Pull out test
• Shall be confirmed to BS 1881 Part 207
• Give direct tensile strength value by tensile fracture
• The insert may be cast into the concrete or positioned in hardened concrete in an
under-reamed groove from a drilled hole.
• Inserts for casting-in should have a circular head and tapered shaft to minimize
side friction during subsequent testing.
• The shaft, which may be removable, should have a diameter not more than 0.6
of the diameter of the head and a length such that the outer surface of the head
is the same depth below the concrete surface as its diameter.
• The inserts may be coated with a release agent to prevent bonding to the
concrete and may be notched to prevent their rotation in the concrete if the
shafts are to be unscrewed.
• Inserts for use in drilled holes should have means for expanding them to fit into
the groove, such as a split ring on a tapered rod.
• The coefficient of variation of a set of measured values at one location under site
conditions is likely to be about 7 %. However, in assessing compressive strength, the
accuracy of the correlation with pull-out force should also be considered as an
additional factor When a general correlation is used, estimates of compressive strength
are unlikely to have 95 % confidence limits better than± 20 % of the mean of four valid
results
• Insert, of metal not readily attacked by fresh concrete, of sufficient thickness and
strength to avoid yielding during the test.
• Reinforcement steel should be away approximately up to 1 bar diameter from the
embedded insert After hardening of concrete apply the force with Hydraulic jack to pull
out the imbedded insert
• specialized equipment for drilling and then enlarging the base of the hole when the
insert is not cast into the concrete.
• At least four pull-out tests should be performed in each location.
• For a 25 mm diameter insert a loading rate of (0.5 f 0.2) kN/s should be used.
• Calculate the direct tensile strength value from hydraulic jack and convert it by
calibrated graph to compressive strength
Pull out test for concrete
Pull out test for concrete

More Related Content

What's hot

Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniques
Zaid Ansari
 

What's hot (20)

Mixing of concrete.pptx
Mixing of concrete.pptxMixing of concrete.pptx
Mixing of concrete.pptx
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
High strength concrete
High strength concreteHigh strength concrete
High strength concrete
 
Rebound hammer test
Rebound hammer testRebound hammer test
Rebound hammer test
 
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETEDESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
 
Shrinkage of concrete
Shrinkage of concreteShrinkage of concrete
Shrinkage of concrete
 
Creep and shrinkage
Creep and shrinkageCreep and shrinkage
Creep and shrinkage
 
Fresh and harden properties of concrete
Fresh and harden properties of concreteFresh and harden properties of concrete
Fresh and harden properties of concrete
 
Fresh concrete
Fresh concreteFresh concrete
Fresh concrete
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concrete
 
Hardened Concrete
Hardened ConcreteHardened Concrete
Hardened Concrete
 
Testing of hardened concrete
Testing of hardened concreteTesting of hardened concrete
Testing of hardened concrete
 
Reactive powder-concrete
Reactive powder-concreteReactive powder-concrete
Reactive powder-concrete
 
Admixture of concrete
Admixture of concreteAdmixture of concrete
Admixture of concrete
 
Production of concrete
Production of concreteProduction of concrete
Production of concrete
 
Chapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairsChapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairs
 
Concrete Mix Design
Concrete Mix DesignConcrete Mix Design
Concrete Mix Design
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniques
 
Aggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limitsAggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limits
 

Similar to Pull out test for concrete

Design and fabrication of bending machine
Design and fabrication of bending machineDesign and fabrication of bending machine
Design and fabrication of bending machine
paramesr2020
 

Similar to Pull out test for concrete (20)

Rebound hammer test (non destructive test
Rebound hammer test (non destructive testRebound hammer test (non destructive test
Rebound hammer test (non destructive test
 
Break off test
Break off testBreak off test
Break off test
 
Unit IV composite beams and continuous beams
Unit IV composite beams and continuous beamsUnit IV composite beams and continuous beams
Unit IV composite beams and continuous beams
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Penetration resistance test
Penetration resistance testPenetration resistance test
Penetration resistance test
 
Soil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptxSoil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptx
 
Good practices in PSC work.ppt
Good practices in PSC work.pptGood practices in PSC work.ppt
Good practices in PSC work.ppt
 
Use of Bolt Steel-Plated to strengthen R.C Beam
Use of Bolt Steel-Plated to strengthen R.C BeamUse of Bolt Steel-Plated to strengthen R.C Beam
Use of Bolt Steel-Plated to strengthen R.C Beam
 
Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation
 
Mechanical Compaction of Concrete
Mechanical Compaction of Concrete Mechanical Compaction of Concrete
Mechanical Compaction of Concrete
 
detailed specification for cement concrete
detailed specification for cement concretedetailed specification for cement concrete
detailed specification for cement concrete
 
ppt on sub structure construction.pptx
ppt on sub structure construction.pptxppt on sub structure construction.pptx
ppt on sub structure construction.pptx
 
driling lecture 3.pdf
driling lecture 3.pdfdriling lecture 3.pdf
driling lecture 3.pdf
 
Lining in tunnels
Lining in tunnelsLining in tunnels
Lining in tunnels
 
Cpnstruction Joints.pptx
Cpnstruction Joints.pptxCpnstruction Joints.pptx
Cpnstruction Joints.pptx
 
Engineering -Fits and tolerances
Engineering -Fits and tolerancesEngineering -Fits and tolerances
Engineering -Fits and tolerances
 
Gaskets, types, construction, and application usage
Gaskets, types, construction, and application usageGaskets, types, construction, and application usage
Gaskets, types, construction, and application usage
 
Design and fabrication of bending machine
Design and fabrication of bending machineDesign and fabrication of bending machine
Design and fabrication of bending machine
 
Soil penetration tests
Soil penetration testsSoil penetration tests
Soil penetration tests
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
 

More from Ayaz khan

More from Ayaz khan (15)

Quality tests for aggregates and concrete mix design
Quality tests for aggregates and concrete mix designQuality tests for aggregates and concrete mix design
Quality tests for aggregates and concrete mix design
 
Cement properties & Types
Cement properties & TypesCement properties & Types
Cement properties & Types
 
Aggregates introduction, types and properties
Aggregates introduction, types and propertiesAggregates introduction, types and properties
Aggregates introduction, types and properties
 
Alkali reaction in concrete
Alkali reaction in concreteAlkali reaction in concrete
Alkali reaction in concrete
 
Cement properties and types
Cement properties and types Cement properties and types
Cement properties and types
 
Ultrasonic pulse velocity test
Ultrasonic pulse velocity testUltrasonic pulse velocity test
Ultrasonic pulse velocity test
 
Pull off test for concrete
Pull off test for concretePull off test for concrete
Pull off test for concrete
 
Tensile strength test for concrete
Tensile strength test for concreteTensile strength test for concrete
Tensile strength test for concrete
 
Cube test for compressive strength of concrete
Cube test for compressive strength of concreteCube test for compressive strength of concrete
Cube test for compressive strength of concrete
 
Air content test for fresh concrete
Air content test for fresh concreteAir content test for fresh concrete
Air content test for fresh concrete
 
Flow test for fresh concrete
Flow test for fresh concreteFlow test for fresh concrete
Flow test for fresh concrete
 
Vebe test
Vebe testVebe test
Vebe test
 
Compaction factor test
Compaction factor testCompaction factor test
Compaction factor test
 
Tests for fresh concrete slump cone test
Tests for fresh concrete slump cone testTests for fresh concrete slump cone test
Tests for fresh concrete slump cone test
 
Cbr aashto t193 plus proctor t180
Cbr aashto t193 plus proctor t180Cbr aashto t193 plus proctor t180
Cbr aashto t193 plus proctor t180
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 

Pull out test for concrete

  • 1. Pull out test • Shall be confirmed to BS 1881 Part 207 • Give direct tensile strength value by tensile fracture • The insert may be cast into the concrete or positioned in hardened concrete in an under-reamed groove from a drilled hole. • Inserts for casting-in should have a circular head and tapered shaft to minimize side friction during subsequent testing. • The shaft, which may be removable, should have a diameter not more than 0.6 of the diameter of the head and a length such that the outer surface of the head is the same depth below the concrete surface as its diameter. • The inserts may be coated with a release agent to prevent bonding to the concrete and may be notched to prevent their rotation in the concrete if the shafts are to be unscrewed. • Inserts for use in drilled holes should have means for expanding them to fit into the groove, such as a split ring on a tapered rod.
  • 2. • The coefficient of variation of a set of measured values at one location under site conditions is likely to be about 7 %. However, in assessing compressive strength, the accuracy of the correlation with pull-out force should also be considered as an additional factor When a general correlation is used, estimates of compressive strength are unlikely to have 95 % confidence limits better than± 20 % of the mean of four valid results • Insert, of metal not readily attacked by fresh concrete, of sufficient thickness and strength to avoid yielding during the test. • Reinforcement steel should be away approximately up to 1 bar diameter from the embedded insert After hardening of concrete apply the force with Hydraulic jack to pull out the imbedded insert • specialized equipment for drilling and then enlarging the base of the hole when the insert is not cast into the concrete. • At least four pull-out tests should be performed in each location. • For a 25 mm diameter insert a loading rate of (0.5 f 0.2) kN/s should be used. • Calculate the direct tensile strength value from hydraulic jack and convert it by calibrated graph to compressive strength