 Train lighting is one of the important passenger amenities
which influence the image of Railways.
 First train ran on 16th April 1853, train lighting system came
to Indian Railway in 1930 through axle driven Dynamo.
 Power supply system for trains is designed and developed to
suit the requirement of AC and non-AC working in the trains.
 Few factors considered for development of such
systems are as under.
• Coach load
• Speed of the train
• Weight of the equipment
• Available technology for reliable equipment etc
TYPES OF GENERATION
 Self-generating
• Axle driven system working on 24V DC/ 110 V DC
 Mid-on-generation
• MOG with 415V, 3 phase generation, and 110V AC utilization
 End-on-generation
• EOG with 415V,3 phase generation, and 110V AC utilization
• EOG with 750V, 3 phase generation and 415 & 110V AC
utilization
TYPES OF GENERATION
 Head-on-generation
• Power feeding from OHE for lighting loads (EMUS):
 750V DC –light & fan works on 110V DC
 1500V DC – light & fan works on 110 V AC
 25 KV—light & fan works on 141 V AC
• Power feeding from HOG for Hotel Loads (Loco):
 Hotel load power is taken from Electric/Diesel Locomotive.
 Hotel load power supply taken directly from OHE through a separate
pantograph mounted on the power car.
SELF GENERATION SYSTEM:
 The power supply arrangement of SG coach has under slung
alternator, which is driven by the running axles of the coach with the
belt of the coach. The voltage of the alternator which varies with the
speed of the train is regulated with the help of RRU and converted to
110 V DC and is used for charging the battery. The electrical load of
the coach is supplied through the 110 v DC battery at the halt.
 Advantages:
• The system is independent of the mode of traction.
• As each coach has a battery, so no additional source is required.
• The problem/defect in any particular coach does not affect the
others.
• The system can be designed to suit its specific requirement.
• It gives better flexibility in rake formation majority of SG type
coach is more.
SELF GENERATION SYSTEM:
 Disadvantages:
• The electrical load of the coach is restricted by the limitation of the capacity of
generation i.e. 2*25 kW per coach at present.
• The power is not generated during standing or slow movement of the train,
therefore bulky batteries are provided.
• There is no standby source for alternator and batteries, so system became poor
reliability.
• The system requires the extensive maintenance of alternator, batteries, belts,
tensioning device etc.
• The system has the very poor efficiency of 57%for power it receives from the
locomotive.
SELF GENERATION SYSTEM:
BASIC CIRCUIT DIAGRAM
END ON GENERATION SYSTEM:
 Each EOG train has 2 power cars with 2 nos. of DA sets in each.
The power is fed by any two DA sets through IVC. The power is
supplied at 3 phase, 750V, which is stepped down in an
individual coach to 3 phase,415 V for supplying various loads
like RMPU, WRA etc. The 110v AC supply for lights and fans is
obtained by further stepping down the 415v supply. A 24 V
battery is used for supplying a few emergency lights provided in
the coach.
 Advantages:
• The system does not require the use of bulky batteries and alternators in
individual coaches.
• The system has higher reliability due to standby DA sets and reduced
number of equipment.
• Due to an elimination of heavy equipment, the dead weight of the coach
is reduced.
• The system is independent of the type of traction i.e. diesel or electric
locomotive.
• The system has better energy efficiency as compared to the self-
generating system.
• Low maintenance.
END ON GENERATION SYSTEM:
 Disadvantages:
• The cost of energy is high due to fuel cost.
• Even with 750V, 3 phase, there is still an effect of voltage drop at the farthest
end of the train.
• Noise and smoke pollution are generated from power cars.
MID ON GENERATION SYSTEM:
 The MOG system was adopted by IR for slow-moving passenger
trains which have the very low generation to non-generation
ratio. These trains had one power car in the middle of the train,
which fed power supply to the coaches at either side of power
car. The power car coach had two DA set of 30 KVA each out of
which one was used as standby. The power car coach also had
one 3 phase, 30 KVA step down transformer of 415/110 V. The
110 V AC supplied to the coaches through couplers. The system
was discontinued after the introduction of EMU and DMU service.
 Advantages:
• The system was most suitable for slow-moving branch line passenger
trains. Light and fan of all the coaches had centralized control in power
car coach. Fan and lights were working on AC supply. There was no need
for standby batteries in the coaches.
 Disadvantages:
• There were noise and smoke; pollution due to DA set working.
• The operator was required to power car coach.
• Some valuable passenger spaces were occupied by DA sets.
HEAD ON GENERATION SYSTEM:
 The HOG scheme is widely used power supply by Railways world
over.
 The power supply system for the coaches is either received from the
locomotive or it is directly tapped from traction overhead lines into
the power cars.
 The system is considered to provide cost-effective, reliable and
energy efficient supply system for coaches.
 The HOG scheme can be considered with following two options.
 Hotel load power is taken from Electric/Diesel Locomotive.
 Hotel load power supply taken directly from OHE through a separate
pantograph mounted on the power car.
The second system is not considered technically feasible for
Indian Railways due to some limitations.
HEAD ON GENERATION SYSTEM:
 The power supply is received directly from locomotive through
couplers. The supply from locomotive can be a 750v, 3 phase supply
or a single phase supply received from loco is regulated and stepped
down in individual AC coaches, with the help of converters to provide
a regulated 415 V, 3 phase supply.
 Similarly, in AC coaches, power supply from locomotive can be
stepped down and regulated to provide single phase, 110 V AC
supplies.
 One power car with standby DA sets is also used in the train, which
can supply power to the coaches in case of failure of a locomotive.
HEAD ON GENERATION SYSTEM:
HEAD ON GENERATION SYSTEM:
 Advantage:
• Cheaper cost of power as compared to EOG & SG system.
• Pollution is less as compared to EOG system.
• One power car may be replaced by trailer coach, revenue increased.
• Escorting staff will be reduced to one power car.
• The net dead weight of the train is reduced as compared to SG system.
• HOG type AC coaches can be used in EOG type trains.
• This system is compatible with diesel and electric traction.
• Maintenance cost of HOG system coaches is lower as compared to SG
coaches
 Disadvantages:
• While working with electric locomotive there are power interruptions for short
durations to various electrical equipment except for lights while through the
neutral section.
• One power car is still required for supplying power during failure of OHE
supply or locomotive etc.HOG type coaches require rake integrity of coaches
similar to EOG system.
Train Lighting Systems: A Concise Guide

More Related Content

What's hot

Electric Traction
Electric Traction Electric Traction
Electric Traction ZunAib Ali
 
Train Lighting System Seminor Presentation
Train Lighting System Seminor PresentationTrain Lighting System Seminor Presentation
Train Lighting System Seminor PresentationAkhil S
 
Electric Traction
Electric TractionElectric Traction
Electric TractionNawaz Nz
 
Traction system
Traction systemTraction system
Traction systematul giri
 
Breaking,Types of Electrical Braking system, Regenerative Braking, Plugging ...
Breaking,Types of Electrical Braking system, Regenerative Braking,  Plugging ...Breaking,Types of Electrical Braking system, Regenerative Braking,  Plugging ...
Breaking,Types of Electrical Braking system, Regenerative Braking, Plugging ...Waqas Afzal
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV systemRamesh Adhikari
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railwayssuresh shindhe
 
Electric traction ppt
Electric traction pptElectric traction ppt
Electric traction pptragulkncet
 
DISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYDISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYRaviraj solanki
 
Protective relay
Protective relay Protective relay
Protective relay Uday Wankar
 
Combined operation of power plants
Combined operation of power plantsCombined operation of power plants
Combined operation of power plantsNishkam Dhiman
 
Major electrical equipment in power plants
Major electrical equipment in power plantsMajor electrical equipment in power plants
Major electrical equipment in power plantsFateh Singh
 
Electric traction system
Electric traction systemElectric traction system
Electric traction systemAmitKumar6931
 
Hvdc transmission seminar
Hvdc transmission seminar Hvdc transmission seminar
Hvdc transmission seminar Utkarsh Jambhule
 

What's hot (20)

Structure of power system
Structure of power systemStructure of power system
Structure of power system
 
Electric Traction
Electric Traction Electric Traction
Electric Traction
 
Electric power system
Electric power systemElectric power system
Electric power system
 
Train Lighting System Seminor Presentation
Train Lighting System Seminor PresentationTrain Lighting System Seminor Presentation
Train Lighting System Seminor Presentation
 
Electric Traction
Electric TractionElectric Traction
Electric Traction
 
Traction system
Traction systemTraction system
Traction system
 
Breaking,Types of Electrical Braking system, Regenerative Braking, Plugging ...
Breaking,Types of Electrical Braking system, Regenerative Braking,  Plugging ...Breaking,Types of Electrical Braking system, Regenerative Braking,  Plugging ...
Breaking,Types of Electrical Braking system, Regenerative Braking, Plugging ...
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV system
 
PPT ON POWER SYSTEM STABILITY
PPT ON POWER SYSTEM STABILITYPPT ON POWER SYSTEM STABILITY
PPT ON POWER SYSTEM STABILITY
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINEFAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
 
Electric traction ppt
Electric traction pptElectric traction ppt
Electric traction ppt
 
MPPT
MPPTMPPT
MPPT
 
DISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYDISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAY
 
Protective relay
Protective relay Protective relay
Protective relay
 
Combined operation of power plants
Combined operation of power plantsCombined operation of power plants
Combined operation of power plants
 
Major electrical equipment in power plants
Major electrical equipment in power plantsMajor electrical equipment in power plants
Major electrical equipment in power plants
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
Energy efficient motors
Energy efficient motorsEnergy efficient motors
Energy efficient motors
 
Hvdc transmission seminar
Hvdc transmission seminar Hvdc transmission seminar
Hvdc transmission seminar
 

Similar to Train Lighting Systems: A Concise Guide

Electrial tractions
Electrial tractionsElectrial tractions
Electrial tractionsVairam _VM
 
Utilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfUtilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfhomanathmore
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipurLokesh Judani
 
sreenivas.pptx
sreenivas.pptxsreenivas.pptx
sreenivas.pptxsameed4
 
Electric traction
Electric tractionElectric traction
Electric tractionManish Sahu
 
Indian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTIndian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTNikunj Parashar
 
28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.pptPrakasBhowmik
 
TRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docTRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docHarishYadav582451
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting bookfiroj shaik
 
Summer training in SOUTH EAST CENTRAL RAILWAY
Summer training in SOUTH EAST CENTRAL RAILWAYSummer training in SOUTH EAST CENTRAL RAILWAY
Summer training in SOUTH EAST CENTRAL RAILWAYvijay patel
 
ELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMSaikumarDendi
 
LHB Coache & Train Lighting.pptx
LHB Coache & Train Lighting.pptxLHB Coache & Train Lighting.pptx
LHB Coache & Train Lighting.pptxhiyoy18481
 
TRACTION INVETERS LOCOMOTIVES 10.pptx
TRACTION  INVETERS LOCOMOTIVES 10.pptxTRACTION  INVETERS LOCOMOTIVES 10.pptx
TRACTION INVETERS LOCOMOTIVES 10.pptxSohailKhan490408
 
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhiyoy18481
 

Similar to Train Lighting Systems: A Concise Guide (20)

Electrial tractions
Electrial tractionsElectrial tractions
Electrial tractions
 
HOTEL LOAD
HOTEL LOADHOTEL LOAD
HOTEL LOAD
 
Utilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfUtilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdf
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipur
 
Northern western raiways ppt
Northern western raiways pptNorthern western raiways ppt
Northern western raiways ppt
 
sreenivas.pptx
sreenivas.pptxsreenivas.pptx
sreenivas.pptx
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Indian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTIndian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPT
 
28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Electrical traction
Electrical traction Electrical traction
Electrical traction
 
TRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docTRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.doc
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting book
 
Summer training in SOUTH EAST CENTRAL RAILWAY
Summer training in SOUTH EAST CENTRAL RAILWAYSummer training in SOUTH EAST CENTRAL RAILWAY
Summer training in SOUTH EAST CENTRAL RAILWAY
 
ELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEM
 
LHB Coache & Train Lighting.pptx
LHB Coache & Train Lighting.pptxLHB Coache & Train Lighting.pptx
LHB Coache & Train Lighting.pptx
 
TRACTION INVETERS LOCOMOTIVES 10.pptx
TRACTION  INVETERS LOCOMOTIVES 10.pptxTRACTION  INVETERS LOCOMOTIVES 10.pptx
TRACTION INVETERS LOCOMOTIVES 10.pptx
 
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
 
Traction motor
Traction motorTraction motor
Traction motor
 
Engine control
Engine controlEngine control
Engine control
 

More from Ankur Mahajan

Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in indiaAnkur Mahajan
 
Magneto hydro-dynamic-power-generation-mhd
Magneto hydro-dynamic-power-generation-mhdMagneto hydro-dynamic-power-generation-mhd
Magneto hydro-dynamic-power-generation-mhdAnkur Mahajan
 
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...Ankur Mahajan
 
LOW SPEED WIND TURBINE
LOW SPEED WIND TURBINELOW SPEED WIND TURBINE
LOW SPEED WIND TURBINEAnkur Mahajan
 
Microcontroller 8051 and its interfacing
Microcontroller 8051 and its interfacingMicrocontroller 8051 and its interfacing
Microcontroller 8051 and its interfacingAnkur Mahajan
 
fuzzy logic application
fuzzy logic applicationfuzzy logic application
fuzzy logic applicationAnkur Mahajan
 
Operational parameters of switching devices
Operational parameters of switching devicesOperational parameters of switching devices
Operational parameters of switching devicesAnkur Mahajan
 
Thermal power plant
Thermal power plant Thermal power plant
Thermal power plant Ankur Mahajan
 
controlled rectifiers
controlled rectifierscontrolled rectifiers
controlled rectifiersAnkur Mahajan
 

More from Ankur Mahajan (14)

Pumps
PumpsPumps
Pumps
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Lhb ac buffet car
Lhb ac buffet carLhb ac buffet car
Lhb ac buffet car
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in india
 
Magneto hydro-dynamic-power-generation-mhd
Magneto hydro-dynamic-power-generation-mhdMagneto hydro-dynamic-power-generation-mhd
Magneto hydro-dynamic-power-generation-mhd
 
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
 
Pees copy
Pees   copyPees   copy
Pees copy
 
LOW SPEED WIND TURBINE
LOW SPEED WIND TURBINELOW SPEED WIND TURBINE
LOW SPEED WIND TURBINE
 
Microcontroller 8051 and its interfacing
Microcontroller 8051 and its interfacingMicrocontroller 8051 and its interfacing
Microcontroller 8051 and its interfacing
 
Facts glanzmann
Facts glanzmannFacts glanzmann
Facts glanzmann
 
fuzzy logic application
fuzzy logic applicationfuzzy logic application
fuzzy logic application
 
Operational parameters of switching devices
Operational parameters of switching devicesOperational parameters of switching devices
Operational parameters of switching devices
 
Thermal power plant
Thermal power plant Thermal power plant
Thermal power plant
 
controlled rectifiers
controlled rectifierscontrolled rectifiers
controlled rectifiers
 

Recently uploaded

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 

Recently uploaded (20)

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 

Train Lighting Systems: A Concise Guide

  • 2. INTRODUCTION  Train lighting is one of the important passenger amenities which influence the image of Railways.  First train ran on 16th April 1853, train lighting system came to Indian Railway in 1930 through axle driven Dynamo.  Power supply system for trains is designed and developed to suit the requirement of AC and non-AC working in the trains.  Few factors considered for development of such systems are as under. • Coach load • Speed of the train • Weight of the equipment • Available technology for reliable equipment etc
  • 3. TYPES OF GENERATION  Self-generating • Axle driven system working on 24V DC/ 110 V DC  Mid-on-generation • MOG with 415V, 3 phase generation, and 110V AC utilization  End-on-generation • EOG with 415V,3 phase generation, and 110V AC utilization • EOG with 750V, 3 phase generation and 415 & 110V AC utilization
  • 4. TYPES OF GENERATION  Head-on-generation • Power feeding from OHE for lighting loads (EMUS):  750V DC –light & fan works on 110V DC  1500V DC – light & fan works on 110 V AC  25 KV—light & fan works on 141 V AC • Power feeding from HOG for Hotel Loads (Loco):  Hotel load power is taken from Electric/Diesel Locomotive.  Hotel load power supply taken directly from OHE through a separate pantograph mounted on the power car.
  • 5. SELF GENERATION SYSTEM:  The power supply arrangement of SG coach has under slung alternator, which is driven by the running axles of the coach with the belt of the coach. The voltage of the alternator which varies with the speed of the train is regulated with the help of RRU and converted to 110 V DC and is used for charging the battery. The electrical load of the coach is supplied through the 110 v DC battery at the halt.  Advantages: • The system is independent of the mode of traction. • As each coach has a battery, so no additional source is required. • The problem/defect in any particular coach does not affect the others. • The system can be designed to suit its specific requirement. • It gives better flexibility in rake formation majority of SG type coach is more.
  • 6. SELF GENERATION SYSTEM:  Disadvantages: • The electrical load of the coach is restricted by the limitation of the capacity of generation i.e. 2*25 kW per coach at present. • The power is not generated during standing or slow movement of the train, therefore bulky batteries are provided. • There is no standby source for alternator and batteries, so system became poor reliability. • The system requires the extensive maintenance of alternator, batteries, belts, tensioning device etc. • The system has the very poor efficiency of 57%for power it receives from the locomotive.
  • 8. END ON GENERATION SYSTEM:  Each EOG train has 2 power cars with 2 nos. of DA sets in each. The power is fed by any two DA sets through IVC. The power is supplied at 3 phase, 750V, which is stepped down in an individual coach to 3 phase,415 V for supplying various loads like RMPU, WRA etc. The 110v AC supply for lights and fans is obtained by further stepping down the 415v supply. A 24 V battery is used for supplying a few emergency lights provided in the coach.  Advantages: • The system does not require the use of bulky batteries and alternators in individual coaches. • The system has higher reliability due to standby DA sets and reduced number of equipment. • Due to an elimination of heavy equipment, the dead weight of the coach is reduced. • The system is independent of the type of traction i.e. diesel or electric locomotive. • The system has better energy efficiency as compared to the self- generating system. • Low maintenance.
  • 9. END ON GENERATION SYSTEM:  Disadvantages: • The cost of energy is high due to fuel cost. • Even with 750V, 3 phase, there is still an effect of voltage drop at the farthest end of the train. • Noise and smoke pollution are generated from power cars.
  • 10. MID ON GENERATION SYSTEM:  The MOG system was adopted by IR for slow-moving passenger trains which have the very low generation to non-generation ratio. These trains had one power car in the middle of the train, which fed power supply to the coaches at either side of power car. The power car coach had two DA set of 30 KVA each out of which one was used as standby. The power car coach also had one 3 phase, 30 KVA step down transformer of 415/110 V. The 110 V AC supplied to the coaches through couplers. The system was discontinued after the introduction of EMU and DMU service.  Advantages: • The system was most suitable for slow-moving branch line passenger trains. Light and fan of all the coaches had centralized control in power car coach. Fan and lights were working on AC supply. There was no need for standby batteries in the coaches.  Disadvantages: • There were noise and smoke; pollution due to DA set working. • The operator was required to power car coach. • Some valuable passenger spaces were occupied by DA sets.
  • 11. HEAD ON GENERATION SYSTEM:  The HOG scheme is widely used power supply by Railways world over.  The power supply system for the coaches is either received from the locomotive or it is directly tapped from traction overhead lines into the power cars.  The system is considered to provide cost-effective, reliable and energy efficient supply system for coaches.  The HOG scheme can be considered with following two options.  Hotel load power is taken from Electric/Diesel Locomotive.  Hotel load power supply taken directly from OHE through a separate pantograph mounted on the power car. The second system is not considered technically feasible for Indian Railways due to some limitations.
  • 12. HEAD ON GENERATION SYSTEM:  The power supply is received directly from locomotive through couplers. The supply from locomotive can be a 750v, 3 phase supply or a single phase supply received from loco is regulated and stepped down in individual AC coaches, with the help of converters to provide a regulated 415 V, 3 phase supply.  Similarly, in AC coaches, power supply from locomotive can be stepped down and regulated to provide single phase, 110 V AC supplies.  One power car with standby DA sets is also used in the train, which can supply power to the coaches in case of failure of a locomotive.
  • 14. HEAD ON GENERATION SYSTEM:  Advantage: • Cheaper cost of power as compared to EOG & SG system. • Pollution is less as compared to EOG system. • One power car may be replaced by trailer coach, revenue increased. • Escorting staff will be reduced to one power car. • The net dead weight of the train is reduced as compared to SG system. • HOG type AC coaches can be used in EOG type trains. • This system is compatible with diesel and electric traction. • Maintenance cost of HOG system coaches is lower as compared to SG coaches  Disadvantages: • While working with electric locomotive there are power interruptions for short durations to various electrical equipment except for lights while through the neutral section. • One power car is still required for supplying power during failure of OHE supply or locomotive etc.HOG type coaches require rake integrity of coaches similar to EOG system.