FEATURED PROJECT – Arizona Refrigeration Facility
2
In 2017-18, Ally Energy Solutions worked with a US manufacturer to upgrade
their Arizona facility’s refrigeration system.
Overview
Ally Updates & Automates Refrigeration
System at Arizona Manufacturing Facility
The Industrial Facilities Experts | www.ally-energy.com
3
In 2017-18, Ally Energy Solutions worked with a US manufacturer to upgrade
their Arizona facility’s refrigeration system.
Overview
Ally Updates & Automates Refrigeration
System at Arizona Manufacturing Facility
The Industrial Facilities Experts | www.ally-energy.com
• Engineering
• Development
• Finance
• Utility Incentive Acquisition
• Construction Management Services
Project Scope
4
Ally Updates & Automates Refrigeration
System at Arizona Manufacturing Facility
The Industrial Facilities Experts | www.ally-energy.com
Controls and monitoring upgrades helped the facility save hundreds of
thousands of dollars in annual energy and operations costs, while also helping
to curtail growth-related capital and repair expenditures.
5
Ally Updates & Automates Refrigeration
System at Arizona Manufacturing Facility
The Industrial Facilities Experts | www.ally-energy.com
Automated Controls System
Updated the existing manual controls system and antiquated electromechanical
switches on the compressor staging, fans, pumps and head pressure to be
operated via automated controls.
Project Details
Controls and monitoring upgrades helped the facility save hundreds of
thousands of dollars in annual energy and operations costs, while also helping
to curtail growth-related capital and repair expenditures.
6
Ally Updates & Automates Refrigeration
System at Arizona Manufacturing Facility
The Industrial Facilities Experts | www.ally-energy.com
Automated Controls System
Updated the existing manual controls system and antiquated electromechanical
switches on the compressor staging, fans, pumps and head pressure to be
operated via automated controls.
Project Details
Controls and monitoring upgrades helped the facility save hundreds of
thousands of dollars in annual energy and operations costs, while also helping
to curtail growth-related capital and repair expenditures.
Condenser Upgrades
Installed new induced draft condenser and variable frequency drives (VFDs) for two
existing condensers.
7
Ally Updates & Automates Refrigeration
System at Arizona Manufacturing Facility
The Industrial Facilities Experts | www.ally-energy.com
o Set up engine room ventilation and AC, remote monitoring, and
on-screen DC and MAU integration
o Replaced hotbox temperature probes and V4 pressure transducer
o Cleaned up wiring in existing hotbox panel, and provided interlocking
spray chill and hot box evap compressor control diagnostics
Added Features Delivered Beyond Scope & In Budget
Controls and monitoring upgrades helped the facility save hundreds of
thousands of dollars in annual energy and operations costs, while also helping
to curtail growth-related capital and repair expenditures.
8
The Industrial Facilities Experts | www.ally-energy.com
Project Results:
Ally Updates & Automates Refrigeration
System at Arizona Manufacturing Facility
Improved
Refrigeration
System Efficiency
& Increased
Load Capacity
Offset the need for additional compressors to
support load growth.
9
The Industrial Facilities Experts | www.ally-energy.com
Ally Updates & Automates Refrigeration
System at Arizona Manufacturing Facility
Improved
Refrigeration
System Efficiency
& Increased
Load Capacity
Offset the need for additional compressors to
support load growth.
Allow for real-time setpoint
adjustments and problem
notification.
Improvements
to Controls
and Monitoring
Systems
Project Results:
10
The Industrial Facilities Experts | www.ally-energy.com
Ally Updates & Automates Refrigeration
System at Arizona Manufacturing Facility
Improved
Refrigeration
System Efficiency
& Increased
Load Capacity
Offset the need for additional compressors to
support load growth.
Allow for real-time setpoint
adjustments and problem
notification.
Improvements
to Controls
and Monitoring
Systems
Provides ongoing energy use comparisons and
savings assessments.
Continuous
Energy
Monitoring
Project Results:
11
The Industrial Facilities Experts | www.ally-energy.com
3,267,000 kWh
Annual Energy Savings
>$3 MILLION
10-Year Positive Cash Flow
$287,000
Annual Cost Savings
>$300,000
Utility Rebates and Incentives
<2 Years
Upfront Simple Payback
Project Savings:
Ally Updates & Automates Refrigeration
System at Arizona Manufacturing Facility
12
The Industrial Facilities Experts | www.ally-energy.com
The Industrial Facilities Experts
Ally Energy Solutions
13
Ally Energy Solutions, LLC
11011 King Street, Suite 12B,
Overland Park, KS 66210
For More Information Visit
www.ally-energy.com
The Industrial Facilities Experts | www.ally-energy.com

More Related Content

What's hot

Industrialsectorpresentation
IndustrialsectorpresentationIndustrialsectorpresentation
Industrialsectorpresentation
Zondits
 
Air Products Case Study (6)
Air Products Case Study (6)Air Products Case Study (6)
Air Products Case Study (6)
Shane Acernese
 
AgriFab_CaseStudy_61715GG-FORMAT
AgriFab_CaseStudy_61715GG-FORMATAgriFab_CaseStudy_61715GG-FORMAT
AgriFab_CaseStudy_61715GG-FORMAT
Greg Gillespie
 

What's hot (20)

Industrialsectorpresentation
IndustrialsectorpresentationIndustrialsectorpresentation
Industrialsectorpresentation
 
Energy Management by Food&Beverage Industry
Energy Management by Food&Beverage IndustryEnergy Management by Food&Beverage Industry
Energy Management by Food&Beverage Industry
 
ESCO Contracting - CII Danfoss, Chennai Aug 2017
ESCO Contracting - CII Danfoss, Chennai Aug 2017ESCO Contracting - CII Danfoss, Chennai Aug 2017
ESCO Contracting - CII Danfoss, Chennai Aug 2017
 
Air Products Case Study (6)
Air Products Case Study (6)Air Products Case Study (6)
Air Products Case Study (6)
 
RWW Case Studies
RWW Case StudiesRWW Case Studies
RWW Case Studies
 
Ally Provides Real-Time Energy Monitoring at No Charge to Prove Value of Ligh...
Ally Provides Real-Time Energy Monitoring at No Charge to Prove Value of Ligh...Ally Provides Real-Time Energy Monitoring at No Charge to Prove Value of Ligh...
Ally Provides Real-Time Energy Monitoring at No Charge to Prove Value of Ligh...
 
Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talk
 
KEYNOTE: "REFRIGERATION MATTERS"
KEYNOTE: "REFRIGERATION MATTERS"KEYNOTE: "REFRIGERATION MATTERS"
KEYNOTE: "REFRIGERATION MATTERS"
 
MR12AB Tuesday13h00 - Ajay Trikam
MR12AB Tuesday13h00 - Ajay TrikamMR12AB Tuesday13h00 - Ajay Trikam
MR12AB Tuesday13h00 - Ajay Trikam
 
CAREL solution for managing CO2 compressors rack
CAREL solution for managing CO2 compressors rackCAREL solution for managing CO2 compressors rack
CAREL solution for managing CO2 compressors rack
 
Resume
ResumeResume
Resume
 
i-Tree vs TreeKeeper 8
i-Tree vs TreeKeeper 8i-Tree vs TreeKeeper 8
i-Tree vs TreeKeeper 8
 
Airius in Manufacturing & Engineering
Airius in Manufacturing & EngineeringAirius in Manufacturing & Engineering
Airius in Manufacturing & Engineering
 
Michael Thompson, RARE Technologies
Michael Thompson, RARE TechnologiesMichael Thompson, RARE Technologies
Michael Thompson, RARE Technologies
 
Energy cost reduction offering industrial manufacturing
Energy cost reduction offering industrial manufacturing Energy cost reduction offering industrial manufacturing
Energy cost reduction offering industrial manufacturing
 
MR12AB Tuesday15h00 - Gavin Puckle
MR12AB Tuesday15h00 - Gavin PuckleMR12AB Tuesday15h00 - Gavin Puckle
MR12AB Tuesday15h00 - Gavin Puckle
 
AgriFab_CaseStudy_61715GG-FORMAT
AgriFab_CaseStudy_61715GG-FORMATAgriFab_CaseStudy_61715GG-FORMAT
AgriFab_CaseStudy_61715GG-FORMAT
 
Terry Plaisted, Automatic Heating
Terry Plaisted, Automatic HeatingTerry Plaisted, Automatic Heating
Terry Plaisted, Automatic Heating
 
Mechanical subcooling of R744 processes with R718 in industrial and commercia...
Mechanical subcooling of R744 processes with R718 in industrial and commercia...Mechanical subcooling of R744 processes with R718 in industrial and commercia...
Mechanical subcooling of R744 processes with R718 in industrial and commercia...
 
Building Performance & Sustainability through Digitalization
Building Performance & Sustainability through DigitalizationBuilding Performance & Sustainability through Digitalization
Building Performance & Sustainability through Digitalization
 

Similar to Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility

SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
Jessica Rearick
 
Winter Newsletter 1.12.16
Winter Newsletter 1.12.16Winter Newsletter 1.12.16
Winter Newsletter 1.12.16
fidge72
 
AspenAir - CaseStudy - Fortune 500 Tech Company
AspenAir - CaseStudy - Fortune 500 Tech CompanyAspenAir - CaseStudy - Fortune 500 Tech Company
AspenAir - CaseStudy - Fortune 500 Tech Company
Pete Fletcher
 
About enerdyne
About enerdyneAbout enerdyne
About enerdyne
Enerdyne
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant Optimization
JoePessa
 
C&I Direct Program Presenation
C&I Direct Program PresenationC&I Direct Program Presenation
C&I Direct Program Presenation
coned
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
Keith Beattie
 

Similar to Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility (20)

dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
 
Winter Newsletter 1.12.16
Winter Newsletter 1.12.16Winter Newsletter 1.12.16
Winter Newsletter 1.12.16
 
Factory Infrastructure for PV Manufacturing
Factory Infrastructure for PV ManufacturingFactory Infrastructure for PV Manufacturing
Factory Infrastructure for PV Manufacturing
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
AspenAir - CaseStudy - Fortune 500 Tech Company
AspenAir - CaseStudy - Fortune 500 Tech CompanyAspenAir - CaseStudy - Fortune 500 Tech Company
AspenAir - CaseStudy - Fortune 500 Tech Company
 
About enerdyne
About enerdyneAbout enerdyne
About enerdyne
 
Case Study Restaurant reduces energy use and doubles revenue
Case Study Restaurant reduces energy use and doubles revenueCase Study Restaurant reduces energy use and doubles revenue
Case Study Restaurant reduces energy use and doubles revenue
 
BCHI Kaizen-PartiallyReview-up to slide 12.pptx
BCHI Kaizen-PartiallyReview-up to slide 12.pptxBCHI Kaizen-PartiallyReview-up to slide 12.pptx
BCHI Kaizen-PartiallyReview-up to slide 12.pptx
 
Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...
Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...
Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant Optimization
 
C&I Direct Program Presenation
C&I Direct Program PresenationC&I Direct Program Presenation
C&I Direct Program Presenation
 
Digital Lime trasformation
Digital Lime trasformationDigital Lime trasformation
Digital Lime trasformation
 
Digital Lime trasformation
Digital Lime trasformationDigital Lime trasformation
Digital Lime trasformation
 
Banking green pkg general-efficiency strategies techniques to reduce your ene...
Banking green pkg general-efficiency strategies techniques to reduce your ene...Banking green pkg general-efficiency strategies techniques to reduce your ene...
Banking green pkg general-efficiency strategies techniques to reduce your ene...
 
How Gracious Living Achieved Annual Energy Savings of Over $400,00
How Gracious Living Achieved Annual Energy Savings of Over $400,00How Gracious Living Achieved Annual Energy Savings of Over $400,00
How Gracious Living Achieved Annual Energy Savings of Over $400,00
 
Heat Pump case studies Aspiration Energy
Heat Pump case studies   Aspiration EnergyHeat Pump case studies   Aspiration Energy
Heat Pump case studies Aspiration Energy
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
 

Recently uploaded

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 

Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility

  • 1. Delivering turnkey energy solutions to manufacturing, industrial, and distribution facilities throughout the US. The Industrial Facilities Experts FEATURED PROJECT – Arizona Refrigeration Facility
  • 2. 2 In 2017-18, Ally Energy Solutions worked with a US manufacturer to upgrade their Arizona facility’s refrigeration system. Overview Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility The Industrial Facilities Experts | www.ally-energy.com
  • 3. 3 In 2017-18, Ally Energy Solutions worked with a US manufacturer to upgrade their Arizona facility’s refrigeration system. Overview Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility The Industrial Facilities Experts | www.ally-energy.com • Engineering • Development • Finance • Utility Incentive Acquisition • Construction Management Services Project Scope
  • 4. 4 Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility The Industrial Facilities Experts | www.ally-energy.com Controls and monitoring upgrades helped the facility save hundreds of thousands of dollars in annual energy and operations costs, while also helping to curtail growth-related capital and repair expenditures.
  • 5. 5 Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility The Industrial Facilities Experts | www.ally-energy.com Automated Controls System Updated the existing manual controls system and antiquated electromechanical switches on the compressor staging, fans, pumps and head pressure to be operated via automated controls. Project Details Controls and monitoring upgrades helped the facility save hundreds of thousands of dollars in annual energy and operations costs, while also helping to curtail growth-related capital and repair expenditures.
  • 6. 6 Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility The Industrial Facilities Experts | www.ally-energy.com Automated Controls System Updated the existing manual controls system and antiquated electromechanical switches on the compressor staging, fans, pumps and head pressure to be operated via automated controls. Project Details Controls and monitoring upgrades helped the facility save hundreds of thousands of dollars in annual energy and operations costs, while also helping to curtail growth-related capital and repair expenditures. Condenser Upgrades Installed new induced draft condenser and variable frequency drives (VFDs) for two existing condensers.
  • 7. 7 Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility The Industrial Facilities Experts | www.ally-energy.com o Set up engine room ventilation and AC, remote monitoring, and on-screen DC and MAU integration o Replaced hotbox temperature probes and V4 pressure transducer o Cleaned up wiring in existing hotbox panel, and provided interlocking spray chill and hot box evap compressor control diagnostics Added Features Delivered Beyond Scope & In Budget Controls and monitoring upgrades helped the facility save hundreds of thousands of dollars in annual energy and operations costs, while also helping to curtail growth-related capital and repair expenditures.
  • 8. 8 The Industrial Facilities Experts | www.ally-energy.com Project Results: Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility Improved Refrigeration System Efficiency & Increased Load Capacity Offset the need for additional compressors to support load growth.
  • 9. 9 The Industrial Facilities Experts | www.ally-energy.com Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility Improved Refrigeration System Efficiency & Increased Load Capacity Offset the need for additional compressors to support load growth. Allow for real-time setpoint adjustments and problem notification. Improvements to Controls and Monitoring Systems Project Results:
  • 10. 10 The Industrial Facilities Experts | www.ally-energy.com Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility Improved Refrigeration System Efficiency & Increased Load Capacity Offset the need for additional compressors to support load growth. Allow for real-time setpoint adjustments and problem notification. Improvements to Controls and Monitoring Systems Provides ongoing energy use comparisons and savings assessments. Continuous Energy Monitoring Project Results:
  • 11. 11 The Industrial Facilities Experts | www.ally-energy.com 3,267,000 kWh Annual Energy Savings >$3 MILLION 10-Year Positive Cash Flow $287,000 Annual Cost Savings >$300,000 Utility Rebates and Incentives <2 Years Upfront Simple Payback Project Savings: Ally Updates & Automates Refrigeration System at Arizona Manufacturing Facility