Table o
Section A
Section B
Section C
Section D
Section E
Section F
Section G
Section H
Section
Section J
Section K
Section L
Section M
 
 
 
 
 
 
BIME
of content
A: BIM Pro
B: Project
C: Key Proj
D: Project G
E: Organiza
F: BIM Proc
G: BIM Infor
H: Collabor
I: Quality C
J: Technolo
K: Model St
L: Project D
M: Attachme
EX |JUM
BI
JUMP
AHM
A
s
oject Executi
Information
ject Contact
Goals / BIM U
ational Roles
cess Design
rmation Exc
ation Proced
Control
ogical Infras
tructure
Deliverables
ents
MP WOR
M PROJECT
WORK SIM
DEV
MED TOWF
AHSANULLA
MOHAM
KHA
on Plan ove
n
ts
Uses
s / Staffing
change
dures
tructure Nee
RK GRO
T EXECUTI
FOR
ULATION G
ELOPED BY
FEEQULLAH
AH HUSSAI
MMED SHO
AJA SAJJAD
 
erview
eds
OUP
ON PLAN 
GROUP – O
Y
H SIDDIQUI
INI SYED
OAIB
D
OSF
1
1
1
1
2-3
4
5
6-7
8
9
10-12
13
14
5-16
17
18-27
1
BIMEX | JUMP WORK GROUP
Section A: BIM Project Execution Plan Overview
To successfully develop an efficient Building Information Model on a
renovation project. This plan is developed to describe in detail various goals
and procedures for the different BIM uses.
This plan further describes the design of processes for executing BIM through
the project lifecycle.
Different subcontractors will be involved in the project tasked with providing
models which will be used in developing a federated model.
2
BIMEX | JUMP WORK GROUP
Section B: Project Information
1. Project Owner: Jump Work Simulation, OSF
2. Project Name: Jump Work Group
3. Project location and address: 1306 N Berkeley Ave, Peoria, IL 61603
4. Contract Type / Delivery Method: Stipulated Sum (Design – Bid –
Build)
5. Brief Project Description : The site shall be renovated as a 2 level office
to be used as an administrative support block for OSF hospital and Jump
Work Simulation group. The proposed site will be developed over
47,000 sq ft costing about $5.5 million. The scope of work includes
improving the overhead clearance of the Mechanical, Electrical and
Plumbing components .
6. Additional Project Information: Building Information modeling
required through interdisciplinary coordination. Note that an additional
access route between the two levels (Level3 & 4) is to accommodate by
cutting open the slab at the center of level 4.
7. Project numbers:
PROJECT INFORMATION NUMBER
Contract number 12254-89
Project Number 21336-98
Net Square footage 47,000 SF
3
BIMEX | JUMP WORK GROUP
8. Project Schedule / Phases / Milestone:
PROJECT
PHASE/MILESTONE
ESTIMATED
START DATE
ESTIMATED
COMPLETION DATE
PROJECT STAKEHOLDERS
INVOLVED
PRELIMINARY PLANNING
Presentation #1: BIM
Wed, July 01, 2015 Sun, July 12, 2015 Architect, CM , Electrical
Engineer, Electrical Sub,
Mechanical Engineer
Mechanical Sub, Fire
Protection Sub, Structural
Engineer
DESIGN DOCUMENTS
Presentation #2: Schematic
Wed, July 15, 2015 Wed, July 22 , 2015 Architect, CM , Electrical
Engineer, Electrical Sub,
Mechanical Engineer
Mechanical Sub, Fire
Protection Sub, Structural
Engineer
DESIGN DOCUMENTS
Presentation #3: Development
Fri, July 24, 2015 Wed, Aug 12, 2015 Architect, CM , Electrical
Engineer, Electrical Sub,
Mechanical Engineer
Mechanical Sub, Fire
Protection Sub, Structural
Engineer
CONSTRUCTION DOCUMENTS
Presentation #4: Final
Mon, Aug 17, 2015 Mon, Aug 31, 2015 Architect, CM , Electrical
Engineer, Electrical Sub,
Mechanical Engineer
Mechanical Sub, Fire
Protection Sub, Structural
Engineer
CONSTRUCTION Sept,2015 Sept 2016 Architect, CM , Electrical
Engineer, Electrical Sub,
Mechanical Engineer
Mechanical Sub, Fire
Protection Sub, Structural
Engineer
4
BIMEX | JUMP WORK GROUP
Section C: Key Project Contacts
Role Organization Contact Name Location E-Mail Phone
BIMEx Manager P.J.Hoerr Ahmed JWP xyz@abc.com 123-897-879
BIM Manager P.J.Hoerr Ahsan JWP xyz@abc.com 123-897-879
Architect P.J.Hoerr Shoaib JWP xyz@abc.com 123-897-879
Construction
Manager
P.J.Hoerr Sajjad JWP xyz@abc.com 123-897-879
Electrical
Engineer
FLEMING Co. John JWP xyz@abc.com 123-897-879
Electrical Sub FLEMINC Co. Mike JWP xyz@abc.com 123-897-879
Mechanical
Engineer
PIPCO Anthony JWP xyz@abc.com 123-897-879
Mechanical Sub PIPCO Pat JWP xyz@abc.com 123-897-879
Fire Protection
Sub
PIPCO Kim KWP xyz@abc.com 123-897-879
BIM Consultant P.J.Hoerr C.Smith JWP xyz@abc.com 123-897-879
Structural
Engineer
P.J.Hoerr Hussaini JWP xyz@abc.com 123-897-879
5
BIMEX | JUMP WORK GROUP
Section D: Project Goals / BIM Uses
1. Major BIM Goals / Objectives:
PRIORITY GOAL DESCRIPTION POTENTIAL BIM
USES
Medium Assess feasibility of the project Feasibility Analysis
High Maximize efficiency of design & coordination
process
3D Coordination, Design
Authoring
High Minimize clashes both in frequency and
severity on-site
3D Coordination
High Ensure there are no cost over-runs Cost Estimation
High Ensure pre-fab components are dead accurate Digital Fabrication
High Ensure project is completed within the
schedule
Phase Planning
Medium To evaluate the feasibility of the schedule 4D modeling
Medium Improve the communication protocol 3D Coorination
2. BIM Uses:
X PLAN X DESIGN X CONSTRUCT X OPERATE
X DESIGN
AUTHORING
3D COORDINATION X 3D COORDINATION
DIGITAL
FABRICATION
X DIGITAL
FABRICATION
X 4D MODELING X 4D MODELING X 4D MODELING 4D MODELING
X COST ESTIMATION X COST ESTIMATION X COST ESTIMATION X COST ESTIMATION
X EXISTING
CONDITION
MODELING
X EXISTING
CONDITION
MODELING
X EXISTING
CONDITION
MODELING
X EXISTING
CONDITION
MODELING
BIM use worksheet: Attachment 1
6
BIMEX | JUMP WORK GROUP
Section E: Organizational Role / Staffing
1. BIM Roles and Responsibilities:
Architect: Irfan Anees
Key Responsibilites:
o Overall renovation concept.
o Identifying owners requirements relating to aesthetics.
o Coordinating with different disciplines and keeping them updated
with changes.
Construction Manager: Sajjad
Key Responsibilites:
o Maintain up-to-date BIM Ex plan.
o Perform Scheduling and Estimation.
o Identify project delivery strategies, risk and conract types.
o Value engineering to identify what component to move in collision
detection.
Structural Engineer: Sajjad
Key Responsibilites:
o Efficient Structural Design for the building.
o Structural analysis of the building.
o 3D coordination with Architect and MEP engineers.
Mechanical Engineer: Sajjad
Key Responsibilites:
o Mechanical systems requirements, selection and layout.
o 3D systems & clash coordination with Architect, Structural, and
Electrical engineer.
7
BIMEX | JUMP WORK GROUP
Overall Team Responsibilites
 Successfully devise a renovation plan for Jump Work Group
 Maintain overall sustainable design.
 Keep value engineering in mind at all stages
 Actively investigate potential clashes between disciplines
 Actively update and utilize the BIMex plan.
8
BIMEX | JUMP WORK GROUP
Section F: BIM Process Design
1. Level One Process Overview Map: Attachment 2
2. List of level Two – Detailed BIM use process maps: Attacment 3
a. Existing Condition Modelling
b. Cost Estimation
c. Phase Planning
d. Design Authoring
e. 3D Coordination
f. Digital Fabrication
9
BIMEX | JUMP WORK GROUP
Section G: BIM Information Exchanges
1. Information Exchange Worksheet:
See Attachment 4
10
BIMEX | JUMP WORK GROUP
Section H: Collaboration Procedures
1. Communication Methods:
Constant communication is the fundamental of BIM (Integration &
Collaboration of teams). Meetings on site and in office will be the primary
communication method while Google documents the secondary. Hours of
communication will be from 8:00am to 6:00pm which happens to be the time
period of major design decisions.
2. Meeting Procedures:
Agenda
Every involved party will need to define their agenda clearly by preparing a
short list of concerns and requests. The briefing will be limited to Google docs
in order to save valuable meeting time.
Location
Meetings will be held on the site and in the office as required. Below is the
location for both the venues.
Room 304
107 N Commerce Pl, Peoria, IL 61604
Site
1306 N Berkeley Ave, Peoria, IL 61603
Schedule Conflicts
At the end of each meeting the parties will confirm the details of the next meeting.
MEETING TYPE PROJECT
STAGE
FREQUENCY PARTICIPAN
TS
LOCATION
BIM EXECUTION PLAN Program 4 times before 07/01
Thrice every 4 weeks
All B-SITE
DESIGN COORDINATION Design 1xa week All Varies
COST ESTIMATION All As needed All Google docs
3D Coordination Construction 1x a week All B-Site , D-Doors
CONFLICT RESOLUTION Varies As needed Varies Varies
PRESENTATIONS Varies 4 times All B-SITE
11
BIMEX | JUMP WORK GROUP
Section H: Collaboration Procedures
MEETING DAY TIME CONFLICT COMMENTS
Monday 11:00a-2:00p
5:30-7:30p
3 meeting & bi-
weekly lab
Tuesday 5:15 -7:15p 0 Not preferred
Wednesday 5:30 – 7:30p 0 preferred
Thursday 5:15 -7:15p 0 work
Friday 2:00p 1 work
Saturday 2:00p Only if necessary
Sunday Not preferred
3. Information exchanges:
All the information required will be made available on the SSD drive. Parties will be
provided access to our Google site, sites.google.com/site/PJHoerr-OSF , for any document
or information they will be needing. Further the following document will be made
available on the website:
meeting transcripts: anyone who misses out on the information will stay updated.
revision log: record for past revisions and a provision for the conflict resolution when
face-to-face meeting is not possible.
BIM execution log: live project manual.
All of the work will be made available in digital format through the life of the project and
parties authorized by the owner will be given access to the files after the project.
3. Conflict Resolution:
The procedure for resolving design conflicts will be group discussion of merits and
demerits of a proposed change. Each person will assess the situation and provide a
solution. A majority vote will be taken to firm up a decision, in case of a tie, an outside
source will decide.
All concerned parties will be contacted.
12
BIMEX | JUMP WORK GROUP
Section H: Collaboration
5.Model Delivery Schedule of information exchange for submission
and approval:
INFORMATION
EXCHANGE
FILE
SENDER
FILE
RECEIVER
FREQUENCY DUE
DATE
MODEL
SOFWARE
NATIVE
FILE
TYPE
FILE
EXCHANGE
TYPE
BIM EXECUTION
PLAN
ALL ALL Weekly 07.01
07.23
08.24
google
docs
.doc
MEP
COORDINATION
MODEL
A/E,M,EE, A,CM Weekly 09.01 Revit .rvt
STRUCTURAL
ANALYSIS
REPORTS
SE CM 09.07 ROBOT .rtd
COST
ESTIMATES
ALL CM 07.22
08.15
Google
docs
SITE LAYOUT A CM As needed 09.01 Autocad .dwg .dwg
SCHEDULE PL CM As needed 07.02 MS
Project
.mpp .mpp
6. Electronic Communications Procedure: SDD drive and VPS
All correspondence shall be through email, google documents, and file
sharing. Further all the project model files should be made available on
our Virtual Server and teams that require access shall be provided key.
13
BIMEX | JUMP WORK GROUP
Section I: Quality Control
1. OVERALL STRATEGY FOR QUALITY CONTROL:
Team members from each discipline are responsible for ensuring that their individual
designs not only conform to the overall design intent, but also coordinate with the
design input from other members. The team will maintain an active awareness of
model accuracy, clash avoidances and overall model soundness.
2. QUALITY CONTROL CHECKS:
The following checks should be performed to assure quality.
CHECKS DEFINITION RESPONSIBLE
PARTY
SOFTWARE
PROGRAMS
FREQUENCY
VISUAL CHECK Ensure there are no
unintended and
unsupported model
components and that
the design intent has
been followed by all
disciplines.
ALL REVIT,
NAVISWORKS
REGULAR
INTERFERENCE
CHECK
Actively look for
clashes between
components related
to all disciplines.
ALL REVIT,
NAVISWORKS
REGULAR
MODEL
INTEGRITY
CHECKS
Confirm that
overlaying files
reference the same
base point and that
the latest versions of
each layer are being
used prior to
authoring new
content
ALL REVIT,
NAVISWORKS
REGULAR
14
BIMEX | JUMP WORK GROUP
Section J: Technological Infrastructure Needs
1. Software:
BIM USE DISCIPLINE SOFTWARE VERSION
ESTIMATION CM On-Screen Take-off 2014
CLASH DETECTION ALL Navisworks 2016
DESIGN AUTHORING EE Revit Electrical Systems 2015
DEISGN AUTHORING SE Revit Structure 2015
MECHANICAL AUTHORING ME AUTOCAD MEP 2015
PROJECT SCHEDULING PL MS Project 2013
4D PLANNING CM Navisworks 2016
STRUCTURAL ANALYSIS SE Autodesk Robot SA 2015
2. Computer Hardware:
BIM USE HARDWARE OWNER OF
HARDWARE
SPECIFICATIONS
DESIGN AUTHORING DELL PRECISION T1600 PIPCO Intel® XEON ® CPU
E31225 @ 3.10 ghz
Memory 8192mb
Nvidia Quadro 2000
DESIGN ENGINEERING DELL PRECISION T1600 P.J.HOERR Intel® XEON ® CPU
E31225 @ 3.10 ghz
Memory 8192mb
Nvidia Quadro 2000
DESIGN ENGINEERING DELL PRECISION T1700 FLEMING.CO Intel® XEON ® CPU
E31220 @ 2.70 ghz
Memory 8192mb
Nvidia Quadro 1500
15
BIMEX | JUMP WORK GROUP
Section K: Model Structure
1. File Naming Structure
Files should be saved and backed up regularly. File versions should be modified
regularly with each revision and be notated as “discipline name 1-1.xyz”.
For each authoring tool a separate folder should be created which shall contain
all the revised versions of the model.
FILE NAMES FOR MODELS SHOULD BE FORMATTED AS:
ARCHITECTURAL MODEL AR-
FIRE PROTECTION MODEL FP-
PLUMBING MODEL PL-
ELECTRICAL MODEL EL-
HEATING MODEL HD-
HEAT PROTECTION MODEL HP-
STRUCTURAL MODEL ST-
16
BIMEX | JUMP WORK GROUP
Section K: Model Structure
2. Model Structure:
The model shall be separated by discipline, based on the categories listed
above , below is a sample file structure.
17
BIMEX | JUMP WORK GROUP
Section L: Project Deliverables
BIM SUBMITTAL
ITEM
STAGE APPROX. DUE DATE FORMAT NOTES
Presentation #1:
BIM
Preliminary
Planning
12.07.15 Ppt BIM execution plan
presentation, Team
charter, Deliverable
Definition, Design
Criteria, Team Org,
Integrated work
flow, BIM/IPD for
sustainability
BIMex Plan Preliminary
Planning
07.07.16 Doc Printed copy
deliverable
Presentation #2:
Schematic Design
Design
Documents
07.22.2015 Ppt Specific to each
discipline
Revised BIMex Plan Design
Documents
07.29.2015 Doct After revising
Designers notes
Presentation #3:
Design
Development
Design
Documents
08.12.2015 Building & site
design,
Sustainability
strategies, Code
Analysis, Preliminary
BIM Model
Presentation
Outline
Construction
Documents
08.15.2015 Doc Must be Approved
Presentation#4:
Final Project
Presentation
Construction
Documents
08.31.2015 Ppt Sustainability
concepts, energy
model, systems
integration, Final
BIm mode, Cost
Estimate/schedule,
Construction
Logistics.
18
BIMEX | JUMP WORK GROUP
Section M: Attachments
1. BIM USE WORKSHEET [From Section D]
2. LEVEL 1 PROCESS OVERVIEW MAP [FROM SECTION F]
3. LEVEL 2 DETAILED BIM USE PROCESS MAP(S) [FROM SECTION F]
4. BIM INFO EXCHANGE SHEET [FROM SECTION G]
19
BIMEX | JUMP WORK GROUP
1. BIM USE WORKSHEET
20
BIMEX | JUMP WORK GROUP
2. BIM LEVEL 1 PROCESS MAPS
21
BIMEX | JUMP WORK GROUP
3. LEVEL 2 PROCESS MAPS
3D Coordination
22
BIMEX | JUMP WORK GROUP
PHASE PLANNING
23
BIMEX | JUMP WORK GROUP
COST ESTIMATION
24
BIMEX | JUMP WORK GROUP
DESIGN AUTHORING
25
BIMEX | JUMP WORK GROUP
EXISTING CONDITION MODELING
26
BIMEX | JUMP WORK GROUP
DIGITAL FABRICATION
27
BIMEX | JUMP WORK GROUP
BIM INFO EXCHANGE SHEET

More Related Content

What's hot

BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for constructionCesare Caoduro
 
BIM Presentation
BIM PresentationBIM Presentation
BIM PresentationOmer Syed
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?Chun Keung Ng
 
How BIM 360 construction document management facilitates building work proces...
How BIM 360 construction document management facilitates building work proces...How BIM 360 construction document management facilitates building work proces...
How BIM 360 construction document management facilitates building work proces...Shubham Bhatnagar
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)Farid Ghori
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation Omar Selim
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentationrsalbin
 
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...Fabio Roberti
 
Bim and project management
Bim and project managementBim and project management
Bim and project managementOmar Selim
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionVeetil Digital Service
 
Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling PresentationMotasem Albanna
 
BIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesBIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesDaan Moreels
 

What's hot (20)

BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
BIM Presentation
BIM PresentationBIM Presentation
BIM Presentation
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
How BIM 360 construction document management facilitates building work proces...
How BIM 360 construction document management facilitates building work proces...How BIM 360 construction document management facilitates building work proces...
How BIM 360 construction document management facilitates building work proces...
 
Bim overview
Bim overviewBim overview
Bim overview
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BIM Introduction
BIM IntroductionBIM Introduction
BIM Introduction
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
Bim execution plan
Bim execution planBim execution plan
Bim execution plan
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentation
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
 
Bim and project management
Bim and project managementBim and project management
Bim and project management
 
The Bim Process Explained
The Bim Process ExplainedThe Bim Process Explained
The Bim Process Explained
 
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLEBIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
 
Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling Presentation
 
what is BIM
what is BIMwhat is BIM
what is BIM
 
BIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesBIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use cases
 

Viewers also liked

BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information ModellingNemat Syed
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...Dalbir Dugal
 
Revit Architecture
Revit ArchitectureRevit Architecture
Revit Architectureniict
 
Architectural Technologist as a BIM Information Manager
Architectural Technologist as a BIM Information ManagerArchitectural Technologist as a BIM Information Manager
Architectural Technologist as a BIM Information ManagerStephen Donoghue
 
Operational Readiness Activation & Transit of Airport Construction
Operational Readiness Activation & Transit of Airport ConstructionOperational Readiness Activation & Transit of Airport Construction
Operational Readiness Activation & Transit of Airport ConstructionAhmed Towfeequllah Siddiqui
 
Why project managers should be leading BIM by Natacha Redon, 19 Sep, APM Nort...
Why project managers should be leading BIM by Natacha Redon, 19 Sep, APM Nort...Why project managers should be leading BIM by Natacha Redon, 19 Sep, APM Nort...
Why project managers should be leading BIM by Natacha Redon, 19 Sep, APM Nort...Association for Project Management
 
Work shareing documents
Work shareing   documentsWork shareing   documents
Work shareing documentstuanmantd102
 
Worksets In Central File Ps
Worksets In Central File   PsWorksets In Central File   Ps
Worksets In Central File PsParveen Sharma
 
Tyler Eslinger_Portfolio (3)
Tyler Eslinger_Portfolio (3)Tyler Eslinger_Portfolio (3)
Tyler Eslinger_Portfolio (3)Tyler Eslinger
 
Revit2015 getting startedguide_imperialmetric
Revit2015 getting startedguide_imperialmetricRevit2015 getting startedguide_imperialmetric
Revit2015 getting startedguide_imperialmetricali lemssefer
 
Coordination & team work
Coordination & team workCoordination & team work
Coordination & team workVimal Yadav
 
RIVET WORK SHARING BASICS SIMPLE STEPS.
RIVET WORK SHARING BASICS SIMPLE STEPS.RIVET WORK SHARING BASICS SIMPLE STEPS.
RIVET WORK SHARING BASICS SIMPLE STEPS.Narsimha murthy
 
Creating custom walls using autodesk revit edu 652-tjackson
Creating custom walls using autodesk revit edu 652-tjacksonCreating custom walls using autodesk revit edu 652-tjackson
Creating custom walls using autodesk revit edu 652-tjacksonTERRANCE JACKSON
 
4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in ContractsBIM User Day
 

Viewers also liked (18)

BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information Modelling
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
 
Revit Architecture
Revit ArchitectureRevit Architecture
Revit Architecture
 
Contract Management in BIM
Contract Management in BIMContract Management in BIM
Contract Management in BIM
 
Design of proposed highway
Design of proposed highwayDesign of proposed highway
Design of proposed highway
 
Architectural Technologist as a BIM Information Manager
Architectural Technologist as a BIM Information ManagerArchitectural Technologist as a BIM Information Manager
Architectural Technologist as a BIM Information Manager
 
Operational Readiness Activation & Transit of Airport Construction
Operational Readiness Activation & Transit of Airport ConstructionOperational Readiness Activation & Transit of Airport Construction
Operational Readiness Activation & Transit of Airport Construction
 
BIM case study
BIM case studyBIM case study
BIM case study
 
Why project managers should be leading BIM by Natacha Redon, 19 Sep, APM Nort...
Why project managers should be leading BIM by Natacha Redon, 19 Sep, APM Nort...Why project managers should be leading BIM by Natacha Redon, 19 Sep, APM Nort...
Why project managers should be leading BIM by Natacha Redon, 19 Sep, APM Nort...
 
Work shareing documents
Work shareing   documentsWork shareing   documents
Work shareing documents
 
Worksets In Central File Ps
Worksets In Central File   PsWorksets In Central File   Ps
Worksets In Central File Ps
 
Tyler Eslinger_Portfolio (3)
Tyler Eslinger_Portfolio (3)Tyler Eslinger_Portfolio (3)
Tyler Eslinger_Portfolio (3)
 
Revit2015 getting startedguide_imperialmetric
Revit2015 getting startedguide_imperialmetricRevit2015 getting startedguide_imperialmetric
Revit2015 getting startedguide_imperialmetric
 
Coordination & team work
Coordination & team workCoordination & team work
Coordination & team work
 
RIVET WORK SHARING BASICS SIMPLE STEPS.
RIVET WORK SHARING BASICS SIMPLE STEPS.RIVET WORK SHARING BASICS SIMPLE STEPS.
RIVET WORK SHARING BASICS SIMPLE STEPS.
 
Creating custom walls using autodesk revit edu 652-tjackson
Creating custom walls using autodesk revit edu 652-tjacksonCreating custom walls using autodesk revit edu 652-tjackson
Creating custom walls using autodesk revit edu 652-tjackson
 
4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts
 
The Role of CIC on BIM Development
The Role of CIC on BIM DevelopmentThe Role of CIC on BIM Development
The Role of CIC on BIM Development
 

Similar to BIM Execution plan

Tài liệu full The Triangle
Tài liệu full The TriangleTài liệu full The Triangle
Tài liệu full The TriangleHuytraining
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptJessDazaOsorio
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptssuser3f4412
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptJessDazaOsorio
 
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).pptgmundacat
 
04c_Process_Map_Templates-V2.0_(pdf).pdf
04c_Process_Map_Templates-V2.0_(pdf).pdf04c_Process_Map_Templates-V2.0_(pdf).pdf
04c_Process_Map_Templates-V2.0_(pdf).pdfhippiemx
 
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...Clarkson Alliance
 
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfle canh
 
Sc bim
Sc bimSc bim
Sc bimLam Yu
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfVincentPoon15
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdfAditi Garg
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”IRJET Journal
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
 
Bim building information modelling
Bim  building information modellingBim  building information modelling
Bim building information modellingSumayyaSayeeda
 
Iabse2008 Chicago Jyrki Jauhiainen
Iabse2008 Chicago Jyrki JauhiainenIabse2008 Chicago Jyrki Jauhiainen
Iabse2008 Chicago Jyrki Jauhiainenjjauhiai
 
Application Of Building Information Modeling (BIM) To Civil Engineering Projects
Application Of Building Information Modeling (BIM) To Civil Engineering ProjectsApplication Of Building Information Modeling (BIM) To Civil Engineering Projects
Application Of Building Information Modeling (BIM) To Civil Engineering ProjectsMichele Thomas
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling reportKiran Birdi
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1Timun Loh
 

Similar to BIM Execution plan (20)

Tài liệu full The Triangle
Tài liệu full The TriangleTài liệu full The Triangle
Tài liệu full The Triangle
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
 
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
 
BIM model analysis
BIM model analysisBIM model analysis
BIM model analysis
 
04c_Process_Map_Templates-V2.0_(pdf).pdf
04c_Process_Map_Templates-V2.0_(pdf).pdf04c_Process_Map_Templates-V2.0_(pdf).pdf
04c_Process_Map_Templates-V2.0_(pdf).pdf
 
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
 
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
 
Sc bim
Sc bimSc bim
Sc bim
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
Bim building information modelling
Bim  building information modellingBim  building information modelling
Bim building information modelling
 
Iabse2008 Chicago Jyrki Jauhiainen
Iabse2008 Chicago Jyrki JauhiainenIabse2008 Chicago Jyrki Jauhiainen
Iabse2008 Chicago Jyrki Jauhiainen
 
Application Of Building Information Modeling (BIM) To Civil Engineering Projects
Application Of Building Information Modeling (BIM) To Civil Engineering ProjectsApplication Of Building Information Modeling (BIM) To Civil Engineering Projects
Application Of Building Information Modeling (BIM) To Civil Engineering Projects
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1
 

Recently uploaded

"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming languageSmritiSharma901052
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsapna80328
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Industrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsIndustrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsAlirezaBagherian3
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 

Recently uploaded (20)

"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming language
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveying
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Industrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsIndustrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal Compressors
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 

BIM Execution plan

  • 1.
  • 2.     Table o Section A Section B Section C Section D Section E Section F Section G Section H Section Section J Section K Section L Section M             BIME of content A: BIM Pro B: Project C: Key Proj D: Project G E: Organiza F: BIM Proc G: BIM Infor H: Collabor I: Quality C J: Technolo K: Model St L: Project D M: Attachme EX |JUM BI JUMP AHM A s oject Executi Information ject Contact Goals / BIM U ational Roles cess Design rmation Exc ation Proced Control ogical Infras tructure Deliverables ents MP WOR M PROJECT WORK SIM DEV MED TOWF AHSANULLA MOHAM KHA on Plan ove n ts Uses s / Staffing change dures tructure Nee RK GRO T EXECUTI FOR ULATION G ELOPED BY FEEQULLAH AH HUSSAI MMED SHO AJA SAJJAD   erview eds OUP ON PLAN  GROUP – O Y H SIDDIQUI INI SYED OAIB D OSF 1 1 1 1 2-3 4 5 6-7 8 9 10-12 13 14 5-16 17 18-27
  • 3. 1 BIMEX | JUMP WORK GROUP Section A: BIM Project Execution Plan Overview To successfully develop an efficient Building Information Model on a renovation project. This plan is developed to describe in detail various goals and procedures for the different BIM uses. This plan further describes the design of processes for executing BIM through the project lifecycle. Different subcontractors will be involved in the project tasked with providing models which will be used in developing a federated model.
  • 4. 2 BIMEX | JUMP WORK GROUP Section B: Project Information 1. Project Owner: Jump Work Simulation, OSF 2. Project Name: Jump Work Group 3. Project location and address: 1306 N Berkeley Ave, Peoria, IL 61603 4. Contract Type / Delivery Method: Stipulated Sum (Design – Bid – Build) 5. Brief Project Description : The site shall be renovated as a 2 level office to be used as an administrative support block for OSF hospital and Jump Work Simulation group. The proposed site will be developed over 47,000 sq ft costing about $5.5 million. The scope of work includes improving the overhead clearance of the Mechanical, Electrical and Plumbing components . 6. Additional Project Information: Building Information modeling required through interdisciplinary coordination. Note that an additional access route between the two levels (Level3 & 4) is to accommodate by cutting open the slab at the center of level 4. 7. Project numbers: PROJECT INFORMATION NUMBER Contract number 12254-89 Project Number 21336-98 Net Square footage 47,000 SF
  • 5. 3 BIMEX | JUMP WORK GROUP 8. Project Schedule / Phases / Milestone: PROJECT PHASE/MILESTONE ESTIMATED START DATE ESTIMATED COMPLETION DATE PROJECT STAKEHOLDERS INVOLVED PRELIMINARY PLANNING Presentation #1: BIM Wed, July 01, 2015 Sun, July 12, 2015 Architect, CM , Electrical Engineer, Electrical Sub, Mechanical Engineer Mechanical Sub, Fire Protection Sub, Structural Engineer DESIGN DOCUMENTS Presentation #2: Schematic Wed, July 15, 2015 Wed, July 22 , 2015 Architect, CM , Electrical Engineer, Electrical Sub, Mechanical Engineer Mechanical Sub, Fire Protection Sub, Structural Engineer DESIGN DOCUMENTS Presentation #3: Development Fri, July 24, 2015 Wed, Aug 12, 2015 Architect, CM , Electrical Engineer, Electrical Sub, Mechanical Engineer Mechanical Sub, Fire Protection Sub, Structural Engineer CONSTRUCTION DOCUMENTS Presentation #4: Final Mon, Aug 17, 2015 Mon, Aug 31, 2015 Architect, CM , Electrical Engineer, Electrical Sub, Mechanical Engineer Mechanical Sub, Fire Protection Sub, Structural Engineer CONSTRUCTION Sept,2015 Sept 2016 Architect, CM , Electrical Engineer, Electrical Sub, Mechanical Engineer Mechanical Sub, Fire Protection Sub, Structural Engineer
  • 6. 4 BIMEX | JUMP WORK GROUP Section C: Key Project Contacts Role Organization Contact Name Location E-Mail Phone BIMEx Manager P.J.Hoerr Ahmed JWP xyz@abc.com 123-897-879 BIM Manager P.J.Hoerr Ahsan JWP xyz@abc.com 123-897-879 Architect P.J.Hoerr Shoaib JWP xyz@abc.com 123-897-879 Construction Manager P.J.Hoerr Sajjad JWP xyz@abc.com 123-897-879 Electrical Engineer FLEMING Co. John JWP xyz@abc.com 123-897-879 Electrical Sub FLEMINC Co. Mike JWP xyz@abc.com 123-897-879 Mechanical Engineer PIPCO Anthony JWP xyz@abc.com 123-897-879 Mechanical Sub PIPCO Pat JWP xyz@abc.com 123-897-879 Fire Protection Sub PIPCO Kim KWP xyz@abc.com 123-897-879 BIM Consultant P.J.Hoerr C.Smith JWP xyz@abc.com 123-897-879 Structural Engineer P.J.Hoerr Hussaini JWP xyz@abc.com 123-897-879
  • 7. 5 BIMEX | JUMP WORK GROUP Section D: Project Goals / BIM Uses 1. Major BIM Goals / Objectives: PRIORITY GOAL DESCRIPTION POTENTIAL BIM USES Medium Assess feasibility of the project Feasibility Analysis High Maximize efficiency of design & coordination process 3D Coordination, Design Authoring High Minimize clashes both in frequency and severity on-site 3D Coordination High Ensure there are no cost over-runs Cost Estimation High Ensure pre-fab components are dead accurate Digital Fabrication High Ensure project is completed within the schedule Phase Planning Medium To evaluate the feasibility of the schedule 4D modeling Medium Improve the communication protocol 3D Coorination 2. BIM Uses: X PLAN X DESIGN X CONSTRUCT X OPERATE X DESIGN AUTHORING 3D COORDINATION X 3D COORDINATION DIGITAL FABRICATION X DIGITAL FABRICATION X 4D MODELING X 4D MODELING X 4D MODELING 4D MODELING X COST ESTIMATION X COST ESTIMATION X COST ESTIMATION X COST ESTIMATION X EXISTING CONDITION MODELING X EXISTING CONDITION MODELING X EXISTING CONDITION MODELING X EXISTING CONDITION MODELING BIM use worksheet: Attachment 1
  • 8. 6 BIMEX | JUMP WORK GROUP Section E: Organizational Role / Staffing 1. BIM Roles and Responsibilities: Architect: Irfan Anees Key Responsibilites: o Overall renovation concept. o Identifying owners requirements relating to aesthetics. o Coordinating with different disciplines and keeping them updated with changes. Construction Manager: Sajjad Key Responsibilites: o Maintain up-to-date BIM Ex plan. o Perform Scheduling and Estimation. o Identify project delivery strategies, risk and conract types. o Value engineering to identify what component to move in collision detection. Structural Engineer: Sajjad Key Responsibilites: o Efficient Structural Design for the building. o Structural analysis of the building. o 3D coordination with Architect and MEP engineers. Mechanical Engineer: Sajjad Key Responsibilites: o Mechanical systems requirements, selection and layout. o 3D systems & clash coordination with Architect, Structural, and Electrical engineer.
  • 9. 7 BIMEX | JUMP WORK GROUP Overall Team Responsibilites  Successfully devise a renovation plan for Jump Work Group  Maintain overall sustainable design.  Keep value engineering in mind at all stages  Actively investigate potential clashes between disciplines  Actively update and utilize the BIMex plan.
  • 10. 8 BIMEX | JUMP WORK GROUP Section F: BIM Process Design 1. Level One Process Overview Map: Attachment 2 2. List of level Two – Detailed BIM use process maps: Attacment 3 a. Existing Condition Modelling b. Cost Estimation c. Phase Planning d. Design Authoring e. 3D Coordination f. Digital Fabrication
  • 11. 9 BIMEX | JUMP WORK GROUP Section G: BIM Information Exchanges 1. Information Exchange Worksheet: See Attachment 4
  • 12. 10 BIMEX | JUMP WORK GROUP Section H: Collaboration Procedures 1. Communication Methods: Constant communication is the fundamental of BIM (Integration & Collaboration of teams). Meetings on site and in office will be the primary communication method while Google documents the secondary. Hours of communication will be from 8:00am to 6:00pm which happens to be the time period of major design decisions. 2. Meeting Procedures: Agenda Every involved party will need to define their agenda clearly by preparing a short list of concerns and requests. The briefing will be limited to Google docs in order to save valuable meeting time. Location Meetings will be held on the site and in the office as required. Below is the location for both the venues. Room 304 107 N Commerce Pl, Peoria, IL 61604 Site 1306 N Berkeley Ave, Peoria, IL 61603 Schedule Conflicts At the end of each meeting the parties will confirm the details of the next meeting. MEETING TYPE PROJECT STAGE FREQUENCY PARTICIPAN TS LOCATION BIM EXECUTION PLAN Program 4 times before 07/01 Thrice every 4 weeks All B-SITE DESIGN COORDINATION Design 1xa week All Varies COST ESTIMATION All As needed All Google docs 3D Coordination Construction 1x a week All B-Site , D-Doors CONFLICT RESOLUTION Varies As needed Varies Varies PRESENTATIONS Varies 4 times All B-SITE
  • 13. 11 BIMEX | JUMP WORK GROUP Section H: Collaboration Procedures MEETING DAY TIME CONFLICT COMMENTS Monday 11:00a-2:00p 5:30-7:30p 3 meeting & bi- weekly lab Tuesday 5:15 -7:15p 0 Not preferred Wednesday 5:30 – 7:30p 0 preferred Thursday 5:15 -7:15p 0 work Friday 2:00p 1 work Saturday 2:00p Only if necessary Sunday Not preferred 3. Information exchanges: All the information required will be made available on the SSD drive. Parties will be provided access to our Google site, sites.google.com/site/PJHoerr-OSF , for any document or information they will be needing. Further the following document will be made available on the website: meeting transcripts: anyone who misses out on the information will stay updated. revision log: record for past revisions and a provision for the conflict resolution when face-to-face meeting is not possible. BIM execution log: live project manual. All of the work will be made available in digital format through the life of the project and parties authorized by the owner will be given access to the files after the project. 3. Conflict Resolution: The procedure for resolving design conflicts will be group discussion of merits and demerits of a proposed change. Each person will assess the situation and provide a solution. A majority vote will be taken to firm up a decision, in case of a tie, an outside source will decide. All concerned parties will be contacted.
  • 14. 12 BIMEX | JUMP WORK GROUP Section H: Collaboration 5.Model Delivery Schedule of information exchange for submission and approval: INFORMATION EXCHANGE FILE SENDER FILE RECEIVER FREQUENCY DUE DATE MODEL SOFWARE NATIVE FILE TYPE FILE EXCHANGE TYPE BIM EXECUTION PLAN ALL ALL Weekly 07.01 07.23 08.24 google docs .doc MEP COORDINATION MODEL A/E,M,EE, A,CM Weekly 09.01 Revit .rvt STRUCTURAL ANALYSIS REPORTS SE CM 09.07 ROBOT .rtd COST ESTIMATES ALL CM 07.22 08.15 Google docs SITE LAYOUT A CM As needed 09.01 Autocad .dwg .dwg SCHEDULE PL CM As needed 07.02 MS Project .mpp .mpp 6. Electronic Communications Procedure: SDD drive and VPS All correspondence shall be through email, google documents, and file sharing. Further all the project model files should be made available on our Virtual Server and teams that require access shall be provided key.
  • 15. 13 BIMEX | JUMP WORK GROUP Section I: Quality Control 1. OVERALL STRATEGY FOR QUALITY CONTROL: Team members from each discipline are responsible for ensuring that their individual designs not only conform to the overall design intent, but also coordinate with the design input from other members. The team will maintain an active awareness of model accuracy, clash avoidances and overall model soundness. 2. QUALITY CONTROL CHECKS: The following checks should be performed to assure quality. CHECKS DEFINITION RESPONSIBLE PARTY SOFTWARE PROGRAMS FREQUENCY VISUAL CHECK Ensure there are no unintended and unsupported model components and that the design intent has been followed by all disciplines. ALL REVIT, NAVISWORKS REGULAR INTERFERENCE CHECK Actively look for clashes between components related to all disciplines. ALL REVIT, NAVISWORKS REGULAR MODEL INTEGRITY CHECKS Confirm that overlaying files reference the same base point and that the latest versions of each layer are being used prior to authoring new content ALL REVIT, NAVISWORKS REGULAR
  • 16. 14 BIMEX | JUMP WORK GROUP Section J: Technological Infrastructure Needs 1. Software: BIM USE DISCIPLINE SOFTWARE VERSION ESTIMATION CM On-Screen Take-off 2014 CLASH DETECTION ALL Navisworks 2016 DESIGN AUTHORING EE Revit Electrical Systems 2015 DEISGN AUTHORING SE Revit Structure 2015 MECHANICAL AUTHORING ME AUTOCAD MEP 2015 PROJECT SCHEDULING PL MS Project 2013 4D PLANNING CM Navisworks 2016 STRUCTURAL ANALYSIS SE Autodesk Robot SA 2015 2. Computer Hardware: BIM USE HARDWARE OWNER OF HARDWARE SPECIFICATIONS DESIGN AUTHORING DELL PRECISION T1600 PIPCO Intel® XEON ® CPU E31225 @ 3.10 ghz Memory 8192mb Nvidia Quadro 2000 DESIGN ENGINEERING DELL PRECISION T1600 P.J.HOERR Intel® XEON ® CPU E31225 @ 3.10 ghz Memory 8192mb Nvidia Quadro 2000 DESIGN ENGINEERING DELL PRECISION T1700 FLEMING.CO Intel® XEON ® CPU E31220 @ 2.70 ghz Memory 8192mb Nvidia Quadro 1500
  • 17. 15 BIMEX | JUMP WORK GROUP Section K: Model Structure 1. File Naming Structure Files should be saved and backed up regularly. File versions should be modified regularly with each revision and be notated as “discipline name 1-1.xyz”. For each authoring tool a separate folder should be created which shall contain all the revised versions of the model. FILE NAMES FOR MODELS SHOULD BE FORMATTED AS: ARCHITECTURAL MODEL AR- FIRE PROTECTION MODEL FP- PLUMBING MODEL PL- ELECTRICAL MODEL EL- HEATING MODEL HD- HEAT PROTECTION MODEL HP- STRUCTURAL MODEL ST-
  • 18. 16 BIMEX | JUMP WORK GROUP Section K: Model Structure 2. Model Structure: The model shall be separated by discipline, based on the categories listed above , below is a sample file structure.
  • 19. 17 BIMEX | JUMP WORK GROUP Section L: Project Deliverables BIM SUBMITTAL ITEM STAGE APPROX. DUE DATE FORMAT NOTES Presentation #1: BIM Preliminary Planning 12.07.15 Ppt BIM execution plan presentation, Team charter, Deliverable Definition, Design Criteria, Team Org, Integrated work flow, BIM/IPD for sustainability BIMex Plan Preliminary Planning 07.07.16 Doc Printed copy deliverable Presentation #2: Schematic Design Design Documents 07.22.2015 Ppt Specific to each discipline Revised BIMex Plan Design Documents 07.29.2015 Doct After revising Designers notes Presentation #3: Design Development Design Documents 08.12.2015 Building & site design, Sustainability strategies, Code Analysis, Preliminary BIM Model Presentation Outline Construction Documents 08.15.2015 Doc Must be Approved Presentation#4: Final Project Presentation Construction Documents 08.31.2015 Ppt Sustainability concepts, energy model, systems integration, Final BIm mode, Cost Estimate/schedule, Construction Logistics.
  • 20. 18 BIMEX | JUMP WORK GROUP Section M: Attachments 1. BIM USE WORKSHEET [From Section D] 2. LEVEL 1 PROCESS OVERVIEW MAP [FROM SECTION F] 3. LEVEL 2 DETAILED BIM USE PROCESS MAP(S) [FROM SECTION F] 4. BIM INFO EXCHANGE SHEET [FROM SECTION G]
  • 21. 19 BIMEX | JUMP WORK GROUP 1. BIM USE WORKSHEET
  • 22. 20 BIMEX | JUMP WORK GROUP 2. BIM LEVEL 1 PROCESS MAPS
  • 23. 21 BIMEX | JUMP WORK GROUP 3. LEVEL 2 PROCESS MAPS 3D Coordination
  • 24. 22 BIMEX | JUMP WORK GROUP PHASE PLANNING
  • 25. 23 BIMEX | JUMP WORK GROUP COST ESTIMATION
  • 26. 24 BIMEX | JUMP WORK GROUP DESIGN AUTHORING
  • 27. 25 BIMEX | JUMP WORK GROUP EXISTING CONDITION MODELING
  • 28. 26 BIMEX | JUMP WORK GROUP DIGITAL FABRICATION
  • 29. 27 BIMEX | JUMP WORK GROUP BIM INFO EXCHANGE SHEET