AMIR D. ALI
Nationality Iraqi
Date of Birth 1964
Marital Status Single
Language Arabic Mother Tongue English Fluent
Mobile +971 55 2651739
Email engamirstr@gmail.com
Key Qualifications Design of various types of reinforced concrete and steel frame's buildings,
Design and review for post-tensioned floors, Design for prestressed concrete
and composite steel bridge, Design for various types of foundations including
piled foundations and interacting with geotechnical engineering, Modeling,
Design and analysis by ETAB, SAP2000 , STAADPRO software Conversant
with British , Euro code and American building codes and specifications.
Education BSc Civil Engineering, Baghdad University, 1986
MSc Structures – Baghdad University – 1995.
Register in Dubai Municipality for Unlimited High Rise Buildings
Registered as structural engineer with Trakhees Accreditation program.
Professional Experience
AMTECH – Dubai, U.A.E 2013 – TO DATE
Design Manager – Structure
- Task including prepare the structural concept design for each project, study various types of structural
system, flooring system and foundation system. Prepare the structural calculations , drawings and
review specifications for projects. Prepare reports for design, tests and the interference with
construction.
- Educational Hospital 600 beds in Kerbala –Iraq. Review the structural design, hold workshops with
designer to follow up the design review and progress and interacting with site. The project cost 200
Millions USD.
- Design for 15 floors building of Al Kademya hotel – Baghdad –Iraq. The building structural system is
R.C. frames with piled foundation.
- Design for 22 floors building of Tiba mall and hotel – Basrah- Iraq. The building is post-tensioned flat
slab with piled foundations.
- Design for various buildings
UPA – Abu Dhabi, U.A.E 2011 – 2013
Senior Structural Engineer
- Abu Dhabi Ladies Club-Phase 2-UAE:- Design of eight buildings with multi functions. The total cost
of project 200millions dhs. The buildings are sport academy, Art academy, restaurant, Spa and health
facilities and shooting range etc. The buildings have different structural system, concrete frames, post-
tensioned floors, precast floors, steel roofs.
- Al Qasim Green University - Babylon-Iraq. The project contains many buildings with various functions
and structural systems.
Cloisall Contracting Co. – L.L.C., U.A.E 2006 – 2011
Structural Engineer, Various Projects
 Dubai Airport concourse -3 :- Design of steel supporting system for Vaulted claddings
 Dubai Airport Terminal -3 :- Design of steel supporting system for various false ceilings and claddings
 Dubai Mall :- Design of steel supporting frame for Red Wall cladding and various supporting frames for
interior finishes
 Delma Mall – Abu Dhabi:- Design of steel supporting frame for curtain wall, curtain roof, curtain for link
bridge and other steel frames.
Hijazy Consultant Architect 2004-2006
Structural Engineer, Various Projects
 Design of 3B+G+23 floors residential building, reinforced concrete structure, post-tensioned slab and bored
piles foundation.
 Design of G+20 floors Emirates Bank building reinforced concrete structure, post-tensioned and bored piles
foundation.
 Design of a various projects steel frames and reinforced concrete structures.
Halcrow Group Limited 2001-2004
Bridge Design Engineer, Various Projects
-Detailed design of a 43m single span composite steel bridge Al Ittihad Interchange Bridge, Sharjah - -Design
of a crossing channels 14m span Dibba Hisan, Sharjah
- Detailed design of a multi spans Reinforced Concrete Bridge consisting of an 18m simple span, Qatar.
- Design of an underpass 8.5m span, Sharjah - Design of services box culvert with chamber, Dubai Marina
- Bridge engineer- supervision for Sharjah- RAK road which is part of Emirates road. The project includes three
bridges with box girder type and 11 underpasses.
Hijazy Consultant Architect 1998-2001
Structural Engineer, Various Projects
-Design of B+G+7 floors residential building reinforced concrete structure, and bored piles foundation - Design
of G+7 floors residential building with reinforced concrete structure, and bored piles foundation - Design of a
Mosque (800 prayers) with 8m diameter dome, 50m high Minaret - Design of various projects, including villas,
commercial buildings.
Jurutera Konsultant (Semenanjung) Sdn Bhd Consulting Engineers 1997-1998
Malaysia: Design Engineer - Various Projects
 Bridge Section, Johor Bahru Inner Ring Road Project/ Package 2, Malaysia
1500 m bridged road total length, - 1300 m (30,34 m)pre stressed post-tension girders, - 100 m cast in
situ beams, - 100 m cast in situ slabs, - 500, 600 mm pre stressed spun piles for foundations
 Bridge Section, Putra Jaya Project, Malaysia
Design of piers and abutment of multi spans arched bridge, 18,25 m span,500 mm pre stressed spun pile for
foundations, slabs supported by 400 mm spun pile for fill embankment at approaches - Design of
vehicular Under Pass with 10.0m span and 12m length with 6.0 m height retaining walls at approaches -
Design of pedestrians underpass (tunnel) with 6.0 meters span and 7.0 m length, reinforced concrete piles
are used for foundations
 Sungai Nipath Project, Malaysia
Design of reinforced concrete box culverts of varying width, reinforced concrete piles for foundations
 North-South Highway, Malaysia
Design of several single span and multi spans bridges. The bridge spans varied between 15 and 30 meter
and were all in the form of post-tensioned or pretension precast beams with composite R.C. deck slab. The
abutments in the form of cantilever wall founded on group of 500mm pre stressed spun piles.
Design of eight-storey reinforced concrete building, with reinforced concrete driven piles for foundation
Design of fifteen-story reinforced concrete building, with basement, and reinforced concrete driven piles
foundation
Dar Al Handasa Bureau Consulting Engineers 1995-1996
Iraq: Design Engineer
Design of six-story reinforced concrete building founded on raft foundation.
Post Graduate Study, MSc Structures 1993-1995
Al Idrisi Consultancy Centre 1991-1993
Iraq: Design and Supervision Engineer
Design of governmental building, industrial buildings and condominiums.
Al Taj Company for Construction 1989-1991
Iraq: Project Engineer
Involved in the construction of 54m three span intersection bridge. Each span was precast pretension girders
with 200 mm composite R.C. slab. The intermediate piers were in the form of circular R.C. columns with a
crosshead beam founded on a group of R.C. bored piles. The abutments were in the form of cantilever wall
supported on a group of bored piles. My site supervision duties included materials testing, checking of
Contractor’s temporary work design, supervising concrete pours in the pre casting yard and on site and general
supervision works.
Al Rawi Company Limited 1986-1989
Iraq: Site Engineer
Involved in construction of reinforced concrete frame stores covering 10,000m², frames are precast units
supported on pad footings.

More Related Content

What's hot

Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015Hossameldin Ahmed
 
Mechanical revit module.draughtsman-CV
Mechanical revit   module.draughtsman-CVMechanical revit   module.draughtsman-CV
Mechanical revit module.draughtsman-CVPrashobh EK
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_VEERAKAMU C
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniPrasad Kulkarni
 
Fayaz KP CV
Fayaz KP CVFayaz KP CV
Fayaz KP CVFayaz KP
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer CvRinu Chacko
 
CV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMANCV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMANwasif
 
HVAC Drafting & MEP Coordination with 7+ years experience
HVAC Drafting & MEP Coordination with 7+ years experienceHVAC Drafting & MEP Coordination with 7+ years experience
HVAC Drafting & MEP Coordination with 7+ years experienceShaik Anwar
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez K
 

What's hot (20)

CV - Sasikumar M
CV - Sasikumar MCV - Sasikumar M
CV - Sasikumar M
 
Civil - Structural Designer CV
Civil - Structural Designer CVCivil - Structural Designer CV
Civil - Structural Designer CV
 
Draftsman Cv (1)
Draftsman Cv (1)Draftsman Cv (1)
Draftsman Cv (1)
 
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
 
NEW CV (2014- DEC)
NEW CV (2014- DEC)NEW CV (2014- DEC)
NEW CV (2014- DEC)
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 
Mechanical revit module.draughtsman-CV
Mechanical revit   module.draughtsman-CVMechanical revit   module.draughtsman-CV
Mechanical revit module.draughtsman-CV
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D Kulkarni
 
Fayaz KP CV
Fayaz KP CVFayaz KP CV
Fayaz KP CV
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
 
CV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMANCV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMAN
 
HVAC Drafting & MEP Coordination with 7+ years experience
HVAC Drafting & MEP Coordination with 7+ years experienceHVAC Drafting & MEP Coordination with 7+ years experience
HVAC Drafting & MEP Coordination with 7+ years experience
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
HVAC DRAFTSMAN CV
HVAC DRAFTSMAN CVHVAC DRAFTSMAN CV
HVAC DRAFTSMAN CV
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CV
 
CV CIVIL ENGINEER
CV CIVIL ENGINEERCV CIVIL ENGINEER
CV CIVIL ENGINEER
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
CV-SITE SUPERVISOR
CV-SITE SUPERVISORCV-SITE SUPERVISOR
CV-SITE SUPERVISOR
 

Viewers also liked

Deepak_Tallur_2016_CV
Deepak_Tallur_2016_CVDeepak_Tallur_2016_CV
Deepak_Tallur_2016_CVDeepak Tallur
 
R. Elumba CV_12_2015A
R. Elumba CV_12_2015AR. Elumba CV_12_2015A
R. Elumba CV_12_2015ARaul Elumba
 
Casimiro Greco CV C# Developer
Casimiro Greco CV C# DeveloperCasimiro Greco CV C# Developer
Casimiro Greco CV C# DeveloperCasimiro Greco
 
Avin kotian u
Avin kotian uAvin kotian u
Avin kotian uAvin K
 
Akkermans et al. (2016) - What About Time? Examining Chronological and Subjec...
Akkermans et al. (2016) - What About Time? Examining Chronological and Subjec...Akkermans et al. (2016) - What About Time? Examining Chronological and Subjec...
Akkermans et al. (2016) - What About Time? Examining Chronological and Subjec...Jos Akkermans
 
Resume_SAP CRM Consultant_ Madhusudan Biswas_9.5yrs Exp_for SAP CRM Analyst P...
Resume_SAP CRM Consultant_ Madhusudan Biswas_9.5yrs Exp_for SAP CRM Analyst P...Resume_SAP CRM Consultant_ Madhusudan Biswas_9.5yrs Exp_for SAP CRM Analyst P...
Resume_SAP CRM Consultant_ Madhusudan Biswas_9.5yrs Exp_for SAP CRM Analyst P...Madhusudan Biswas
 
Rasit Ozer CV
Rasit Ozer CVRasit Ozer CV
Rasit Ozer CVrasitozer
 
Matthew A. Roberts Resume
Matthew A. Roberts ResumeMatthew A. Roberts Resume
Matthew A. Roberts ResumeMatthew Roberts
 
Cv Robert Platt 12062011
Cv Robert Platt 12062011Cv Robert Platt 12062011
Cv Robert Platt 12062011Robert Platt
 

Viewers also liked (16)

Souvik_Das_CV
Souvik_Das_CVSouvik_Das_CV
Souvik_Das_CV
 
cv1
cv1cv1
cv1
 
resume
resumeresume
resume
 
Deepak_Tallur_2016_CV
Deepak_Tallur_2016_CVDeepak_Tallur_2016_CV
Deepak_Tallur_2016_CV
 
R. Elumba CV_12_2015A
R. Elumba CV_12_2015AR. Elumba CV_12_2015A
R. Elumba CV_12_2015A
 
Casimiro Greco CV C# Developer
Casimiro Greco CV C# DeveloperCasimiro Greco CV C# Developer
Casimiro Greco CV C# Developer
 
newset cv
newset cvnewset cv
newset cv
 
Avin kotian u
Avin kotian uAvin kotian u
Avin kotian u
 
Engr.Fadwa - CV
Engr.Fadwa - CVEngr.Fadwa - CV
Engr.Fadwa - CV
 
Akkermans et al. (2016) - What About Time? Examining Chronological and Subjec...
Akkermans et al. (2016) - What About Time? Examining Chronological and Subjec...Akkermans et al. (2016) - What About Time? Examining Chronological and Subjec...
Akkermans et al. (2016) - What About Time? Examining Chronological and Subjec...
 
Resume_SAP CRM Consultant_ Madhusudan Biswas_9.5yrs Exp_for SAP CRM Analyst P...
Resume_SAP CRM Consultant_ Madhusudan Biswas_9.5yrs Exp_for SAP CRM Analyst P...Resume_SAP CRM Consultant_ Madhusudan Biswas_9.5yrs Exp_for SAP CRM Analyst P...
Resume_SAP CRM Consultant_ Madhusudan Biswas_9.5yrs Exp_for SAP CRM Analyst P...
 
Kishore 6+ Years
Kishore 6+ YearsKishore 6+ Years
Kishore 6+ Years
 
CurriculumVitae_GustavoChavarro
CurriculumVitae_GustavoChavarroCurriculumVitae_GustavoChavarro
CurriculumVitae_GustavoChavarro
 
Rasit Ozer CV
Rasit Ozer CVRasit Ozer CV
Rasit Ozer CV
 
Matthew A. Roberts Resume
Matthew A. Roberts ResumeMatthew A. Roberts Resume
Matthew A. Roberts Resume
 
Cv Robert Platt 12062011
Cv Robert Platt 12062011Cv Robert Platt 12062011
Cv Robert Platt 12062011
 

Similar to Amir Ali - Structural Engineer-CV

Similar to Amir Ali - Structural Engineer-CV (20)

FINISHING QA/QC MANAGER
FINISHING QA/QC MANAGERFINISHING QA/QC MANAGER
FINISHING QA/QC MANAGER
 
CV- edited 2014
CV- edited 2014CV- edited 2014
CV- edited 2014
 
0.Khalid - Project Manager
0.Khalid  - Project Manager0.Khalid  - Project Manager
0.Khalid - Project Manager
 
Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016
 
Soha Sabry cv
Soha Sabry cvSoha Sabry cv
Soha Sabry cv
 
Ashraf Zayed CV _Final_
Ashraf Zayed CV _Final_Ashraf Zayed CV _Final_
Ashraf Zayed CV _Final_
 
Dr Mohsen-Academic & Exper.2
Dr Mohsen-Academic & Exper.2Dr Mohsen-Academic & Exper.2
Dr Mohsen-Academic & Exper.2
 
Mohamed sayed cv - civil-2012-2016
Mohamed sayed   cv - civil-2012-2016Mohamed sayed   cv - civil-2012-2016
Mohamed sayed cv - civil-2012-2016
 
Mohamed sayed Mohamed Ali - Civil Structure Enginner
Mohamed sayed Mohamed Ali - Civil Structure EnginnerMohamed sayed Mohamed Ali - Civil Structure Enginner
Mohamed sayed Mohamed Ali - Civil Structure Enginner
 
Ahmd Mahmoud c.v
Ahmd Mahmoud c.vAhmd Mahmoud c.v
Ahmd Mahmoud c.v
 
my CV 03-01-2015-reduced
my CV 03-01-2015-reducedmy CV 03-01-2015-reduced
my CV 03-01-2015-reduced
 
My C.V -Updated Mrach 2015
My C.V -Updated Mrach 2015My C.V -Updated Mrach 2015
My C.V -Updated Mrach 2015
 
Summery
SummerySummery
Summery
 
CV . 2017
CV . 2017CV . 2017
CV . 2017
 
Ahmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-Baky
 
Imran-Res
Imran-ResImran-Res
Imran-Res
 
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mbEng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
 
Mohd Riyad CV1
Mohd Riyad CV1Mohd Riyad CV1
Mohd Riyad CV1
 
CV - Sanjeev Aggarwal
CV - Sanjeev AggarwalCV - Sanjeev Aggarwal
CV - Sanjeev Aggarwal
 
MyCV-SC REV-02
MyCV-SC REV-02MyCV-SC REV-02
MyCV-SC REV-02
 

Amir Ali - Structural Engineer-CV

  • 1. AMIR D. ALI Nationality Iraqi Date of Birth 1964 Marital Status Single Language Arabic Mother Tongue English Fluent Mobile +971 55 2651739 Email engamirstr@gmail.com Key Qualifications Design of various types of reinforced concrete and steel frame's buildings, Design and review for post-tensioned floors, Design for prestressed concrete and composite steel bridge, Design for various types of foundations including piled foundations and interacting with geotechnical engineering, Modeling, Design and analysis by ETAB, SAP2000 , STAADPRO software Conversant with British , Euro code and American building codes and specifications. Education BSc Civil Engineering, Baghdad University, 1986 MSc Structures – Baghdad University – 1995. Register in Dubai Municipality for Unlimited High Rise Buildings Registered as structural engineer with Trakhees Accreditation program. Professional Experience AMTECH – Dubai, U.A.E 2013 – TO DATE Design Manager – Structure - Task including prepare the structural concept design for each project, study various types of structural system, flooring system and foundation system. Prepare the structural calculations , drawings and review specifications for projects. Prepare reports for design, tests and the interference with construction. - Educational Hospital 600 beds in Kerbala –Iraq. Review the structural design, hold workshops with designer to follow up the design review and progress and interacting with site. The project cost 200 Millions USD. - Design for 15 floors building of Al Kademya hotel – Baghdad –Iraq. The building structural system is R.C. frames with piled foundation. - Design for 22 floors building of Tiba mall and hotel – Basrah- Iraq. The building is post-tensioned flat slab with piled foundations. - Design for various buildings UPA – Abu Dhabi, U.A.E 2011 – 2013 Senior Structural Engineer - Abu Dhabi Ladies Club-Phase 2-UAE:- Design of eight buildings with multi functions. The total cost of project 200millions dhs. The buildings are sport academy, Art academy, restaurant, Spa and health facilities and shooting range etc. The buildings have different structural system, concrete frames, post- tensioned floors, precast floors, steel roofs. - Al Qasim Green University - Babylon-Iraq. The project contains many buildings with various functions and structural systems. Cloisall Contracting Co. – L.L.C., U.A.E 2006 – 2011 Structural Engineer, Various Projects  Dubai Airport concourse -3 :- Design of steel supporting system for Vaulted claddings  Dubai Airport Terminal -3 :- Design of steel supporting system for various false ceilings and claddings
  • 2.  Dubai Mall :- Design of steel supporting frame for Red Wall cladding and various supporting frames for interior finishes  Delma Mall – Abu Dhabi:- Design of steel supporting frame for curtain wall, curtain roof, curtain for link bridge and other steel frames. Hijazy Consultant Architect 2004-2006 Structural Engineer, Various Projects  Design of 3B+G+23 floors residential building, reinforced concrete structure, post-tensioned slab and bored piles foundation.  Design of G+20 floors Emirates Bank building reinforced concrete structure, post-tensioned and bored piles foundation.  Design of a various projects steel frames and reinforced concrete structures. Halcrow Group Limited 2001-2004 Bridge Design Engineer, Various Projects -Detailed design of a 43m single span composite steel bridge Al Ittihad Interchange Bridge, Sharjah - -Design of a crossing channels 14m span Dibba Hisan, Sharjah - Detailed design of a multi spans Reinforced Concrete Bridge consisting of an 18m simple span, Qatar. - Design of an underpass 8.5m span, Sharjah - Design of services box culvert with chamber, Dubai Marina - Bridge engineer- supervision for Sharjah- RAK road which is part of Emirates road. The project includes three bridges with box girder type and 11 underpasses. Hijazy Consultant Architect 1998-2001 Structural Engineer, Various Projects -Design of B+G+7 floors residential building reinforced concrete structure, and bored piles foundation - Design of G+7 floors residential building with reinforced concrete structure, and bored piles foundation - Design of a Mosque (800 prayers) with 8m diameter dome, 50m high Minaret - Design of various projects, including villas, commercial buildings. Jurutera Konsultant (Semenanjung) Sdn Bhd Consulting Engineers 1997-1998 Malaysia: Design Engineer - Various Projects  Bridge Section, Johor Bahru Inner Ring Road Project/ Package 2, Malaysia 1500 m bridged road total length, - 1300 m (30,34 m)pre stressed post-tension girders, - 100 m cast in situ beams, - 100 m cast in situ slabs, - 500, 600 mm pre stressed spun piles for foundations  Bridge Section, Putra Jaya Project, Malaysia Design of piers and abutment of multi spans arched bridge, 18,25 m span,500 mm pre stressed spun pile for foundations, slabs supported by 400 mm spun pile for fill embankment at approaches - Design of vehicular Under Pass with 10.0m span and 12m length with 6.0 m height retaining walls at approaches - Design of pedestrians underpass (tunnel) with 6.0 meters span and 7.0 m length, reinforced concrete piles are used for foundations  Sungai Nipath Project, Malaysia Design of reinforced concrete box culverts of varying width, reinforced concrete piles for foundations  North-South Highway, Malaysia Design of several single span and multi spans bridges. The bridge spans varied between 15 and 30 meter and were all in the form of post-tensioned or pretension precast beams with composite R.C. deck slab. The abutments in the form of cantilever wall founded on group of 500mm pre stressed spun piles. Design of eight-storey reinforced concrete building, with reinforced concrete driven piles for foundation Design of fifteen-story reinforced concrete building, with basement, and reinforced concrete driven piles foundation Dar Al Handasa Bureau Consulting Engineers 1995-1996 Iraq: Design Engineer Design of six-story reinforced concrete building founded on raft foundation.
  • 3. Post Graduate Study, MSc Structures 1993-1995 Al Idrisi Consultancy Centre 1991-1993 Iraq: Design and Supervision Engineer Design of governmental building, industrial buildings and condominiums. Al Taj Company for Construction 1989-1991 Iraq: Project Engineer Involved in the construction of 54m three span intersection bridge. Each span was precast pretension girders with 200 mm composite R.C. slab. The intermediate piers were in the form of circular R.C. columns with a crosshead beam founded on a group of R.C. bored piles. The abutments were in the form of cantilever wall supported on a group of bored piles. My site supervision duties included materials testing, checking of Contractor’s temporary work design, supervising concrete pours in the pre casting yard and on site and general supervision works. Al Rawi Company Limited 1986-1989 Iraq: Site Engineer Involved in construction of reinforced concrete frame stores covering 10,000m², frames are precast units supported on pad footings.