Scheme for Promotion of Manufacturing
of Electronic Components and
Semiconductors (SPECS)
Scheme for Promotion of Manufacturing of Electronic Components
and Semiconductors (SPECS)
Incentives
(INR 3,285 crore)
Financial Incentive of 25% on Capital Expenditure, on reimbursement basis
Tenure 3 Years for Filing Applications, 5 Years for Investment
Coverage
Electronic components, semiconductor/ display fabrication units, ATMP
units, specialized sub-assemblies and capital goods for manufacture of
aforesaid goods. (Electronics Products such as Mobiles and Consumer
Goods excluded)
Eligibility
Investments in new and expansion of capacity / modernization and
diversification of existing units
Minimum Investment
Threshold
Ranges from INR 5 crore to 1,000 crore (Will encourage Domestic Players)
Eligible Capex
Plant, Machinery, Equipment, Associated Utilities and Technology
including R&D (Land and Building excluded)
Draft
Appraisal and Disbursement
Guidelines
Key Definitions (Paragraph 2)
1
1. Applicant: Private Limited Company, Public Limited Company, Sole Proprietorship,
Partnership, or Limited Liability Partnership registered in India.
2. Project / Unit: New business unit or expansion of capacity / modernization and / or
diversification of an existing unit.
3. Expansion of capacity / modernization and/ or diversification of an existing unit: An
increase in the value of fixed capital investment in plant, machinery, equipment, associated
utilities and technology, including for Research & Development (R&D) of an existing unit.
4. Approved Project / Unit: Project for which approval is issued by the Project Management
Agency (PMA), based on the recommendations of Executive Committee (EC) under MeitY.
Key Definitions (Paragraph 2)
1
5. Acknowledgement Date: Date on which, acknowledgment is issued by the PMA.
6. Approval Date: Date on which approval letter for the Project / Unit is issued by the PMA.
7. Commercial Production: Production is undertaken for the sale of manufactured goods by the
approved Project/ Unit.
8. Eligible capital expenditure: The capital expenditure considered eligible for incentive as per
the approved list of capital items annexed to the approval letter given to the applicant.
9. Total Incentive: Total Incentive under the Scheme is 25% of eligible capital expenditure for an
approved application under the Scheme.
Key Definitions (Paragraph 2)
1
10. Project Management Agency (PMA): Refers to the agency appointed by MeitY to act on its
behalf for receipt of application, issuance of acknowledgement, appraisal / evaluation of the
project (including eligible capital expenditure), recommending project to the Executive
Committee (EC) of MeitY, issuance of approval letter on the recommendation of Executive
Committee of MeitY, verification of claim for incentive.
11. Executive Committee (EC): Committee constituted by MeitY and chaired by an officer not
below the rank of Joint Secretary in MeitY.
12. Governing Council (GC): Constituted by MeitY under the chairmanship of Secretary, MeitY.
The constitution of GC is included in these Guidelines.
Eligibility Criteria under the Scheme (Paragraph 3)
2
q The scheme shall be applicable for investments in new units as well as expansion of
capacity / modernization and / or diversification of existing units.
q If an application covers more than one product categories, then the minimum threshold of
investment (capital expenditure) shall be the highest of the individual threshold
investment for each of the product category(ies).
q The minimum investment thresholds are same for new units or expansion of capacity /
modernization and / or diversification by existing units.
q A Project / Unit proposed may include multiple manufacturing facilities at one or more
proposed locations. There is no limit on the number of applications for an Applicant.
Eligible Capital expenditure (Paragraph 4)
3
q Eligible Capital expenditure is expenditure is made on or after the date of acknowledgement
of an application and within 5 years of date of acknowledgement of application
q Capital expenditure made before the date of acknowledgement of application, but on or after
the date of application, on the approved list of capital items, shall be considered for calculation
of threshold.
q The date of invoice would be considered as the date of booking capital expenditure under the
Scheme.
q The capital expenditure, based on which eligible capital expenditure is being determined, shall
be capitalized in the books of accounts of the applicants.
Eligible Capital expenditure (Paragraph 4)
3
1. Expenditure incurred on plant, machinery, equipment and associated utilities:
• tools, dies, moulds, jigs, fixtures (including parts, accessories, components, and spares
thereof) of the same.
• expenditure on packaging, freight/ transport, insurance, and erection and
commissioning.
• The Associated utilities - captive power and effluent treatment plants, essential equipment
required in operations areas such as clean rooms, air curtains, temperature and air quality
control systems, compressed air, water & power supply and control systems, etc.
• The Associated utilities also include IT and ITES infrastructure related to manufacturing
including servers, software and ERP solutions.
• The total expenditure incurred on associated utilities - not exceeding 20% of the total
eligible capital expenditure for plant, machinery and equipment.
Eligible Capital expenditure (Paragraph 4)
3
2. Expenditure incurred for Research and Development (R&D): Include expenditure on in-house
and captive R&D including test and measuring instruments, purchase of design tools,
software cost (directly used for R&D) and license fee, expenditure on technology, IPR,
Patents and Copyrights for R&D - not exceeding 20% of the total eligible capital expenditure.
3. Expenditure incurred on Transfer of Technology (ToT), including cost of technology: Include
cost of technology and initial technology purchase related to goods - not exceeding 10% of the total
eligible capital expenditure.
4. Expenditure incurred on refurbished plant, machinery and equipment : Include expenditure on
used / second hand / refurbished plant, machinery and equipment (including for associated utilities and
R&D), whether imported or procured domestically - not exceeding 20% of the total eligible capital
expenditure.
Eligible Capital expenditure (Paragraph 4)
3
5. Expenditure incurred on Land and Building: The expenditure incurred on land and building
(including factory building / construction) required for the project / unit is not covered under
the Scheme.
6. Expenditure on consumables and raw material used for manufacturing shall not be
considered as capital expenditure.
SPECS Application Process Flow
Step One
APPLICATION PROCESS
Step Two
DISBURSEMENT PROCESS
1. Submission of Application – Applicant
2. Prima Facie Examination – Project Management
Agency (PMA)
3. Letter of Acknowledgement issued – PMA (within 15
working days post completion of examination)
4. Application Appraisal – PMA (Appraisal Report (AR) to
be prepared - 45 working days application submission)
5. Application Approval – PMA, based on
recommendations of Executive Committee (Letter of
Approval issued within 5 days of EC meeting)
1. Submission of Claim for Disbursement of
Incentive – Applicant
2. Verification of Claims and Application for
Incentives – PMA (Verification Report to be
issued by the PMA within 15 working days
from the date of submission of claim)
3. Disbursement of Funds – PMA ( Sanction
Letter to be issued and Claim to be
processed with 10 working days;
Disbursement of Funds within 5 working days
of all disbursal formalities)
4
Application process and Approval (Paragraph 5, 6 and 11)
5
q An application under the Scheme can be made (through an Online Portal) to the Project
Management Agency (PMA) by any legal entity.
q PMA shall appraise the applications, as received, after issuing the acknowledgements.
q The PMA shall accordingly make appropriate submissions to the Executive Committee (EC).
EC shall recommend to PMA for approval / rejection / modification of the applications.
q After receiving recommendations of the EC, PMA shall issue a letter to the applicant within 5
(Five) working days, communicating approval under the Scheme, with a copy to MeitY.
q The approval letter not to be construed as a guarantee for disbursement of incentive as the same
shall be dependent upon verification of eligibility after submission of disbursal claim.
Application Documents (Annexure 2 and 5)
6
q Application to have Company Details, Promoter
Details, Credit History, Key Financial Details.
q Applicant to provide Forecasted Revenue in
Targeted Segments, Proposed Plan for Domestic
Value Addition and Employment Generation in
India for next 5 years.
q Details of Existing and Proposed Investment with
Sources of Funding to be provided.
q Operation and Facility details (Project plan) and
Market Research on Product Feasibility
Key Documents to be provided inter-alia
includes:
• Certified copy of the MOA, AOA and CoI
• Statutory Auditor / Company Secretary
certificate showing shareholding pattern
• CA certified copies of PAN, GST Certificate
• Self-certified copies of brief profile of
Chairman, CXOs, Directors, Authorised
representative and key Promoters along with
their PAN / DIN.
• CA certified copies of Annual Reports
including Annual Financial Reports for 3
years
• Building and Land Lease/ Purchases
Agreement
• Land Lease/ Purchase Agreement
• Financial closure documents -Debt, Equity,
Unsecured Loans.
15
Nodal Agency
[Project Management
Agency (PMA)]
Executive Committee
(EC)
Governing Council
(GC)
-Constituted by MeitY. Chaired
by Secretary.
-Review the progress of the
Scheme and carrying out
amendments
Chaired by an officer
not below the rank of
Joint Secretary in MeitY.
-Assessment /Appraisal
of the application.
-Get the disbursal
claims examined and
disburse the incentive .
EC will recommend to PMA for approval/ rejection /
modification of the applications. On the basis of the
recommendations of EC, PMA shall issue approval letter
to the applicant, with copy to MeitY.
Governance Mechanism
7
Project Management Agency (PMA) (Paragraph 8)
8
q The PMA would inter-alia be responsible for:
• Receipt of applications, examination and appraisal of applications and issuing
acknowledgements.
• Determination of eligibility of the applications and investment threshold.
• Determination of total capital expenditure and eligible capital expenditure for applications.
• Making appropriate submissions to the Executive Committee (EC) for consideration of
applications
• Issuing approval letters to the applicant on the basis of recommendations of EC.
• Examination of claims for disbursement of incentive as per disbursal procedures
• Disbursal of incentive whose claims are found eligible as per disbursal procedures
Executive Committee (EC) (Paragraph 9)
9
q The EC shall be chaired by an officer not below the rank of Joint Secretary in MeitY.
q Constitution: Representatives from Internal Finance Division (IFD) of MeitY, Department for
Promotion of Industry and Internal Trade (DPIIT), Department of Commerce (DoC), Department
of Economic Affairs (DEA), Department of Revenue (DoR), Department of Telecommunications
(DoT), representative from Project Management Agency (PMA) and two representatives from
the Electronics Industry.
q The EC shall meet to ensure timely consideration of applications and conduct periodic reviews.
q The EC shall consider applications, as submitted by the PMA for consideration under the
Scheme and make appropriate recommendations to the PMA for issuing approval letters.
Governing Council (GC) (Paragraph 10)
10
q GC constituted under the chairmanship of Secretary, MeitY to review the progress of the Scheme
and units / projects thereof. GC shall comprise of experts from the Government and Industry.
q GC shall review, and amend, if deemed necessary, the list of goods eligible for the incentive
under the Scheme, along with the applicable investment thresholds.
q Authorized to carry out any amendments in Scheme Guidelines
q Deal with the exceptional cases to provide flexibility in the scheme, especially in case of land,
when different states and agencies have their own rules and regulations for lease of land.
q The GC shall generally meet once in every three months or as often as necessary.
Claim for Incentive (Paragraph 12)
11
q An applicant shall be eligible for claiming incentive for the project / unit which is approved under
the scheme. The further Claim for incentive may be submitted on a six-monthly basis.
q PMA shall have the right to verify any documents in relation to the Claim for Incentive including but
not limited to actual bills / invoices for the amounts claimed.
q In case of doubt with respect to the eligibility of any capital expenditure - decision of EC shall
be final in this regard.
q Any variation in expenditure due to exchange rate variations, technology upgradation, etc. shall
be allowed as long as total actual expenditure is within approved eligible capital expenditure.
q The PMA shall process the claim for incentive on the basis of Verification Report.
Disbursement of Incentive (Paragraph 13)
q The incentive against the eligible capital expenditure shall be released after the approval of the
claim for incentive by PMA, subject to
• capital expenditure meeting the minimum threshold value,
• commencement of commercial production,
• compliance to terms and conditions stipulated in the Scheme / Guidelines / Approval Letter.
q The PMA shall disburse the funds immediately upon completion of all pre- disbursal formalities
by the Applicant. The disbursement of incentive may be in the form of Direct Bank Transfer.
q Units receiving incentive under SPECS shall have to remain in commercial production for a
period of at least 3 (three) years from the date of commencement of commercial
production or 1 (one) year from the date of receipt of last incentive, whichever is later.
11
Provision w.r.t Changes/ Deviations (Paragraph 15)
12
q Any change / deviation in the location of a project / unit, after filing the application and before
approval of the same, shall be allowed by PMA after due verification.
q Any change / deviation in the location of a project / unit, after approval of the project, shall be
intimated by PMA to the EC for consideration and recommendation.
q Any deviation with respect to approved product category, after approval of the project, shall be
intimated by PMA to EC for its consideration and recommendation.
q Any deviation with respect to approved eligible capital expenditure, after approval of the
project, shall be intimated by PMA to EC for its consideration and recommendation.
List of Goods eligible for Incentive
under SPECS – Product Categories
with Thresholds
S. No Description of Goods
1. SMT components including LED Chips
2. Chip Modules for Smart Cards, RFID Antenna & Labels, CoB/ System in Package
3.
Passive components including resistors, capacitors, ferrites, filters etc. for electronic
applications
4.
Electromechanical components including transformers, inductors, coils, relays, switches, micro
motors, stepper motors, BLDC Motors, Connectors, Heat Sinks, USB/Data Cables, HDMI
Cables, Antenna, Speakers, Microphones etc. for electronic applications
5.
Magnetrons, Wave guides, Circulators, Couplers, Isolators, Filters, Magnets, RF Components
for electronic applications
6.
Printed Circuit Boards (PCB): PCB Laminates, Prepegs, Photopolymer films, PCB Printing
Inks, Printed Flexible electronics.
7.
Sensors, Transducers, Camera Modules, Vibrator motors / ringer Actuators, Crystals for
electronic applications
8. Capital goods for all the goods covered under SPECS
23
A. List of goods with Minimum Investment Threshold Limit of INR 5
crore
S. No Description of Goods
1. Discrete semiconductor devices including transistors, diodes, etc.
2. Power semiconductors including FETs, MOSFETs, Thyristors etc.
3. Preform of Silica and Optical Fiber
4. Display Assembly and Touch Panel / Cover Glass Assembly
24
B. List of goods with Minimum Investment Threshold Limit of INR 15
crore
S. No Description of Goods
Minimum
Investment
Threshold Limit
1. Micro / Nano-electronic Components (NEMS, MEMS, IoT Devices etc.) INR 25 crore
2. Assembly, Testing, Marking and Packaging (ATMP) units INR 25 crore
3. Mechanics (plastic and metal parts) for electronic applications INR 75 crore
4.
Compound Semiconductors such as GaN, SiC, GaAs, etc. and Silicon Photonics
devices/ Integrated Circuits, Optoelectronic components
INR 250 crore
5. Semiconductor Wafering INR 500 crore
6.
Semiconductor Integrated Chips (ICs) including Logic [Microprocessor,
Microcontrollers, Digital Signal Processors (DSP) and Application Specific Integrated
Circuits (ASICs)]; Memory; Analog/ Mixed Signal ICs, etc.
INR 1000 crore
7.
Display fabrication units including Liquid Crystal Displays (LCD), Light Emitting Diode
(LED), Organic Light Emitting Diode (OLED), etc. for electronic applications
INR 1000 crore
25
C. Other List of Goods
Provision w.r.t Changes/ Deviations (Paragraph 15)
q Any change / deviation in the location of a project / unit, after filing the application and before
approval of the same, shall be allowed by PMA after due verification.
q Any change / deviation in the location of a project / unit, after approval of the project, shall be
intimated by PMA to the EC for consideration and recommendation.
q Any deviation with respect to approved product category, after approval of the project, shall be
intimated by PMA to EC for its consideration and recommendation.
q Any deviation with respect to approved eligible capital expenditure, after approval of the
project, shall be intimated by PMA to EC for its consideration and recommendation.
THANK YOU

Weitere ähnliche Inhalte

Ähnlich wie SPECS-Guidelines-Presentation.pdf

Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptx
Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptxTax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptx
Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptxREENAALEKSSANDRAACOP
 
Guide for audit, report writing etc.doc
Guide for audit, report writing etc.docGuide for audit, report writing etc.doc
Guide for audit, report writing etc.docNeerajOjha17
 
RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guidelineSamsher Singh
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selectionanojan kanagarathnam
 
A-complete-Guide-on-licensing-process.pdf
A-complete-Guide-on-licensing-process.pdfA-complete-Guide-on-licensing-process.pdf
A-complete-Guide-on-licensing-process.pdfAlemayehu
 
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...IRJET Journal
 
 Financial analysis and appraisal of projects.pptx
 Financial analysis and appraisal of projects.pptx Financial analysis and appraisal of projects.pptx
 Financial analysis and appraisal of projects.pptxJaafar47
 
IT Services Management
IT Services ManagementIT Services Management
IT Services ManagementChetan Goenka
 
Application for Great Streets Small Business Capital Improvement Grants
Application for Great Streets Small Business Capital Improvement GrantsApplication for Great Streets Small Business Capital Improvement Grants
Application for Great Streets Small Business Capital Improvement GrantsWashington, DC Economic Partnership
 
2014 12 grant process
2014 12 grant process2014 12 grant process
2014 12 grant processElchinMelikov
 
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...Europeana
 
SADC_Powerpoint_info_session_10_January_2022.pptx
SADC_Powerpoint_info_session_10_January_2022.pptxSADC_Powerpoint_info_session_10_January_2022.pptx
SADC_Powerpoint_info_session_10_January_2022.pptxGeRald652383
 
Final presentation from shahida
Final presentation from shahidaFinal presentation from shahida
Final presentation from shahidashahida quraishi
 
Procedure to start small scale industries
Procedure to start small scale industriesProcedure to start small scale industries
Procedure to start small scale industrieszeeshanabdullateef
 
Technical and financial_evaluation
Technical and financial_evaluationTechnical and financial_evaluation
Technical and financial_evaluationRCREEE
 
Prequalification document(1)
Prequalification document(1)Prequalification document(1)
Prequalification document(1)Muhammad Akram
 

Ähnlich wie SPECS-Guidelines-Presentation.pdf (20)

Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptx
Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptxTax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptx
Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptx
 
Guide for audit, report writing etc.doc
Guide for audit, report writing etc.docGuide for audit, report writing etc.doc
Guide for audit, report writing etc.doc
 
RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guideline
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
report A
report Areport A
report A
 
A-complete-Guide-on-licensing-process.pdf
A-complete-Guide-on-licensing-process.pdfA-complete-Guide-on-licensing-process.pdf
A-complete-Guide-on-licensing-process.pdf
 
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
 
 Financial analysis and appraisal of projects.pptx
 Financial analysis and appraisal of projects.pptx Financial analysis and appraisal of projects.pptx
 Financial analysis and appraisal of projects.pptx
 
IT Services Management
IT Services ManagementIT Services Management
IT Services Management
 
5 financial new
5 financial new5 financial new
5 financial new
 
Application for Great Streets Small Business Capital Improvement Grants
Application for Great Streets Small Business Capital Improvement GrantsApplication for Great Streets Small Business Capital Improvement Grants
Application for Great Streets Small Business Capital Improvement Grants
 
2014 12 grant process
2014 12 grant process2014 12 grant process
2014 12 grant process
 
highlight2015
highlight2015highlight2015
highlight2015
 
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
 
SADC_Powerpoint_info_session_10_January_2022.pptx
SADC_Powerpoint_info_session_10_January_2022.pptxSADC_Powerpoint_info_session_10_January_2022.pptx
SADC_Powerpoint_info_session_10_January_2022.pptx
 
Final presentation from shahida
Final presentation from shahidaFinal presentation from shahida
Final presentation from shahida
 
Procedure to start small scale industries
Procedure to start small scale industriesProcedure to start small scale industries
Procedure to start small scale industries
 
Technical and financial_evaluation
Technical and financial_evaluationTechnical and financial_evaluation
Technical and financial_evaluation
 
Prequalification document(1)
Prequalification document(1)Prequalification document(1)
Prequalification document(1)
 

Kürzlich hochgeladen

Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfinfogdgmi
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URLRuncy Oommen
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Websitedgelyza
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxMatsuo Lab
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationIES VE
 
Building AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptxBuilding AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptxUdaiappa Ramachandran
 
UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8DianaGray10
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesDavid Newbury
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...Aggregage
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfDaniel Santiago Silva Capera
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioChristian Posta
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemAsko Soukka
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopBachir Benyammi
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintMahmoud Rabie
 

Kürzlich hochgeladen (20)

Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdf
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URL
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Website
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptx
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
 
201610817 - edge part1
201610817 - edge part1201610817 - edge part1
201610817 - edge part1
 
Building AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptxBuilding AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptx
 
UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond Ontologies
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
 
20150722 - AGV
20150722 - AGV20150722 - AGV
20150722 - AGV
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and Istio
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystem
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 Workshop
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership Blueprint
 

SPECS-Guidelines-Presentation.pdf

  • 1. Scheme for Promotion of Manufacturing of Electronic Components and Semiconductors (SPECS)
  • 2. Scheme for Promotion of Manufacturing of Electronic Components and Semiconductors (SPECS) Incentives (INR 3,285 crore) Financial Incentive of 25% on Capital Expenditure, on reimbursement basis Tenure 3 Years for Filing Applications, 5 Years for Investment Coverage Electronic components, semiconductor/ display fabrication units, ATMP units, specialized sub-assemblies and capital goods for manufacture of aforesaid goods. (Electronics Products such as Mobiles and Consumer Goods excluded) Eligibility Investments in new and expansion of capacity / modernization and diversification of existing units Minimum Investment Threshold Ranges from INR 5 crore to 1,000 crore (Will encourage Domestic Players) Eligible Capex Plant, Machinery, Equipment, Associated Utilities and Technology including R&D (Land and Building excluded)
  • 4. Key Definitions (Paragraph 2) 1 1. Applicant: Private Limited Company, Public Limited Company, Sole Proprietorship, Partnership, or Limited Liability Partnership registered in India. 2. Project / Unit: New business unit or expansion of capacity / modernization and / or diversification of an existing unit. 3. Expansion of capacity / modernization and/ or diversification of an existing unit: An increase in the value of fixed capital investment in plant, machinery, equipment, associated utilities and technology, including for Research & Development (R&D) of an existing unit. 4. Approved Project / Unit: Project for which approval is issued by the Project Management Agency (PMA), based on the recommendations of Executive Committee (EC) under MeitY.
  • 5. Key Definitions (Paragraph 2) 1 5. Acknowledgement Date: Date on which, acknowledgment is issued by the PMA. 6. Approval Date: Date on which approval letter for the Project / Unit is issued by the PMA. 7. Commercial Production: Production is undertaken for the sale of manufactured goods by the approved Project/ Unit. 8. Eligible capital expenditure: The capital expenditure considered eligible for incentive as per the approved list of capital items annexed to the approval letter given to the applicant. 9. Total Incentive: Total Incentive under the Scheme is 25% of eligible capital expenditure for an approved application under the Scheme.
  • 6. Key Definitions (Paragraph 2) 1 10. Project Management Agency (PMA): Refers to the agency appointed by MeitY to act on its behalf for receipt of application, issuance of acknowledgement, appraisal / evaluation of the project (including eligible capital expenditure), recommending project to the Executive Committee (EC) of MeitY, issuance of approval letter on the recommendation of Executive Committee of MeitY, verification of claim for incentive. 11. Executive Committee (EC): Committee constituted by MeitY and chaired by an officer not below the rank of Joint Secretary in MeitY. 12. Governing Council (GC): Constituted by MeitY under the chairmanship of Secretary, MeitY. The constitution of GC is included in these Guidelines.
  • 7. Eligibility Criteria under the Scheme (Paragraph 3) 2 q The scheme shall be applicable for investments in new units as well as expansion of capacity / modernization and / or diversification of existing units. q If an application covers more than one product categories, then the minimum threshold of investment (capital expenditure) shall be the highest of the individual threshold investment for each of the product category(ies). q The minimum investment thresholds are same for new units or expansion of capacity / modernization and / or diversification by existing units. q A Project / Unit proposed may include multiple manufacturing facilities at one or more proposed locations. There is no limit on the number of applications for an Applicant.
  • 8. Eligible Capital expenditure (Paragraph 4) 3 q Eligible Capital expenditure is expenditure is made on or after the date of acknowledgement of an application and within 5 years of date of acknowledgement of application q Capital expenditure made before the date of acknowledgement of application, but on or after the date of application, on the approved list of capital items, shall be considered for calculation of threshold. q The date of invoice would be considered as the date of booking capital expenditure under the Scheme. q The capital expenditure, based on which eligible capital expenditure is being determined, shall be capitalized in the books of accounts of the applicants.
  • 9. Eligible Capital expenditure (Paragraph 4) 3 1. Expenditure incurred on plant, machinery, equipment and associated utilities: • tools, dies, moulds, jigs, fixtures (including parts, accessories, components, and spares thereof) of the same. • expenditure on packaging, freight/ transport, insurance, and erection and commissioning. • The Associated utilities - captive power and effluent treatment plants, essential equipment required in operations areas such as clean rooms, air curtains, temperature and air quality control systems, compressed air, water & power supply and control systems, etc. • The Associated utilities also include IT and ITES infrastructure related to manufacturing including servers, software and ERP solutions. • The total expenditure incurred on associated utilities - not exceeding 20% of the total eligible capital expenditure for plant, machinery and equipment.
  • 10. Eligible Capital expenditure (Paragraph 4) 3 2. Expenditure incurred for Research and Development (R&D): Include expenditure on in-house and captive R&D including test and measuring instruments, purchase of design tools, software cost (directly used for R&D) and license fee, expenditure on technology, IPR, Patents and Copyrights for R&D - not exceeding 20% of the total eligible capital expenditure. 3. Expenditure incurred on Transfer of Technology (ToT), including cost of technology: Include cost of technology and initial technology purchase related to goods - not exceeding 10% of the total eligible capital expenditure. 4. Expenditure incurred on refurbished plant, machinery and equipment : Include expenditure on used / second hand / refurbished plant, machinery and equipment (including for associated utilities and R&D), whether imported or procured domestically - not exceeding 20% of the total eligible capital expenditure.
  • 11. Eligible Capital expenditure (Paragraph 4) 3 5. Expenditure incurred on Land and Building: The expenditure incurred on land and building (including factory building / construction) required for the project / unit is not covered under the Scheme. 6. Expenditure on consumables and raw material used for manufacturing shall not be considered as capital expenditure.
  • 12. SPECS Application Process Flow Step One APPLICATION PROCESS Step Two DISBURSEMENT PROCESS 1. Submission of Application – Applicant 2. Prima Facie Examination – Project Management Agency (PMA) 3. Letter of Acknowledgement issued – PMA (within 15 working days post completion of examination) 4. Application Appraisal – PMA (Appraisal Report (AR) to be prepared - 45 working days application submission) 5. Application Approval – PMA, based on recommendations of Executive Committee (Letter of Approval issued within 5 days of EC meeting) 1. Submission of Claim for Disbursement of Incentive – Applicant 2. Verification of Claims and Application for Incentives – PMA (Verification Report to be issued by the PMA within 15 working days from the date of submission of claim) 3. Disbursement of Funds – PMA ( Sanction Letter to be issued and Claim to be processed with 10 working days; Disbursement of Funds within 5 working days of all disbursal formalities) 4
  • 13. Application process and Approval (Paragraph 5, 6 and 11) 5 q An application under the Scheme can be made (through an Online Portal) to the Project Management Agency (PMA) by any legal entity. q PMA shall appraise the applications, as received, after issuing the acknowledgements. q The PMA shall accordingly make appropriate submissions to the Executive Committee (EC). EC shall recommend to PMA for approval / rejection / modification of the applications. q After receiving recommendations of the EC, PMA shall issue a letter to the applicant within 5 (Five) working days, communicating approval under the Scheme, with a copy to MeitY. q The approval letter not to be construed as a guarantee for disbursement of incentive as the same shall be dependent upon verification of eligibility after submission of disbursal claim.
  • 14. Application Documents (Annexure 2 and 5) 6 q Application to have Company Details, Promoter Details, Credit History, Key Financial Details. q Applicant to provide Forecasted Revenue in Targeted Segments, Proposed Plan for Domestic Value Addition and Employment Generation in India for next 5 years. q Details of Existing and Proposed Investment with Sources of Funding to be provided. q Operation and Facility details (Project plan) and Market Research on Product Feasibility Key Documents to be provided inter-alia includes: • Certified copy of the MOA, AOA and CoI • Statutory Auditor / Company Secretary certificate showing shareholding pattern • CA certified copies of PAN, GST Certificate • Self-certified copies of brief profile of Chairman, CXOs, Directors, Authorised representative and key Promoters along with their PAN / DIN. • CA certified copies of Annual Reports including Annual Financial Reports for 3 years • Building and Land Lease/ Purchases Agreement • Land Lease/ Purchase Agreement • Financial closure documents -Debt, Equity, Unsecured Loans.
  • 15. 15 Nodal Agency [Project Management Agency (PMA)] Executive Committee (EC) Governing Council (GC) -Constituted by MeitY. Chaired by Secretary. -Review the progress of the Scheme and carrying out amendments Chaired by an officer not below the rank of Joint Secretary in MeitY. -Assessment /Appraisal of the application. -Get the disbursal claims examined and disburse the incentive . EC will recommend to PMA for approval/ rejection / modification of the applications. On the basis of the recommendations of EC, PMA shall issue approval letter to the applicant, with copy to MeitY. Governance Mechanism 7
  • 16. Project Management Agency (PMA) (Paragraph 8) 8 q The PMA would inter-alia be responsible for: • Receipt of applications, examination and appraisal of applications and issuing acknowledgements. • Determination of eligibility of the applications and investment threshold. • Determination of total capital expenditure and eligible capital expenditure for applications. • Making appropriate submissions to the Executive Committee (EC) for consideration of applications • Issuing approval letters to the applicant on the basis of recommendations of EC. • Examination of claims for disbursement of incentive as per disbursal procedures • Disbursal of incentive whose claims are found eligible as per disbursal procedures
  • 17. Executive Committee (EC) (Paragraph 9) 9 q The EC shall be chaired by an officer not below the rank of Joint Secretary in MeitY. q Constitution: Representatives from Internal Finance Division (IFD) of MeitY, Department for Promotion of Industry and Internal Trade (DPIIT), Department of Commerce (DoC), Department of Economic Affairs (DEA), Department of Revenue (DoR), Department of Telecommunications (DoT), representative from Project Management Agency (PMA) and two representatives from the Electronics Industry. q The EC shall meet to ensure timely consideration of applications and conduct periodic reviews. q The EC shall consider applications, as submitted by the PMA for consideration under the Scheme and make appropriate recommendations to the PMA for issuing approval letters.
  • 18. Governing Council (GC) (Paragraph 10) 10 q GC constituted under the chairmanship of Secretary, MeitY to review the progress of the Scheme and units / projects thereof. GC shall comprise of experts from the Government and Industry. q GC shall review, and amend, if deemed necessary, the list of goods eligible for the incentive under the Scheme, along with the applicable investment thresholds. q Authorized to carry out any amendments in Scheme Guidelines q Deal with the exceptional cases to provide flexibility in the scheme, especially in case of land, when different states and agencies have their own rules and regulations for lease of land. q The GC shall generally meet once in every three months or as often as necessary.
  • 19. Claim for Incentive (Paragraph 12) 11 q An applicant shall be eligible for claiming incentive for the project / unit which is approved under the scheme. The further Claim for incentive may be submitted on a six-monthly basis. q PMA shall have the right to verify any documents in relation to the Claim for Incentive including but not limited to actual bills / invoices for the amounts claimed. q In case of doubt with respect to the eligibility of any capital expenditure - decision of EC shall be final in this regard. q Any variation in expenditure due to exchange rate variations, technology upgradation, etc. shall be allowed as long as total actual expenditure is within approved eligible capital expenditure. q The PMA shall process the claim for incentive on the basis of Verification Report.
  • 20. Disbursement of Incentive (Paragraph 13) q The incentive against the eligible capital expenditure shall be released after the approval of the claim for incentive by PMA, subject to • capital expenditure meeting the minimum threshold value, • commencement of commercial production, • compliance to terms and conditions stipulated in the Scheme / Guidelines / Approval Letter. q The PMA shall disburse the funds immediately upon completion of all pre- disbursal formalities by the Applicant. The disbursement of incentive may be in the form of Direct Bank Transfer. q Units receiving incentive under SPECS shall have to remain in commercial production for a period of at least 3 (three) years from the date of commencement of commercial production or 1 (one) year from the date of receipt of last incentive, whichever is later. 11
  • 21. Provision w.r.t Changes/ Deviations (Paragraph 15) 12 q Any change / deviation in the location of a project / unit, after filing the application and before approval of the same, shall be allowed by PMA after due verification. q Any change / deviation in the location of a project / unit, after approval of the project, shall be intimated by PMA to the EC for consideration and recommendation. q Any deviation with respect to approved product category, after approval of the project, shall be intimated by PMA to EC for its consideration and recommendation. q Any deviation with respect to approved eligible capital expenditure, after approval of the project, shall be intimated by PMA to EC for its consideration and recommendation.
  • 22. List of Goods eligible for Incentive under SPECS – Product Categories with Thresholds
  • 23. S. No Description of Goods 1. SMT components including LED Chips 2. Chip Modules for Smart Cards, RFID Antenna & Labels, CoB/ System in Package 3. Passive components including resistors, capacitors, ferrites, filters etc. for electronic applications 4. Electromechanical components including transformers, inductors, coils, relays, switches, micro motors, stepper motors, BLDC Motors, Connectors, Heat Sinks, USB/Data Cables, HDMI Cables, Antenna, Speakers, Microphones etc. for electronic applications 5. Magnetrons, Wave guides, Circulators, Couplers, Isolators, Filters, Magnets, RF Components for electronic applications 6. Printed Circuit Boards (PCB): PCB Laminates, Prepegs, Photopolymer films, PCB Printing Inks, Printed Flexible electronics. 7. Sensors, Transducers, Camera Modules, Vibrator motors / ringer Actuators, Crystals for electronic applications 8. Capital goods for all the goods covered under SPECS 23 A. List of goods with Minimum Investment Threshold Limit of INR 5 crore
  • 24. S. No Description of Goods 1. Discrete semiconductor devices including transistors, diodes, etc. 2. Power semiconductors including FETs, MOSFETs, Thyristors etc. 3. Preform of Silica and Optical Fiber 4. Display Assembly and Touch Panel / Cover Glass Assembly 24 B. List of goods with Minimum Investment Threshold Limit of INR 15 crore
  • 25. S. No Description of Goods Minimum Investment Threshold Limit 1. Micro / Nano-electronic Components (NEMS, MEMS, IoT Devices etc.) INR 25 crore 2. Assembly, Testing, Marking and Packaging (ATMP) units INR 25 crore 3. Mechanics (plastic and metal parts) for electronic applications INR 75 crore 4. Compound Semiconductors such as GaN, SiC, GaAs, etc. and Silicon Photonics devices/ Integrated Circuits, Optoelectronic components INR 250 crore 5. Semiconductor Wafering INR 500 crore 6. Semiconductor Integrated Chips (ICs) including Logic [Microprocessor, Microcontrollers, Digital Signal Processors (DSP) and Application Specific Integrated Circuits (ASICs)]; Memory; Analog/ Mixed Signal ICs, etc. INR 1000 crore 7. Display fabrication units including Liquid Crystal Displays (LCD), Light Emitting Diode (LED), Organic Light Emitting Diode (OLED), etc. for electronic applications INR 1000 crore 25 C. Other List of Goods
  • 26. Provision w.r.t Changes/ Deviations (Paragraph 15) q Any change / deviation in the location of a project / unit, after filing the application and before approval of the same, shall be allowed by PMA after due verification. q Any change / deviation in the location of a project / unit, after approval of the project, shall be intimated by PMA to the EC for consideration and recommendation. q Any deviation with respect to approved product category, after approval of the project, shall be intimated by PMA to EC for its consideration and recommendation. q Any deviation with respect to approved eligible capital expenditure, after approval of the project, shall be intimated by PMA to EC for its consideration and recommendation.