6. Scope
Resurface Edgerton Highway from MP 0-19 with
asphalt
Includes resurfacing existing bicycle path through Kenny
Lake
Resurface existing driveway approaches
Resurface Kenny Lake Material Site Access Road
Replace mailboxes and guardrail
Minor drainage improvements
Brush clearing
Update signing and striping
7. Project Objectives
• Preventive Maintenance:
Extend service life of highway and delay future
deterioration
Focus is on pavement preservation
• Safety Benefits: guardrail, signs, stripes, brushing
• Reduce maintenance costs and efforts:
Delay/reduce need for routine patching/pot holing, crack
sealing
8. What to Expect During Construction
• Delays (typically <20 minutes)
• Reduced Speeds
• Gravel surfaces
• Business and residential access will always be
maintained
• Community meeting prior to Construction