Using Data Management and 3-Dimensional Data
Visualization to Generate More Complete Conceptual
Site Models and Streamline...
Speaker
Joshua Orris
Consultant
Antea Group
Joshua.Orris@anteagroup.com
717.712.5456
Co-Author
Jason Ruf
S2C2
Jason.Ruf@s2...
Objective
Enhanced Data Management & 3DVA to Streamline Site Closure
Leveraging technology for complete site models to str...
Technical Management Challenges
• Complex data sets over several years
• Complex environmental systems
• Varied site inves...
Strategic Management Challenges
Enhanced Data Management & 3DVA to Streamline Site Closure
Challenges to Enhance Better Bu...
Enhanced Data Management & 3DVA to Streamline Site Closure
Antea USA, Inc. 6
Not a Comprehensive Site
Model (CSM)!
(# Figu...
Building the Conceptual Site Model (CSM)
Enhanced Data Management & 3DVA to Streamline Site Closure
Antea USA, Inc. 7
•Inn...
Conceptual Site Model – Populating the Database
Enhanced Data Management & 3DVA to Streamline Site Closure
Antea USA, Inc....
Conceptual Site Model – 3D Analytical Data Visualization
• Identifying data gaps
• Evaluate plume degradation
• Analyzing ...
• Leverage Technology
• Field Services
• Office-based technology solutions
• High Resolution Site Characterization (HRSC)
...
Best Management Practice 3D CSM
Enhanced Data Management & 3DVA to Streamline Site Closure
Provides a standardized solutio...
Best Management Practice 3D CSM (Cont’d)
 Plume architecture credibility
 Validation of mass and volume
estimates
 Enha...
Best Management Practice 3D CSM (Cont’d)
• Best-fit solution strategy
• Global Continuity
• Corporate reserve cost validat...
Solution Advantages
Enhanced Data Management & 3DVA to Streamline Site Closure
Antea USA, Inc. 14
MODEL CALCULATIONS
“Garb...
 Investing in technology-based solutions can
streamline site lifecycle closure strategies
 Yields High Resolution Site
C...
Enhanced Data Visualization Leading to Best-in-Class Business Practices
Antea USA, Inc. 16
Case Study 1: 12-acre Former Sp...
Enhanced Data Visualization Leading to Best-in-Class Business Practices
Antea USA, Inc. 17
• 1992 – Original Release Date
...
Enhanced Data Visualization Leading to Best-in-Class Business Practices
Antea USA, Inc. 18
Case Study 3: 12-acre Former Ma...
Q&A
Special Thanks to
Jack Sheldon, Antea Group
Deborah Schnell, P.E., Panther Technologies
Joshua Orris
Antea Group
Joshu...
Nächste SlideShare
Wird geladen in …5
×

Using Data Management and 3-Dimensional Data Visualization to Generate More Complete Conceptual Site Models and Streamline Site Closure

173 Aufrufe

Veröffentlicht am

This presentation explains how leveraging technology for complete site models to streamline site closure strategies leads to better business descisions and improved data quality by bridging abstract scienced for refined engineering design and enhanced data analytics for continuous quality performance.

This was presented by Joshua Orris at the Battelle 2018 Chlorinated Conference.

Veröffentlicht in: Umweltschutz
  • Als Erste(r) kommentieren

  • Gehören Sie zu den Ersten, denen das gefällt!

Using Data Management and 3-Dimensional Data Visualization to Generate More Complete Conceptual Site Models and Streamline Site Closure

  1. 1. Using Data Management and 3-Dimensional Data Visualization to Generate More Complete Conceptual Site Models and Streamline Site Closure Battelle 2018 Chlorinated Conference Palm Springs, CA April 2018
  2. 2. Speaker Joshua Orris Consultant Antea Group Joshua.Orris@anteagroup.com 717.712.5456 Co-Author Jason Ruf S2C2 Jason.Ruf@s2c2inc.com 908.256.2710 Presented By:
  3. 3. Objective Enhanced Data Management & 3DVA to Streamline Site Closure Leveraging technology for complete site models to streamline site closure strategies, leading to better business decisions. Data visualization is a solution to bridge the abstract science for refined engineering design and enhanced data analytics for continuous quality performance. Purpose • Data Quality & Management • Data Analysis and Refined Decision Insights • Investment(s) Evaluation and Validation • Facilitates Stakeholder Engagement
  4. 4. Technical Management Challenges • Complex data sets over several years • Complex environmental systems • Varied site investigation methods • Performance Inconsistency • Stakeholder engagement • Receptors & third-party potential impacts • Varied regulatory requirements for cleanup: numeric vs risk-based Enhanced Data Management & 3DVA to Streamline Site Closure Challenges to Enhance Better Business Decisions:
  5. 5. Strategic Management Challenges Enhanced Data Management & 3DVA to Streamline Site Closure Challenges to Enhance Better Business Decisions (Con’t): Legal Regulatory Business/Real Estate AuditorsStakeholders:
  6. 6. Enhanced Data Management & 3DVA to Streamline Site Closure Antea USA, Inc. 6 Not a Comprehensive Site Model (CSM)! (# Figures in SI/RI Report vs 1 CSM) Traditional Workflow Challenges
  7. 7. Building the Conceptual Site Model (CSM) Enhanced Data Management & 3DVA to Streamline Site Closure Antea USA, Inc. 7 •Innovative Investigation Methods •Direct Sensing •Mobile Laboratories •Real Estate - Current & Future Land Use •Source Area Evaluation •Contaminant Distribution •Receptors •Regulatory Drivers •Site Investigation •Geology/Hydrogeology •Effective Remedy Selection, Engineering Design •Performance Monitoring Goal: Build All Relevant Site Knowledge into the CSM
  8. 8. Conceptual Site Model – Populating the Database Enhanced Data Management & 3DVA to Streamline Site Closure Antea USA, Inc. 8 Project Database Well Log Data Fluid Level Data Analytical Data 3D Visualization 3D Analysis Seismic “Picks” 2D Visualization 2D Analysis Boring Log Data
  9. 9. Conceptual Site Model – 3D Analytical Data Visualization • Identifying data gaps • Evaluate plume degradation • Analyzing well network to determine statistical significance of each well • Refining GW monitoring well network • Standardizing the calculation of mass and volume of groundwater plumes • Identifying targeted treatment areas (location and depth) • More precise reserve lifecycle cost modeling Enhanced Data Management & 3DVA to Streamline Site Closure A baseline CSM analysis of site conditions and remedial options provide strategic insights for: Focused Injection Design
  10. 10. • Leverage Technology • Field Services • Office-based technology solutions • High Resolution Site Characterization (HRSC) • Enhanced data density • Enhanced data quality • Data Visualization and Analytics Provide: • A communication tool • Validation of strategies & investments that influences stakeholders • Reduction in project life cycle costs • Enhanced reserve cost modeling • Improvement to the bottom line Reducing Environmental Liability Management Enhanced Data Management & 3DVA to Streamline Site Closure
  11. 11. Best Management Practice 3D CSM Enhanced Data Management & 3DVA to Streamline Site Closure Provides a standardized solution process for the management and representation of complex data sets leading to reduction of environmental liabilities & more informed business decisions Operations Management Real Estate / Legal Third Party Stakeholders Technical Team Regulatory Oversight 1. Communication to Stakeholders • 3DVA is a tool to communicate technical data sets to all stakeholders • Facilitates collaborative discussions with regulators • Helps ownership team gain a better understanding of environmental drivers and risks
  12. 12. Best Management Practice 3D CSM (Cont’d)  Plume architecture credibility  Validation of mass and volume estimates  Enhanced visualization of data sets over time; predictive model (simulations)  More targeted Investigation & remediation solution strategies  Improved risk management  Lifecycle cost reductions Enhanced Data Management & 3DVA to Streamline Site Closure 2. Technical Advantages -100 -50 0 50 100 150 200 250 300 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 100,000 Jun-02 May-04 May-06 May-08 May-10 May-12 May-14 Mass(lbs) Concentration(ug/L) Date 1,1,1-Trichloroethane - Rock Average Concentration Maximum Concentration
  13. 13. Best Management Practice 3D CSM (Cont’d) • Best-fit solution strategy • Global Continuity • Corporate reserve cost validation • Refined targeted design and implementation remedial strategies • Streamlines lifecycle management sensitive receptor risk-based assessment Enhanced Data Management & 3DVA to Streamline Site Closure 3. Cultural Barriers Minimized by Technology-Data Visualization Model
  14. 14. Solution Advantages Enhanced Data Management & 3DVA to Streamline Site Closure Antea USA, Inc. 14 MODEL CALCULATIONS “Garbage In – Garbage Out” Paradigm Garbage Data Perfect Model Garbage Results Perfect Data Garbage Model Garbage Results
  15. 15.  Investing in technology-based solutions can streamline site lifecycle closure strategies  Yields High Resolution Site Characterization to maximize field data density  Reduces labor & laboratory costs  Reduces engineering and field costs  Increases data QA/QC  Increases field quality performance  Confirms and reduces data gaps  Defines source areas  Reduces lifecycle and costs Solution Advantages Enhanced Data Management & 3DVA to Streamline Site Closure
  16. 16. Enhanced Data Visualization Leading to Best-in-Class Business Practices Antea USA, Inc. 16 Case Study 1: 12-acre Former Specialty Chemical Manufacturer • Late 1990’s NJDEP ISRA 7:26E • Geology • 0-6 ft bgs Fill/Weathered bedrock • 6-60 ft bgs Brunswick shale-bedrock • Hydrogeology • Perched groundwater in overburden • Fractured groundwater flow in bedrock • Remediation • Pump & Treat 2001-2006 • Pilot testing EVO/ZVI pneumatic injection • Full scale injection 2007 • Excavation 240 tons 2011 • Lifecycle Value • IRM shutdown - $180k per year / $2.1M to date savings • HRSC / 3D visualization - $300k savings in remediation design & implementation • MNA closure strategy $100k monitoring reduction https://youtu.be/DTrB_R6zAEU
  17. 17. Enhanced Data Visualization Leading to Best-in-Class Business Practices Antea USA, Inc. 17 • 1992 – Original Release Date • Remediation Strategies • $1.0 MM lifecycle cost-to-date • IRM GW Pump & Treat • ZVI/EVO • GW monitoring was $50k @ 30-year lifecycle • 2015 Project Transition • Implemented 3DVA, data management and CSM development • HRSC MIP program was scoped but was deferred after 3DVA was completed • 2017 obtained FDEP Closure NFA • $100K 2-year lifecycle Case Study 2: 1.6-acre Former Manufacturing Facility, Tampa, FL https://youtu.be/ali4LT2Sz2w
  18. 18. Enhanced Data Visualization Leading to Best-in-Class Business Practices Antea USA, Inc. 18 Case Study 3: 12-acre Former Manufacturing Facility, Sorocaba, Brazil • 2003 Original Release Date • Remediation Strategies • BioStimulation • GW monitoring $200k annual @ 30-year lifecycle • $2.0 MM lifecycle cost through 2011 • Project Transition 2011 • Implemented 3DVA and Data and CSM Development • $50k – 3DVA/Data management • $60k annual GW monitoring • 2 new source areas identified • Targeted remediation strategies implemented (2012 & 2014) • Chemical Soil Mixing • Source Area Excavation • Permeable Reactive Barrier • 2017 site reached commercial closure levels • $800k spent 2011-2017 https://youtu.be/QTaBqIeNPPY
  19. 19. Q&A Special Thanks to Jack Sheldon, Antea Group Deborah Schnell, P.E., Panther Technologies Joshua Orris Antea Group Joshua.Orris@anteagroup.com 717.712.5456 Jason Ruf S2C2 Jason.Ruf@s2c2inc.com 908.256.2710 Contacts: AnteaGroup @AnteaGroup

×