BACK GROUND OF THE PROJECT
LIGHTHOUSE IS A 5-STAR FRANCHISE
HOTEL BELONGING TO JET WING
HOTELS, LOCATED IN GALLE, SRI
LANKA
THE HOTEL WAS COMMISSIONED BY
HERBERT COORAY IN 1995 FOR HIS
TRAVEL COMPANY JETWINGS AND
DESIGNED BY GEOFFREY BAWA
FEATURES OF THE EXISTING BUILDING
• The hotel had 60 rooms
• Three suites
• two restaurants
• a swimming pool
• recreational facilities.
PROPOSED FEATURES
EXPECTING RISKS
• Physical risks
• Technical risks
• Political risks
• Legal & contractual risks
• Economic/Financial risks
• Marketing risks
• Management risks
• Environmental risks
• Schedule risks
• Operational Performance risks
Risk Breakdown Structure
Level 0 Level 01 Level 02 Level 03
Internal Environmental Technical Risks Demolishion , support ,Design , Site
investigation (capable for the reimbursement,
Specification and source material
Managemental Planning , Confirm the safety , mange resources
and labors wastage
Administrative Labor , stores , transport
External
Environmental
Environment Weather and natural disaster
Financial risks Tax , inflation , foreign exchange , payment
delay , financial expenses
Political and legal Policy changes , customs , disposing and
liabilities
Propose risk management
•Innovative concepts
•Apply the effective
construction technology
Design
•Take precautions to face
environmental issues
•Effectively Use the
resources
Sources and
environment •Perfect funding resources
•Contingency for the
economic changes
Economic
•Create situation the
employers to work
•Complete tasks according to
the working schedule
Management •The esthetic appearance
according to the clients
objective
Out put
Awareness
• Aware the risk management team about the risks which will occur
during & after the amendments
• Stakeholders of the project;
• Client (Lighthouse Hotel PLC)
• Management (Jetwing Hotels)
• Contractor
• Legal bodies
Awareness cntd.
• Aware the relevant stakeholders about the amendments which are
made to the building structure.
• Aware the client about the risks which would occur during and afterwards of
the construction period
• Aware the client about the legal and practical obligations which would occur
against the amendments
• Risks with the site such as soil type and the bearing ability
Awareness cntd.
• Aware the stakeholders about the risks and the requirements of a risk
management process.
• Aware the stakeholders about the risk management process that we
implemented to the building.
Skills
• Empower the stakeholders with the skills that are required in risk
management.
• In this skills mean the steps that the stakeholders can take in order to
minimize or neutralize risks.
ex: Consulting a Geo-Technical engineer for analyze the soil and
neutralizing the risk with that
Skills cntd.
• After that we have to identify the skills which the personals who are
connected with the project indirectly and make usage of them.
Culture
• Every step which we take in the risk management process should be
accord to the culture of the hotel.
• Such as;
• It should be accord to the vision of the hotel
• None of the occupants must feel uncomfortable by the process
• Under this we have to make sure the risk for the safety of the
occupants during the construction period is penalized by
implementing suitable precautionary methods.
Image
• After implementing the risk management system the image of the
external parties towards the hotel must not be changed.
• After the implementation of the risk management system we have to
take a report regarding almost every aspects of the hotel and analyze
whether there are any deviations about them.
• Such as:
• Occupancy rate
• Safety issues
• Etc.
Image cntd.
• If the reports indicate negative deviations we have to change the
strategy which we used for the risk management system
Process
• Under this we have to determine that the process we use for the risk
management is accord with the contractual, procurement and
management practices.
• This is occur in situations such as if the amendment we are going to
do is contractually illegal we have to do variations for it.
• This implies that there is a contractual and procurement risk in this
kind of refurbishment projects.
Process cntd.
• To overcome theses risks we have to consult contractual expertise
such as Quantity Surveyors.
Confidence
• Under this step we have consider about how the stakeholders of the
project is confident with the risk management.
• For this purpose we have to take a feedback from the each
stakeholders and we should analyze their idea about the risk
management system which we proposed.
Applications
• After implementation of the risk management system we should
consider about the effectivity of that system to the day to day basis
operations of the hotel
• This also include determining that whether the risk management
system is applicable as a decision making tool for the client
• After practicing all of these steps we should rate each of them
regarding the feedback with the hotel project.
• This will enhance us to have an idea about how effective the system
we proposed is and will acknowledge us about the defects and the
adjustments
Purpose of having a risk management system
• The purpose of risk policy is not to completely eliminate the risk from
the hotel .
• To ensure that every effort is made by the hotel to manage risk
appropriately to maximize potential opportunities and minimize the
adverse effects of risk.
4. Creating and Implementing a Risk Management
Risk Management Team
• Geo Technical Engineer- to assure the risks and errors that could arise in the soil
when modifying the hotel programme
• Structural Engineer - the assurance of the Newley constructing hotel room’s
structures
• Service Engineer/Facility Manager - should ensure whether all the facilities
provided without any failure.
Technical Risks
Managerial Risks
• Project Manager- Uncertainties that could affect the objectives of the
Hotel Refurbishment Project. (Eg: Time, cost,
performance, quality, scope, client satisfaction)
- Responsible for funding agencies to determine the
requirement for a contract modification regarding the
hotel project.
Financial Risks
• Quantity Surveyor responsible on the errors or risks that could
happen with the payments, rates etc, while hotel project is going
on.
• Financial Manager- the financial support relevant to the hotel
process.
 Therefore, a Risk Managing Team can be implemented with considering of the risks that can happen in the Hotel
Project.
Risk Mgt. Manual
• Includes the Risk Managing practices throughout the Hotel Project
• These are used to record the opportunities, threats and risks at each stage of
“Hotel project with refurbishment” and to provide the on-going action plans to
address the risks.
A detailed techniques of
Risk Identification
Eg: Risk due to the lack of
strength of the foundation
of the existing building
ResponseAnalysis
Required tastings,
modifications are
explored.
Installing external
foundations to give
the sufficient
strength
Risk Mgt. Plan
• This document includes the records of the project
and the made decision.
• In this Hotel refurbishment project, the remedies/
decisions taken to minimize/ avoid risk as the
most suitable option
• Maintained records of such risks for reference(Plans)
in the future and is recommend that an archive risk
register is kept.
Risk Mgt. Training & Rewarding System
• A proper training should be done in order to obtain a effective Risk management in
accordance to the Hotel Project
• The Risk Managing Team has gained a proper and suitable training with relevance to
the Hotel project with refurbishment
• The personal rewards that can be gained with a proper Risk management system with
managing financial, managing, technical, …, risks that come across.
Risk Mgt. Information Systems
Risk Mgt. Information Systems conts…
• Record details of risks which occurs in the refurbishment of hotel project, controls and
priorities, and to show any changes in them
• Record risk treatments and related resource requirements;
• Record details of incidents where the new application of refurbished building, and loss
events, and the lessons learned
• Track accountability for risks, controls and treatments
• Track progress and record the completion of risk treatment actions
• Allow progress checks against the risk management plan
• Trigger monitoring and assurance activity
Purpose of RMIS
Risk Mgt. Performance Measurement System
• Risk management and performance measurement should be linked together to
enable, to each supply chain partner, to define and guide its overall risk profile,
as well as to shape its strategic direction.
• The Risk must be continuously addressed and monitored in order to refurbish
the hotel building and get the attraction of the customers with out getting
damaged through risks.
5. Building a Risk Mgt ethic into corporate culture
• The way the stake holders of the construction process act, behave, refers to the
culture of that organization.
• As the last step of the Risk Management System, the ethics, principals that should
be within each other while managing the Risks according to the Project that is
going to be completed.
Scope of the policy
• Risk is an inherent aspect of all management, administrative and
commercial business activities. Sound risk management principles
must become part of routine management activity across the hotel.
• The key objective of this policy is to ensure the hotel has a consistent
basis for measuring, controlling, monitoring and reporting risk across
the hotel at all levels.
Detailing the policy
• Detailing the policy is important to identify the key parameters and
important factors that we should have to include in the Risk
management policy form. Those details are as follows.
• What is risk
Risk exists as a consequence of uncertainty and is present in all
activities whatever the size or complexity and whatever industry or
business sector.
We can’t forecast the risks accurately for the hotel when designing the
risk management system.
The hotel approach
• The Risk Management process will be as user friendly as possible and
add value
• The concentration on control improvements to mitigate significant
risks.
• produce a comprehensive picture of risk across all hotel activities.
Risk responsibilities
• It is essential that all participants in risk management are aware of
their roles in the overall process and their own responsibilities.
Risk review
• The Group Risk Manager manage the risk process including the roll out of
the risk management programmed.
• The Group Risk Office will maintain the hotel’s strategic risk register.
• It will help to audit risk periodically.
Project risk management
• Project risk management will follow a similar process to that defined for
corporate risks.
• The Project Manager will take responsibility for risk management.
• The risk register in the format set up in this policy will be populated at the
point at which permission is sought for a project to proceed.
AR management company ltd. Is keen to inform that the company will make sure
to do in company’s full potential to manage risk that arise in this hotel’s internal
and external environment. Identification of those risks will help the employer to
achieve his organizational and operational goals with out any delay.
We ensure that we will give enough knowledge about risk identification and risk
management to all the occupants in the hotel. The required lectures will be
conducted by experience professionals in risk management field. We ensure that
risk management will be a part of the company’s culture and operation of the
company.
Through this risk management strategies hotel can gain following positive
outcomes,
 Increase the efficiency and effectiveness of decisions that hotel
administration or management would take in crucial occasions.
 Maintain the risk management strategies all over the company.
 Follow the legal and regulation policies.
 Implementation and improvement of risk management prosses.
 Efficient implementation of risk management plan.
RISK POLICY FOR JETWING HOTEL PROJECT
Monitor whether the risk
management system is
functioning well.
After developing risk management system we have to check whether
the system is functioning efficiency and effectively to manage the risk.
We can monitor the system accordance with following facts.
Analyze the risk management system
• In this process we do check whether this system minimize the risk and
maximize the efficiency.
• How the system comply with the hotel operation .
• What are the treat to manage the risk.
• Are there any implementations and improvements should do to the
system
Are their any changes to do
• Check whether there is some risks have to give the priority.
• Do some modification to management process if it is required.
New risks
• Check weather there is some missing risks that has been not detect by the
system.
• What are the emerging risks.
• What are the implementation that is required to do to manage those new
risks
The process of monitoring risk management system
• Risk is about uncertainity.
• The main objective of the monitoring is to evaluate the progress and
impact of the risk management option determine whether adaptive
action is required.
• End of this process we determine that current options should be
continued or go for some modifications to the risk that we identify in
this hotel.
• We communicate with the stakeholders and inform all the details of
this process with them.
Record the monitoring process
• It is important to record those monitoring details because when some
need of implementation arise it is easy to do those implementations
to the risk management system by looking at those records.
• We can moderate previous system by looking ad those monitoring
records.
• Identify defects in future to forecast and be prepare for future risks.
CONCLUSION

Weitere ähnliche Inhalte

Was ist angesagt?

Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)rafeeqameen
 
Chapter 11
Chapter 11Chapter 11
Chapter 11jezratty
 
8.8 Las Vegas - Adversary Emulation con C2 Matrix
8.8 Las Vegas - Adversary Emulation con C2 Matrix8.8 Las Vegas - Adversary Emulation con C2 Matrix
8.8 Las Vegas - Adversary Emulation con C2 MatrixJorge Orchilles
 
Risk Management Process Steps PowerPoint Presentation Slides
Risk Management Process Steps PowerPoint Presentation Slides Risk Management Process Steps PowerPoint Presentation Slides
Risk Management Process Steps PowerPoint Presentation Slides SlideTeam
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentationRaven Morgan
 
Mitigation Plan In Risk Management PowerPoint Presentation Slides
Mitigation Plan In Risk Management PowerPoint Presentation SlidesMitigation Plan In Risk Management PowerPoint Presentation Slides
Mitigation Plan In Risk Management PowerPoint Presentation SlidesSlideTeam
 
Risk Management
Risk ManagementRisk Management
Risk Managementcgeorgeo
 
Risk Management 101
Risk Management 101Risk Management 101
Risk Management 101Wil Rickards
 
Risk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation SlidesRisk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation SlidesSlideTeam
 
The importance of risk management in business
The importance of risk management in businessThe importance of risk management in business
The importance of risk management in businessr2financial
 
Yield management - Front office
Yield management - Front office Yield management - Front office
Yield management - Front office Amit Vohra
 
Strategic risk management
Strategic risk managementStrategic risk management
Strategic risk managementKarim Farag
 
Chapter 6 Designing and Managing Tourism and Hospitality Products(Tourism and...
Chapter 6 Designing and Managing Tourism and Hospitality Products(Tourism and...Chapter 6 Designing and Managing Tourism and Hospitality Products(Tourism and...
Chapter 6 Designing and Managing Tourism and Hospitality Products(Tourism and...Md Shaifullar Rabbi
 
Risk Mitigation Strategy PowerPoint Presentation Slides
Risk Mitigation Strategy PowerPoint Presentation SlidesRisk Mitigation Strategy PowerPoint Presentation Slides
Risk Mitigation Strategy PowerPoint Presentation SlidesSlideTeam
 

Was ist angesagt? (20)

Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)
 
Chapter 11
Chapter 11Chapter 11
Chapter 11
 
Plan Risk responses
Plan Risk responsesPlan Risk responses
Plan Risk responses
 
Enterprise risk management Hospitality
Enterprise risk management  HospitalityEnterprise risk management  Hospitality
Enterprise risk management Hospitality
 
8.8 Las Vegas - Adversary Emulation con C2 Matrix
8.8 Las Vegas - Adversary Emulation con C2 Matrix8.8 Las Vegas - Adversary Emulation con C2 Matrix
8.8 Las Vegas - Adversary Emulation con C2 Matrix
 
Risk Management Process Steps PowerPoint Presentation Slides
Risk Management Process Steps PowerPoint Presentation Slides Risk Management Process Steps PowerPoint Presentation Slides
Risk Management Process Steps PowerPoint Presentation Slides
 
Risk management
Risk managementRisk management
Risk management
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
 
Mitigation Plan In Risk Management PowerPoint Presentation Slides
Mitigation Plan In Risk Management PowerPoint Presentation SlidesMitigation Plan In Risk Management PowerPoint Presentation Slides
Mitigation Plan In Risk Management PowerPoint Presentation Slides
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Risk management
Risk managementRisk management
Risk management
 
Risk Management 101
Risk Management 101Risk Management 101
Risk Management 101
 
Time share
Time shareTime share
Time share
 
Risk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation SlidesRisk Management Process And Procedures PowerPoint Presentation Slides
Risk Management Process And Procedures PowerPoint Presentation Slides
 
The importance of risk management in business
The importance of risk management in businessThe importance of risk management in business
The importance of risk management in business
 
Yield management - Front office
Yield management - Front office Yield management - Front office
Yield management - Front office
 
Strategic risk management
Strategic risk managementStrategic risk management
Strategic risk management
 
Chapter 6 Designing and Managing Tourism and Hospitality Products(Tourism and...
Chapter 6 Designing and Managing Tourism and Hospitality Products(Tourism and...Chapter 6 Designing and Managing Tourism and Hospitality Products(Tourism and...
Chapter 6 Designing and Managing Tourism and Hospitality Products(Tourism and...
 
Risk Mitigation Strategy PowerPoint Presentation Slides
Risk Mitigation Strategy PowerPoint Presentation SlidesRisk Mitigation Strategy PowerPoint Presentation Slides
Risk Mitigation Strategy PowerPoint Presentation Slides
 
Risk management
Risk managementRisk management
Risk management
 

Ähnlich wie Risk Management System

PROJECT RISK MANAGEMENT
PROJECT  RISK  MANAGEMENTPROJECT  RISK  MANAGEMENT
PROJECT RISK MANAGEMENTNeenu Babu
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementKaustubh Gupta
 
Operational Risk : Take a look at the raw canvas
Operational Risk : Take a look at the raw canvasOperational Risk : Take a look at the raw canvas
Operational Risk : Take a look at the raw canvasTreat Risk
 
Critical role of_risk_assessment_in_international_projects_en
Critical role of_risk_assessment_in_international_projects_enCritical role of_risk_assessment_in_international_projects_en
Critical role of_risk_assessment_in_international_projects_enVyacheslav Guzovsky
 
Project Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionProject Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionAbigail Pugal-Somera
 
Security Organization/ Infrastructure
Security Organization/ InfrastructureSecurity Organization/ Infrastructure
Security Organization/ InfrastructurePriyank Hada
 
Risk Management
Risk ManagementRisk Management
Risk ManagementSaqib Raza
 
3 b. project life cycle and risk management
3 b. project life cycle and risk management3 b. project life cycle and risk management
3 b. project life cycle and risk managementDr.R. SELVAM
 
IT Outsourcing Risks In Financial Sector
IT Outsourcing Risks In Financial SectorIT Outsourcing Risks In Financial Sector
IT Outsourcing Risks In Financial SectorUKNGroupLtd
 
Risk response planning.pptx
Risk response planning.pptxRisk response planning.pptx
Risk response planning.pptxSaranSaravanan22
 
Enterprise 360 degree risk management
Enterprise 360 degree risk managementEnterprise 360 degree risk management
Enterprise 360 degree risk managementInfosys
 
Outsourcing Risk Management
Outsourcing Risk ManagementOutsourcing Risk Management
Outsourcing Risk ManagementPECB
 
Unit 8-risk manaegement (1) -
Unit 8-risk manaegement (1) - Unit 8-risk manaegement (1) -
Unit 8-risk manaegement (1) - Shashi Kumar
 
Project risk management in automotive industry
Project risk management in automotive industryProject risk management in automotive industry
Project risk management in automotive industrySumit Bhattacharya
 

Ähnlich wie Risk Management System (20)

London 2012 Olympics, Managing and controlling contingency
London 2012 Olympics, Managing and controlling contingencyLondon 2012 Olympics, Managing and controlling contingency
London 2012 Olympics, Managing and controlling contingency
 
PROJECT RISK MANAGEMENT
PROJECT  RISK  MANAGEMENTPROJECT  RISK  MANAGEMENT
PROJECT RISK MANAGEMENT
 
Integrating risk and benefits management
Integrating risk and benefits managementIntegrating risk and benefits management
Integrating risk and benefits management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Entetrprise risk management process
Entetrprise risk  management processEntetrprise risk  management process
Entetrprise risk management process
 
Operational Risk : Take a look at the raw canvas
Operational Risk : Take a look at the raw canvasOperational Risk : Take a look at the raw canvas
Operational Risk : Take a look at the raw canvas
 
presentation.pptx
presentation.pptxpresentation.pptx
presentation.pptx
 
Project risk analysis
Project risk analysisProject risk analysis
Project risk analysis
 
Critical role of_risk_assessment_in_international_projects_en
Critical role of_risk_assessment_in_international_projects_enCritical role of_risk_assessment_in_international_projects_en
Critical role of_risk_assessment_in_international_projects_en
 
Project Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionProject Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussion
 
Security Organization/ Infrastructure
Security Organization/ InfrastructureSecurity Organization/ Infrastructure
Security Organization/ Infrastructure
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
3 b. project life cycle and risk management
3 b. project life cycle and risk management3 b. project life cycle and risk management
3 b. project life cycle and risk management
 
IT Outsourcing Risks In Financial Sector
IT Outsourcing Risks In Financial SectorIT Outsourcing Risks In Financial Sector
IT Outsourcing Risks In Financial Sector
 
Risk response planning.pptx
Risk response planning.pptxRisk response planning.pptx
Risk response planning.pptx
 
Enterprise 360 degree risk management
Enterprise 360 degree risk managementEnterprise 360 degree risk management
Enterprise 360 degree risk management
 
Outsourcing Risk Management
Outsourcing Risk ManagementOutsourcing Risk Management
Outsourcing Risk Management
 
Unit 8-risk manaegement (1) -
Unit 8-risk manaegement (1) - Unit 8-risk manaegement (1) -
Unit 8-risk manaegement (1) -
 
Project risk management in automotive industry
Project risk management in automotive industryProject risk management in automotive industry
Project risk management in automotive industry
 
Risk analyst engstrom
Risk analyst engstromRisk analyst engstrom
Risk analyst engstrom
 

Mehr von anojan kanagarathnam

Mehr von anojan kanagarathnam (15)

Involvement of QS in the Building Defects.pptx
Involvement of QS in the Building Defects.pptxInvolvement of QS in the Building Defects.pptx
Involvement of QS in the Building Defects.pptx
 
Report.docx
Report.docxReport.docx
Report.docx
 
Health and Safety - Responsibilities of employers’ and workers’ r for a safe ...
Health and Safety - Responsibilities of employers’ and workers’ r for a safe ...Health and Safety - Responsibilities of employers’ and workers’ r for a safe ...
Health and Safety - Responsibilities of employers’ and workers’ r for a safe ...
 
Whole Life Cycle Cost
Whole Life Cycle CostWhole Life Cycle Cost
Whole Life Cycle Cost
 
Discuss on cida act provision
Discuss on cida act provisionDiscuss on cida act provision
Discuss on cida act provision
 
Application of BIM
Application of BIMApplication of BIM
Application of BIM
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Matrix
MatrixMatrix
Matrix
 
Economics
EconomicsEconomics
Economics
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Construction industry
Construction industryConstruction industry
Construction industry
 
Application of surveying
Application of surveyingApplication of surveying
Application of surveying
 
Micro economics issues
Micro economics issuesMicro economics issues
Micro economics issues
 
Quantity surveyors jargon
Quantity surveyors jargonQuantity surveyors jargon
Quantity surveyors jargon
 
Account as a decession making tool for qs
Account as a decession making tool for qsAccount as a decession making tool for qs
Account as a decession making tool for qs
 

Kürzlich hochgeladen

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 

Kürzlich hochgeladen (20)

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 

Risk Management System

  • 1.
  • 2. BACK GROUND OF THE PROJECT LIGHTHOUSE IS A 5-STAR FRANCHISE HOTEL BELONGING TO JET WING HOTELS, LOCATED IN GALLE, SRI LANKA THE HOTEL WAS COMMISSIONED BY HERBERT COORAY IN 1995 FOR HIS TRAVEL COMPANY JETWINGS AND DESIGNED BY GEOFFREY BAWA
  • 3. FEATURES OF THE EXISTING BUILDING • The hotel had 60 rooms • Three suites • two restaurants • a swimming pool • recreational facilities.
  • 5. EXPECTING RISKS • Physical risks • Technical risks • Political risks • Legal & contractual risks • Economic/Financial risks • Marketing risks • Management risks • Environmental risks • Schedule risks • Operational Performance risks
  • 6. Risk Breakdown Structure Level 0 Level 01 Level 02 Level 03 Internal Environmental Technical Risks Demolishion , support ,Design , Site investigation (capable for the reimbursement, Specification and source material Managemental Planning , Confirm the safety , mange resources and labors wastage Administrative Labor , stores , transport External Environmental Environment Weather and natural disaster Financial risks Tax , inflation , foreign exchange , payment delay , financial expenses Political and legal Policy changes , customs , disposing and liabilities
  • 7. Propose risk management •Innovative concepts •Apply the effective construction technology Design •Take precautions to face environmental issues •Effectively Use the resources Sources and environment •Perfect funding resources •Contingency for the economic changes Economic •Create situation the employers to work •Complete tasks according to the working schedule Management •The esthetic appearance according to the clients objective Out put
  • 8. Awareness • Aware the risk management team about the risks which will occur during & after the amendments • Stakeholders of the project; • Client (Lighthouse Hotel PLC) • Management (Jetwing Hotels) • Contractor • Legal bodies
  • 9. Awareness cntd. • Aware the relevant stakeholders about the amendments which are made to the building structure. • Aware the client about the risks which would occur during and afterwards of the construction period • Aware the client about the legal and practical obligations which would occur against the amendments • Risks with the site such as soil type and the bearing ability
  • 10. Awareness cntd. • Aware the stakeholders about the risks and the requirements of a risk management process. • Aware the stakeholders about the risk management process that we implemented to the building.
  • 11. Skills • Empower the stakeholders with the skills that are required in risk management. • In this skills mean the steps that the stakeholders can take in order to minimize or neutralize risks. ex: Consulting a Geo-Technical engineer for analyze the soil and neutralizing the risk with that
  • 12. Skills cntd. • After that we have to identify the skills which the personals who are connected with the project indirectly and make usage of them.
  • 13. Culture • Every step which we take in the risk management process should be accord to the culture of the hotel. • Such as; • It should be accord to the vision of the hotel • None of the occupants must feel uncomfortable by the process • Under this we have to make sure the risk for the safety of the occupants during the construction period is penalized by implementing suitable precautionary methods.
  • 14. Image • After implementing the risk management system the image of the external parties towards the hotel must not be changed. • After the implementation of the risk management system we have to take a report regarding almost every aspects of the hotel and analyze whether there are any deviations about them. • Such as: • Occupancy rate • Safety issues • Etc.
  • 15. Image cntd. • If the reports indicate negative deviations we have to change the strategy which we used for the risk management system
  • 16. Process • Under this we have to determine that the process we use for the risk management is accord with the contractual, procurement and management practices. • This is occur in situations such as if the amendment we are going to do is contractually illegal we have to do variations for it. • This implies that there is a contractual and procurement risk in this kind of refurbishment projects.
  • 17. Process cntd. • To overcome theses risks we have to consult contractual expertise such as Quantity Surveyors.
  • 18. Confidence • Under this step we have consider about how the stakeholders of the project is confident with the risk management. • For this purpose we have to take a feedback from the each stakeholders and we should analyze their idea about the risk management system which we proposed.
  • 19. Applications • After implementation of the risk management system we should consider about the effectivity of that system to the day to day basis operations of the hotel • This also include determining that whether the risk management system is applicable as a decision making tool for the client
  • 20. • After practicing all of these steps we should rate each of them regarding the feedback with the hotel project. • This will enhance us to have an idea about how effective the system we proposed is and will acknowledge us about the defects and the adjustments
  • 21. Purpose of having a risk management system • The purpose of risk policy is not to completely eliminate the risk from the hotel . • To ensure that every effort is made by the hotel to manage risk appropriately to maximize potential opportunities and minimize the adverse effects of risk.
  • 22. 4. Creating and Implementing a Risk Management Risk Management Team • Geo Technical Engineer- to assure the risks and errors that could arise in the soil when modifying the hotel programme • Structural Engineer - the assurance of the Newley constructing hotel room’s structures • Service Engineer/Facility Manager - should ensure whether all the facilities provided without any failure. Technical Risks
  • 23. Managerial Risks • Project Manager- Uncertainties that could affect the objectives of the Hotel Refurbishment Project. (Eg: Time, cost, performance, quality, scope, client satisfaction) - Responsible for funding agencies to determine the requirement for a contract modification regarding the hotel project.
  • 24. Financial Risks • Quantity Surveyor responsible on the errors or risks that could happen with the payments, rates etc, while hotel project is going on. • Financial Manager- the financial support relevant to the hotel process.  Therefore, a Risk Managing Team can be implemented with considering of the risks that can happen in the Hotel Project.
  • 25. Risk Mgt. Manual • Includes the Risk Managing practices throughout the Hotel Project • These are used to record the opportunities, threats and risks at each stage of “Hotel project with refurbishment” and to provide the on-going action plans to address the risks. A detailed techniques of Risk Identification Eg: Risk due to the lack of strength of the foundation of the existing building ResponseAnalysis Required tastings, modifications are explored. Installing external foundations to give the sufficient strength
  • 26.
  • 27. Risk Mgt. Plan • This document includes the records of the project and the made decision. • In this Hotel refurbishment project, the remedies/ decisions taken to minimize/ avoid risk as the most suitable option • Maintained records of such risks for reference(Plans) in the future and is recommend that an archive risk register is kept.
  • 28. Risk Mgt. Training & Rewarding System • A proper training should be done in order to obtain a effective Risk management in accordance to the Hotel Project • The Risk Managing Team has gained a proper and suitable training with relevance to the Hotel project with refurbishment • The personal rewards that can be gained with a proper Risk management system with managing financial, managing, technical, …, risks that come across.
  • 30. Risk Mgt. Information Systems conts… • Record details of risks which occurs in the refurbishment of hotel project, controls and priorities, and to show any changes in them • Record risk treatments and related resource requirements; • Record details of incidents where the new application of refurbished building, and loss events, and the lessons learned • Track accountability for risks, controls and treatments • Track progress and record the completion of risk treatment actions • Allow progress checks against the risk management plan • Trigger monitoring and assurance activity Purpose of RMIS
  • 31. Risk Mgt. Performance Measurement System • Risk management and performance measurement should be linked together to enable, to each supply chain partner, to define and guide its overall risk profile, as well as to shape its strategic direction. • The Risk must be continuously addressed and monitored in order to refurbish the hotel building and get the attraction of the customers with out getting damaged through risks.
  • 32. 5. Building a Risk Mgt ethic into corporate culture • The way the stake holders of the construction process act, behave, refers to the culture of that organization. • As the last step of the Risk Management System, the ethics, principals that should be within each other while managing the Risks according to the Project that is going to be completed.
  • 33. Scope of the policy • Risk is an inherent aspect of all management, administrative and commercial business activities. Sound risk management principles must become part of routine management activity across the hotel. • The key objective of this policy is to ensure the hotel has a consistent basis for measuring, controlling, monitoring and reporting risk across the hotel at all levels.
  • 34. Detailing the policy • Detailing the policy is important to identify the key parameters and important factors that we should have to include in the Risk management policy form. Those details are as follows. • What is risk Risk exists as a consequence of uncertainty and is present in all activities whatever the size or complexity and whatever industry or business sector. We can’t forecast the risks accurately for the hotel when designing the risk management system.
  • 35. The hotel approach • The Risk Management process will be as user friendly as possible and add value • The concentration on control improvements to mitigate significant risks. • produce a comprehensive picture of risk across all hotel activities. Risk responsibilities • It is essential that all participants in risk management are aware of their roles in the overall process and their own responsibilities.
  • 36. Risk review • The Group Risk Manager manage the risk process including the roll out of the risk management programmed. • The Group Risk Office will maintain the hotel’s strategic risk register. • It will help to audit risk periodically. Project risk management • Project risk management will follow a similar process to that defined for corporate risks. • The Project Manager will take responsibility for risk management. • The risk register in the format set up in this policy will be populated at the point at which permission is sought for a project to proceed.
  • 37. AR management company ltd. Is keen to inform that the company will make sure to do in company’s full potential to manage risk that arise in this hotel’s internal and external environment. Identification of those risks will help the employer to achieve his organizational and operational goals with out any delay. We ensure that we will give enough knowledge about risk identification and risk management to all the occupants in the hotel. The required lectures will be conducted by experience professionals in risk management field. We ensure that risk management will be a part of the company’s culture and operation of the company. Through this risk management strategies hotel can gain following positive outcomes,  Increase the efficiency and effectiveness of decisions that hotel administration or management would take in crucial occasions.  Maintain the risk management strategies all over the company.  Follow the legal and regulation policies.  Implementation and improvement of risk management prosses.  Efficient implementation of risk management plan. RISK POLICY FOR JETWING HOTEL PROJECT
  • 38. Monitor whether the risk management system is functioning well.
  • 39. After developing risk management system we have to check whether the system is functioning efficiency and effectively to manage the risk. We can monitor the system accordance with following facts. Analyze the risk management system • In this process we do check whether this system minimize the risk and maximize the efficiency. • How the system comply with the hotel operation . • What are the treat to manage the risk. • Are there any implementations and improvements should do to the system
  • 40. Are their any changes to do • Check whether there is some risks have to give the priority. • Do some modification to management process if it is required. New risks • Check weather there is some missing risks that has been not detect by the system. • What are the emerging risks. • What are the implementation that is required to do to manage those new risks
  • 41. The process of monitoring risk management system • Risk is about uncertainity. • The main objective of the monitoring is to evaluate the progress and impact of the risk management option determine whether adaptive action is required. • End of this process we determine that current options should be continued or go for some modifications to the risk that we identify in this hotel. • We communicate with the stakeholders and inform all the details of this process with them.
  • 42. Record the monitoring process • It is important to record those monitoring details because when some need of implementation arise it is easy to do those implementations to the risk management system by looking at those records. • We can moderate previous system by looking ad those monitoring records. • Identify defects in future to forecast and be prepare for future risks.

Hinweis der Redaktion

  1. ACCORDING TO THE SCANRIO WE HAVE TO DISCUSS A BOUT THE PROPOSE A RISK MGT SYSTEM FOR A HOTEL PROJECT WHICH IS GOING TO REIMBURSE FOR YOUR EASY UNDERSTANDING WE SELECTED A REAL PROJECT AND PROPOSE A REIMBURSEMENT ACCORDING TO OUR VIEW
  2. THIS IS OUR CLIENT REQUIREMENT
  3. These type project risk in high level WE start the RISK MANAGEMENT PROCESS THROUGH THE IDENTIFICAN CLASSIFICATION AND ANALYZE TO PROPOSE THE RMS WE NEED TO ANALYE THESE RISKS SO WE PROPOSE THE Risk break down STRUCTURE
  4. Eariler designer made a number of the natural boulders the focus of the hotel, framing views of them from the air-conditioned dining room and the open-air lounge Management RISK THIS CONSTRUCTION IS THE REIMBURSEMENT THE CLIENT EXPECT TO RUN THE HOTEL WHILE THE CONSTRUCTION SO THE SFETY FOR THE CUSTOMESRS AND THE SOURCES OF THE CLIENT ADMIN OR LOGISTIC SPECIALLY THE TRANSPORT PROBLEM AND STORGE LABOURS REST AREA PLANTS PARKING AREA EVERY THING OPERATE WITHOUT DISTRUB THE CUSTOMERS OF THE CLIENT ENVIORMENTAL COSTAL VERY CLOSER TO SEE SO EASILY AFFECT WINDS AND RAIN SUN SHINE CORROSION EFFECTS FINACIAL CZ WE ARE GOING TO DO THIS PROJECT WITH THE TIME OF COMPETION IS SPECIFIED SO THE FUNDS AND THE EXPENCES WILL EFFECT THIS PROJECT POLITICAL AND LEEGAL THIS IS TOURISAM RELATED THE PROCESS SHOULD ACCOULDING TO THE RULE AND ALSO THE DEMOLISION WASTE
  5. We proposed the risk mgt by analysizing customer objective CUSTOMER FOCUS SATISFACTION RUN THE HOTEL WITH THE PREVIOUS SOURCES Demonstrate exceptional service Innovative realistic
  6. First we have to acknowledge ourselves as the risk management team about the risks and the system we are going to imply to the scenario
  7. Such as the risks about the site For overcome the risks during the construction we have to prepare a proper risk management system And to overcome the legal obligations we have take suitable steps such as consulting legal bodies and considering legal principles
  8. For gain the maximum outcome from the risk management system we have to identify the skills which clients and the other parties have and use them
  9. The team should include an experts from each department who can handle the risks, at the point of occurrence. Each relating member should identify the risk and take necessary actions. The bearing capacity of soil, whether the Newley attached parts are bearable with the soil or a modification should done for the current soil. The new structures such as walls, staircases, columns are placed securely and stably. The facilities as HVAC, lighting building transportation should install with minimized risk in the project.
  10. The objectives on the time- completion time, contract expiration time, Quality – that is expected as the required level of the hotel in order to attract customers Cost- to achieve the completion of project within the Budget etc.
  11. Manuals, intended to maximize the beneficial outcome of the opportunities and minimize or eliminate the consequences of adverse risk events
  12. A Risk Management Information System (RMIS) is an integrated computer information system that is used to help decision makers evaluate risks and keep track of all relevant information.  stored information include loss-control measures, property values, records of prior claims, and relevant insurance policies.