1. up
Riser
Hatch
Lockers
Office
Treatment
Reception
Prep
Anaesthetics
Recovery
Acc. WC &
change
Patient
change
Waiting
Gowned
Waiting
Goods
lift
Riser
Staff base
Stores
Office
Family
Room
MRI
Imaging
Control
MRI
Plant
SwitchCupboards
Meeting
Room
RiserAbove
m.
Stores
Training
Room
up
Clean Utility
Dirty Utility
Patient
change
Patient
change
Hydr.Lift
Pump
Room
Store
Control
Room 1
Plant
Area
Meeting
Room
Meeting
Room
Store
Accelerator
Chamber
LIGHTsystem
RiserAbove
Plant
and
Services
Distribution
area
Staff
Rest
up
sh.
M
sh.
Bed Lift
Staff Change Staff Change
35790
55 m²
15 m²
57 m²
18 m²
18 m²
26 m²21 m²
12 m²
16 m²
5000
5750
Staff/ Plant
Accelerator
Control
30 m²
Testing
25 m²
Staff /
Plant
Power
Room
48 m²
Plant
Redundant
Room
48 m²
Analogic
Control
26 m²
9000
F E D C B A
1
2
3
4
5
6
7500
7500 7500
7500
9010
9000900090006000
14 m² Control
Room 3
5000
4000
Main stores
Disposal
Hold
55 m² Change Room
32 m²
Acc. WC
21 m² 21 m²
7 m²7 m²
16500
90009000
18000
2550
12m²Control
Room2
Proton Treatment
room 1 + CT scanner
Proton Treatment
room 2
Proton Treatment
room 3
Proton
Beam
Dump
73 m²
110 m²
140 m²
4900
13550
The arrangement of the therapy floor:
The basement level -2 is dedicated to the AVO treatment facility and its support
accommodation. Eight zones are arranged around circulation points of access, and located
to provide good circulation and adjacency.
Patient Areas
Treatment Area
Proton beam generation and delivery
Proton beam control
Plant and services distribution
Admin and Staff areas
Treatment Support
Circulation 608 m²
129 m²
410 m²
373 m²
600 m²
427 m²
359 m²
272 m²
TOT areas 3178 m²
+ AVO Services Mezzanine 1970 m²
1:200@A1 Aug 2016
C 08.Aug.16 dks Layout amended to take AVO
treatment areas onto a single floor at
Basement level -2
SK15 revD