Project Management
CONTRUCTION PROJECT MANAGEMENT 1
Construction Project Management
Project : Converting Vision or Need to reality.
A project is composed of activities or tasks that are
related to one another in some manner and all these
should be completed in order to complete the
project.
Project management: Is the application of
knowledge, skills, tools, and techniques to project
activities to meet the project requirements.
Aim: Completion of the project on time within the
budget without compromising the quality.
CONTRUCTION PROJECT MANAGEMENT 2
Project Manager
Project managers have the responsibility of the
planning, procurement and execution of a project.
Project managers are the first point of contact for any
issues or discrepancies arising from within the heads
of various departments in an organization before the
problem escalates to higher authorities.
CONTRUCTION PROJECT MANAGEMENT 3
Why do we need Project Management?
▪Advancing technology and increased size and complexity of projects need effective planning
▪For effective Planning of project and to control cost and time over run
▪To plan the project in detail. i.e. identifying the logical sequence of occurrence of the activity
and inter-dependency and inter-relationship between them.
▪To have proper control over project during unfavourable circumstances. (Plan –B)
CONTRUCTION PROJECT MANAGEMENT 4
Project Management Triangle
Each side represents a constraint of the project
Time constraint: Amount of time available to complete a project
Cost constraint: Amount budgeted for the project
Scope constraint: What must be done to produce the project's end result
Competing constraints
Increased scope  Increased time and increased cost,
Tight time constraint  Increased costs and reduced scope,
Tight budget  Increased time and reduced scope..
One side of the triangle cannot be changed without affecting the others
*A further refinement of the constraints separates product "quality" or
"performance" from scope, and turns quality into a fourth constraint
Triple Constraint or the Iron Triangle
CONTRUCTION PROJECT MANAGEMENT 5
Project Management Phases
1. Definition
2. Planning
3. Execution
4. Control
5. Closure
CONTRUCTION PROJECT MANAGEMENT 6
Detailed planning of the project
Listing all the activities and their logical sequence.
Determining overall requirement of resources and their quantities .
Development of schedule
Working out time estimates for various activities based on available resources.
Preparing time schedule and calculate total project cost.
Periodic review of progress of work
Comparing the work progress with planned target whether work is as per schedule or not.
Identify corrective action to meet the lapses to achieve the target.
Ensure optimum use of resources such as men material money and machinery.
Objectives of Project Management
CONTRUCTION PROJECT MANAGEMENT 7
Tools of Planning and Scheduling
Conventional
Methods
Bar Chart
Milestone
Flow
Chart
Network
Methods
CPM
PERT
CONTRUCTION PROJECT MANAGEMENT 8
Gantt or Bar Chart
Project is divided in to different activities represented by Horizontal bars on the Time scale
The beginning and the end of the bar represent the time of start and completion of the activity
Length of the bar represents the total time required to complete the activity.
Reviewing progress
The bars are shaded to indicate the portion of the work completed.
Helps to identify particular activity is behind schedule, ahead of schedule or on time.
CONTRUCTION PROJECT MANAGEMENT 9
Partition wall
Wood work
Electrical work
Furniture procurement
Painting
Flooring
False ceiling
Art work procurement
1/08/15 15/09/15 15/10/15 1/12/15 10/01/16 30/02/16
CONTRUCTION PROJECT MANAGEMENT 10
CONTRUCTION PROJECT MANAGEMENT 11
Limitation of Gantt or Bar chart
Does not indicate the inter-relationship between various activities.
Does not indicate the effect of the activity on the overall completion of the activity.
Does not indicate which activity is critical and which has spare time.
Difficult to optimise the use of resources.
Bar charts for complex projects are complicated and not practical.
CONTRUCTION PROJECT MANAGEMENT 12
Tools of Planning and Scheduling
Conventional
Methods
Bar Chart
Milestone
Flow
Chart
Network
Methods
CPM
PERT
CONTRUCTION PROJECT MANAGEMENT 13
Elements of Network
The network is a graphic plan showing jobs or activities that must be completed to achieve completion of a project.
OR
A network is also defined as an arrow diagram obtained by connecting all the activities of the project in logical sequence.
Activity: Jobs that required to
be performed in executing a
project.
Event: is a Point in time
representing start and
completion of one or more
activities.
Dummy Activity: It is a zero
time activity and
consumes no resources.
Introduced when two or more
activities start and end at the
same nodes
1 3
2
CONTRUCTION PROJECT MANAGEMENT 14
Network Method
CPM –Critical Path Method
Network are generally used for planning, scheduling and controlling of repetitive
type of the projects where one can make fairly accurate assessment of the time
for completion of each activity.
PERT-Program Evaluation and Review Technique
Network are generally used in research and development type of project which
are non- repetitive in nature.
Also employed for the projects where it is difficult to allot definite time for
performing each and every activity for want of information regarding past
experience of handling similar projects
CONTRUCTION PROJECT MANAGEMENT 15
Development of Network
Steps to be followed for developing a network:
a) Note down all the activities which are required to be
performed for completing the project
b) Arrange the activities in their correct logical sequence.
Logical sequence means:
Which activity must be completed before particular activity can
be started?
Which activity can be started concurrently with other activity?
Which activity must immediately follow this activity?
a) Consider possibilities of sub-dividing different activities in
phases or sections to introduce the concept of performing
jobs simultaneously or concurrently. This helps in reducing
overall time of completion of the project.
Network Diagram
CONTRUCTION PROJECT MANAGEMENT 16
Identify the Critical path
The critical path is path along the network which requires the longest time for
the project from start to its completion and thus decides the time of completion
of the project.
Event slack/Float is the free time available up to which occurrence of an event
can be delayed without causing any delay in the completion date of the project
Zero slack  event is on schedule.
Positive slack  event is ahead of schedule
Negative slack  event is behind schedule.
CONTRUCTION PROJECT MANAGEMENT 17
To Estimate project duration
To assess the project duration 5 steps to be followed in their sequential order.
1. Estimation of activity duration time
2. Estimation of early expected even time
3. Estimation of latest allowable event time.
4. Calculation of even slack
5. Identify the Critical path.
CONTRUCTION PROJECT MANAGEMENT 18
Process of Drawing Network
NO. Activity
A Partition wall
B Electrical work
C False Ceiling
D Flooring
E Painting
F Furniture
G Cleaning
1
2
3
4
5
6
A C
D
B
E
G
F
Network diagram –First draft
CONTRUCTION PROJECT MANAGEMENT 19
Process of Drawing Network
1
2
3
4
5
6
A
C
D
B
E
G
F
Timing the Network
No Activity
A Partition
wall
B Electrical
work
C False
Ceiling
D Flooring
E Painting
F Furniture
G Cleaning
8 10
5
12
8
69
8
18
30
189
0
EFT LFT
EFT LFT
To assess the project duration 5 steps to be followed in their
sequential order.
1. Estimation of activity duration time
2. Estimation of early expected even time
3. Estimation of latest allowable event time.
4. Calculation of even slack
5. Identify the Critical path.
CONTRUCTION PROJECT MANAGEMENT 20
Process of Drawing Network
1
2
3
4
5
6
B
Project Duration-30 days
A
8
C
10
G
5
F
12E
8
D
69
8 8
18 18
30 30
18 189 12
0 0
EFT LFT
EFT LFT
0
No Activity
A Partition
wall
B Electrical
work
C False
Ceiling
D Flooring
E Painting
F Furniture
G Cleaning
To assess the project duration 5 steps to be followed in their
sequential order.
1. Estimation of activity duration time
2. Estimation of early expected even time
3. Estimation of latest allowable event time.
4. Calculation of even slack
5. Identify the Critical path.
Critical Path Activity – A-C-Dummy-F
CONTRUCTION PROJECT MANAGEMENT 21
Analysing and scheduling of network
1. Calculate time estimates for each activity
2. Determine the critical path which governs the minimum project completion
3. Determine the events slack and the activity floats for Activities which are not on
critical path.
4. Examine possibility of diverting unutilized resources from noncritical activity to a
critical activity.
5. Analyse the network again after considering the redistribution of resources
6. Workout revised starting and completion dates of the activity.
CONTRUCTION PROJECT MANAGEMENT 22
Advantage of Network method
Easier to build a team and create human network for efficient handling of a multitasked project.
Takes into consideration the requirements well in advance to complete a project in the most
efficient way possible.
Easy to determine the estimate exact time and cost of the project.
Helps to monitor human resources, and the direct and indirect costs associated with the project.
Charting in a Network makes it easier to evaluate parallel activities, handle delays and judge the
outcome of a task.
Enables the managers to minimize the project length by monitoring the critical path.
Enables the project head to determine if the task is on schedule or needs boost to accelerate the
process.
CONTRUCTION PROJECT MANAGEMENT 23
Difference Between CPM and PERT
CPM PERT
CPM uses activity oriented network. PERT uses event oriented Network.
Durations of activity may be estimated with a fair degree
of accuracy.
Estimate of time for activities are not so accurate and
definite.
It is used extensively in construction projects. It is used mostly in research and development projects,
particularly projects of non-repetitive nature.
Deterministic concept is used. Probabilistic model concept is used.
CPM can control both time and cost when planning. PERT is basically a tool for planning.
In CPM, cost optimization is given prime importance. The
time for the completion of the project depends upon cost
optimization. The cost is not directly proportioned to time.
Thus, cost is the controlling factor.
In PERT, it is assumed that cost varies directly with time.
Attention is therefore given to minimize the time so that
minimum cost results. Thus in PERT, time is the controlling
factor.
CONTRUCTION PROJECT MANAGEMENT 24
Project Cost
TOTAL COST
INDIRECT COSTDIRECT COST
OVERHEADS OUTAGE LOSS
CONTRUCTION PROJECT MANAGEMENT 25
INDIRECT PROJECT COST
❖ These are those expenditures which cannot clearly allocated to the individual activities of a
project, but are assessed as whole.
❖ It includes expenditure related to administrative and establishment charges, supervision,
expenditures on central store organisation, loss of revenue, lost profit, penalty etc.
❖ Indirect cost rises with increased duration.
❖ OUTAGE LOSS : loss in profits due to inability to meet demand or penalty due to delay.
CONTRUCTION PROJECT MANAGEMENT 26
❖ Those expenditures which are directly chargeable to and can be identified
specifically with the activities of the project.
❖ These include labour cost, material cost, equipment cost etc.
TIME
C
c
tn
Normal
Duration
tc
Crash
duration
C
n
CONTRUCTION PROJECT MANAGEMENT 27
CONTRUCTION PROJECT MANAGEMENT 28

More Related Content

What's hot

3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
Kabilan Kabi
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
haroldtaylor1113
 

What's hot (20)

3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
 
Construction management
Construction managementConstruction management
Construction management
 
5 principles of construction project management
5 principles of construction project management5 principles of construction project management
5 principles of construction project management
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projects
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Module-1:Introduction to Construction Management by Dr. Vinay Kumar B M
Module-1:Introduction to Construction Management by Dr. Vinay Kumar B MModule-1:Introduction to Construction Management by Dr. Vinay Kumar B M
Module-1:Introduction to Construction Management by Dr. Vinay Kumar B M
 
Contract management
Contract managementContract management
Contract management
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
Introduction to construction project management
Introduction to construction project managementIntroduction to construction project management
Introduction to construction project management
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential Building
 
8. (lecture 6) Project Cost Control.ppt
8. (lecture 6) Project Cost Control.ppt8. (lecture 6) Project Cost Control.ppt
8. (lecture 6) Project Cost Control.ppt
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 

Similar to Construction Project management

Projectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit PayalProjectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit Payal
AMIT PAYAL
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
guestc8140fe
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
pisal3
 

Similar to Construction Project management (20)

Projectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit PayalProjectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit Payal
 
Chapter 5-Project Management.pptx
Chapter 5-Project Management.pptxChapter 5-Project Management.pptx
Chapter 5-Project Management.pptx
 
Network Analysis- CPM ppt..pptx
Network Analysis- CPM  ppt..pptxNetwork Analysis- CPM  ppt..pptx
Network Analysis- CPM ppt..pptx
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
PMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptxPMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptx
 
A760535773_16727_28_2018_u6.ppt
A760535773_16727_28_2018_u6.pptA760535773_16727_28_2018_u6.ppt
A760535773_16727_28_2018_u6.ppt
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
09 lecture project scheduling 1
09 lecture project scheduling 109 lecture project scheduling 1
09 lecture project scheduling 1
 
PM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptxPM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptx
 
PM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptxPM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptx
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
Chapter 4.pptx
Chapter 4.pptxChapter 4.pptx
Chapter 4.pptx
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managers
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULING
 

Recently uploaded

Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 

Recently uploaded (20)

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 

Construction Project management

  • 2. Construction Project Management Project : Converting Vision or Need to reality. A project is composed of activities or tasks that are related to one another in some manner and all these should be completed in order to complete the project. Project management: Is the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements. Aim: Completion of the project on time within the budget without compromising the quality. CONTRUCTION PROJECT MANAGEMENT 2
  • 3. Project Manager Project managers have the responsibility of the planning, procurement and execution of a project. Project managers are the first point of contact for any issues or discrepancies arising from within the heads of various departments in an organization before the problem escalates to higher authorities. CONTRUCTION PROJECT MANAGEMENT 3
  • 4. Why do we need Project Management? ▪Advancing technology and increased size and complexity of projects need effective planning ▪For effective Planning of project and to control cost and time over run ▪To plan the project in detail. i.e. identifying the logical sequence of occurrence of the activity and inter-dependency and inter-relationship between them. ▪To have proper control over project during unfavourable circumstances. (Plan –B) CONTRUCTION PROJECT MANAGEMENT 4
  • 5. Project Management Triangle Each side represents a constraint of the project Time constraint: Amount of time available to complete a project Cost constraint: Amount budgeted for the project Scope constraint: What must be done to produce the project's end result Competing constraints Increased scope  Increased time and increased cost, Tight time constraint  Increased costs and reduced scope, Tight budget  Increased time and reduced scope.. One side of the triangle cannot be changed without affecting the others *A further refinement of the constraints separates product "quality" or "performance" from scope, and turns quality into a fourth constraint Triple Constraint or the Iron Triangle CONTRUCTION PROJECT MANAGEMENT 5
  • 6. Project Management Phases 1. Definition 2. Planning 3. Execution 4. Control 5. Closure CONTRUCTION PROJECT MANAGEMENT 6
  • 7. Detailed planning of the project Listing all the activities and their logical sequence. Determining overall requirement of resources and their quantities . Development of schedule Working out time estimates for various activities based on available resources. Preparing time schedule and calculate total project cost. Periodic review of progress of work Comparing the work progress with planned target whether work is as per schedule or not. Identify corrective action to meet the lapses to achieve the target. Ensure optimum use of resources such as men material money and machinery. Objectives of Project Management CONTRUCTION PROJECT MANAGEMENT 7
  • 8. Tools of Planning and Scheduling Conventional Methods Bar Chart Milestone Flow Chart Network Methods CPM PERT CONTRUCTION PROJECT MANAGEMENT 8
  • 9. Gantt or Bar Chart Project is divided in to different activities represented by Horizontal bars on the Time scale The beginning and the end of the bar represent the time of start and completion of the activity Length of the bar represents the total time required to complete the activity. Reviewing progress The bars are shaded to indicate the portion of the work completed. Helps to identify particular activity is behind schedule, ahead of schedule or on time. CONTRUCTION PROJECT MANAGEMENT 9
  • 10. Partition wall Wood work Electrical work Furniture procurement Painting Flooring False ceiling Art work procurement 1/08/15 15/09/15 15/10/15 1/12/15 10/01/16 30/02/16 CONTRUCTION PROJECT MANAGEMENT 10
  • 12. Limitation of Gantt or Bar chart Does not indicate the inter-relationship between various activities. Does not indicate the effect of the activity on the overall completion of the activity. Does not indicate which activity is critical and which has spare time. Difficult to optimise the use of resources. Bar charts for complex projects are complicated and not practical. CONTRUCTION PROJECT MANAGEMENT 12
  • 13. Tools of Planning and Scheduling Conventional Methods Bar Chart Milestone Flow Chart Network Methods CPM PERT CONTRUCTION PROJECT MANAGEMENT 13
  • 14. Elements of Network The network is a graphic plan showing jobs or activities that must be completed to achieve completion of a project. OR A network is also defined as an arrow diagram obtained by connecting all the activities of the project in logical sequence. Activity: Jobs that required to be performed in executing a project. Event: is a Point in time representing start and completion of one or more activities. Dummy Activity: It is a zero time activity and consumes no resources. Introduced when two or more activities start and end at the same nodes 1 3 2 CONTRUCTION PROJECT MANAGEMENT 14
  • 15. Network Method CPM –Critical Path Method Network are generally used for planning, scheduling and controlling of repetitive type of the projects where one can make fairly accurate assessment of the time for completion of each activity. PERT-Program Evaluation and Review Technique Network are generally used in research and development type of project which are non- repetitive in nature. Also employed for the projects where it is difficult to allot definite time for performing each and every activity for want of information regarding past experience of handling similar projects CONTRUCTION PROJECT MANAGEMENT 15
  • 16. Development of Network Steps to be followed for developing a network: a) Note down all the activities which are required to be performed for completing the project b) Arrange the activities in their correct logical sequence. Logical sequence means: Which activity must be completed before particular activity can be started? Which activity can be started concurrently with other activity? Which activity must immediately follow this activity? a) Consider possibilities of sub-dividing different activities in phases or sections to introduce the concept of performing jobs simultaneously or concurrently. This helps in reducing overall time of completion of the project. Network Diagram CONTRUCTION PROJECT MANAGEMENT 16
  • 17. Identify the Critical path The critical path is path along the network which requires the longest time for the project from start to its completion and thus decides the time of completion of the project. Event slack/Float is the free time available up to which occurrence of an event can be delayed without causing any delay in the completion date of the project Zero slack  event is on schedule. Positive slack  event is ahead of schedule Negative slack  event is behind schedule. CONTRUCTION PROJECT MANAGEMENT 17
  • 18. To Estimate project duration To assess the project duration 5 steps to be followed in their sequential order. 1. Estimation of activity duration time 2. Estimation of early expected even time 3. Estimation of latest allowable event time. 4. Calculation of even slack 5. Identify the Critical path. CONTRUCTION PROJECT MANAGEMENT 18
  • 19. Process of Drawing Network NO. Activity A Partition wall B Electrical work C False Ceiling D Flooring E Painting F Furniture G Cleaning 1 2 3 4 5 6 A C D B E G F Network diagram –First draft CONTRUCTION PROJECT MANAGEMENT 19
  • 20. Process of Drawing Network 1 2 3 4 5 6 A C D B E G F Timing the Network No Activity A Partition wall B Electrical work C False Ceiling D Flooring E Painting F Furniture G Cleaning 8 10 5 12 8 69 8 18 30 189 0 EFT LFT EFT LFT To assess the project duration 5 steps to be followed in their sequential order. 1. Estimation of activity duration time 2. Estimation of early expected even time 3. Estimation of latest allowable event time. 4. Calculation of even slack 5. Identify the Critical path. CONTRUCTION PROJECT MANAGEMENT 20
  • 21. Process of Drawing Network 1 2 3 4 5 6 B Project Duration-30 days A 8 C 10 G 5 F 12E 8 D 69 8 8 18 18 30 30 18 189 12 0 0 EFT LFT EFT LFT 0 No Activity A Partition wall B Electrical work C False Ceiling D Flooring E Painting F Furniture G Cleaning To assess the project duration 5 steps to be followed in their sequential order. 1. Estimation of activity duration time 2. Estimation of early expected even time 3. Estimation of latest allowable event time. 4. Calculation of even slack 5. Identify the Critical path. Critical Path Activity – A-C-Dummy-F CONTRUCTION PROJECT MANAGEMENT 21
  • 22. Analysing and scheduling of network 1. Calculate time estimates for each activity 2. Determine the critical path which governs the minimum project completion 3. Determine the events slack and the activity floats for Activities which are not on critical path. 4. Examine possibility of diverting unutilized resources from noncritical activity to a critical activity. 5. Analyse the network again after considering the redistribution of resources 6. Workout revised starting and completion dates of the activity. CONTRUCTION PROJECT MANAGEMENT 22
  • 23. Advantage of Network method Easier to build a team and create human network for efficient handling of a multitasked project. Takes into consideration the requirements well in advance to complete a project in the most efficient way possible. Easy to determine the estimate exact time and cost of the project. Helps to monitor human resources, and the direct and indirect costs associated with the project. Charting in a Network makes it easier to evaluate parallel activities, handle delays and judge the outcome of a task. Enables the managers to minimize the project length by monitoring the critical path. Enables the project head to determine if the task is on schedule or needs boost to accelerate the process. CONTRUCTION PROJECT MANAGEMENT 23
  • 24. Difference Between CPM and PERT CPM PERT CPM uses activity oriented network. PERT uses event oriented Network. Durations of activity may be estimated with a fair degree of accuracy. Estimate of time for activities are not so accurate and definite. It is used extensively in construction projects. It is used mostly in research and development projects, particularly projects of non-repetitive nature. Deterministic concept is used. Probabilistic model concept is used. CPM can control both time and cost when planning. PERT is basically a tool for planning. In CPM, cost optimization is given prime importance. The time for the completion of the project depends upon cost optimization. The cost is not directly proportioned to time. Thus, cost is the controlling factor. In PERT, it is assumed that cost varies directly with time. Attention is therefore given to minimize the time so that minimum cost results. Thus in PERT, time is the controlling factor. CONTRUCTION PROJECT MANAGEMENT 24
  • 25. Project Cost TOTAL COST INDIRECT COSTDIRECT COST OVERHEADS OUTAGE LOSS CONTRUCTION PROJECT MANAGEMENT 25
  • 26. INDIRECT PROJECT COST ❖ These are those expenditures which cannot clearly allocated to the individual activities of a project, but are assessed as whole. ❖ It includes expenditure related to administrative and establishment charges, supervision, expenditures on central store organisation, loss of revenue, lost profit, penalty etc. ❖ Indirect cost rises with increased duration. ❖ OUTAGE LOSS : loss in profits due to inability to meet demand or penalty due to delay. CONTRUCTION PROJECT MANAGEMENT 26
  • 27. ❖ Those expenditures which are directly chargeable to and can be identified specifically with the activities of the project. ❖ These include labour cost, material cost, equipment cost etc. TIME C c tn Normal Duration tc Crash duration C n CONTRUCTION PROJECT MANAGEMENT 27