Learning objectives
 How to build up a company with registration documents
 Learn how to act as consultant as well as contractor
 As contractor our company have managed to build a pedestrian bridge
 As consultant we have inspected a wind turbine
 Identify the different bridge designs and construction materials used in modern
day engineering
 To learn about management process in engineering field
OUTLINE
CONSULTATIONS • Wind Turbine
CONSTRUCTION • Pedestrian Bridge
• Specifications
• Design
• Time schedule
• Cost analysis
• Problems faced
3
Organization Chart of ConFire Engineering Pvt(Ltd)
Board of Directors
1. Fernando W.N.M (Mechanical Engineer)
2. Thennakoon T.M.N.D (Civil Engineer)
CEO
Fernando W.N.M
(Mechanical
Engineer)
Secretary
Mapa M.M.D.A.B
CTO
D.B.Pandithasekar
a(Charted
Engineer-
Mechanical)
Design and Engineering
Division
G.R.L.Vinod( Mechanical
Engineer)
4
Timeline
Pre- Proposal conference 20th July 2015
RFP due date 27th July 2015
Shortlist interviews 10th August 2015
Planning 17th August 2015
Finalize the design & complete the final
design development
24th August 2015
Symposium 31st August 2015
Complete final construction documents 18st September 2015
5
Contractor-BRANDOUT
Design-Wind Turbine
6
Consultant-
Omega
Engineering PVT.
Ltd
7
Pedestrian
Bridge
EQUIPMENTS ENVIRONMENT USES
Drill Machine Sun Shine
Rainy
Helps people to walk across
Connects to locations in
a elegant style
Timber(Rubber
and Pinus)
MATERIALS PROCEDURE
Decrease the curvature of
the arc
AMENDMENTS
Metal cutting Hack Saw
Hammer
Brass Nuts
and Bolts
Cutting wood
Draw and cut the arc shape
Shaping and grinding
Assembling and connect
all parts together
Use quality timber and
paints
Grinder Machine
8
Pedestrian Bridge details and specifications.
9
10
Items Cost
Timber(Rubber and Pinus) Rs. 6000/=
8mm,4 inch brass nut and bolts-24 Rs. 900/=
Steel washers Rs. 60/=
Timber Smoothing Process Rs. 500/=
Varnish,thinner,grinding papers
and other
Rs. 1000/=
FINAL COST Rs. 8460/=
Cost Analysis11
12
Problems we faced…
 To find appropriate and economical timber
 To align both arcs
 How to cut the arc shape correctly
 Which type of nuts should use
 Balance of the base stands
13
Phase I
• Collecting the necessary materials for the construction
• Assembling the components
• Completed on the 12th September,2015
Phase II
• Testing and development stage: Testing if the bridge is
capable of carrying a load of 700N Completed on 21st
September,2015
14
In future…
 We can use this technology and the experience we gained in future constructions
as engineers
 As real engineers we can manage a project according to a given documentation
 To design projects such as highways, buildings, bridges and all type of structures
for the benefit of humanity and our world
 Engineering principles are very useful to communicate with fellow engineers as well
as clients
Suggestions
 As engineering students we would like to suggest more reflective modules like
engineering principles
 Through out modules like this undergraduates can gain more learning outcomes
about management process
 Would like to suggest modules like this in future for give an idea about what
leadership and group work is?
16
Thennakoon T.M.N.D : EN15549532
Vinod G.R.L : EN15550736
Fernando W.N.M : EN15552648
D.B.Pandithasekara : EN15554314
Mapa M.M.D.A.B : EN15555922
17

More Related Content

Viewers also liked

Why Too Much Running Is Bad for Your Health | ACTIVE
Why Too Much Running Is Bad for Your Health | ACTIVEWhy Too Much Running Is Bad for Your Health | ACTIVE
Why Too Much Running Is Bad for Your Health | ACTIVEyogisri001
 
18. gastos de-advance_services_febrero_15
18. gastos de-advance_services_febrero_1518. gastos de-advance_services_febrero_15
18. gastos de-advance_services_febrero_15Anibal Carrera
 
101 Greatest Running Tips | Women's Health Magazine
101 Greatest Running Tips | Women's Health Magazine101 Greatest Running Tips | Women's Health Magazine
101 Greatest Running Tips | Women's Health Magazineyogisri001
 
Innovative Direct to-Patient Study Model to Capture ePRO Instrument Validatio...
Innovative Direct to-Patient Study Model to Capture ePRO Instrument Validatio...Innovative Direct to-Patient Study Model to Capture ePRO Instrument Validatio...
Innovative Direct to-Patient Study Model to Capture ePRO Instrument Validatio...John Reites
 
Women's Running Magazine - Sports Magazine for Women
Women's Running Magazine - Sports Magazine for Women Women's Running Magazine - Sports Magazine for Women
Women's Running Magazine - Sports Magazine for Women yogisri001
 
Sobre el goce y la felicidad Stuart Mill
Sobre el goce y la felicidad Stuart MillSobre el goce y la felicidad Stuart Mill
Sobre el goce y la felicidad Stuart MillM261999
 
Remarketing in Google adwords - Conceptual and Broader Level
Remarketing in Google adwords - Conceptual and Broader LevelRemarketing in Google adwords - Conceptual and Broader Level
Remarketing in Google adwords - Conceptual and Broader LevelAditya Rai
 

Viewers also liked (15)

Lending Resume
Lending ResumeLending Resume
Lending Resume
 
Why Too Much Running Is Bad for Your Health | ACTIVE
Why Too Much Running Is Bad for Your Health | ACTIVEWhy Too Much Running Is Bad for Your Health | ACTIVE
Why Too Much Running Is Bad for Your Health | ACTIVE
 
18. gastos de-advance_services_febrero_15
18. gastos de-advance_services_febrero_1518. gastos de-advance_services_febrero_15
18. gastos de-advance_services_febrero_15
 
101 Greatest Running Tips | Women's Health Magazine
101 Greatest Running Tips | Women's Health Magazine101 Greatest Running Tips | Women's Health Magazine
101 Greatest Running Tips | Women's Health Magazine
 
Portfolio theo
Portfolio theoPortfolio theo
Portfolio theo
 
Innovative Direct to-Patient Study Model to Capture ePRO Instrument Validatio...
Innovative Direct to-Patient Study Model to Capture ePRO Instrument Validatio...Innovative Direct to-Patient Study Model to Capture ePRO Instrument Validatio...
Innovative Direct to-Patient Study Model to Capture ePRO Instrument Validatio...
 
Women's Running Magazine - Sports Magazine for Women
Women's Running Magazine - Sports Magazine for Women Women's Running Magazine - Sports Magazine for Women
Women's Running Magazine - Sports Magazine for Women
 
Sobre el goce y la felicidad Stuart Mill
Sobre el goce y la felicidad Stuart MillSobre el goce y la felicidad Stuart Mill
Sobre el goce y la felicidad Stuart Mill
 
Tg nec 19_az1
Tg nec 19_az1Tg nec 19_az1
Tg nec 19_az1
 
pilas
pilaspilas
pilas
 
Surabhi-Resume
Surabhi-ResumeSurabhi-Resume
Surabhi-Resume
 
Remarketing in Google adwords - Conceptual and Broader Level
Remarketing in Google adwords - Conceptual and Broader LevelRemarketing in Google adwords - Conceptual and Broader Level
Remarketing in Google adwords - Conceptual and Broader Level
 
Method Statement D Wall
Method Statement D WallMethod Statement D Wall
Method Statement D Wall
 
RRPP Internacionales
RRPP InternacionalesRRPP Internacionales
RRPP Internacionales
 
Types of research
Types of researchTypes of research
Types of research
 

Similar to ConFire Engineering Pvt

Building project presentation
Building project presentationBuilding project presentation
Building project presentationemdad bhuiyan
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghushashi tr
 
Resume_Milind_Dhake
Resume_Milind_DhakeResume_Milind_Dhake
Resume_Milind_DhakeMilind Dhake
 
Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxSiharaGallage
 
CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)Puneet Dogra
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Icixitdprojectintegration 150507054409-lva1-app6891
Icixitdprojectintegration 150507054409-lva1-app6891Icixitdprojectintegration 150507054409-lva1-app6891
Icixitdprojectintegration 150507054409-lva1-app6891Randall Martin
 
Career in civil engineering
Career in civil engineeringCareer in civil engineering
Career in civil engineeringPiyush Bhandari
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)Mochammad Anis
 
Resume - Chirag Sarang 26112016
Resume - Chirag Sarang 26112016Resume - Chirag Sarang 26112016
Resume - Chirag Sarang 26112016chirag sarang
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Shafik
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othmannadiacbass
 

Similar to ConFire Engineering Pvt (20)

Building project presentation
Building project presentationBuilding project presentation
Building project presentation
 
Construction company
Construction companyConstruction company
Construction company
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
 
Resume_Milind_Dhake
Resume_Milind_DhakeResume_Milind_Dhake
Resume_Milind_Dhake
 
Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptx
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Icixitdprojectintegration 150507054409-lva1-app6891
Icixitdprojectintegration 150507054409-lva1-app6891Icixitdprojectintegration 150507054409-lva1-app6891
Icixitdprojectintegration 150507054409-lva1-app6891
 
ICI+ITD (PROJECT 1 INTEGRATION)
ICI+ITD (PROJECT 1 INTEGRATION)ICI+ITD (PROJECT 1 INTEGRATION)
ICI+ITD (PROJECT 1 INTEGRATION)
 
Career in civil engineering
Career in civil engineeringCareer in civil engineering
Career in civil engineering
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Resume
ResumeResume
Resume
 
Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)
 
Resume - Chirag Sarang 26112016
Resume - Chirag Sarang 26112016Resume - Chirag Sarang 26112016
Resume - Chirag Sarang 26112016
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
 
Resume--Shishir
Resume--ShishirResume--Shishir
Resume--Shishir
 
“DESIGN AND DEVELOPMENT OF FIXTURE FOR FIXING BEARING IN CRANK-CASE
“DESIGN AND DEVELOPMENT OF FIXTURE FOR  FIXING BEARING IN CRANK-CASE“DESIGN AND DEVELOPMENT OF FIXTURE FOR  FIXING BEARING IN CRANK-CASE
“DESIGN AND DEVELOPMENT OF FIXTURE FOR FIXING BEARING IN CRANK-CASE
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othman
 

ConFire Engineering Pvt

  • 1. ConFire Engineering Pvt. Ltd 1358, 13 th lane, Zone 5, Millenium City, Athurugiriya 1
  • 2. Learning objectives  How to build up a company with registration documents  Learn how to act as consultant as well as contractor  As contractor our company have managed to build a pedestrian bridge  As consultant we have inspected a wind turbine  Identify the different bridge designs and construction materials used in modern day engineering  To learn about management process in engineering field
  • 3. OUTLINE CONSULTATIONS • Wind Turbine CONSTRUCTION • Pedestrian Bridge • Specifications • Design • Time schedule • Cost analysis • Problems faced 3
  • 4. Organization Chart of ConFire Engineering Pvt(Ltd) Board of Directors 1. Fernando W.N.M (Mechanical Engineer) 2. Thennakoon T.M.N.D (Civil Engineer) CEO Fernando W.N.M (Mechanical Engineer) Secretary Mapa M.M.D.A.B CTO D.B.Pandithasekar a(Charted Engineer- Mechanical) Design and Engineering Division G.R.L.Vinod( Mechanical Engineer) 4
  • 5. Timeline Pre- Proposal conference 20th July 2015 RFP due date 27th July 2015 Shortlist interviews 10th August 2015 Planning 17th August 2015 Finalize the design & complete the final design development 24th August 2015 Symposium 31st August 2015 Complete final construction documents 18st September 2015 5
  • 8. Pedestrian Bridge EQUIPMENTS ENVIRONMENT USES Drill Machine Sun Shine Rainy Helps people to walk across Connects to locations in a elegant style Timber(Rubber and Pinus) MATERIALS PROCEDURE Decrease the curvature of the arc AMENDMENTS Metal cutting Hack Saw Hammer Brass Nuts and Bolts Cutting wood Draw and cut the arc shape Shaping and grinding Assembling and connect all parts together Use quality timber and paints Grinder Machine 8
  • 9. Pedestrian Bridge details and specifications. 9
  • 10. 10
  • 11. Items Cost Timber(Rubber and Pinus) Rs. 6000/= 8mm,4 inch brass nut and bolts-24 Rs. 900/= Steel washers Rs. 60/= Timber Smoothing Process Rs. 500/= Varnish,thinner,grinding papers and other Rs. 1000/= FINAL COST Rs. 8460/= Cost Analysis11
  • 12. 12
  • 13. Problems we faced…  To find appropriate and economical timber  To align both arcs  How to cut the arc shape correctly  Which type of nuts should use  Balance of the base stands 13
  • 14. Phase I • Collecting the necessary materials for the construction • Assembling the components • Completed on the 12th September,2015 Phase II • Testing and development stage: Testing if the bridge is capable of carrying a load of 700N Completed on 21st September,2015 14
  • 15. In future…  We can use this technology and the experience we gained in future constructions as engineers  As real engineers we can manage a project according to a given documentation  To design projects such as highways, buildings, bridges and all type of structures for the benefit of humanity and our world  Engineering principles are very useful to communicate with fellow engineers as well as clients
  • 16. Suggestions  As engineering students we would like to suggest more reflective modules like engineering principles  Through out modules like this undergraduates can gain more learning outcomes about management process  Would like to suggest modules like this in future for give an idea about what leadership and group work is? 16
  • 17. Thennakoon T.M.N.D : EN15549532 Vinod G.R.L : EN15550736 Fernando W.N.M : EN15552648 D.B.Pandithasekara : EN15554314 Mapa M.M.D.A.B : EN15555922 17