Negotiating a Public Private Partnership
                                                                                                     Introduction
Institutional Arrangement to Restore the
                                                                       • Gorongosa National Park was one of the first protected
         Gorongosa National Park                                         areas declared in the country and became famous due
                                                                         to its diverse and abundant wildlife;

                                                                       • According to the legislation the Park was Administered
                                                                         by Government until it was abandoned in decade of
                                                                         80´s due to civil war.

                                                                       • The Government returned to the Park in 1993 after the
                                                                         1992 peace agreement.




                            Introduction                                                          The PPP Attempts
• The paradigm shift was determined by the forestry and
  wildlife law(1999) that created a provision that forest ,              • In 1997 the Government launched a tender to
  wildlife and protected areas can be delegated to an                      identify tourism concessionairs and received
  administration of other sectors than public;                             a proposal which comprised the following
                                                                           institutional arragement:
• Gorongosa Park was subject to three attempts of
  negotiations for a Public Private Partnerships namelly:                     – The Mozambican company, the promoter
   –   Clivia and Investimento lda.                                             (Clivia+Investimento lda);
   –   African Park                                                           – Government;
   –   Bernardo Pedro Ferraz
                                                                              – Local communities;
   –   Associação Comercial da Beira
                                                                              – Other Mozambican Investors
   –   Carr Foundation – This was the one that took shape




                     The PPP Attempts                                                               The PPP Attempts
                                                                      • Unsolicited Proposal was received from African Park in 2003;
 • The Council of Ministers did not consider that                     • At the same year government received other two proposals from
                                                                        Bernardo Ferraz and Associação Comercial Moçambicana
   proposal due to the following:
                                                                      • The Government dicided to not engage AP due to following:
       – The promoter failed to prove that could mobilise the funds      – Interpretation of legislation left a grey area on the need or not of a public tender to
         to Gorongosa Park;                                                identifiy a partner to co- manage Gorongosa Park and direct negotiation were
                                                                           suspended;

       – Did not have any track record in working in Conservation        – This was exacerbated by the fact that the Govenment was under pressure to attend
         areas;                                                            other proposals Bernardo Ferraz and Associação Comercial Moçambicana

                                                                         – African Park demanded that the funds that would invest in the Park should be
       – The roles and responsibilities of partners were not well          reimbursed to the mother compony by the revenue of the Park, which was not
         spelled out;                                                      attractive to Government;

                                                                         – There was no Mozambican participation in African Park, although AP has agreed to
                                                                           involve them;
What is Negotiation?                                                            Preparation of Negotiation

 • Negotiation is a process of interaction between
   parties directed at reaching some form of
   agreement that will hold and which is based
   upon common interests (Spoelstra & Pienner,
   1999);

 • When approaching a negotiation situation it is
   important to consider the aim of finding an
   outcome where both sides could gain, even if it
   means giving something else in the process




             Preparation of Negotiation




                                                                                             THE PREPARATION FOR THE
                                                                                        NEGOTIATIONS BETWEEN THE MITUR AND
                                                                                               THE CARR FOUNDATION




                            The Preparation                                                                   The Preparation
                    Carr Foundation                  MITUR                                            Carr Foundation                MITUR

Objectives          •Provide financial & tecnhical   •Receive financial and          Legal            Ensured that it was negotiating •Ensured that the partner was
                    support                          technical support for           Implications     with the right partner and got ideal for partnership
                    •take leadership in              management of Gorongosa                          legal advice from Mozambican
                    management of Gorongosa          •take leadership in                              lawyer
                                                     management of resources.
                                                                                     Tactics          •Experienced negotiators       •No experienced negotiator
Analysis of the     Contatcs with Moz Embassy in     MITUR got information of                         •Organised the Hotel Avenida   •Experienced in protected
situation           USA and authorities in Moz       moral and financial                              as a Venue                     areas management
                    provided good impression         streghthens from Embassy of                      •Drafted the text of the       •Did not have venue and did
                                                     Moz in USA                                       agreement                      not dicided for one
                                                                                     Feed Back        Strong feed back in            Feed back in performance was
Identification of   •Provide support for             •Ensure that the ownership of   (Prepartion for performance                     being done, but there were
issues              reabilitation of the Park        the process remains with the    the next phases) The performance was imroved    concerns that were coming up
                    •Ensure that the support will    Mozambique                                       in following rounds            most of time. (is there a
                    be sustainable                   •Ensure that the process is                                                     comercial interest? Are we
                                                     legal                                                                           securing the ownership?)
Phases of Negotiation
 • Exploratory negotiatin – wherein preferences and bottom
   lines are discussed, information exchanged, consensus
   reached as areas of conflitis and areas of consensus;
 • Accomodative negotiation wherein the process of the
   bridging of differences and easy agreements are negotiated
 • Confrontational negotiation wherein hard bargaining is done
   on the core differences between groups, where moment of
   crisis often arise and reciprocal blackmail is quite common
 • Compromise negotiation wherein solutions are found
   through give and take, contracts obtained and general                      THE PHASES OF NEGOTIATIONS BETWEEN
   consensus established (de Klerk, 1993)
                                                                              THE MITUR AND THE CARR FOUNDATION




                        The Negotiations                                                           The Negotiations
• The Exploratory Negotiation                                                • The Accomodative Negotiation
   – Government and Carr Foundation established a MoU for 6
     months to allow joint activities while the parties finilise a long
     term agreement;                                                           – The negotiating team from Government made initial
   – Policy or legal statements about partnerships in PA´s were                  attempts to convince Government to accept the institutional
     scattered and not well understood;                                          arrangement proposed by Carr;
   – The parties agreed to draft principles of the relationship;               – Government did not agree and was concerned about
                                                                                 onwership and soverenigty issue;
   – There was no good information on each other Party. A
     conflict emerged on the Institutional arrangement for the                 – Carr oferred to not interfere with legislation and establishing
     partnership;                                                                a Warden who would deal with ecology and antipoaching;
      • Government wanted to keep the arrangement, maintaing a                 – Carr wanted to keep the planning and management under
        Government Park warden;                                                  his representative;
      • Carr wanted to establish horizontal Departments with more power to
        one Head of Department appointed by Carr Foundation




                   The Negotiations                                                                The Negotiations
• The Confrontational Negotiation
                                                                             • The Compromise Negotiation
  – Carr indicated that key premises to continue to sign any
    agreement:                                                                 – There were found the following solutions:
                                                                                  • Carr Foundation would keep the key position of planning and
      • Needed to be responsible of planning and management;
                                                                                    government would appoint a warden who is dedicated to the
      • 30 years implementation to give time to ensure sustainability;              antipoaching but represents the Park with other agents;
      • Inclusion of força major;                                                 • Steering committe composed by Greg Carr and a senior officer
      • Governnment commit to pay part of the cost of management of the             appointed by the Minister take decisions that are for the Park warden
        Park;                                                                       in Mozambique legislation;
      • Revenues from the Park be retained directly by the Park                   • There are 6 Departments and each Party appointed 3 Heads of the
  – Carr demanded that once negotiations are not completed by 31                    Departments
    December 2007 it would consider it terminated                                 • The period of agreement is 20 years and an evaluation would
                                                                                    determine a need or not of additional 10 years;
  – Government indicated key premises such as:
                                                                                  • Government committed to pay part of the costs of the management of
      • Not ready to give up the role in planning and management;                   the Park;
      • Wanted a short period of agreement 5-10 years;                            • Revenues from the Park are send to Ministry of Finance and returned
      • Wanted the revenues to be channelled to FUTUR according to Moz              to the Park instead of going through FUTUR
        legislation and then to Gorongosa Park
Conclusions                                      Thank You
• While government was talking about participative management,
  clear guidance on how to establish it were absent;

• The Government had no experince in negotiating partnership
  agreements. Previous failures were blamed to the other Party for
  whom the government created suspicious about possible hiden
  agenda;

• Government did not have enough preparation for the negotiation;
  the text of the agreement was drafted by Carr and the venue
  provided by Carr

• The negotiations took 2 years while both parties were antecipating 6
  months, this indicates that both were over optimistic;

Weitere ähnliche Inhalte

Mehr von Anna Spenceley

COVID-19 and tourism in developing countries: Needs, challenges & options
COVID-19 and tourism in developing countries: Needs, challenges & optionsCOVID-19 and tourism in developing countries: Needs, challenges & options
COVID-19 and tourism in developing countries: Needs, challenges & optionsAnna Spenceley
 
COVID-19 and impacts on protected area tourism: Great Limpopo and KAZA TFCAs
COVID-19 and impacts on protected area tourism: Great Limpopo and KAZA TFCAsCOVID-19 and impacts on protected area tourism: Great Limpopo and KAZA TFCAs
COVID-19 and impacts on protected area tourism: Great Limpopo and KAZA TFCAsAnna Spenceley
 
Nature based tourism tools and resources
Nature based tourism tools and resourcesNature based tourism tools and resources
Nature based tourism tools and resourcesAnna Spenceley
 
Increasing financial resiliency for protected areas and key biodiversity areas
Increasing financial resiliency for protected areas and key biodiversity areasIncreasing financial resiliency for protected areas and key biodiversity areas
Increasing financial resiliency for protected areas and key biodiversity areasAnna Spenceley
 
Tourism and visitor management in protected areas: visitor management tools a...
Tourism and visitor management in protected areas: visitor management tools a...Tourism and visitor management in protected areas: visitor management tools a...
Tourism and visitor management in protected areas: visitor management tools a...Anna Spenceley
 
Tourism in Africa and the Sustainable Development Goals
Tourism in Africa and the Sustainable Development GoalsTourism in Africa and the Sustainable Development Goals
Tourism in Africa and the Sustainable Development GoalsAnna Spenceley
 
Sources of finance, Sue Snyman and Paul Eagles
Sources of finance, Sue Snyman and Paul EaglesSources of finance, Sue Snyman and Paul Eagles
Sources of finance, Sue Snyman and Paul EaglesAnna Spenceley
 
Concession 'speed dating'
Concession 'speed dating'Concession 'speed dating'
Concession 'speed dating'Anna Spenceley
 
Planning follow on meetings
Planning follow on meetingsPlanning follow on meetings
Planning follow on meetingsAnna Spenceley
 
iSimangaliso Wetland Park, Terri Castis
iSimangaliso Wetland Park, Terri CastisiSimangaliso Wetland Park, Terri Castis
iSimangaliso Wetland Park, Terri CastisAnna Spenceley
 
Legal framework for concessions in protected areas, Paul F J Eagles
Legal framework for concessions in protected areas, Paul F J EaglesLegal framework for concessions in protected areas, Paul F J Eagles
Legal framework for concessions in protected areas, Paul F J EaglesAnna Spenceley
 
Integrating sustainability, Sue Snyman
Integrating sustainability, Sue SnymanIntegrating sustainability, Sue Snyman
Integrating sustainability, Sue SnymanAnna Spenceley
 
Phase 2? Anna Spenceley
Phase 2? Anna SpenceleyPhase 2? Anna Spenceley
Phase 2? Anna SpenceleyAnna Spenceley
 
Understanding tourism, Sue Snyman
Understanding tourism, Sue SnymanUnderstanding tourism, Sue Snyman
Understanding tourism, Sue SnymanAnna Spenceley
 
Fundamentals of tourism: NGOs in protected areas, Paul F J Eagles
Fundamentals of tourism: NGOs in protected areas, Paul F J EaglesFundamentals of tourism: NGOs in protected areas, Paul F J Eagles
Fundamentals of tourism: NGOs in protected areas, Paul F J EaglesAnna Spenceley
 
Fundamentals of tourism and concessions in protected areas, Paul F J Eagles
Fundamentals of tourism and concessions in protected areas, Paul F J EaglesFundamentals of tourism and concessions in protected areas, Paul F J Eagles
Fundamentals of tourism and concessions in protected areas, Paul F J EaglesAnna Spenceley
 
Getting the job done: Skills and capacity needs, Sue Snyman
Getting the job done: Skills and capacity needs, Sue SnymanGetting the job done: Skills and capacity needs, Sue Snyman
Getting the job done: Skills and capacity needs, Sue SnymanAnna Spenceley
 
Getting ready: Scoping, design and feasibility, Anna Spenceley
Getting ready: Scoping, design and feasibility, Anna SpenceleyGetting ready: Scoping, design and feasibility, Anna Spenceley
Getting ready: Scoping, design and feasibility, Anna SpenceleyAnna Spenceley
 
Managing concessions in protected areas, Paul F J Eagles
Managing concessions in protected areas, Paul F J EaglesManaging concessions in protected areas, Paul F J Eagles
Managing concessions in protected areas, Paul F J EaglesAnna Spenceley
 
Guidelines for tourism partnerships and concessions in protected areas, Anna ...
Guidelines for tourism partnerships and concessions in protected areas, Anna ...Guidelines for tourism partnerships and concessions in protected areas, Anna ...
Guidelines for tourism partnerships and concessions in protected areas, Anna ...Anna Spenceley
 

Mehr von Anna Spenceley (20)

COVID-19 and tourism in developing countries: Needs, challenges & options
COVID-19 and tourism in developing countries: Needs, challenges & optionsCOVID-19 and tourism in developing countries: Needs, challenges & options
COVID-19 and tourism in developing countries: Needs, challenges & options
 
COVID-19 and impacts on protected area tourism: Great Limpopo and KAZA TFCAs
COVID-19 and impacts on protected area tourism: Great Limpopo and KAZA TFCAsCOVID-19 and impacts on protected area tourism: Great Limpopo and KAZA TFCAs
COVID-19 and impacts on protected area tourism: Great Limpopo and KAZA TFCAs
 
Nature based tourism tools and resources
Nature based tourism tools and resourcesNature based tourism tools and resources
Nature based tourism tools and resources
 
Increasing financial resiliency for protected areas and key biodiversity areas
Increasing financial resiliency for protected areas and key biodiversity areasIncreasing financial resiliency for protected areas and key biodiversity areas
Increasing financial resiliency for protected areas and key biodiversity areas
 
Tourism and visitor management in protected areas: visitor management tools a...
Tourism and visitor management in protected areas: visitor management tools a...Tourism and visitor management in protected areas: visitor management tools a...
Tourism and visitor management in protected areas: visitor management tools a...
 
Tourism in Africa and the Sustainable Development Goals
Tourism in Africa and the Sustainable Development GoalsTourism in Africa and the Sustainable Development Goals
Tourism in Africa and the Sustainable Development Goals
 
Sources of finance, Sue Snyman and Paul Eagles
Sources of finance, Sue Snyman and Paul EaglesSources of finance, Sue Snyman and Paul Eagles
Sources of finance, Sue Snyman and Paul Eagles
 
Concession 'speed dating'
Concession 'speed dating'Concession 'speed dating'
Concession 'speed dating'
 
Planning follow on meetings
Planning follow on meetingsPlanning follow on meetings
Planning follow on meetings
 
iSimangaliso Wetland Park, Terri Castis
iSimangaliso Wetland Park, Terri CastisiSimangaliso Wetland Park, Terri Castis
iSimangaliso Wetland Park, Terri Castis
 
Legal framework for concessions in protected areas, Paul F J Eagles
Legal framework for concessions in protected areas, Paul F J EaglesLegal framework for concessions in protected areas, Paul F J Eagles
Legal framework for concessions in protected areas, Paul F J Eagles
 
Integrating sustainability, Sue Snyman
Integrating sustainability, Sue SnymanIntegrating sustainability, Sue Snyman
Integrating sustainability, Sue Snyman
 
Phase 2? Anna Spenceley
Phase 2? Anna SpenceleyPhase 2? Anna Spenceley
Phase 2? Anna Spenceley
 
Understanding tourism, Sue Snyman
Understanding tourism, Sue SnymanUnderstanding tourism, Sue Snyman
Understanding tourism, Sue Snyman
 
Fundamentals of tourism: NGOs in protected areas, Paul F J Eagles
Fundamentals of tourism: NGOs in protected areas, Paul F J EaglesFundamentals of tourism: NGOs in protected areas, Paul F J Eagles
Fundamentals of tourism: NGOs in protected areas, Paul F J Eagles
 
Fundamentals of tourism and concessions in protected areas, Paul F J Eagles
Fundamentals of tourism and concessions in protected areas, Paul F J EaglesFundamentals of tourism and concessions in protected areas, Paul F J Eagles
Fundamentals of tourism and concessions in protected areas, Paul F J Eagles
 
Getting the job done: Skills and capacity needs, Sue Snyman
Getting the job done: Skills and capacity needs, Sue SnymanGetting the job done: Skills and capacity needs, Sue Snyman
Getting the job done: Skills and capacity needs, Sue Snyman
 
Getting ready: Scoping, design and feasibility, Anna Spenceley
Getting ready: Scoping, design and feasibility, Anna SpenceleyGetting ready: Scoping, design and feasibility, Anna Spenceley
Getting ready: Scoping, design and feasibility, Anna Spenceley
 
Managing concessions in protected areas, Paul F J Eagles
Managing concessions in protected areas, Paul F J EaglesManaging concessions in protected areas, Paul F J Eagles
Managing concessions in protected areas, Paul F J Eagles
 
Guidelines for tourism partnerships and concessions in protected areas, Anna ...
Guidelines for tourism partnerships and concessions in protected areas, Anna ...Guidelines for tourism partnerships and concessions in protected areas, Anna ...
Guidelines for tourism partnerships and concessions in protected areas, Anna ...
 

Kürzlich hochgeladen

69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)Escort Service
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)Mazie Garcia
 
Revolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI UpdateRevolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI Updatejoymorrison10
 
How Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s WatersHow Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s WatersMakena Coast Charters
 
Inspirational Quotes About Italy and Food
Inspirational Quotes About Italy and FoodInspirational Quotes About Italy and Food
Inspirational Quotes About Italy and FoodKasia Chojecki
 
It’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldIt’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldParagliding Billing Bir
 
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's JewelSicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's JewelTime for Sicily
 
Phil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptxPhil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptxDitasDelaCruz
 
Lucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur TaxiLucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur TaxiCab Bazar
 
Paragliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir
 
Authentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptxAuthentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptxGregory DeShields
 
a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.moritzmieg
 
Disney Dreams in Europe: A Guide to Disneyland Paris
Disney Dreams in Europe: A Guide to Disneyland ParisDisney Dreams in Europe: A Guide to Disneyland Paris
Disney Dreams in Europe: A Guide to Disneyland ParisisangoTravel
 
Solbello Sun Shade Umbrella for Beach 2024
Solbello Sun Shade Umbrella for Beach 2024Solbello Sun Shade Umbrella for Beach 2024
Solbello Sun Shade Umbrella for Beach 2024Solbello
 

Kürzlich hochgeladen (16)

69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
 
Enjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCR
 
Revolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI UpdateRevolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI Update
 
How Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s WatersHow Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s Waters
 
Inspirational Quotes About Italy and Food
Inspirational Quotes About Italy and FoodInspirational Quotes About Italy and Food
Inspirational Quotes About Italy and Food
 
Enjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCR
 
It’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldIt’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The World
 
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's JewelSicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
 
Phil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptxPhil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptx
 
Lucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur TaxiLucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur Taxi
 
Paragliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal Pardesh
 
Authentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptxAuthentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptx
 
a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.
 
Disney Dreams in Europe: A Guide to Disneyland Paris
Disney Dreams in Europe: A Guide to Disneyland ParisDisney Dreams in Europe: A Guide to Disneyland Paris
Disney Dreams in Europe: A Guide to Disneyland Paris
 
Solbello Sun Shade Umbrella for Beach 2024
Solbello Sun Shade Umbrella for Beach 2024Solbello Sun Shade Umbrella for Beach 2024
Solbello Sun Shade Umbrella for Beach 2024
 

Gorongosa Concession Bartolomeu Soto

  • 1. Negotiating a Public Private Partnership Introduction Institutional Arrangement to Restore the • Gorongosa National Park was one of the first protected Gorongosa National Park areas declared in the country and became famous due to its diverse and abundant wildlife; • According to the legislation the Park was Administered by Government until it was abandoned in decade of 80´s due to civil war. • The Government returned to the Park in 1993 after the 1992 peace agreement. Introduction The PPP Attempts • The paradigm shift was determined by the forestry and wildlife law(1999) that created a provision that forest , • In 1997 the Government launched a tender to wildlife and protected areas can be delegated to an identify tourism concessionairs and received administration of other sectors than public; a proposal which comprised the following institutional arragement: • Gorongosa Park was subject to three attempts of negotiations for a Public Private Partnerships namelly: – The Mozambican company, the promoter – Clivia and Investimento lda. (Clivia+Investimento lda); – African Park – Government; – Bernardo Pedro Ferraz – Local communities; – Associação Comercial da Beira – Other Mozambican Investors – Carr Foundation – This was the one that took shape The PPP Attempts The PPP Attempts • Unsolicited Proposal was received from African Park in 2003; • The Council of Ministers did not consider that • At the same year government received other two proposals from Bernardo Ferraz and Associação Comercial Moçambicana proposal due to the following: • The Government dicided to not engage AP due to following: – The promoter failed to prove that could mobilise the funds – Interpretation of legislation left a grey area on the need or not of a public tender to to Gorongosa Park; identifiy a partner to co- manage Gorongosa Park and direct negotiation were suspended; – Did not have any track record in working in Conservation – This was exacerbated by the fact that the Govenment was under pressure to attend areas; other proposals Bernardo Ferraz and Associação Comercial Moçambicana – African Park demanded that the funds that would invest in the Park should be – The roles and responsibilities of partners were not well reimbursed to the mother compony by the revenue of the Park, which was not spelled out; attractive to Government; – There was no Mozambican participation in African Park, although AP has agreed to involve them;
  • 2. What is Negotiation? Preparation of Negotiation • Negotiation is a process of interaction between parties directed at reaching some form of agreement that will hold and which is based upon common interests (Spoelstra & Pienner, 1999); • When approaching a negotiation situation it is important to consider the aim of finding an outcome where both sides could gain, even if it means giving something else in the process Preparation of Negotiation THE PREPARATION FOR THE NEGOTIATIONS BETWEEN THE MITUR AND THE CARR FOUNDATION The Preparation The Preparation Carr Foundation MITUR Carr Foundation MITUR Objectives •Provide financial & tecnhical •Receive financial and Legal Ensured that it was negotiating •Ensured that the partner was support technical support for Implications with the right partner and got ideal for partnership •take leadership in management of Gorongosa legal advice from Mozambican management of Gorongosa •take leadership in lawyer management of resources. Tactics •Experienced negotiators •No experienced negotiator Analysis of the Contatcs with Moz Embassy in MITUR got information of •Organised the Hotel Avenida •Experienced in protected situation USA and authorities in Moz moral and financial as a Venue areas management provided good impression streghthens from Embassy of •Drafted the text of the •Did not have venue and did Moz in USA agreement not dicided for one Feed Back Strong feed back in Feed back in performance was Identification of •Provide support for •Ensure that the ownership of (Prepartion for performance being done, but there were issues reabilitation of the Park the process remains with the the next phases) The performance was imroved concerns that were coming up •Ensure that the support will Mozambique in following rounds most of time. (is there a be sustainable •Ensure that the process is comercial interest? Are we legal securing the ownership?)
  • 3. Phases of Negotiation • Exploratory negotiatin – wherein preferences and bottom lines are discussed, information exchanged, consensus reached as areas of conflitis and areas of consensus; • Accomodative negotiation wherein the process of the bridging of differences and easy agreements are negotiated • Confrontational negotiation wherein hard bargaining is done on the core differences between groups, where moment of crisis often arise and reciprocal blackmail is quite common • Compromise negotiation wherein solutions are found through give and take, contracts obtained and general THE PHASES OF NEGOTIATIONS BETWEEN consensus established (de Klerk, 1993) THE MITUR AND THE CARR FOUNDATION The Negotiations The Negotiations • The Exploratory Negotiation • The Accomodative Negotiation – Government and Carr Foundation established a MoU for 6 months to allow joint activities while the parties finilise a long term agreement; – The negotiating team from Government made initial – Policy or legal statements about partnerships in PA´s were attempts to convince Government to accept the institutional scattered and not well understood; arrangement proposed by Carr; – The parties agreed to draft principles of the relationship; – Government did not agree and was concerned about onwership and soverenigty issue; – There was no good information on each other Party. A conflict emerged on the Institutional arrangement for the – Carr oferred to not interfere with legislation and establishing partnership; a Warden who would deal with ecology and antipoaching; • Government wanted to keep the arrangement, maintaing a – Carr wanted to keep the planning and management under Government Park warden; his representative; • Carr wanted to establish horizontal Departments with more power to one Head of Department appointed by Carr Foundation The Negotiations The Negotiations • The Confrontational Negotiation • The Compromise Negotiation – Carr indicated that key premises to continue to sign any agreement: – There were found the following solutions: • Carr Foundation would keep the key position of planning and • Needed to be responsible of planning and management; government would appoint a warden who is dedicated to the • 30 years implementation to give time to ensure sustainability; antipoaching but represents the Park with other agents; • Inclusion of força major; • Steering committe composed by Greg Carr and a senior officer • Governnment commit to pay part of the cost of management of the appointed by the Minister take decisions that are for the Park warden Park; in Mozambique legislation; • Revenues from the Park be retained directly by the Park • There are 6 Departments and each Party appointed 3 Heads of the – Carr demanded that once negotiations are not completed by 31 Departments December 2007 it would consider it terminated • The period of agreement is 20 years and an evaluation would determine a need or not of additional 10 years; – Government indicated key premises such as: • Government committed to pay part of the costs of the management of • Not ready to give up the role in planning and management; the Park; • Wanted a short period of agreement 5-10 years; • Revenues from the Park are send to Ministry of Finance and returned • Wanted the revenues to be channelled to FUTUR according to Moz to the Park instead of going through FUTUR legislation and then to Gorongosa Park
  • 4. Conclusions Thank You • While government was talking about participative management, clear guidance on how to establish it were absent; • The Government had no experince in negotiating partnership agreements. Previous failures were blamed to the other Party for whom the government created suspicious about possible hiden agenda; • Government did not have enough preparation for the negotiation; the text of the agreement was drafted by Carr and the venue provided by Carr • The negotiations took 2 years while both parties were antecipating 6 months, this indicates that both were over optimistic;