process mapping exercise identified major errors in the order entry process. These errors often resulted in lack of validation of customer required dates and impacted on production, delivery and work in process levels. A new procedure was developed that correctly validated customer delivery dates resulting in substantial savings on costs and improved customer service. Build to Order Analysis of current stock quantities revealed that many product lines were built in advance of customer orders. This resulted in a huge stock of kitted product that took up an entire storage unit. The solution was to identify and create Min/Max levels for key subassemblies and smaller unique parts. This resulted in customer orders being kitted within one day of receipt and the storage unit being surplus to requirements. Improvement Through People