SlideShare a Scribd company logo
1 of 50
Download to read offline
ashwani tyagi
bridge & structural engineer
ashwanikomartyagi@gmail.com
+91-9999779774
89 gf, ashiana green
indirapuram
ghaziabad 201012
India
Education
Bachelor of Technology
Civil Engineering
1985-1989
Regional Engineering College, Kurukshetra,
India
Have 25 year’s experience in planning, design, erection
engineering, specification & analysis of Cable stayed & segmental
bridges and structures. Proficient in computer usage including
application software like RMV8i, ADAPT & SAP, MS Project.
Exposure to CEB-FIP Modal code 1990, British, American &
Indian Standards. Familiar with FIDIC. Has been a lead member of
a team, which worked on Delhi Metro, Chennai Metro and
Bangalore Metro. Have an experience on planning and design of a
Concrete cable stayed bridge, erection engineering and
construction supervision of cable-stayed bridge over Yamuna. Did
project coordination and proof check the design of 480m & 245 m
steel arch bridges and approach viaducts. Currently with SYSTRA
India and working on metro projects.
Synopsis
Trainings
• Training on cable stay technology at VSL Academy Bangkok
• Training on Post tensioning at VSL Academy, Bangkok
• Training on Geometry control of Precast segmental bridges at
Singapore
• Training on Construction equipment's at Switzerland
My Skills
Permanent Works
• Planning & design of Precast segmental post tensioned bridges
• Planning & Design of Balanced Cantilever bridges
• Planning & design of cable supported brides- Cable stayed &
Suspension
• Planning & Design of Steel Bridges
• Cable stay technology
• Post tensioning technology
• Design of Bearings and Articulations
• Instrumentation for Bridges
• Rail & Structure interaction Analysis
My Skills
Temporary Works
• Planning & design of Erection Gantries
• Stability Analysis for Erection Gantries
• Planning & Design of Form travelers & lifting frames
• Planning & Design of formwork and casting cells for
shortline method
My Skills
Construction Engineering
• Stage by Stage Analysis
• Precamber calculations
• Load Transfer Analysis
• Geometry control
• Method Statements & work procedures
My Skills
Management
• Client Management
• Upstream Marketing
• Training & grooming of young engineers
• Preparation of Technical & Financial Proposal
• Project Planning & Management
My Skills
Software
• RM V8i
• Adapt
• SAP2000
• Oasys
• MS Project
Design code & specifications
• Indian Standards,
• Indian Road Congress
• Indian Railway standards
• British Standards BS5400
• American Concrete institute
• Model code 1990
• AASHTO
Experience
Period Firm Position
2013 June- SYSTRA India Technical Manager 1 Year
2013 Jan 2014 June Freyssinet India Technical Manager 1.5 Year
2006 Jan- 2013 Jan Technical Centre VSL Satellite Manager 7.0 Year
2004 Sept -2006 Jan Scot Wilson Consultant 1.5 year
1994 Feb- 2004 Sept COWI-SPAN JV Structural Engineer 9 Years
1989 June-1994 Feb Mahindra Raj Structural Engineer 5 Year
25 Year
Languages
Language Proficiency
Hindi Mother Tongue
English Medium of Education
German Two year Diploma
French One year Certificate
Design Basis for Cable Stayed Concrete Bridge over Yamuna”
for International conference 1999 by Indian Institution of
Bridge Engineers.
“Tolerances in Construction of Concrete Bridges” for
National Seminar 2002 by Indian Concrete Institute.
“Sustainable Transport: the New Burden” for National Seminar
2003 by Indian Concrete Institute.
“Construction of Cable Stayed Concrete Bridge over Yamuna”
for International symposium 2004, Shanghai by IABSE.
“Cable stay technology and its application to Lakadiya bridge
at Bhavnagar Gujrat” for International symposium 2013,
Kolkata by IABSE.
“Continuous Welded Rails & Bridge Interaction Analysis:
State of the Art”.
Publications
Professional Membership
• Indian Road Congress (IRC),
• International Association of Bridge and
Structural engineering (IABSE)
Detailed design of viaduct and stations for section R5 (15.42 km) and 17
stations of Lucknow metro rail project, Airport to Munshi Pulia ( North South
Corridor).
Detailed design of viaduct and stations for section R5 (18.82 km) and 16
stations of Bangalore metro rail project, Phase 2
Project coordination and proof checking of viaduct and stations for Mundka-
Bahadurgarh & Dwarka-Najafgarh elevated lines of Phase III of Delhi Metro
project
Feasibility study for High Speed Rail Project
Delhi to Amritsar
Feasibility study for Light Rail Transit System
for City of Astana, Kazakistan
Feasibility study for Greater Dhaka Urban Transport Project, 25km long
BRT with 10 flyover and 4.5km long elevated road.
Design and construction engineering for a cable stayed bridge at
Bhavanagar, Gujrat
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 9.5 km long segmental elevated Expressway,
Bangalore.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 9.5 km long segmental elevated Expressway,
Bangalore.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 9.5 km long segmental elevated Expressway,
Bangalore.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 9.5 km long segmental elevated Expressway,
Bangalore.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 9.5 km long segmental elevated Expressway,
Bangalore.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering, for 4.5 km long segmental elevated Expressway, at
Neelamagla, Bangalore.
Planning and design of permanent & enabling works including overhead Erection
Gantry, construction engineering, for 4.5 km long segmental elevated metro viaduct,
Chennai.
Planning and design of permanent & enabling works including overhead Erection
Gantry, construction engineering, for Worli Bandra Bridge at Mumbai.
Planning, design and Construction engineering for pylon and bridge deck,
stay cable fabrication and installation method for Keppel stay cable
bridge, Singapore built by segmental method of construction.
Planning, design of permanent work & Construction engineering for pylon and bridge
deck, stay cable fabrication and installation method for Metro Bridge at Moolchand,
New Delhi built by segmental method of construction
Planning, Design of permanent work & Formtravelers for Gateway Bridge,
Australia, with statical system of 162m+260m+162m built by FCM method of
construction.
Planning, design of Permanent work, construction engineering &
Design of Formtravelers for Veracruzana in Mexico built by
segmental method of construction.
Planning and design of permanent work, construction engineering
&enabling works including under slung Erection Gantry for Gauteng
rapid link ,South Africa built by segmental method of construction.
Planning and design of permanent work, construction engineering
&enabling works including under slung Erection Gantry for Gauteng
rapid link ,South Africa built by segmental method of construction.
Planning, design & Construction engineering for continuous
balanced cantilever bridge at Suramadu, Malaysia,
Planning and construction engineering for 300m span suspension bridge
across river Subhansiri, Assam.
Planning & Designed continuous elevated urban structures at 3
intersections at Chennai.
Planned & designed bridges with curved and continuous spans on pile
foundation, on NH-54 in Assam , with segmental method of construction.
Did project coordination and proof check the design of 480m & 245 m steel
arch bridges over Chenab and Anjikhand and approach viaducts for Northern
Railway India.
Lead a team that designed Elevated track & a station of Delhi Metro of
Phase 1.
Planned & designed 300m to 3000m long bridges with continuous spans on
pile foundation, across rivers on National Highways in India.
Prepared Conditions of Contract & Technical specifications for Major bridges.
Prepared successful Technical/Financial proposals for bidding.
Has been a part of a team that designed a cable-
stayed bridge across river Yamuna, Allahabad.
Has been a part of a team that designed a cable-stayed bridge across river
Yamuna, Allahabad.
Designed and Supervised, erection and tensioning of stay cables, form traveler
operation, and deck construction of a cable stayed bridge across river Yamuna,
Allahabad and adjoining viaducts with Well & pile foundations.
Designed and Supervised, erection and tensioning of stay cables, form traveler
operation, and deck construction of a cable stayed bridge across river Yamuna,
Allahabad and adjoining viaducts with Well & pile foundations.
Planning and design of permanent work, enabling works including overhead Erection
Gantry, construction engineering for airport link metro, Bangkok.
Planning & construction engineering for erection
of roof of Jawarlal Nehru stadium, new Delhi.
My strengths & Weakness
• Adaptability
• Positive attitude
• Persistence
• Self motivated
• Honest
• Trust people quickly
• Can not say no, when someone ask for help
• Take decisions quickly
• Bit lazy about which I am not interested
I wish to promote Sustainable development and to incorporate
Environmental objectives into design, planning, construction and
operational criteria. To educate self and fellow workers on these issues
and to freely transfer this knowledge to society

More Related Content

What's hot (20)

Highway Engineer
Highway EngineerHighway Engineer
Highway Engineer
 
Curriculum Vitae-Zuber
Curriculum Vitae-ZuberCurriculum Vitae-Zuber
Curriculum Vitae-Zuber
 
(Highway Engineer) Raj singh
(Highway  Engineer) Raj singh(Highway  Engineer) Raj singh
(Highway Engineer) Raj singh
 
cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014 Abhinandan K -Highway Engineer with 3 + yr Expr 2014
Abhinandan K -Highway Engineer with 3 + yr Expr 2014
 
Col SP Tomar_CV
Col SP Tomar_CVCol SP Tomar_CV
Col SP Tomar_CV
 
CV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design EngineerCV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design Engineer
 
ER. PRASHANT'S CV pdf
ER. PRASHANT'S CV pdfER. PRASHANT'S CV pdf
ER. PRASHANT'S CV pdf
 
LVS Varma
LVS VarmaLVS Varma
LVS Varma
 
C.V.
C.V.C.V.
C.V.
 
Biswajit Das_Resume
Biswajit Das_ResumeBiswajit Das_Resume
Biswajit Das_Resume
 
Civil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - FinalCivil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - Final
 
CV Partha
CV ParthaCV Partha
CV Partha
 
Farooqh pasha_CV
Farooqh pasha_CVFarooqh pasha_CV
Farooqh pasha_CV
 
CV of Yogesh Final
CV of Yogesh FinalCV of Yogesh Final
CV of Yogesh Final
 
CV
CVCV
CV
 
CAD/BIM Modeler
CAD/BIM ModelerCAD/BIM Modeler
CAD/BIM Modeler
 
Resume sk tyagi
Resume sk tyagiResume sk tyagi
Resume sk tyagi
 
CHVR CV
CHVR CVCHVR CV
CHVR CV
 

Viewers also liked

Route 2020 Metro Dubai Construction Details
Route 2020 Metro Dubai   Construction DetailsRoute 2020 Metro Dubai   Construction Details
Route 2020 Metro Dubai Construction DetailsDavid H Moloney
 
The road to breaking bridges and stereotypes
The road to breaking bridges and stereotypesThe road to breaking bridges and stereotypes
The road to breaking bridges and stereotypesEva Lantsoght
 
TLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayTLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayRiverFirst Initiative
 
RIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
RIMS Update - Bridge Data Guidelines for Asset Management of Road BridgesRIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
RIMS Update - Bridge Data Guidelines for Asset Management of Road BridgesSimon Gough
 
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel
 
150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_Javad150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_JavadJavad Akhtar
 
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges A Study on Development of Live Load Model for Passenger Vehicles-only Bridges
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges Hyeok Jin Choi
 
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTIONINDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTIONBhavek Sharma
 
CONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERCONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERSyed Rizvi
 
Non destructive testing of railway bridges
Non destructive testing of railway bridgesNon destructive testing of railway bridges
Non destructive testing of railway bridgesHarsh Singh
 
Sabarmati Riverfront development project
Sabarmati Riverfront development projectSabarmati Riverfront development project
Sabarmati Riverfront development projectNoopur Raval
 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 junPrathamesh Kulkarni
 

Viewers also liked (19)

Route 2020 Metro Dubai Construction Details
Route 2020 Metro Dubai   Construction DetailsRoute 2020 Metro Dubai   Construction Details
Route 2020 Metro Dubai Construction Details
 
The road to breaking bridges and stereotypes
The road to breaking bridges and stereotypesThe road to breaking bridges and stereotypes
The road to breaking bridges and stereotypes
 
TLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayTLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 May
 
RIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
RIMS Update - Bridge Data Guidelines for Asset Management of Road BridgesRIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
RIMS Update - Bridge Data Guidelines for Asset Management of Road Bridges
 
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resources
 
150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_Javad150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_Javad
 
Road and flyover planning v2.0
Road and flyover planning v2.0Road and flyover planning v2.0
Road and flyover planning v2.0
 
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges A Study on Development of Live Load Model for Passenger Vehicles-only Bridges
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges
 
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTIONINDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
 
RiverFirst Vision (Final 2012)
RiverFirst Vision (Final 2012)RiverFirst Vision (Final 2012)
RiverFirst Vision (Final 2012)
 
CONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERCONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVER
 
Non destructive testing of railway bridges
Non destructive testing of railway bridgesNon destructive testing of railway bridges
Non destructive testing of railway bridges
 
flyover and bridge problems and its solutions
flyover and bridge problems and its solutionsflyover and bridge problems and its solutions
flyover and bridge problems and its solutions
 
Ahmedabad srfdcl
Ahmedabad srfdclAhmedabad srfdcl
Ahmedabad srfdcl
 
Sabarmati Riverfront development project
Sabarmati Riverfront development projectSabarmati Riverfront development project
Sabarmati Riverfront development project
 
Flyover bridge
Flyover bridgeFlyover bridge
Flyover bridge
 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 jun
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 
Build Features, Not Apps
Build Features, Not AppsBuild Features, Not Apps
Build Features, Not Apps
 

Similar to Resume of Ashwani Tyagi

Similar to Resume of Ashwani Tyagi (20)

Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15
 
Imran-Res
Imran-ResImran-Res
Imran-Res
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Farooqh pasha_CV
Farooqh pasha_CVFarooqh pasha_CV
Farooqh pasha_CV
 
bala resume
bala resumebala resume
bala resume
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
 
JYOTI THAKURIA CV
JYOTI THAKURIA CVJYOTI THAKURIA CV
JYOTI THAKURIA CV
 
Ramprasad_Resume_SEP-2016
Ramprasad_Resume_SEP-2016Ramprasad_Resume_SEP-2016
Ramprasad_Resume_SEP-2016
 
Resume_Shiva Kaitha
Resume_Shiva KaithaResume_Shiva Kaitha
Resume_Shiva Kaitha
 
Prashant - CV simple format
Prashant - CV  simple formatPrashant - CV  simple format
Prashant - CV simple format
 
Fawad cv a
Fawad cv aFawad cv a
Fawad cv a
 
Force structural engineers - Company profile
Force structural engineers - Company profileForce structural engineers - Company profile
Force structural engineers - Company profile
 
CV Dylan Tate 2015_Brief
CV Dylan Tate 2015_BriefCV Dylan Tate 2015_Brief
CV Dylan Tate 2015_Brief
 
Hafiz Ahmed Waqas Resume
Hafiz Ahmed Waqas ResumeHafiz Ahmed Waqas Resume
Hafiz Ahmed Waqas Resume
 
CV_Debajit
CV_DebajitCV_Debajit
CV_Debajit
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Muhammad naeem (2)
Muhammad naeem (2)Muhammad naeem (2)
Muhammad naeem (2)
 
Handbook cum coffee table book titled staying with cables a modern construct...
Handbook cum coffee table book titled staying with cables  a modern construct...Handbook cum coffee table book titled staying with cables  a modern construct...
Handbook cum coffee table book titled staying with cables a modern construct...
 
Jayasankar_CV_for QA Manager
Jayasankar_CV_for QA ManagerJayasankar_CV_for QA Manager
Jayasankar_CV_for QA Manager
 
Resume - Raveendra S
Resume - Raveendra SResume - Raveendra S
Resume - Raveendra S
 

Resume of Ashwani Tyagi

  • 1. ashwani tyagi bridge & structural engineer ashwanikomartyagi@gmail.com +91-9999779774 89 gf, ashiana green indirapuram ghaziabad 201012 India
  • 2. Education Bachelor of Technology Civil Engineering 1985-1989 Regional Engineering College, Kurukshetra, India
  • 3. Have 25 year’s experience in planning, design, erection engineering, specification & analysis of Cable stayed & segmental bridges and structures. Proficient in computer usage including application software like RMV8i, ADAPT & SAP, MS Project. Exposure to CEB-FIP Modal code 1990, British, American & Indian Standards. Familiar with FIDIC. Has been a lead member of a team, which worked on Delhi Metro, Chennai Metro and Bangalore Metro. Have an experience on planning and design of a Concrete cable stayed bridge, erection engineering and construction supervision of cable-stayed bridge over Yamuna. Did project coordination and proof check the design of 480m & 245 m steel arch bridges and approach viaducts. Currently with SYSTRA India and working on metro projects. Synopsis
  • 4. Trainings • Training on cable stay technology at VSL Academy Bangkok • Training on Post tensioning at VSL Academy, Bangkok • Training on Geometry control of Precast segmental bridges at Singapore • Training on Construction equipment's at Switzerland
  • 5. My Skills Permanent Works • Planning & design of Precast segmental post tensioned bridges • Planning & Design of Balanced Cantilever bridges • Planning & design of cable supported brides- Cable stayed & Suspension • Planning & Design of Steel Bridges • Cable stay technology • Post tensioning technology • Design of Bearings and Articulations • Instrumentation for Bridges • Rail & Structure interaction Analysis
  • 6. My Skills Temporary Works • Planning & design of Erection Gantries • Stability Analysis for Erection Gantries • Planning & Design of Form travelers & lifting frames • Planning & Design of formwork and casting cells for shortline method
  • 7. My Skills Construction Engineering • Stage by Stage Analysis • Precamber calculations • Load Transfer Analysis • Geometry control • Method Statements & work procedures
  • 8. My Skills Management • Client Management • Upstream Marketing • Training & grooming of young engineers • Preparation of Technical & Financial Proposal • Project Planning & Management
  • 9. My Skills Software • RM V8i • Adapt • SAP2000 • Oasys • MS Project Design code & specifications • Indian Standards, • Indian Road Congress • Indian Railway standards • British Standards BS5400 • American Concrete institute • Model code 1990 • AASHTO
  • 10. Experience Period Firm Position 2013 June- SYSTRA India Technical Manager 1 Year 2013 Jan 2014 June Freyssinet India Technical Manager 1.5 Year 2006 Jan- 2013 Jan Technical Centre VSL Satellite Manager 7.0 Year 2004 Sept -2006 Jan Scot Wilson Consultant 1.5 year 1994 Feb- 2004 Sept COWI-SPAN JV Structural Engineer 9 Years 1989 June-1994 Feb Mahindra Raj Structural Engineer 5 Year 25 Year
  • 11. Languages Language Proficiency Hindi Mother Tongue English Medium of Education German Two year Diploma French One year Certificate
  • 12. Design Basis for Cable Stayed Concrete Bridge over Yamuna” for International conference 1999 by Indian Institution of Bridge Engineers. “Tolerances in Construction of Concrete Bridges” for National Seminar 2002 by Indian Concrete Institute. “Sustainable Transport: the New Burden” for National Seminar 2003 by Indian Concrete Institute. “Construction of Cable Stayed Concrete Bridge over Yamuna” for International symposium 2004, Shanghai by IABSE. “Cable stay technology and its application to Lakadiya bridge at Bhavnagar Gujrat” for International symposium 2013, Kolkata by IABSE. “Continuous Welded Rails & Bridge Interaction Analysis: State of the Art”. Publications
  • 13. Professional Membership • Indian Road Congress (IRC), • International Association of Bridge and Structural engineering (IABSE)
  • 14. Detailed design of viaduct and stations for section R5 (15.42 km) and 17 stations of Lucknow metro rail project, Airport to Munshi Pulia ( North South Corridor).
  • 15. Detailed design of viaduct and stations for section R5 (18.82 km) and 16 stations of Bangalore metro rail project, Phase 2
  • 16. Project coordination and proof checking of viaduct and stations for Mundka- Bahadurgarh & Dwarka-Najafgarh elevated lines of Phase III of Delhi Metro project
  • 17. Feasibility study for High Speed Rail Project Delhi to Amritsar
  • 18. Feasibility study for Light Rail Transit System for City of Astana, Kazakistan
  • 19. Feasibility study for Greater Dhaka Urban Transport Project, 25km long BRT with 10 flyover and 4.5km long elevated road.
  • 20. Design and construction engineering for a cable stayed bridge at Bhavanagar, Gujrat
  • 21. Planning and design of permanent work, enabling works including overhead Erection Gantry, construction engineering, for 9.5 km long segmental elevated Expressway, Bangalore.
  • 22. Planning and design of permanent work, enabling works including overhead Erection Gantry, construction engineering, for 9.5 km long segmental elevated Expressway, Bangalore.
  • 23. Planning and design of permanent work, enabling works including overhead Erection Gantry, construction engineering, for 9.5 km long segmental elevated Expressway, Bangalore.
  • 24. Planning and design of permanent work, enabling works including overhead Erection Gantry, construction engineering, for 9.5 km long segmental elevated Expressway, Bangalore.
  • 25. Planning and design of permanent work, enabling works including overhead Erection Gantry, construction engineering, for 9.5 km long segmental elevated Expressway, Bangalore.
  • 26. Planning and design of permanent work, enabling works including overhead Erection Gantry, construction engineering, for 4.5 km long segmental elevated Expressway, at Neelamagla, Bangalore.
  • 27. Planning and design of permanent & enabling works including overhead Erection Gantry, construction engineering, for 4.5 km long segmental elevated metro viaduct, Chennai.
  • 28. Planning and design of permanent & enabling works including overhead Erection Gantry, construction engineering, for Worli Bandra Bridge at Mumbai.
  • 29. Planning, design and Construction engineering for pylon and bridge deck, stay cable fabrication and installation method for Keppel stay cable bridge, Singapore built by segmental method of construction.
  • 30. Planning, design of permanent work & Construction engineering for pylon and bridge deck, stay cable fabrication and installation method for Metro Bridge at Moolchand, New Delhi built by segmental method of construction
  • 31. Planning, Design of permanent work & Formtravelers for Gateway Bridge, Australia, with statical system of 162m+260m+162m built by FCM method of construction.
  • 32. Planning, design of Permanent work, construction engineering & Design of Formtravelers for Veracruzana in Mexico built by segmental method of construction.
  • 33. Planning and design of permanent work, construction engineering &enabling works including under slung Erection Gantry for Gauteng rapid link ,South Africa built by segmental method of construction.
  • 34. Planning and design of permanent work, construction engineering &enabling works including under slung Erection Gantry for Gauteng rapid link ,South Africa built by segmental method of construction.
  • 35. Planning, design & Construction engineering for continuous balanced cantilever bridge at Suramadu, Malaysia,
  • 36. Planning and construction engineering for 300m span suspension bridge across river Subhansiri, Assam.
  • 37. Planning & Designed continuous elevated urban structures at 3 intersections at Chennai.
  • 38. Planned & designed bridges with curved and continuous spans on pile foundation, on NH-54 in Assam , with segmental method of construction.
  • 39. Did project coordination and proof check the design of 480m & 245 m steel arch bridges over Chenab and Anjikhand and approach viaducts for Northern Railway India.
  • 40. Lead a team that designed Elevated track & a station of Delhi Metro of Phase 1.
  • 41. Planned & designed 300m to 3000m long bridges with continuous spans on pile foundation, across rivers on National Highways in India.
  • 42. Prepared Conditions of Contract & Technical specifications for Major bridges. Prepared successful Technical/Financial proposals for bidding.
  • 43. Has been a part of a team that designed a cable- stayed bridge across river Yamuna, Allahabad.
  • 44. Has been a part of a team that designed a cable-stayed bridge across river Yamuna, Allahabad.
  • 45. Designed and Supervised, erection and tensioning of stay cables, form traveler operation, and deck construction of a cable stayed bridge across river Yamuna, Allahabad and adjoining viaducts with Well & pile foundations.
  • 46. Designed and Supervised, erection and tensioning of stay cables, form traveler operation, and deck construction of a cable stayed bridge across river Yamuna, Allahabad and adjoining viaducts with Well & pile foundations.
  • 47. Planning and design of permanent work, enabling works including overhead Erection Gantry, construction engineering for airport link metro, Bangkok.
  • 48. Planning & construction engineering for erection of roof of Jawarlal Nehru stadium, new Delhi.
  • 49. My strengths & Weakness • Adaptability • Positive attitude • Persistence • Self motivated • Honest • Trust people quickly • Can not say no, when someone ask for help • Take decisions quickly • Bit lazy about which I am not interested
  • 50. I wish to promote Sustainable development and to incorporate Environmental objectives into design, planning, construction and operational criteria. To educate self and fellow workers on these issues and to freely transfer this knowledge to society