Prepared by :-
Ajinkya Karlekar
The worker and machine process chart (Man-machine chart)
is used to study, analyze, and improve one workstation at a
time.
The chart shows the exact time relationship between the
working cycle of the person and operating cycle of the
machine.
These facts can lead to utilization of both worker and
machine time, and a better balance of the work cycle.
To detect the idle time on machine and workers
To optimize work distribution between workers and
machines.
To decide no. of workers in a group.
To balance the work team
To examine the activities.
It is used for recording the complex movements of
material or men.
To organize teams of workers on mass production
work.
Plant repair & maintenance.
Job construction.
Planning team work.
It is used to check whether the
work station is correctly located.
Independent Combined Ideal time
Activity Activity
7
8
TIME
(MIN)
MAN MACHINE TIME
(MIN)
0.2 Remove finished casting
cleans with compressed
air
IDLE 0.2
0.4 Gauge depth of slot on
surface plate
IDLE 0.4
0.8 PLACE in a box obtains
new casting
IDLE 0.8
1.0 Cleans machine with
compressed air
IDLE 1.0
1.2 Locates castings in
fixture, starts machine
IDLE 1.2
1.4 IDLE Cutting slot 1 1.4
1.6 IDLE Cutting slot 2 1.6
1.8 IDLE Cutting slot 3 1.8
2.0 IDLE Cutting slot 4 2.0
Example on Man Machine Chart (Present Method)
Man –
Machine
Working
Time
(min.)
Idle Time
(min.)
Utilizatio
n
(%)
MAN 1.2 0.8 60%
MACHINE 0.8 1.2 40%
9
CYCLE TIME(MIN)= 2.0
EXAMPLE ON MAN MACHINE CHART
(Summary of Present method)
TIME
(MIN
)
MAN MACHIN
E
TIME
(MIN)
0.2 REMOVED FINISHED CASTING
CLEANS WITH COM PRESED AIR
IDLE 0.2
0.4 CLEAN MACHINE WITH
COMPRESED AIR
IDLE 0.4
0.6 LOCATEES A NEW CASTING IN A
FIXTURE START MACHINE
IDLE 0.6
0.8 BREAKS SHARP EDGES WITH
FILES CLEANS WITH
COMPRESSED AIR
CUTTING
SLOT 1
0.8
1.0 GAUGE DEPTH OF SLOT ON
SURFACE PLATE
CUTTING
SLOT 2
1.0
1.2 PLACES CASTING IN A BOX
PICKS UP NEW CASTING AND
PLATE BY MACHINE
CUTTING
SLOT 3
1.2
1.4 IDLE CUTTING
SLOT 4
1.4
10
Example on Man Machine Chart (Improved Method)
EXAMPLE ON MAN MACHINE CHART
(Summary of Improved method)
CYCLE TIME(MIN)= 1.4
Man –
Machine
Working
Time
(min.)
Idle Time
(min.)
Utilizatio
n
(%)
MAN 1.2 0.2 85.7%
MACHINE 0.8 0.6 57.0%
11
COMPARISION BETWEEN
PRESENT AND IMPROVED METHOD
CYCLE
TIME
(MIN)
MAN IDLE
TIME(MIN
)
MACHINE
IDLE TIME
( MIN)
PRESENT
METHOD
2.0 0.8 1.2
IMPROVED
METHOD
1.4 0.2 0.6
12
THANK YOU

More Related Content

What's hot

Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study ppt
Beereddy Swapna
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
Lizzette Danan
 

What's hot (20)

Work sample
Work sampleWork sample
Work sample
 
Performance rating
Performance ratingPerformance rating
Performance rating
 
Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study ppt
 
Line balancing
Line balancingLine balancing
Line balancing
 
Cycle time
Cycle timeCycle time
Cycle time
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
UNIT 2 - WORK STUDY
UNIT 2 -  WORK STUDYUNIT 2 -  WORK STUDY
UNIT 2 - WORK STUDY
 
Lecture 2 process charts work study
Lecture 2 process charts work studyLecture 2 process charts work study
Lecture 2 process charts work study
 
Micro-Macro Motion Study
Micro-Macro Motion StudyMicro-Macro Motion Study
Micro-Macro Motion Study
 
Work measurement (1)
Work measurement (1)Work measurement (1)
Work measurement (1)
 
Different types of Production Layout
Different types of Production LayoutDifferent types of Production Layout
Different types of Production Layout
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
 
Cellular manufacturing and group technology
Cellular manufacturing and group technologyCellular manufacturing and group technology
Cellular manufacturing and group technology
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Flow process chart
Flow process chartFlow process chart
Flow process chart
 
Industrial Engineering
Industrial EngineeringIndustrial Engineering
Industrial Engineering
 
Operations Management : Line Balancing
Operations Management : Line BalancingOperations Management : Line Balancing
Operations Management : Line Balancing
 
method study- micromotion vs memo motion
method study- micromotion vs memo motionmethod study- micromotion vs memo motion
method study- micromotion vs memo motion
 
travel chart for plant layout
travel chart for plant layouttravel chart for plant layout
travel chart for plant layout
 

Viewers also liked

7 steps to world class manufacturing
7 steps to world class manufacturing7 steps to world class manufacturing
7 steps to world class manufacturing
Navneet Sharma
 
Logistics WCM Presentation Final - Converted (2)
Logistics WCM Presentation Final - Converted (2)Logistics WCM Presentation Final - Converted (2)
Logistics WCM Presentation Final - Converted (2)
Ashley Smith
 

Viewers also liked (12)

WCM LOGISTICS
WCM LOGISTICSWCM LOGISTICS
WCM LOGISTICS
 
7 steps to world class manufacturing
7 steps to world class manufacturing7 steps to world class manufacturing
7 steps to world class manufacturing
 
Logistics WCM Presentation Final - Converted (2)
Logistics WCM Presentation Final - Converted (2)Logistics WCM Presentation Final - Converted (2)
Logistics WCM Presentation Final - Converted (2)
 
WCM - World Class Manufacturing. Informativo: I.004.2014
WCM - World Class Manufacturing. Informativo: I.004.2014WCM - World Class Manufacturing. Informativo: I.004.2014
WCM - World Class Manufacturing. Informativo: I.004.2014
 
World class manufacturing
World class manufacturingWorld class manufacturing
World class manufacturing
 
Метод микроэлементного нормирования труда Modapts
Метод микроэлементного нормирования труда ModaptsМетод микроэлементного нормирования труда Modapts
Метод микроэлементного нормирования труда Modapts
 
Methods-Time Measurement and Functional Capacity Evaluation 041610
Methods-Time Measurement and Functional Capacity Evaluation 041610Methods-Time Measurement and Functional Capacity Evaluation 041610
Methods-Time Measurement and Functional Capacity Evaluation 041610
 
WCM (World Class Manufacturing)
WCM (World Class Manufacturing)WCM (World Class Manufacturing)
WCM (World Class Manufacturing)
 
different techniques to productivity improvement
different techniques to productivity improvementdifferent techniques to productivity improvement
different techniques to productivity improvement
 
Productivity
ProductivityProductivity
Productivity
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 
Human Resource Management
Human Resource ManagementHuman Resource Management
Human Resource Management
 

Similar to Man and machine chart

02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx
Ahmed Sobhi
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
Praveen S R
 

Similar to Man and machine chart (20)

Case Study of Designing a Special Purpose Machine
Case Study of Designing a Special Purpose Machine Case Study of Designing a Special Purpose Machine
Case Study of Designing a Special Purpose Machine
 
A012430106
A012430106A012430106
A012430106
 
DESIGN OF SPECIAL PURPOSE MACHINE HEAD TO IMPROVE THE PRODUCTION OF ENGINE BL...
DESIGN OF SPECIAL PURPOSE MACHINE HEAD TO IMPROVE THE PRODUCTION OF ENGINE BL...DESIGN OF SPECIAL PURPOSE MACHINE HEAD TO IMPROVE THE PRODUCTION OF ENGINE BL...
DESIGN OF SPECIAL PURPOSE MACHINE HEAD TO IMPROVE THE PRODUCTION OF ENGINE BL...
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
 
Ie microsoft office power point presentation
Ie  microsoft office power point presentationIe  microsoft office power point presentation
Ie microsoft office power point presentation
 
Design of special purpose machine head to improve the production of engine block
Design of special purpose machine head to improve the production of engine blockDesign of special purpose machine head to improve the production of engine block
Design of special purpose machine head to improve the production of engine block
 
Ijmet 10 02_042
Ijmet 10 02_042Ijmet 10 02_042
Ijmet 10 02_042
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
Smed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineSmed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping line
 
Scooter india,sip presentation
Scooter india,sip presentationScooter india,sip presentation
Scooter india,sip presentation
 
Automatic cleaning system ppt
Automatic cleaning system pptAutomatic cleaning system ppt
Automatic cleaning system ppt
 
SHEARING MACHINE.pptx
SHEARING MACHINE.pptxSHEARING MACHINE.pptx
SHEARING MACHINE.pptx
 
02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx02_Ch(2)_Work Systems and How They Work.pptx
02_Ch(2)_Work Systems and How They Work.pptx
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM Report
CIM ReportCIM Report
CIM Report
 
Project Report on Screw Press
Project Report on Screw PressProject Report on Screw Press
Project Report on Screw Press
 

Recently uploaded

Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 

Recently uploaded (20)

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

Man and machine chart

  • 2. The worker and machine process chart (Man-machine chart) is used to study, analyze, and improve one workstation at a time. The chart shows the exact time relationship between the working cycle of the person and operating cycle of the machine. These facts can lead to utilization of both worker and machine time, and a better balance of the work cycle.
  • 3. To detect the idle time on machine and workers To optimize work distribution between workers and machines. To decide no. of workers in a group. To balance the work team To examine the activities. It is used for recording the complex movements of material or men. To organize teams of workers on mass production work.
  • 4. Plant repair & maintenance. Job construction. Planning team work. It is used to check whether the work station is correctly located.
  • 5. Independent Combined Ideal time Activity Activity
  • 6.
  • 7. 7
  • 8. 8 TIME (MIN) MAN MACHINE TIME (MIN) 0.2 Remove finished casting cleans with compressed air IDLE 0.2 0.4 Gauge depth of slot on surface plate IDLE 0.4 0.8 PLACE in a box obtains new casting IDLE 0.8 1.0 Cleans machine with compressed air IDLE 1.0 1.2 Locates castings in fixture, starts machine IDLE 1.2 1.4 IDLE Cutting slot 1 1.4 1.6 IDLE Cutting slot 2 1.6 1.8 IDLE Cutting slot 3 1.8 2.0 IDLE Cutting slot 4 2.0 Example on Man Machine Chart (Present Method)
  • 9. Man – Machine Working Time (min.) Idle Time (min.) Utilizatio n (%) MAN 1.2 0.8 60% MACHINE 0.8 1.2 40% 9 CYCLE TIME(MIN)= 2.0 EXAMPLE ON MAN MACHINE CHART (Summary of Present method)
  • 10. TIME (MIN ) MAN MACHIN E TIME (MIN) 0.2 REMOVED FINISHED CASTING CLEANS WITH COM PRESED AIR IDLE 0.2 0.4 CLEAN MACHINE WITH COMPRESED AIR IDLE 0.4 0.6 LOCATEES A NEW CASTING IN A FIXTURE START MACHINE IDLE 0.6 0.8 BREAKS SHARP EDGES WITH FILES CLEANS WITH COMPRESSED AIR CUTTING SLOT 1 0.8 1.0 GAUGE DEPTH OF SLOT ON SURFACE PLATE CUTTING SLOT 2 1.0 1.2 PLACES CASTING IN A BOX PICKS UP NEW CASTING AND PLATE BY MACHINE CUTTING SLOT 3 1.2 1.4 IDLE CUTTING SLOT 4 1.4 10 Example on Man Machine Chart (Improved Method)
  • 11. EXAMPLE ON MAN MACHINE CHART (Summary of Improved method) CYCLE TIME(MIN)= 1.4 Man – Machine Working Time (min.) Idle Time (min.) Utilizatio n (%) MAN 1.2 0.2 85.7% MACHINE 0.8 0.6 57.0% 11
  • 12. COMPARISION BETWEEN PRESENT AND IMPROVED METHOD CYCLE TIME (MIN) MAN IDLE TIME(MIN ) MACHINE IDLE TIME ( MIN) PRESENT METHOD 2.0 0.8 1.2 IMPROVED METHOD 1.4 0.2 0.6 12