Arena Internationals’ Operations & Maintenance Strategies for Coal & Gas Power Stations being held on 18th and 19th March in London, UK, aims to establish solutions to key issues such as:
The impact of future government legislation on your O&M strategies
Executing the best O&M strategies to ensure your plant’s life is extended
The impact of carbon capture on your power station - case study on a CCS pilot plant
How to make your plant more flexible by understanding how to implement successful optimisation techniques
Through case study driven presentations from leading energy operators and a series of informative panel debates, this event will provide you with best practice solutions to help you comply with existing and upcoming challenges in the market.
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
Operation & Maintenance Strategies for
1. Operation & Maintenance
Strategies for Existing
Coal & Gas Power Stations
Thursday 18th and Friday 19th March 2010 London, United Kingdom
Cutting edge strategies to ensure your O&M strategy is cost
effective, station life is extended & you remain compliant
3 GREAT REASONS YOU SHOULD ATTEND HEAR FROM LEADING INDUSTRY
• Network with leading figures from the top 10 EXPERTS INCLUDING:
European operators and many more Marianne Wenning, Marc Rudd, Engineering
• Discover the most e ective strategies to Head of Industrial Manager, SCOTTISH AND
improve your O&M procedures by hearing from Emissions Unit, EUROPEAN SOUTHERN ENERGY
policy makers and Carbon Capture & Storage COMMISSION, DG
pioneers on future initiatives ENVIRONMENT, INDUSTRIAL Alan Kemp, Engineering
EMISSIONS UNIT & Maintenance Manager,
• Equip yourself with unparalleled knowledge SCOTTISH POWER
of how to extend the life of your asset by Jack Turner, Station
investing in the best technology and adopting Manager – Fiddler’s Ferry Dave Carlton,
a top O&M strategy Power Station, SCOTTISH Project Manager, Aberthaw
AND SOUTHERN ENERGY Carbon Capture Project,
RWE NPOWER
FIND OUT HOW TO… Kevin Nix, Director,
Power Station Operations, John Armstrong,
• Extend the life of your assets by adopting an Engineering Manager,
RWE NPOWER
optimum operations and maintenance strategy Enfield Power Station,
• Gauge the impact of carbon capture on Martin Schoenrok, Head of E.ON UK GENERATION
your power station and the best way to the Asset Management, E.ON
Tony Wilkes,
overcome integration challenges James Varley, Managing Portfolio Maintenance
• Taylor your O&M strategy to a ect regulatory Editor, MODERN POWER Co-ordinator,
compliance and its impact on your portfolio SYSTEMS MAGAZINE RWE AG NPOWER
Media partners: Organised by:
Energy
BUSINESS Review
REGISTER NOW: www.arena-international.com/omse
Tel: +44 (0)207 7753 4268 • Email: book@arena-international.com • Fax: +44 (0)20 7915 9773
2. Programme Day One Thursday 18 March 2010
08.30 Registration desk opens 11.00 A case study of the carbon dioxide capture plant at
Aberthaw power station
08.55 Chairman’s opening remarks ● Gain an overview of the RWE CO2 stratagem and it’s impact
James Varley, Managing Editor, MODERN POWER SYSTEMS on CO2 capture
MAGAZINE ● Examine the process involved
● What is the best way to overcome integration challenges?
09.00 Keynote presentation: Towards an improved policy ● Analysing environmental considerations and applying it to
on industrial emissions – Implications for large your Power Station
combustion plants ● How to best address construction issues
● Evaluate how pollutant emissions (other than greenhouse ● Analysing the impact of carbon capture on your power station
gases) from thermal power plants are regulated at EU level Dave Carlton, Project Manager, Aberthaw Carbon Capture
by the IPPC (integrated pollution prevention and control) Project, RWE NPOWER
Directive and the LCP (large combustion plant) Directive
● Understand how the IPPC Directive requires installations 11.30 PANEL DISCUSSION: Evaluate how Combined Cycle
to be operated according to integrated permits containing Gas Turbine Plants’ technological advances can alter
conditions based on the Best Available Techniques (BAT) your O&M strategy for the better
● Gain an overview on the exchange of information involving
● Two shifting on a daily basis while maintaining plant
Member States and industry in which, the Commission has
reliability – best practice in cycle and operation and what
adopted 32 BAT Reference Documents (BREFs) describing BAT
maintenance strategy you need to employ
for IPPC activities across the EU
● Deciding on the best operation strategies to extend the life
● Look at how the LCP Directive sets EU-wide "minimum"
of your ageing CCGT
emission limit values and monitoring requirements for SO2,
NOx and dust
● Examine the niche technology being developed for gas turbine
engines and how this can benefit the longevity of your turbine
● Following the revision of the IPPC Directive, revealing a
lack of implementation of BAT across the EU, hear how the
● Selecting the best O&M strategy for your CCGT by investing
in the most appropriate technology and by looking at cutting
Commission has proposed to recast the IPPC, LCP and five
edge technological developments
other Directives into a new Industrial Emissions Directive (IED).
● Recent commercially driven design changes and their
● The proposed IED is currently being discussed in the EU
consequence on the user sector – have they influenced your
institutions with a view of adoption in the course of 2010.
O&M strategy as a direct result?
Marianne Wenning, Head of Industrial Emissions Unit,
● Overcoming supply shortages in terms of essential
EUROPEAN COMMISSION, DG ENVIRONMENT, INDUSTRIAL
technology needed for your CCGT and how this can help you
EMISSIONS UNIT
cope with a breakdown more efficiently
Moderated by: James Varley, Managing Editor,
09.30 Keynote presentation: How to extend the life of MODERN POWER SYSTEMS MAGAZINE
mid life to older assets by adopting the most
appropriate O&M strategy Plus a selection of speakers from the day
● Assess the condition need of a plant to meet commercial
operational requirements 12.30 Getting the best from your plant by implementing
● Understand the overall level of investment necessary to extend successful plant optimisation techniques
plant life in a competitive market ● How to focus on the root cause of performance issues
● Learn how to make the investment case ● Output optimisation for gas plants – how performance
● Prioritise specific investments by taking account of factors systems and performance techniques strategy can help you
such as process safety and environmental performance ● CCGT maintenance optimisation – maintain the asset
● Key factors in deciding on best technical solutions sufficiently while running the station for an optimum amount
● The benefits of different O&M strategies, major re-investment of time
versus ongoing maintenance ● Opportunities for developing plants to respond to increasing
Kevin Nix, Director, Power Station Operations, RWE NPOWER demands for load flexibility
● Achieve plant optimisation by delivering maximum output
during times of peak demand
10.00 Keynote presentation: Achieving Emission
John Armstrong, Engineering Manager, Enfield Power Station,
Compliance in a cost-effective and innovative manner
E.ON UK GENERATION
● RWE npower’s approach to emissions compliance within LCPD
● The assessment of technology against individual plant 13.00 Networking Lunch
configurations
● Balancing emissions compliance against capital and running
costs of plants
14.30 Advanced coating systems for gas turbines
● Managing annualised emission limits ● Existing coating systems available on the market and their
advantages and disadvantages
● Maintaining fuel flexibility options
● New coating concepts for corrosion protection in aggressive
● Cross-company approach in the assessment of emission
environments
compliance schemes
● Modelling corrosion processes to permit predictable
Edward Jamieson, Group Head of Combustion Technology
component lives
Development, Boilers & Combustion Team, RWE NPOWER
● An overview of the latest thermal barrier coating systems
● A comparison study of the life prediction of thermal barrier
10.30 Morning networking refreshment break
coatings
● Examining the benefits of smart thermal barrier coating systems
Professor John R. Nicholls, Professor of Coating Technology,
CRANFIELD UNIVERSITY
3. Day One Thursday 18 March 2010 Programme Day Two
15.00 Afternoon refreshment and networking 08:30 Registration and refreshments
15.30 How to best optimise efficiency at your coal fired 08.55 Chairman’s opening remarks
station by examining the best O&M strategy for
coal plants in the next 2-3 years
09.00 Minimising the down time of your asset during
Deciding on the best strategy for planning a shut down
●
an outage by applying best management practice
● How to select the most appropriate equipment with the
objective of making your asset more flexible and efficient – ● How adopting best O&M strategy will help you plan for an
overcoming the biggest challenge for O&M effective outage
● Examine the best O&M strategy for coal plants in the next ● Deciding which essential maintenance is needed for your
2-3 years individual station and focusing on addressing these as a priority
● Effective portfolio management – assessing productivity vs. ● Implementing effective budget and costs planning for an outage
maintenance investment needed to help you decide to opt an Tony Wilkes, Portfolio Maintenance Co-ordinator,
asset in or out RWE AG NPOWER
● How to best comply with the Large Combustion Plant Directive
(LCPD) while maintaining and increasing the overall value of 09.30 Securing and sustaining Operation and Maintenance
your portfolio skills, productivity and performance
● Striking the perfect balance – continuing the life of existing ● Meeting the rising demand for station operating and
technology by employing the best O&M strategy that will contractor personnel by focusing on both keeping the current
help you to do so fleet operating safely and efficiently and getting ready for new
Martin Schoenrok, Head of Asset Management, E.ON gas, coal, wind or nuclear stations
● Overcoming the skills gap of trained staff – if statistics show
16.00 Examining the advantages from an O&M perspective that 50% of the workforce will retire before 50% of the new
on using biomass to reduce environmental impact stations are built
● Assessing the O&M demand placed on a station firing both ● Examining the structured training currently available and how
coal and bio fuels – is it greater or the same? it needs to be expanded to create a new generation of
personnel with common frameworks for operators and
● Is the reduction of environmental damage significantly
contractors to maximise competence and transferability
reduced by incorporating bio fuels?
across station types and within the supply chain
● Assess how much cleaner your coal station can become by
● Analysing the link between more efficient career paths and
using non renewable sources and bio sources together
increased flow of talent to the industry - how this can aid
● Future strategy – increase the ratio of bio fuels vs. coal competence and safety performance
to optimising output while reducing environmental
David Edwards, Chief Executive, ENGINEERING
damage further
CONSTRUCTION INDUSTRY TRAINING BOARD
Alan Kemp, Engineering & Maintenance Manager,
SCOTTISH POWER
10.00 Managing power stations statutory inspections
under Pressure System Safety Regulations (PSSR)
16.30 Adopt an O&M strategy to help you ensure your gas
turbine rota does not fail ● How does a power station ensure compliance with PSSR?
● What is the process and the time lines for implementation
● Avoid the risk of failure by examining the main types of motors
and their cost impact ● Evaluating examples of the process for an existing coal fired
and a new gas fired power stations
● Assess the impact of lead time on a new motor in order to
avoid a breakdown ● Analysing the benefits for the stations
● What are the best life assessment options available on ● What are the benefits for the insurers
the market? Alan Fitzpatrick, Contracts Engineer, ROYAL & SUN
● What are the most effective staff health and safety ALLIANCE ENGINEERING
precautions taken in case a rota fails? Are they sufficient?
● Examples of rota failures and how they have been dealt with – 10.30 Morning refreshment and networking break
learning from experience
Dr Mike Wood, Gas Turbine Consultant 11.00 CASE STUDY: Enhance your plants effectiveness by
assessing the best engine types
17.00 Chairman’s closing remarks and end of day one ● Examining the issues related to a particular engine type
● Selecting the most appropriate engine for your station
● How to minimize costs being passed to customers by selecting
the right technology
● Analyze and compare the benefits of the four top engines in
the market
Sponsor led session
REGISTER ONLINE NOW!
wwww.arena-international.com/omse
4. Day Two Friday 19 March 2010
11.30 ROUNDTABLE DISCUSSION: Operation & maintenance 15.00 Afternoon refreshments and networking
threats and opportunities for fossil fuel power plants
Delegates will have the opportunity to break into groups 15.30 Operation & maintenance policy from a service
and discuss specific details surrounding operation & provider’s point of view
maintenance issues across both coal and gas power ● Strategic policy on O&M and what activities are being
stations. The session will be supported by specialists in the undertaken in this area?
field and delegates will have the opportunity to participate
● Analyse O&M policy for gas power stations and the new
in a real benefit led interactive discussion. The following
advances in this field
topics will be addressed and delegates are welcome to take
● Coal power stations – what are the O&M solutions and
part in as many discussions as they wish:
equipment developments for the near future
● What new kits of equipment are available to help you achieve
● Assessment of the three major components for gas plants:
new plants standards?
compressor, turbine & rota - how to maintain these and extend
● Analyse the best O&M technologies which will help you
the lifetime of equipment as well as the plant
maintain plant availability
● Control instrumentation: spending the station budget wisely
● Looking to the future - will the next 10-15 years provide the
and obtaining maximum return on investment
advances needed in terms of technology so that existing
● Combustion: managing the plant while adhering to
plants can carry on operating?
environmental regulatory limits
● Discover the most appropriate technology asset owners
● Transition to low carbon fuels: the answer to achieving and
should purchase to avoid any new investments being outdated
fulfilling the Industrial Emissions Directive in terms of NOx and
by government legislation
Sulphur reduction while remaining profitable?
Sponsor led session
● Gas plants: plant equipment and staff safety, examining best
practice and insurance policy
● Opted in plants: making wise investments in terms of O&M
16.00 PANEL DISCUSSION: How does regulatory compliance
in the challenge to meet environmental criteria with affect O&M strategy for both the utility operators as
particular focus on retro-fitting well as the technology and maintenance providers?
Moderated by your chairman: James Varley, Managing Editor, ● Is regulatory compliance perceived as a real challenge from an
MODERN POWER SYSTEMS MAGAZINE O&M perspective?
● How much of a competitive advantage is regulatory
12.30 Networking lunch compliance bestowing upon the O&M sector?
● Is the development of carbon capture and storage technology
14.00 Defining the best commercial strategy for coal and the main focus for O&M providers?
gas stations ● Has regulatory compliance caused a long or just a short term
change of strategy for the utility sector?
● Examining the investments operators are currently making
● How important is it in determining future strategy for them?
● How investors see portfolios changing and what will be their
strategy for the next ten years? ● Examining the impact on a large utility provider’s portfolio of
meeting legislation and how much need there is to look for
● Assessing if a plant should be opted in or out and how opting
new channels to expand it?
out a plant impacts the portfolio as a whole
Moderated by: James Varley, Managing Editor,
● Declining technology options for coal plants – is in-house
MODERN POWER SYSTEMS MAGAZINE
O&M the future?
● Assessing the issues with steam turbines and what operators Panellists: Marc Rudd, Engineering Manager,
are doing to overcome them SCOTTISH AND SOUTHERN ENERGY
● Ageing of vital instruments such as valves and circulation Alan Fitzpatrick, Contracts Engineer, ROYAL & SUN ALLIANCE
pumps and how best to deal with such problems before they Tony Wilkes, Portfolio Maintenance Co-ordinator,
become a maintenance burden RWE AG NPOWER
● Defining the strategy for fossil fuel plants in the next two years
Jack Turner, Station Manager – Fiddler’s Ferry Power Station, 17.00 Chairman’s closing remarks and end of conference
SCOTTISH AND SOUTHERN ENERGY
14.30 Keeping the lights on – does it have to cost
the earth?
● Analysing the costs of producing electricity from different
technologies
● How renewable generation contributes to the supply mix
● Mitigate additional costs of carbon capture on a thermal plant
● Contribution of capital, O&M and fuel costs to the electricity
cost for the different technologies
● Overcome challenges to the electricity industry from the
carbon reduction targets in the climate change legislation
● What will be the impact of future policies and legislation on
costs and security of supply
Ian Burdon, Technical Director, ENERGY STRATEGIC
CONSULTING
5. Sponsors & Media partners
Media partners
Modern Power Systems provides in-
depth independent coverage of power
plant and transmission and distribution
technology. Widely read throughout the world of electricity generation, it
specialises in presenting key engineering and commercial developments
in an authoritative but accessible style. From advanced power plant and
transmission design to repair and maintenance case studies, Modern Power
Systems is unrivalled as a platform for exploring cutting edge developments
in the power industry. www.modernpowersystems.com
Energy Business Review (EBR) is the fastest Energy
growing website within the energy industry. EBR
provides a high level audience with a ‘one-stop-
BUSINESS Review
shop’, where the latest opinion and forecasts of
Datamonitor analysts are provided alongside the
latest industry news. www.energy-business-review.com
Power-technology.com, with more than 70,000
visitors a month, is the essential one-stop-shop
for global energy industry professionals every
day. The site comprises of the following key elements:
● Industry Projects ● Company A-Z listing
● Products and Services ● Employment
● Events Opportunities
● Latest Industry News
Members of the industry’s leading energy providers, engineering
companies, consulting services, nuclear power plants and electronic
corporations rely on power-technology.com as their primary source of
industry intelligence.
Energy etrack
GlobalData’s Energy eTrack is the
new, interactive desktop tool designed for executives & analysts active in
or supplying services to the oil & gas industry. Energy eTrack subscribers
receive access to eight unique oil & gas asset databases, news & deals,
company profiles, opinions and research reports fully integrated with
innovative desktop tools for easy search, browse, and data access.
Sign up for a free demonstration. For more information on GlobalData’s
Energy eTrack visit: www.energyetrack.com
About the conference
Operation & Maintenance Strategies for Existing Coal & Gas Power
Stations provides a platform for the industry to discuss critical issues
and share different approaches to common O&M problems. Join the
leading operators across Europe as they discuss cutting edge O&M
strategies for ensuring profitability and compliance.
Arena Internationals’ Operations & Maintenance Strategies for Coal
& Gas Power Stations being held on 18th and 19th March in London,
UK, will establish solutions to key issues such as:
● The impact of future government legislation on your O&M strategies
● Executing the best O&M strategies to ensure your plant’s life is extended
● The impact of carbon capture on your power station - case study on a
CCS pilot plant
● How to make your plant more flexible by understanding how to
implement successful optimisation techniques
Through case study driven presentations from leading energy operators
and a series of informative panel debates, this event will provide you
with best practice solutions to help you comply with existing and
upcoming challenges in the market.
Who should attend
This event would be extremely beneficial for the fleet team and in
particular the plant station management team responsible for the day
to day running of the plant to attend.
● Plant/Station Manager Development Manager
● Engineering Manager ● Health & Safety Manager
● Operations Manager ● Asset Manager
● Maintenance Manager ● Gas Turbine Engineer
● Development or Business ● Other fleet members
6. BOOKING FORM Operation & Maintenance Strategies for Existing Coal & Gas Power
Stations, Thursday 18th and Friday 19th March 2010 London, UK
Prices & Payment Information (please tick option) Four Easy Ways To Book:
Yes, I would like to register for the event: Book before Book before Book after ■ Register online at
22.01.2010 19.02.2010 19.02.2010 www.arena-international.com/omse
Government and Regulatory bodies, Utilities and Academics:
■ Email us at
I would like the VIP Attendee Package to include the 2 day book@arena-international.com
£1548 † £1648 † £1748 †
conference and the interactive CD-ROM (saving £50)
£1099 £1199 £1299 ■ Tel +44 (0)20 7753 4268
I would like to attend the two day conference only (+VAT @ 17.5% (+VAT @ 17.5% (+VAT @ 17.5%
= £1291.33) = £1408.83) = £1526.33 ■ Fax +44 (0)20 7915 9773
Fees for all other attendees
Venue Details
I would like the VIP Attendee Package to include the 2 day The two day conference will take place on Thursday
£2048 † £2148 † £2248 †
conference and the interactive CD-ROM (saving £50) 18th and Friday 19th March 2010 in London, UK.
For further information contact our Operations
£1599 £1699 £1799 department on +44 (o) 207 753 4201.
I would like to attend the two day conference only (+VAT @ 17.5% (+VAT @ 17.5% (+VAT @ 17.5%
= £1878.83) = £1996.33) = £2113.83) Are you registered?
Non-attendees
You will always receive an acknowledgement
of your booking. If you do not receive anything,
I cannot attend the conference but would like to receive the please call us on +44 (0) 20 7753 4268 to make
£499 † £499 † £499 †
interactive CD-ROM sure we have received your booking.
† + VAT where applicable
Total Discount code if applicable ________________________________
are at the discretion of Arena International and are not cumulative
All total fees are subject to a 2.5% service charge
Arena International Conference Delegate terms and conditions prior to the event if this is sooner. All registrants must provide a credit card the CD-ROM (or any part of it) to any other person other than in accordance
1 Scope of Agreement: These are the conditions of the contract between number as a guarantee at the time of booking. We reserve the right to charge with these terms and conditions.
you, the Client (“You” and “your”) and Arena International Events Group your card in full if payment is not received in accordance with these payment • Arena International Events Group is subject to the UK Data Protection
(“Arena International Events Group”, “we”, “us” and “our”) governing terms. We reserve the right to refuse admission if full payment is not received Act 1998 and is registered in the UK with the Information Commissioner to
your use of our services, including the conference registration as set out in accordance with these terms. process your personal information. Our primary goal in collecting personal
in your booking form. This agreement constitutes the entire agreement 4 Cancellations: In the event of cancellation, 100% of the event fee is information from you is to give you an enjoyable customised experience
between Arena International Events Group and you. All prior agreements payable and non-refundable. All cancellation requests must be submitted whilst allowing us to provide services and features that most likely meet your
understandings and negotiations and representations (save for fraudulent to us in writing. If we agree to your cancellation then all cancellation fees needs. We collect certain personal information from you, which you give to us
misrepresentation) whether oral or in writing are cancelled in their are payable immediately after the acceptance of your cancellation in when using our Sites and/or registering or subscribing for our products and
entirety. The terms of any other electronic communications will not form writing by us. services. We also collect certain personal data from other group companies to
part of this agreement. 5 General: You, your executive/s or your agents may not transfer or assign whom you have given information through their websites. If you do not want
2 Our commitment to you: Should the Event be cancelled or the location any of the rights or obligations of this Agreement (in whole or part) without us to continue using this information please notify us at unsubscribe@arena-
be changed for reasons or circumstances beyond our control, we reserve our prior consent. Any attempt to resell, assign or transfer rights without our international.com. Any personal information supplied to SPG Media Ltd as
the right to reschedule the Event, including changing the location, upon consent will entitle us to cancel the contract without liability to you. part of this registration process and/or any other interaction with SPG Media
written notice to you. Should the event fail to be rescheduled for any reason • This agreement is governed by and will be construed in accordance Ltd will be collected, stored and used by SPG Media Ltd its subsidiaries,
your refund shall not exceed the total charge received by us from you. with English law and each party irrevocably agrees that the courts of related companies or affiliates in accordance with the SPG Media Ltd Privacy
3 Payment Terms: The Total Fees specified on the booking form are England will have the non-exclusive jurisdiction to deal with any disputes Policy. Please email privacypolicy@arena-international.com for a copy of the
subject to an additional service charge of 2.5% (“Service Charge”) arising out of or in connection with this agreement. SPG Media Ltd Privacy Policy.
applied to cover administration costs, and are exclusive of VAT and any • Grant of Licence: If your booking includes the CD-ROM, you warrant • The working language of the Event is English. Executives requiring
other applicable sales tax which shall be payable in addition. that you will only use the CD-ROM for your business purposes and shall not, an interpretation service must make their own arrangements at their
• Following completion and return of the booking form, full payment without our prior written consent, make available, copy, reproduce, transmit, own expense.
including Service Charge is required within five days from the invoice date or disseminate, sell, licence, distribute, publish, broadcast or otherwise circulate
Arena International Events Group, a trading division of SPG Media Ltd. Registered Office: John Carpenter House, John Carpenter Street, London UK EC4Y 0AN. Registered in England No. 01155599. www.arena-international.com
Delegate Details please photocopy form for multiple bookings
Mr/Mrs/Ms/Dr: First Name: Surname:
Email: Tel: Job Title:
Fax: Department:
Company Details
Company: Address:
Town: Postcode: Country:
VAT Number: Nature of Business:
Payment Details
Purchase Order No.
■ I enclose a cheque drawn on a UK bank (please make cheque payable to Arena International and write reference PPMO0310 on the reverse)
■ I will transfer payment to your Lloyds TSB account City Branch, London, UK: 01492549, sort code 30-00-02 (using reference PPMO0310)
■ I would like to pay with my credit card ■ Visa ■ Mastercard ■ AMEX ■ Maestro ■ Solo
Card Number: Expiry Date: Issue Date: CSV*:
Cardholder's Name:
Cardholder's Address:
*The CSV number is the last 3 digit number on the reverse of the card
■ Yes, I have read and understood the terms and cancellations conditions and am happy to proceed with my registration
MKTG
Signature Date