Vendor Surveillance and Inspection Services – 2015
Houston, TX USA Kristiansand, Norway Singapore
Macae, Brazil Aberdeen, Scotland Gdansk, Poland
Confidential
Contents
 Overview
 Clients
 Vendor Surveillance Services
 Project Example
 Summary
“Entrion’s vendor surveillance program for the DSM
I & DSM II drillship projects were key to ensuring an
on schedule delivery of the vessels. Through its
global network of highly skilled multi discipline
engineers located near to the major OEM’s, we were
able to identify early risks to schedule and quality at
the vendor facilities and address these in a timely
manner. Through this approach we secured timely
delivery of the drilling equipment, while maintaining
the highest quality on each product.”
- - Craig Riddell
Technical Director
Odfjell Drilling
Confidential
Overview
 Our Vision - Global inspection firm of choice
• Vendor Surveillance and Inspection
• Audit and Verification
 Headquarters – Houston, Texas
• International operations – Kristiansand, Norway, Gdańsk, Poland, Aberdeen, UK, Singapore,
and Macaé, Brazil
 Over 100 experienced professionals located near major manufacturers worldwide
• Upstream and Downstream
 Clients – Drilling Contractors, Producers, Shipyards, and OEMs
 Well established internal systems and processes
• Consistent reporting
• QMS and HSE implemented
• ISO 9001 Certified and Achilles Approved
Confidential
Clients
Aban Offshore Limited Atlas Insite Atwood Oceanics
CenterPoint Energy Chevron DCOR
Diamond Offshore Dolphin Drilling Enseada
Enbridge ENSCO Frigstad Offshore
Hyundai Heavy Industries Hyundai Samho Noble Drilling
MacGregor Maersk Drilling Ocean Rig
Odfjell Drilling Odfjell Galvao Opus Offshore Pte Ltd
OtterTail Power Company PAA Natural Gas Storage Petroserv S/A
Queiroz Galvao Oleo e Gas Remontowa Rowan Companies
Sempra Energy Songa Offshore Stena Drilling
Transocean Vallourec Vantage Drilling
Yantai CIMC Raffles
Confidential
Improve Reliability and Prevent Delays
Design &
Engineering
• Engineering Support
• Procurement Support
Fabrication &
Construction
• Vendor Surveillance &
Inspection Services
• Audit and Verification
• Project Management
Operations &
After Market
• Vendor Surveillance &
Inspection Services
• Certification Support
• Asset Integrity
Management
Confidential
Vendor Surveillance & Inspection Services
 On-time delivery of reliable equipment
 Early detection of delay to expedite/reduce impact
 Identification and resolution quality issues
 “Eyes and Ears” in the field
 Local extension of project team
 Independent insight into EPC Contractor/OEM
 Lessons learned to improve vendor performance
 Compliance to standards, regulations and contracts
 Verification to 3rd party standard
 ENTRION Vendor Surveillance Standard (ENT 006)
Inspection of repair of double body
Cameron Blow Out Preventer (BOP) in
Patterson, LA
Factory Acceptance Test (FAT) of 165t
AHC Knuckle Boom Crane KBC in
Molde, Norway
Confidential
Vendor Surveillance Program
Skilled Local Professionals and Process Provide Predictable Results on Time on Budget
1.Risk-based
Planning
2.Project
Execution
3.Feedback &
Resolution
• Scope
• Activities
• Plan
• Schedule
• Contract/PO Review
• QA/ITP Review
• FAT Procedure Review
• Kick-Off Meeting
• Progress Monitoring
• FAT Witnessing
• Final Inspection
• Reporting
• Issue
Management
• Punch
management
• Improvement/
feedback
4.Management
• Organization
• Document
Control
• Resource
Management
• Project Finance
Confidential
Vendor Surveillance and Inspection Equipment Scope
Mechanical, Marine, Hydraulic, Refinery, Electrical, and Control Systems
 Topside Equipment
• Cranes & Winches
• Mud handling
• Drill floor Systems
• Drillers Control
• Drawworks
• Elevators
• Tanks & Vessels
• Derrick
 Subsea Equipment
• BOP Control Systems
• BOP Stacks
• Riser Systems
• Connectors
• Valves
 Propulsion & Power
• Engines
• Generators
• UPS
• Transformers
• Switch gear
• Thrusters
 Shipboard Systems
• Lifeboats
• Firewater system
• Helicopter refueling
• SCADA
• Breathing air
• Bilge Water
 Refinery & Processing
• Heat exchanges
• Vessels
• Storage tanks
• Separators
• Columns
• Piping
• Steel Structures
• Emergency Generators
• Control Systems
Confidential
Project References
Delivered on a Project or a Call-out Basis
 Rowan, Noble, Dolphin, DODI at HHI (14)
 Odfjell Drilling: Deepsea Metro I and II,
Deepsea Aberdeen, Deepsea Stavanger,
Deepsea Bergen, Deepsea Atlantic, various
fixed platforms (12)
 Chevron Escravos
 DWC, DSM I, DSM II at HHI (3)
 Clear Leader rigs at DSME (5)
 Aker Drilling at DSME (2)
 Transocean at DSME (5) in progress
 KG1, KG2, Petrobras 10K at SHI (3)
 ENSCO 8500 Class at KFELS (4)
 Brazilian Shipyard Enseada (4) in progress
 DDIII, B326, B327, B335 at KFELS (4)
 Frigstad at Yantai (2) in progress
Confidential
Project Example – Risk Based Planning
 Introduction and Objectives
 Plan, execute and manage a global surveillance program for a drillship
 On-time delivery and quality equipment based on ENT-006
 “Eyes and ears” in the field to oversee contractor performance
 Budget - $950K (0.12% of total)
 Scope of Work
 Drilling and subsea equip.
 Risk based approach
 Long range plan
 375 Surveys
 Short term dispatch plan
System / Package Criticality Assessment Field Activities
High Med Low Total KOM PM FAT FI Total
BOP Control System 12 1 0 13 3 8 4 5 20
BOP Stack 16 0 0 16 1 84 30 1 116
Bulk and Mud System 0 50 0 50 0 2 27 24 53
Choke & Kill System 0 5 0 5 4 5 9
Cranes and Material Handling 4 27 0 31 1 4 18 17 40
Derrick 1 19 0 20 0 9 15 13 37
Diverter System 4 6 0 10 0 11 3 1 15
Driller's Control System 12 3 0 15 1 1 1 1 4
Drillfloor System & Equipment 0 19 7 26 0 23 20 12 55
Riser System 0 31 0 31 0 26 5 1 32
Total 49 161 7 217 6 168 127 80 375
Criticality Definition DOC KOM PM FAT FI
High (I) Equipment delay will significantly impact the overall project schedule
or poor quality will significantly impact safety or reliability.
R R R R R
Medium (II) Equipment delay may result in a minor overall project delay or poor
quality may impact safety or reliability.
O O O R R
Low (III) Equipment delay does not impact the overall project schedule and
poor quality does not significantly impact safety or reliability.
O O O O R
Confidential
Project Example – Program Execution
 Inspection Activities
 Contract, ITP, QP, FAT Procedure review (DOC)
 Fabrication Kick-off-Meeting (KOM)
 Fabrication Progress Monitoring (PM)
 Factory Acceptance Test (FAT)
 Final Inspection (FI)
 Inspections
 Inspection packet
 Inspection
 Reporting
 Quality Assurance
Confidential
Project Example – Feedback and Resolution (Quality)
 Quality metrics definition
 Punch item: Satisfy contract
 Action Item: Concern that does
not qualify as a punch item
 Punch items
 Identified 543 punch items, closed
396, transferred 147 to the yard
 Action items
 Identified 78 action items, closed
51, transferred 27 to the yard
Equipment Issue Impact Resolution
HP Mud Pumps Improper preservation causing
water in blowers during
transportation
Delay in installation and
commissioning
Final inspection during loading to assure
proper preservation
Lifting
Equipment
Requirement from Shell for
critical lift equipment NDE
inspection
Delay in commissioning
and additional
inspection after FAT
Attended as many NDE’s as possible. Add
inspections during PO phase and include
in work orders.
BOP Stack BOP Low force shear rams
seals damage after shear
testing
Delay in BOP stack
delivery for shipyard SIT
Perform shear test during BOP body
assembly as performed by OEM 1, or OEM
2 to avoid this issue during BOP SIT
Class certificates Delay from OEM 3 supplying
Class certificates. In some
cases up to a year
Delay in SIT Coordinate with vendor to track Class
certificates in parallel with equipment.
HP Mud pumps
Ship loose items
Incorrect tagging and missing
items for shipping loose items
Delay in HP Mud pumps
installation
Review ship loose items with OEM 3 prior
to crating
Mud Gun &
agitators
OEM 3 Mud Guns and
Agitators actuals dimensional
error (too long) due to
incorrect drawings used by
vendor
Cutting and re-welding
at the shipyard,
delaying installation
and testing
Provide approved drawings to inspectors
from end user, and shipbuilder.
Confidential
Project Example – Feedback and Resolution (Schedule)
 Schedule metric definition
 Difference between contractual
and actual delivery date
 Schedule metrics
 43% on time
 50% of within 10 days
 78% within 60 days
 Subsea equipment with major
delays
Equipment Issue Impact Resolution
Diverter
Support
Housing
Schedule delays affected the
installation procedure and
duration.
Delay on moon pool
structure
construction.
Increase inspections for diverter housing prior to
FAT to mitigate or plan around delays from the
vendor.
HPU & Diverter
Skid
i. Testing of unit is not being
done fully by OEM 1, ii
Electronic components not
fully tested, iii System
Connectivity test was not
done
Delay in
commissioning
Increase number of
punch items during
commissioning phase
Assure all areas not tested are fully documented
by the inspector so they may be tested during
commissioning.
Coordinate with Class to make sure unit will
meet class requirements after commissioning.
BOP Stack Low force Shear rams do not
properly seal
Delay in BOP stack
FAT
Perform Shear seal testing at BOP body testing
phase
BOP controls
systems
Incorrect wiring in MUX PODS BOP stack SIT delay Attend FAT at subcontractor facility.
Tensioner Ring New design and NDE
requirements delay
manufacturing.
Delay in RIG SIT Perform inspections at OEM 1 subcontractors to
mitigate or plan around delays from the vendor
Riser Hydraulic
running tool
Delay from OEM 1’s
subcontractors.
Delay in RIG SIT Perform inspections at OEM 1 subcontractors to
mitigate or plan around delays from the vendor
Choke and Kill
manifold
Valves were not properly
tested prior to assembly.
Delay in testing and
delivery
Perform inspection during testing of the choke
and kill valves to assure proper testing.
Confidential
Cost Benefit Analysis
$-
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$7,000
Two Days Estimated Inspection Costs
Client - Remote Inspector
Entrion - Local Skilled Inspector
Confidential
Economics
Direct Savings
59%
 No increase in fixed personnel resources
 Trained professionals to meet client needs
 Availability of technically qualified resources worldwide
 Dedicated individual resources
 Strong past experience with vendors and OEMs
 Reductions in travel and overall expenses
 Standardized reporting formats
Confidential
Summary
 Global operations
 Work with drilling contractors, producers,
OEMs and shipyards globally
 100 experienced professionals located near
your equipment vendors
 Well established systems and processes
 Consistent reporting
 QMS and HSE implemented
 ISO 9001 Certified and Achilles Approved
 Vendor surveillance and inspection services
for on-time delivery and operational
readiness
 59% Direct Savings
“Entrion has now been providing support for our
new build drill ship project with HHI for over a
year. During that time they have been coordinating
all the inspectors and project management for the
vendor surveillance for all builder furnished
equipment outside of Korea. Entrion has provided
experienced professionals that have done a good
job documenting, reporting, and ensuring the
equipment is manufactured to a high level of
quality. The systems Entrion uses for
documentation and tracking are efficient, reliable,
and easy to use. Rowan has been very happy with
the level of service and the quality of people
performing monitoring, inspections, and project
management. Additionally Rowan also uses Entrion
for monitoring and inspections of our owner
furnished well control equipment and have been
very satisfied with the work performed.”
- Al Browning, Director Vendor Quality
Management, Rowan Companies
Confidential
Global Offices
ENTRION, Inc. ENTRION Norway ENTRION Poland ENTRION Singapore ENTRION do Brasil
10497 Town and Country Way
Suite 550
Houston, TX 77024
+1 832 623 6242
Suldalsveien 23A
4617 Kristiansand
Norway
+ 47 476 55 443
Ul. Cypriana Kamila
Norwida 2
80-280
Gdańsk, Poland
+48 588 813 053
80 Raffles Place #26-01
UOB Plaza 1
Singapore, 048624
+65 3158 3300
Estrada Sào José e
Imboassica
n 1000
Barrio de Imboassica
Macaé – RJ
+55 21404 21210
website: www.entrion.com

More Related Content

What's hot

Arnel Moncada Resume
Arnel Moncada ResumeArnel Moncada Resume
Arnel Moncada Resumearnel moncada
 
resume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adressresume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adressMichael Bartlett
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015Jim Reaves
 
PRAGASH-QC INSPECTION ENGG Feb'2016
PRAGASH-QC INSPECTION ENGG Feb'2016PRAGASH-QC INSPECTION ENGG Feb'2016
PRAGASH-QC INSPECTION ENGG Feb'2016pragash kannan
 
Keith Patrick C.V._2015
Keith Patrick C.V._2015Keith Patrick C.V._2015
Keith Patrick C.V._2015Keith Patrick
 
Mitch Nelson Resume 2015
Mitch Nelson Resume 2015Mitch Nelson Resume 2015
Mitch Nelson Resume 2015Mitch Nelson
 
Awareness of RIG high pressure piping activities
Awareness of RIG high pressure piping activitiesAwareness of RIG high pressure piping activities
Awareness of RIG high pressure piping activitiesAbdul Sayeed Mohammed
 
Paul Clayton QA CV
Paul Clayton QA CVPaul Clayton QA CV
Paul Clayton QA CVpeecee1741
 
Advanced Pipeline Risk Assessment vs. Simplified NACE Standards
Advanced Pipeline Risk Assessment vs. Simplified NACE StandardsAdvanced Pipeline Risk Assessment vs. Simplified NACE Standards
Advanced Pipeline Risk Assessment vs. Simplified NACE StandardsDavid Richardson
 
IDJ CV SEPT 2016
IDJ CV SEPT 2016IDJ CV SEPT 2016
IDJ CV SEPT 2016Ian Jones
 
Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015Roy McCullough
 
Resume - Suncor
Resume - SuncorResume - Suncor
Resume - SuncorSyed Rizvi
 

What's hot (20)

P7512-EXT-SQ-0030
P7512-EXT-SQ-0030P7512-EXT-SQ-0030
P7512-EXT-SQ-0030
 
Pipeline integrity documentation
Pipeline integrity documentationPipeline integrity documentation
Pipeline integrity documentation
 
Arnel Moncada Resume
Arnel Moncada ResumeArnel Moncada Resume
Arnel Moncada Resume
 
resume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adressresume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adress
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015
 
PRAGASH-QC INSPECTION ENGG Feb'2016
PRAGASH-QC INSPECTION ENGG Feb'2016PRAGASH-QC INSPECTION ENGG Feb'2016
PRAGASH-QC INSPECTION ENGG Feb'2016
 
Deq notes linden
Deq notes lindenDeq notes linden
Deq notes linden
 
NACE CIP
NACE CIPNACE CIP
NACE CIP
 
CV TemplateREV [1]
CV TemplateREV [1]CV TemplateREV [1]
CV TemplateREV [1]
 
Keith Patrick C.V._2015
Keith Patrick C.V._2015Keith Patrick C.V._2015
Keith Patrick C.V._2015
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
 
Mitch Nelson Resume 2015
Mitch Nelson Resume 2015Mitch Nelson Resume 2015
Mitch Nelson Resume 2015
 
Awareness of RIG high pressure piping activities
Awareness of RIG high pressure piping activitiesAwareness of RIG high pressure piping activities
Awareness of RIG high pressure piping activities
 
Paul Clayton QA CV
Paul Clayton QA CVPaul Clayton QA CV
Paul Clayton QA CV
 
CV_FAIZ
CV_FAIZCV_FAIZ
CV_FAIZ
 
Advanced Pipeline Risk Assessment vs. Simplified NACE Standards
Advanced Pipeline Risk Assessment vs. Simplified NACE StandardsAdvanced Pipeline Risk Assessment vs. Simplified NACE Standards
Advanced Pipeline Risk Assessment vs. Simplified NACE Standards
 
IDJ CV SEPT 2016
IDJ CV SEPT 2016IDJ CV SEPT 2016
IDJ CV SEPT 2016
 
Precious S Dagba resume
Precious S  Dagba resumePrecious S  Dagba resume
Precious S Dagba resume
 
Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015
 
Resume - Suncor
Resume - SuncorResume - Suncor
Resume - Suncor
 

Viewers also liked

euNetwork about us web brochure
euNetwork about us web brochureeuNetwork about us web brochure
euNetwork about us web brochureJonathan Cronin
 
2015 10 - rebecca bennett
2015   10 - rebecca bennett2015   10 - rebecca bennett
2015 10 - rebecca bennettSevernEstuary
 
Nordstrom Visual Merchandising
Nordstrom Visual MerchandisingNordstrom Visual Merchandising
Nordstrom Visual MerchandisingT-na Presutti
 
How to make LGBT Travel Matter to Millennials
How to make LGBT Travel Matter to MillennialsHow to make LGBT Travel Matter to Millennials
How to make LGBT Travel Matter to MillennialsPeter Jordan
 
AUTHROIZATION LETTER Johnriggs
AUTHROIZATION LETTER JohnriggsAUTHROIZATION LETTER Johnriggs
AUTHROIZATION LETTER JohnriggsJohn M Riggs
 
Ave maria cada hora
Ave maria   cada horaAve maria   cada hora
Ave maria cada horaFatoze
 
Berikut ini fadilah sholat tarawih
Berikut ini fadilah sholat tarawihBerikut ini fadilah sholat tarawih
Berikut ini fadilah sholat tarawihali mustofa
 
Giải pháp quản lý bán vé xe khách Miễn phí - Gọi 0979 36 27 37
Giải pháp quản lý bán vé xe khách Miễn phí  - Gọi 0979 36 27 37Giải pháp quản lý bán vé xe khách Miễn phí  - Gọi 0979 36 27 37
Giải pháp quản lý bán vé xe khách Miễn phí - Gọi 0979 36 27 37Cat Van Khoi
 
INFORME ESTUDIO DE SUELO DEFENSA RIBEREÑA (GABIONES)RIO SECO
INFORME ESTUDIO DE SUELO DEFENSA RIBEREÑA (GABIONES)RIO SECOINFORME ESTUDIO DE SUELO DEFENSA RIBEREÑA (GABIONES)RIO SECO
INFORME ESTUDIO DE SUELO DEFENSA RIBEREÑA (GABIONES)RIO SECOdante guzman
 
In tit for tat,indian hackers deface 37 brazilian websites
In tit for tat,indian hackers deface 37 brazilian websitesIn tit for tat,indian hackers deface 37 brazilian websites
In tit for tat,indian hackers deface 37 brazilian websitescyber advocate
 
Slow U.S. GDP for Second Quarter 2016
Slow U.S. GDP for Second Quarter 2016Slow U.S. GDP for Second Quarter 2016
Slow U.S. GDP for Second Quarter 2016Brian Kasal
 

Viewers also liked (14)

euNetwork about us web brochure
euNetwork about us web brochureeuNetwork about us web brochure
euNetwork about us web brochure
 
2015 10 - rebecca bennett
2015   10 - rebecca bennett2015   10 - rebecca bennett
2015 10 - rebecca bennett
 
Nordstrom Visual Merchandising
Nordstrom Visual MerchandisingNordstrom Visual Merchandising
Nordstrom Visual Merchandising
 
How to make LGBT Travel Matter to Millennials
How to make LGBT Travel Matter to MillennialsHow to make LGBT Travel Matter to Millennials
How to make LGBT Travel Matter to Millennials
 
認知、科技與設計_1050108_期末成果展第三組
認知、科技與設計_1050108_期末成果展第三組認知、科技與設計_1050108_期末成果展第三組
認知、科技與設計_1050108_期末成果展第三組
 
AUTHROIZATION LETTER Johnriggs
AUTHROIZATION LETTER JohnriggsAUTHROIZATION LETTER Johnriggs
AUTHROIZATION LETTER Johnriggs
 
Ave maria cada hora
Ave maria   cada horaAve maria   cada hora
Ave maria cada hora
 
Senior Paper
Senior PaperSenior Paper
Senior Paper
 
Berikut ini fadilah sholat tarawih
Berikut ini fadilah sholat tarawihBerikut ini fadilah sholat tarawih
Berikut ini fadilah sholat tarawih
 
Giải pháp quản lý bán vé xe khách Miễn phí - Gọi 0979 36 27 37
Giải pháp quản lý bán vé xe khách Miễn phí  - Gọi 0979 36 27 37Giải pháp quản lý bán vé xe khách Miễn phí  - Gọi 0979 36 27 37
Giải pháp quản lý bán vé xe khách Miễn phí - Gọi 0979 36 27 37
 
INFORME ESTUDIO DE SUELO DEFENSA RIBEREÑA (GABIONES)RIO SECO
INFORME ESTUDIO DE SUELO DEFENSA RIBEREÑA (GABIONES)RIO SECOINFORME ESTUDIO DE SUELO DEFENSA RIBEREÑA (GABIONES)RIO SECO
INFORME ESTUDIO DE SUELO DEFENSA RIBEREÑA (GABIONES)RIO SECO
 
In tit for tat,indian hackers deface 37 brazilian websites
In tit for tat,indian hackers deface 37 brazilian websitesIn tit for tat,indian hackers deface 37 brazilian websites
In tit for tat,indian hackers deface 37 brazilian websites
 
Slow U.S. GDP for Second Quarter 2016
Slow U.S. GDP for Second Quarter 2016Slow U.S. GDP for Second Quarter 2016
Slow U.S. GDP for Second Quarter 2016
 
Memoria descriptiva final
Memoria descriptiva finalMemoria descriptiva final
Memoria descriptiva final
 

Similar to General_ENTRION_Presentation_December2015

CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseComit Projects Ltd
 
Zentech Manufacturing Capabilities
Zentech Manufacturing CapabilitiesZentech Manufacturing Capabilities
Zentech Manufacturing CapabilitiesTransline Technology
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...yusuf699644
 
Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi
 
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydNitin Sethi
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceSimon Lawrence
 

Similar to General_ENTRION_Presentation_December2015 (20)

Abraham Sanni CV
Abraham Sanni CVAbraham Sanni CV
Abraham Sanni CV
 
CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian Showcase
 
Zentech Manufacturing Capabilities
Zentech Manufacturing CapabilitiesZentech Manufacturing Capabilities
Zentech Manufacturing Capabilities
 
CV_Thangaraj Raja
CV_Thangaraj RajaCV_Thangaraj Raja
CV_Thangaraj Raja
 
API 610 pumps .pdf
API 610 pumps .pdfAPI 610 pumps .pdf
API 610 pumps .pdf
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017
 
Company Brochures
Company BrochuresCompany Brochures
Company Brochures
 
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
LINGAM
LINGAMLINGAM
LINGAM
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
CV 23-10-2014
CV 23-10-2014CV 23-10-2014
CV 23-10-2014
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
CV Elect
CV ElectCV Elect
CV Elect
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdfFAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
 
Thiru.CV_Latest
Thiru.CV_LatestThiru.CV_Latest
Thiru.CV_Latest
 

General_ENTRION_Presentation_December2015

  • 1. Vendor Surveillance and Inspection Services – 2015 Houston, TX USA Kristiansand, Norway Singapore Macae, Brazil Aberdeen, Scotland Gdansk, Poland
  • 2. Confidential Contents  Overview  Clients  Vendor Surveillance Services  Project Example  Summary “Entrion’s vendor surveillance program for the DSM I & DSM II drillship projects were key to ensuring an on schedule delivery of the vessels. Through its global network of highly skilled multi discipline engineers located near to the major OEM’s, we were able to identify early risks to schedule and quality at the vendor facilities and address these in a timely manner. Through this approach we secured timely delivery of the drilling equipment, while maintaining the highest quality on each product.” - - Craig Riddell Technical Director Odfjell Drilling
  • 3. Confidential Overview  Our Vision - Global inspection firm of choice • Vendor Surveillance and Inspection • Audit and Verification  Headquarters – Houston, Texas • International operations – Kristiansand, Norway, Gdańsk, Poland, Aberdeen, UK, Singapore, and Macaé, Brazil  Over 100 experienced professionals located near major manufacturers worldwide • Upstream and Downstream  Clients – Drilling Contractors, Producers, Shipyards, and OEMs  Well established internal systems and processes • Consistent reporting • QMS and HSE implemented • ISO 9001 Certified and Achilles Approved
  • 4. Confidential Clients Aban Offshore Limited Atlas Insite Atwood Oceanics CenterPoint Energy Chevron DCOR Diamond Offshore Dolphin Drilling Enseada Enbridge ENSCO Frigstad Offshore Hyundai Heavy Industries Hyundai Samho Noble Drilling MacGregor Maersk Drilling Ocean Rig Odfjell Drilling Odfjell Galvao Opus Offshore Pte Ltd OtterTail Power Company PAA Natural Gas Storage Petroserv S/A Queiroz Galvao Oleo e Gas Remontowa Rowan Companies Sempra Energy Songa Offshore Stena Drilling Transocean Vallourec Vantage Drilling Yantai CIMC Raffles
  • 5. Confidential Improve Reliability and Prevent Delays Design & Engineering • Engineering Support • Procurement Support Fabrication & Construction • Vendor Surveillance & Inspection Services • Audit and Verification • Project Management Operations & After Market • Vendor Surveillance & Inspection Services • Certification Support • Asset Integrity Management
  • 6. Confidential Vendor Surveillance & Inspection Services  On-time delivery of reliable equipment  Early detection of delay to expedite/reduce impact  Identification and resolution quality issues  “Eyes and Ears” in the field  Local extension of project team  Independent insight into EPC Contractor/OEM  Lessons learned to improve vendor performance  Compliance to standards, regulations and contracts  Verification to 3rd party standard  ENTRION Vendor Surveillance Standard (ENT 006) Inspection of repair of double body Cameron Blow Out Preventer (BOP) in Patterson, LA Factory Acceptance Test (FAT) of 165t AHC Knuckle Boom Crane KBC in Molde, Norway
  • 7. Confidential Vendor Surveillance Program Skilled Local Professionals and Process Provide Predictable Results on Time on Budget 1.Risk-based Planning 2.Project Execution 3.Feedback & Resolution • Scope • Activities • Plan • Schedule • Contract/PO Review • QA/ITP Review • FAT Procedure Review • Kick-Off Meeting • Progress Monitoring • FAT Witnessing • Final Inspection • Reporting • Issue Management • Punch management • Improvement/ feedback 4.Management • Organization • Document Control • Resource Management • Project Finance
  • 8. Confidential Vendor Surveillance and Inspection Equipment Scope Mechanical, Marine, Hydraulic, Refinery, Electrical, and Control Systems  Topside Equipment • Cranes & Winches • Mud handling • Drill floor Systems • Drillers Control • Drawworks • Elevators • Tanks & Vessels • Derrick  Subsea Equipment • BOP Control Systems • BOP Stacks • Riser Systems • Connectors • Valves  Propulsion & Power • Engines • Generators • UPS • Transformers • Switch gear • Thrusters  Shipboard Systems • Lifeboats • Firewater system • Helicopter refueling • SCADA • Breathing air • Bilge Water  Refinery & Processing • Heat exchanges • Vessels • Storage tanks • Separators • Columns • Piping • Steel Structures • Emergency Generators • Control Systems
  • 9. Confidential Project References Delivered on a Project or a Call-out Basis  Rowan, Noble, Dolphin, DODI at HHI (14)  Odfjell Drilling: Deepsea Metro I and II, Deepsea Aberdeen, Deepsea Stavanger, Deepsea Bergen, Deepsea Atlantic, various fixed platforms (12)  Chevron Escravos  DWC, DSM I, DSM II at HHI (3)  Clear Leader rigs at DSME (5)  Aker Drilling at DSME (2)  Transocean at DSME (5) in progress  KG1, KG2, Petrobras 10K at SHI (3)  ENSCO 8500 Class at KFELS (4)  Brazilian Shipyard Enseada (4) in progress  DDIII, B326, B327, B335 at KFELS (4)  Frigstad at Yantai (2) in progress
  • 10. Confidential Project Example – Risk Based Planning  Introduction and Objectives  Plan, execute and manage a global surveillance program for a drillship  On-time delivery and quality equipment based on ENT-006  “Eyes and ears” in the field to oversee contractor performance  Budget - $950K (0.12% of total)  Scope of Work  Drilling and subsea equip.  Risk based approach  Long range plan  375 Surveys  Short term dispatch plan System / Package Criticality Assessment Field Activities High Med Low Total KOM PM FAT FI Total BOP Control System 12 1 0 13 3 8 4 5 20 BOP Stack 16 0 0 16 1 84 30 1 116 Bulk and Mud System 0 50 0 50 0 2 27 24 53 Choke & Kill System 0 5 0 5 4 5 9 Cranes and Material Handling 4 27 0 31 1 4 18 17 40 Derrick 1 19 0 20 0 9 15 13 37 Diverter System 4 6 0 10 0 11 3 1 15 Driller's Control System 12 3 0 15 1 1 1 1 4 Drillfloor System & Equipment 0 19 7 26 0 23 20 12 55 Riser System 0 31 0 31 0 26 5 1 32 Total 49 161 7 217 6 168 127 80 375 Criticality Definition DOC KOM PM FAT FI High (I) Equipment delay will significantly impact the overall project schedule or poor quality will significantly impact safety or reliability. R R R R R Medium (II) Equipment delay may result in a minor overall project delay or poor quality may impact safety or reliability. O O O R R Low (III) Equipment delay does not impact the overall project schedule and poor quality does not significantly impact safety or reliability. O O O O R
  • 11. Confidential Project Example – Program Execution  Inspection Activities  Contract, ITP, QP, FAT Procedure review (DOC)  Fabrication Kick-off-Meeting (KOM)  Fabrication Progress Monitoring (PM)  Factory Acceptance Test (FAT)  Final Inspection (FI)  Inspections  Inspection packet  Inspection  Reporting  Quality Assurance
  • 12. Confidential Project Example – Feedback and Resolution (Quality)  Quality metrics definition  Punch item: Satisfy contract  Action Item: Concern that does not qualify as a punch item  Punch items  Identified 543 punch items, closed 396, transferred 147 to the yard  Action items  Identified 78 action items, closed 51, transferred 27 to the yard Equipment Issue Impact Resolution HP Mud Pumps Improper preservation causing water in blowers during transportation Delay in installation and commissioning Final inspection during loading to assure proper preservation Lifting Equipment Requirement from Shell for critical lift equipment NDE inspection Delay in commissioning and additional inspection after FAT Attended as many NDE’s as possible. Add inspections during PO phase and include in work orders. BOP Stack BOP Low force shear rams seals damage after shear testing Delay in BOP stack delivery for shipyard SIT Perform shear test during BOP body assembly as performed by OEM 1, or OEM 2 to avoid this issue during BOP SIT Class certificates Delay from OEM 3 supplying Class certificates. In some cases up to a year Delay in SIT Coordinate with vendor to track Class certificates in parallel with equipment. HP Mud pumps Ship loose items Incorrect tagging and missing items for shipping loose items Delay in HP Mud pumps installation Review ship loose items with OEM 3 prior to crating Mud Gun & agitators OEM 3 Mud Guns and Agitators actuals dimensional error (too long) due to incorrect drawings used by vendor Cutting and re-welding at the shipyard, delaying installation and testing Provide approved drawings to inspectors from end user, and shipbuilder.
  • 13. Confidential Project Example – Feedback and Resolution (Schedule)  Schedule metric definition  Difference between contractual and actual delivery date  Schedule metrics  43% on time  50% of within 10 days  78% within 60 days  Subsea equipment with major delays Equipment Issue Impact Resolution Diverter Support Housing Schedule delays affected the installation procedure and duration. Delay on moon pool structure construction. Increase inspections for diverter housing prior to FAT to mitigate or plan around delays from the vendor. HPU & Diverter Skid i. Testing of unit is not being done fully by OEM 1, ii Electronic components not fully tested, iii System Connectivity test was not done Delay in commissioning Increase number of punch items during commissioning phase Assure all areas not tested are fully documented by the inspector so they may be tested during commissioning. Coordinate with Class to make sure unit will meet class requirements after commissioning. BOP Stack Low force Shear rams do not properly seal Delay in BOP stack FAT Perform Shear seal testing at BOP body testing phase BOP controls systems Incorrect wiring in MUX PODS BOP stack SIT delay Attend FAT at subcontractor facility. Tensioner Ring New design and NDE requirements delay manufacturing. Delay in RIG SIT Perform inspections at OEM 1 subcontractors to mitigate or plan around delays from the vendor Riser Hydraulic running tool Delay from OEM 1’s subcontractors. Delay in RIG SIT Perform inspections at OEM 1 subcontractors to mitigate or plan around delays from the vendor Choke and Kill manifold Valves were not properly tested prior to assembly. Delay in testing and delivery Perform inspection during testing of the choke and kill valves to assure proper testing.
  • 14. Confidential Cost Benefit Analysis $- $1,000 $2,000 $3,000 $4,000 $5,000 $6,000 $7,000 Two Days Estimated Inspection Costs Client - Remote Inspector Entrion - Local Skilled Inspector
  • 15. Confidential Economics Direct Savings 59%  No increase in fixed personnel resources  Trained professionals to meet client needs  Availability of technically qualified resources worldwide  Dedicated individual resources  Strong past experience with vendors and OEMs  Reductions in travel and overall expenses  Standardized reporting formats
  • 16. Confidential Summary  Global operations  Work with drilling contractors, producers, OEMs and shipyards globally  100 experienced professionals located near your equipment vendors  Well established systems and processes  Consistent reporting  QMS and HSE implemented  ISO 9001 Certified and Achilles Approved  Vendor surveillance and inspection services for on-time delivery and operational readiness  59% Direct Savings “Entrion has now been providing support for our new build drill ship project with HHI for over a year. During that time they have been coordinating all the inspectors and project management for the vendor surveillance for all builder furnished equipment outside of Korea. Entrion has provided experienced professionals that have done a good job documenting, reporting, and ensuring the equipment is manufactured to a high level of quality. The systems Entrion uses for documentation and tracking are efficient, reliable, and easy to use. Rowan has been very happy with the level of service and the quality of people performing monitoring, inspections, and project management. Additionally Rowan also uses Entrion for monitoring and inspections of our owner furnished well control equipment and have been very satisfied with the work performed.” - Al Browning, Director Vendor Quality Management, Rowan Companies
  • 17. Confidential Global Offices ENTRION, Inc. ENTRION Norway ENTRION Poland ENTRION Singapore ENTRION do Brasil 10497 Town and Country Way Suite 550 Houston, TX 77024 +1 832 623 6242 Suldalsveien 23A 4617 Kristiansand Norway + 47 476 55 443 Ul. Cypriana Kamila Norwida 2 80-280 Gdańsk, Poland +48 588 813 053 80 Raffles Place #26-01 UOB Plaza 1 Singapore, 048624 +65 3158 3300 Estrada Sào José e Imboassica n 1000 Barrio de Imboassica Macaé – RJ +55 21404 21210 website: www.entrion.com