Strategic Planning A3 Report
Plymouth Tube Company
Winamac In
Printed: 9/18/2015 4:43 PM
2A
2B
2C
2D
2E Mangement Review. Further develop hygiene informaiton
3A
3B
3C
3D Job Hazard Analysis. Continue regular reviews
4A
4B
4C
4D
4E
4F Contractor Safety. Add language to program for non tolerance /violation
5A Training Requirements. .6, .8 and . 10. Focus attention on these elements
5B Taining Needs . Training for floor leaders on observation , coaching
5C Training Matrix. New employee training . Checklist and schedule
5D
5E Transfer of Training System developed to determine effectiveness
5F
SO
SO
1
2
Actual Complete
WSP 42 findings as of March 26 13 completed as of April 20th 31 % complete
environment
Gap analysis indicated areas in need of improvement on for
certification of 18001
improve the general work environment.
Gear changes of the safety program to better align it with the requirements of 18001
69%Gap analysis of safety program to 18001
Elements in Red above indicate those at the 60 % or below level.
A-3 Owner:
Amanda Boggan
Date
Cold Draw 45 findings as of March 26 19 completed as of April 20th 42 % complete
V. Follow-Up Unresolved issues and actions top resolve them. Identify how & when the effects will be checked. Identify how and when the findings will be reported.
Include contingency plans if needed.
Increase overall score by focusing on elements below the 60 % scoring. Target score will be 75% .
Signature Amanda Boggan
Manage correction of audit findings. Review weekly for progress .
Bill K OP's Mgr's
Schedule regular reviews for each mill to reach 30-60 - 90 day completion
Watch indicators:
MSDS / 3E system. Some documents still need to be entered into database
Safety Written Programs converted to more formal 18001 format Bill K , Intern
Bill K
Hot Mill 30 findings as of March 26 9 items completed as of April 20th 30 % complete
Bill K , Intern
Bill K OP's Mgr's
Feb
Bill K
Bill K
Bill K
Bill K
Target
Jan Oct Nov
Goals and Objectives. Observation process using JSA Bill K OP's Mgr's
Employee Particpation. EE Roles in training and audits. Bill K OP's Mgr's
Comp?
(Date)Date
S&H policy. Commitment defined and signatures. Post Bill K G.M.'s
Aug SepJunResponsible
Focus Area: XYZ Company Amanda BogganChampion:
III. Analysis/Justification for 2012 Activities
After reflecting, identify new factors/threats &
their effect. Summarize key activities &
rationale.
IV. Action Plan (Milestone Chart) Chart showing actions, responsibilities, and timelines (Gantt chart format might be useful).
Provide SMART goals. Realistic timelines. No more than 5 key activity areas.
Bill K Maint.
Hazard Controls. Develop log tracking system for changes Bill K
Self Inspection. Ergonomic study. 30 -60 day tracking tool
Accident Investigation. Develop new database
Mar DecApr Jul
Bill K.
Bill K
Bill K
Bill K
May
Preventive Maint. Further develop JSA for maint. activities.
Bill K Maint.Assess each activity according to SMART goals.
Provide results (target, actual, and relevant
comments.
Bill K
I. 2012 March Audit Results
Visualize the data, benchmark the data,
and provide historical company and
industry context.
Management Commitment.Define roles and responsiblities Bill K G.M.'s
Insert key obstacle/objective above.
Occupation Health.Industrial hygiene recognigntion of issues.
Managing Change. Equipment safety for repairs etc.
#
certification standards
II. Reflection on 2012 Activities & Results
Assessment Actions
Activity Rating
Legal Requirements. Health and Hygiene addressed.
Various issues pointed out to improve general workFloor audit
Training records. Improve training on new safety database and 3E
Bill, Colleen, Lloyd
4/3/12
Bill K , Lloyd
Key Results/Issues Emergncy Planning . Further develop plan with local emergency services.
Review and prioritize safety audit findings. Determine methods to correct that will improve the areas to
Bill K OP's Mgr's
Training Effectiveness System develeoped to determine effectiveness
Safety Observation Walk Develop tracking sheets
Bill K G.M.'s
4/3/2012
0
5
10
15
20
25
30
2A 2B 2C 2D 2E 3A 3B 3C 3D 4A 4B 4C 4D 4E 4F 5A 5B 5C 5D 5E 5F
Gap Analysis Score Sheet
Pts Rec'vd
Pts Pos

More Related Content

Similar to ProAct Strategic Planning Temp1

Project attrition
Project attritionProject attrition
Project attritiondigvijayra
 
Strategic Performance Management System
Strategic  Performance Management SystemStrategic  Performance Management System
Strategic Performance Management Systemjo bitonio
 
Sales Maximization Plan
Sales Maximization PlanSales Maximization Plan
Sales Maximization PlanJoshHeebner
 
Acc 640 final project guidelines and rubric
Acc 640 final project guidelines and rubricAcc 640 final project guidelines and rubric
Acc 640 final project guidelines and rubricLisaha milton
 
2Project and Change Management [Your name][Institut
 2Project and Change Management [Your name][Institut 2Project and Change Management [Your name][Institut
2Project and Change Management [Your name][InstitutMargaritoWhitt221
 
Lon Taulbee Bio-Resume 2015
Lon Taulbee Bio-Resume 2015Lon Taulbee Bio-Resume 2015
Lon Taulbee Bio-Resume 2015Lon Taulbee
 
BCMS Audit Report【My Continuous Learning】
BCMS Audit  Report【My Continuous Learning】BCMS Audit  Report【My Continuous Learning】
BCMS Audit Report【My Continuous Learning】Jerimi Soma
 
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt CourseDMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt CourseESTIEM
 
A comprehensive guide to us cma syllabus converted
A comprehensive guide to us cma syllabus convertedA comprehensive guide to us cma syllabus converted
A comprehensive guide to us cma syllabus convertedshindeprahalad
 
Creative Performance Audit
Creative Performance AuditCreative Performance Audit
Creative Performance AuditHumanology
 
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017April Bright
 
Policy management
Policy management Policy management
Policy management kjanand
 
Pialan, Ruth (100421411)_Project 3_Practical Application.pdf
Pialan, Ruth (100421411)_Project 3_Practical Application.pdfPialan, Ruth (100421411)_Project 3_Practical Application.pdf
Pialan, Ruth (100421411)_Project 3_Practical Application.pdfRuthPialan
 
Quality Data anlysis ch.pptx
Quality Data anlysis ch.pptxQuality Data anlysis ch.pptx
Quality Data anlysis ch.pptxssuserc77c5a
 
SAP Application Controls Follow-up - final audit report.pdf
SAP Application Controls Follow-up - final audit report.pdfSAP Application Controls Follow-up - final audit report.pdf
SAP Application Controls Follow-up - final audit report.pdfssusera8f2d2
 

Similar to ProAct Strategic Planning Temp1 (20)

Green audit
Green auditGreen audit
Green audit
 
Green audit
Green auditGreen audit
Green audit
 
Six Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational StepsSix Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational Steps
 
Project attrition
Project attritionProject attrition
Project attrition
 
ISO9001:2015 presentation
ISO9001:2015 presentationISO9001:2015 presentation
ISO9001:2015 presentation
 
Strategic Performance Management System
Strategic  Performance Management SystemStrategic  Performance Management System
Strategic Performance Management System
 
Sales Maximization Plan
Sales Maximization PlanSales Maximization Plan
Sales Maximization Plan
 
Corrective Action_.pptx
Corrective Action_.pptxCorrective Action_.pptx
Corrective Action_.pptx
 
Acc 640 final project guidelines and rubric
Acc 640 final project guidelines and rubricAcc 640 final project guidelines and rubric
Acc 640 final project guidelines and rubric
 
2Project and Change Management [Your name][Institut
 2Project and Change Management [Your name][Institut 2Project and Change Management [Your name][Institut
2Project and Change Management [Your name][Institut
 
Lon Taulbee Bio-Resume 2015
Lon Taulbee Bio-Resume 2015Lon Taulbee Bio-Resume 2015
Lon Taulbee Bio-Resume 2015
 
BCMS Audit Report【My Continuous Learning】
BCMS Audit  Report【My Continuous Learning】BCMS Audit  Report【My Continuous Learning】
BCMS Audit Report【My Continuous Learning】
 
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt CourseDMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
 
A comprehensive guide to us cma syllabus converted
A comprehensive guide to us cma syllabus convertedA comprehensive guide to us cma syllabus converted
A comprehensive guide to us cma syllabus converted
 
Creative Performance Audit
Creative Performance AuditCreative Performance Audit
Creative Performance Audit
 
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
 
Policy management
Policy management Policy management
Policy management
 
Pialan, Ruth (100421411)_Project 3_Practical Application.pdf
Pialan, Ruth (100421411)_Project 3_Practical Application.pdfPialan, Ruth (100421411)_Project 3_Practical Application.pdf
Pialan, Ruth (100421411)_Project 3_Practical Application.pdf
 
Quality Data anlysis ch.pptx
Quality Data anlysis ch.pptxQuality Data anlysis ch.pptx
Quality Data anlysis ch.pptx
 
SAP Application Controls Follow-up - final audit report.pdf
SAP Application Controls Follow-up - final audit report.pdfSAP Application Controls Follow-up - final audit report.pdf
SAP Application Controls Follow-up - final audit report.pdf
 

ProAct Strategic Planning Temp1

  • 1. Strategic Planning A3 Report Plymouth Tube Company Winamac In Printed: 9/18/2015 4:43 PM 2A 2B 2C 2D 2E Mangement Review. Further develop hygiene informaiton 3A 3B 3C 3D Job Hazard Analysis. Continue regular reviews 4A 4B 4C 4D 4E 4F Contractor Safety. Add language to program for non tolerance /violation 5A Training Requirements. .6, .8 and . 10. Focus attention on these elements 5B Taining Needs . Training for floor leaders on observation , coaching 5C Training Matrix. New employee training . Checklist and schedule 5D 5E Transfer of Training System developed to determine effectiveness 5F SO SO 1 2 Actual Complete WSP 42 findings as of March 26 13 completed as of April 20th 31 % complete environment Gap analysis indicated areas in need of improvement on for certification of 18001 improve the general work environment. Gear changes of the safety program to better align it with the requirements of 18001 69%Gap analysis of safety program to 18001 Elements in Red above indicate those at the 60 % or below level. A-3 Owner: Amanda Boggan Date Cold Draw 45 findings as of March 26 19 completed as of April 20th 42 % complete V. Follow-Up Unresolved issues and actions top resolve them. Identify how & when the effects will be checked. Identify how and when the findings will be reported. Include contingency plans if needed. Increase overall score by focusing on elements below the 60 % scoring. Target score will be 75% . Signature Amanda Boggan Manage correction of audit findings. Review weekly for progress . Bill K OP's Mgr's Schedule regular reviews for each mill to reach 30-60 - 90 day completion Watch indicators: MSDS / 3E system. Some documents still need to be entered into database Safety Written Programs converted to more formal 18001 format Bill K , Intern Bill K Hot Mill 30 findings as of March 26 9 items completed as of April 20th 30 % complete Bill K , Intern Bill K OP's Mgr's Feb Bill K Bill K Bill K Bill K Target Jan Oct Nov Goals and Objectives. Observation process using JSA Bill K OP's Mgr's Employee Particpation. EE Roles in training and audits. Bill K OP's Mgr's Comp? (Date)Date S&H policy. Commitment defined and signatures. Post Bill K G.M.'s Aug SepJunResponsible Focus Area: XYZ Company Amanda BogganChampion: III. Analysis/Justification for 2012 Activities After reflecting, identify new factors/threats & their effect. Summarize key activities & rationale. IV. Action Plan (Milestone Chart) Chart showing actions, responsibilities, and timelines (Gantt chart format might be useful). Provide SMART goals. Realistic timelines. No more than 5 key activity areas. Bill K Maint. Hazard Controls. Develop log tracking system for changes Bill K Self Inspection. Ergonomic study. 30 -60 day tracking tool Accident Investigation. Develop new database Mar DecApr Jul Bill K. Bill K Bill K Bill K May Preventive Maint. Further develop JSA for maint. activities. Bill K Maint.Assess each activity according to SMART goals. Provide results (target, actual, and relevant comments. Bill K I. 2012 March Audit Results Visualize the data, benchmark the data, and provide historical company and industry context. Management Commitment.Define roles and responsiblities Bill K G.M.'s Insert key obstacle/objective above. Occupation Health.Industrial hygiene recognigntion of issues. Managing Change. Equipment safety for repairs etc. # certification standards II. Reflection on 2012 Activities & Results Assessment Actions Activity Rating Legal Requirements. Health and Hygiene addressed. Various issues pointed out to improve general workFloor audit Training records. Improve training on new safety database and 3E Bill, Colleen, Lloyd 4/3/12 Bill K , Lloyd Key Results/Issues Emergncy Planning . Further develop plan with local emergency services. Review and prioritize safety audit findings. Determine methods to correct that will improve the areas to Bill K OP's Mgr's Training Effectiveness System develeoped to determine effectiveness Safety Observation Walk Develop tracking sheets Bill K G.M.'s 4/3/2012 0 5 10 15 20 25 30 2A 2B 2C 2D 2E 3A 3B 3C 3D 4A 4B 4C 4D 4E 4F 5A 5B 5C 5D 5E 5F Gap Analysis Score Sheet Pts Rec'vd Pts Pos