INTRODUCING THE PROJECT
Problem Statement
Project Background
Objectives of the Project
Expected Outcomes of the Project
PART II
PROJECTDESCRIPTION
Target Group
Implementation Strategy
Resources and Facilities
PART III
PROJECTACTIVITIES
Establishing an Organizational Structure for the Project
Project AdvocacyVisit
Assessment of Needs, Resources and Constraints
Data and information gathering methods
PART IV
Project Work Plan
Budget Breakdown
Project Implementation Schedule Time Frame in days
Supervision
Evaluation
PART I
INTRODUCING THE PROJECT
Problem Statement
The majority of adults (male and female) in the rural areas do not have the
literacy skills and functional skills require for survival and participation in the
development process. A survey carried out shows that a number of them who were
initially literate, after a while relapsed into illiteracy because there are no platforms
for them to match theory with practice.
Project Background
Adult education as an academic field of study is one saddled with the
responsibility of rebuilding the nation through the active process of sensitizing and
also equipping the adult citizenry of the nation with the right tools for sustainable
development. Adult educators are facilitators of change, and are hence referred to
as change agents.
However, a survey of the impact of adult education on development in
contemporary times leaves much to be desired. It is on this premise that I
document and submit this project proposal for due authorization and support. I,
under the umbrella and auspices of the department, in collaboration with other
departments from the university intend to teach for free, participants of the
programme, various entrepreneurial skills that will help supplement their sources
of income thereby reducing their dependency ratio and improve their standard of
living. A survey was carried out in three separate locations viz.; ‘Ibagwa’, ‘Opi’
and ‘Obimo’ which are autonomous communities in Nsukka Local Government
Area of Enugu state.
The data obtained from the survey shows that the most likely suitable
location for the project would be ‘Obimo’, hence I have chosen the community to
be the launching site of the project. With the influence of some of my trusted
friends and advocates who are natives of ‘Obimo’, mobilization in terms of man
power and accommodation has been taking care of. Notwithstanding, there are
other issues which if not properly tackled may hinder the success of the project.
The issues perceived to deter the project from achieving its set aims and objectives
include the following;
i. Inadequate funding,
ii. Low support services,
iii. Shortage of human; and
iv. Materials resources.
This project is new and may have several shortcomings; it is therefore, in
this regard, that I solicit for support and authorization.
Objectives of the Project
The objectives of this project are:
i. To provide participants with basic literacy, functional and entrepreneurial
skills which will enable them to participate effectively and benefit fully
from the development programmes organized for them by government
and development assistance agencies;
ii. To organize educational, social and economic activities for participants
from rural areas where they can learn and practice work skills to enable
them embark on income – generating projects;
iii. Availing them to the numerous opportunities inherent in their societies;
iv. Reducing the menacing rate of illiteracy among the people;
Expected Outcomes
i. At each stage of the project execution, detailed reports will be made on
project activities and research findings.
ii. It is expected that during the baseline survey, detailed demographic and
socio-economic data of the target groups, their literacy levels and socio-
economic problems will be identified.
iii. The project will provide vital information on daily life of different groups
of participants as regards the range of activities performed, their life
skills, the time demands of the various activities and the social
constraints faced by them in carrying out these activities.
PART II
PROJECT DESCRIPTION
Targetgroup
The project is for all adults, basically those who are deficient in literacy and
functional skills. The project will also cater for the needs of youths who are out of
school.
Implementation Strategies
The first part of the project will be the preparatory activities, which will be
followed by the training and teaching activities. The second part will be the
training activities and the development of educational/learning materials to respond
to identified learning needs and problems of the target group. The third part of the
project will be the teaching of the relevant literacy and functional skills to the
target group with the educational/learning materials developed.
Resources and Facilities
The project will use educational resources and facilities available in the
community. Literacy classes and functional skills training sessions will be run
simultaneously. Participants will choose their preferred classes based on their
needs. Instructional materials to be used will be borrowed from the department’s
library and returned at the completion of the project.
PART III
PROJECT ACTIVITIES
Five major projects activities are envisaged. These are as are follows:
a. Establishing an Organizational Structure for the Project
b. Project AdvocacyVisit
c. Assessment of Needs, Resources and Constraints
d. Development of Educational/Learning Materials
e. Teaching Literacy and Functional Skills Acquisition
Establishing an Organizational Structure for the Project
An organizational structure will be needed in order to determine who will
implement the activities as well as to identify members of the operational bodies
that will help to run the project. An awareness raising and public enlightenment
workshop will be organized.
Project Advocacy Visits
The project focal persons ill visit the local government officials, local
leaders and members of the community to brief them on the nature of the project
and to seek their participation and support as the case may be.
As the project continues, there will be regular visits to the project community and
notable personalities. Project participants will be trained to keep records of
relevant project events and activities. In this way, details of qualitative and
quantitative changes in the overall project goals will be identified for project
evaluation purposes.
Expected Outcomes from visitations and mobilization
The public will be sufficiently enlightened and mobilized about the project,
and highly motivated groups will be identified.
Needs Assessment
A survey of the needs and problems of the target population and the resources
available for and constraints against project implementation will be conducted. The
survey activities which will be carried out will include:
 Assessment of the demographic, socio-economic characteristics, educational
needs and problems of the population.
 Vocabulary search to identify key words used by the target population in
connection with the identified needs and problems.
 Literacy and functional skills.
 Standard of living of the average community members.
Data and Information Gathering Methods
The following methods were used in gathering information and data:
questionnaire, focus group discussion, participants’ observations, and structured
interviews.
Table 1. Respondents’ views on problems facing the community in terms of
development.
S/N Items SA
(4)
A
(3)
D
(2)
SD
(1)
U
(1)
Total
1. Lack of political will to fund
community development
programmes
5 30 25 35 5 100
2. High illiteracy level 25 12 3 50 10 100
3. Inadequate and inexperienced
capital and human resources.
45 15 100
4. Environmental factors such as
natural disasters (flood, storms,
drought, rain etc.)
100
5. Youth unemployment 100
Table 2. Analysis of respondents’ views
S/
N
Items SA
(4)
A
(3)
D
(2)
SD
(1)
U
(1)
Tot
al
Mean Inter-
pretation
1. Lack of political will to
fund community
development programmes
2. High illiteracy level
3. Inadequate and
inexperienced capital and
human resources.
4. Environmental factors such
as natural disasters (flood,
storms, drought, rain etc.)
5. Youth unemployment
PART IV
THE PROJECT WORK PLAN
Table 3. Projectline of activities
ACTIVITY SEQUENCE OF ACTIVITIES
1. Study and analysis of the
existing social system in the
project area of location.
Preparation of organization profiles community
profiles, matrices of services and institutional
relationships.
2. Project advocacy visit
(mobilization)
Identification of potential partners, community
forum, face-to-face visits
3. Progress evaluation
4. Launching of the project Short speeches by invited dignitaries, lecturers
present and pioneers of the project
5. Literacy Education Series of talks, lectures and discussion classes
shall be held on the need for education. Basic
literacy skills shall be taught.
6. Skills acquisition Bead making, baking of cakes, entrepreneurial
development training, network marketing
investment and savings.
7. Monitoring, evaluation and Daily project support activities, back up
report writing on group
activities and projects.
training, formative evaluation, report writing
Project Implementation Schedule Time Frame in days
Days
ACTIVITIES 1 2 3 4 5
I. Establishing An Organizational Structure
Drawing up workshop programmes
Inviting participants and consultants
Conducting the workshop
Selecting potential project
Writing the report
II. Project Advocacy Visit
Meeting with the community leaders and members
Meeting with the LGA officials
Writing report
III. Needs Assessment Survey
Preparing the instruments
Identifying and training field assistance
Conducting the survey
Data analysis
Writing report
Iv. Training Activities
Meeting of project team to discuss survey results
Prioritizing areas of need
Preparing training programme and schedule
Arranging the venue
Preparing training materials
Inviting Trainees
Facilitating and conducting the learning and training
Budget Breakdown
Itemized Budget
i. Mobilization
and
mobilization
materials
ii. Material
resources
Activity Cost (N)
Project Advocacy visits
3 bottles of Aromatic schnapps…………………… 2,100
Transportation……………………………………… 500
Organizing public address…………………………. 2,000
Production of banners and fliers………………….. 3,000
Sub-total……………………………………………. 7,600
Project set up, Literacy materials and skills
acquisition equipments
Handouts, chalk board, chalks………..…………… 3,000
iii. Invitations
iv. facilitators
welfare
Photographing of events…………………………… 2,000
Rental of baking and other kitchen utensils……… 1,500
Rental of canopies and chairs (3,000 X 4days).… 12,000
Sub-total…………………………………………… 14,500
Letters and gifts to be given to supporters
and collaborating departments and other bodies
Drafting of letters and printing of letters
(10 copies X 10N)……………………..…………….. 200
Eva wine (6 pieces X 600N)………………………… 3,600
Chivita fruit drink (6 pieces X 250)………………… 1,500
Sub-total……………………………………………… 5,300
Transportation and feeding
Transportation to and fro target location
(200 X 10 project assistants)(2000 X 3days)……… 6,000
4 bags of sachet water.……………………………… 320
Snacks……………………………………………….. 1,500
Sub-total……………………………………………... 7,820
GRAND TOTAL N 39,220
Supervision
Members of the project team will supervise the teaching learning sessions and may
therefore have to visit three of the participants before the end of the project.
Review meeting will be held with the project assistants at least twice.
Evaluation
The project will be evaluated both formally and informally. Evaluation will be
carried out through measurements, questionnaires, focus group discussions,
observations and interviews. Also evaluation processes will be on a daily basis.
Process documentation as an action-research technique, will also be used.

More Related Content

What's hot

Maurits Spoelder. The Conceptualisation of Quality Education in Zambia. DRAFT...
Maurits Spoelder. The Conceptualisation of Quality Education in Zambia. DRAFT...Maurits Spoelder. The Conceptualisation of Quality Education in Zambia. DRAFT...
Maurits Spoelder. The Conceptualisation of Quality Education in Zambia. DRAFT...Maurits Spoelder
 
The role of knowledge management towards the achievement of
The role of knowledge management towards the achievement ofThe role of knowledge management towards the achievement of
The role of knowledge management towards the achievement ofAlexander Decker
 
The role of knowledge management towards the achievement of vision 2030.a sur...
The role of knowledge management towards the achievement of vision 2030.a sur...The role of knowledge management towards the achievement of vision 2030.a sur...
The role of knowledge management towards the achievement of vision 2030.a sur...Alexander Decker
 
Alternative sources of financing secondary school education in the rural coun...
Alternative sources of financing secondary school education in the rural coun...Alternative sources of financing secondary school education in the rural coun...
Alternative sources of financing secondary school education in the rural coun...Alexander Decker
 
Ability and willingness to pay for university education in calabar, nigeria
Ability and willingness to pay for university education in calabar, nigeriaAbility and willingness to pay for university education in calabar, nigeria
Ability and willingness to pay for university education in calabar, nigeriaAlexander Decker
 
Trends In Philippine Education
Trends In Philippine EducationTrends In Philippine Education
Trends In Philippine EducationSarah Antigua
 
Adult education and community development programmes as vital tool for transf...
Adult education and community development programmes as vital tool for transf...Adult education and community development programmes as vital tool for transf...
Adult education and community development programmes as vital tool for transf...Alexander Decker
 
First africa forum on science, technology and innovation for youth employment...
First africa forum on science, technology and innovation for youth employment...First africa forum on science, technology and innovation for youth employment...
First africa forum on science, technology and innovation for youth employment...Dr Lendy Spires
 
Guidance high school graduation cermonies 5.1.20
Guidance  high school graduation cermonies 5.1.20Guidance  high school graduation cermonies 5.1.20
Guidance high school graduation cermonies 5.1.20EducationNC
 
Challenges of human capacity development in federal universities in akwa ibom...
Challenges of human capacity development in federal universities in akwa ibom...Challenges of human capacity development in federal universities in akwa ibom...
Challenges of human capacity development in federal universities in akwa ibom...Alexander Decker
 
Tertiary education trust fund intervention on academic staff capacity buildin...
Tertiary education trust fund intervention on academic staff capacity buildin...Tertiary education trust fund intervention on academic staff capacity buildin...
Tertiary education trust fund intervention on academic staff capacity buildin...Journal of Education and Learning (EduLearn)
 
Ac4301157160
Ac4301157160Ac4301157160
Ac4301157160IJERA Editor
 
Vilnius pres goolam mohamedbhai
Vilnius pres goolam mohamedbhaiVilnius pres goolam mohamedbhai
Vilnius pres goolam mohamedbhaiIAU_Past_Conferences
 
Financing Higher Education
Financing Higher EducationFinancing Higher Education
Financing Higher Educationsagar_urp
 
Adult education organizations
Adult education organizationsAdult education organizations
Adult education organizationsjlhindman
 
Pondi me, dr.bk ravi - final (a2)
Pondi  me, dr.bk ravi - final (a2)Pondi  me, dr.bk ravi - final (a2)
Pondi me, dr.bk ravi - final (a2)Arulselvan Senthivel
 
Ravi Bheemaiah Krishnan-Media Education and the marginalized-A critical study...
Ravi Bheemaiah Krishnan-Media Education and the marginalized-A critical study...Ravi Bheemaiah Krishnan-Media Education and the marginalized-A critical study...
Ravi Bheemaiah Krishnan-Media Education and the marginalized-A critical study...pumediaseminar2011
 

What's hot (19)

Maurits Spoelder. The Conceptualisation of Quality Education in Zambia. DRAFT...
Maurits Spoelder. The Conceptualisation of Quality Education in Zambia. DRAFT...Maurits Spoelder. The Conceptualisation of Quality Education in Zambia. DRAFT...
Maurits Spoelder. The Conceptualisation of Quality Education in Zambia. DRAFT...
 
The role of knowledge management towards the achievement of
The role of knowledge management towards the achievement ofThe role of knowledge management towards the achievement of
The role of knowledge management towards the achievement of
 
The role of knowledge management towards the achievement of vision 2030.a sur...
The role of knowledge management towards the achievement of vision 2030.a sur...The role of knowledge management towards the achievement of vision 2030.a sur...
The role of knowledge management towards the achievement of vision 2030.a sur...
 
NAP summary
NAP summaryNAP summary
NAP summary
 
Alternative sources of financing secondary school education in the rural coun...
Alternative sources of financing secondary school education in the rural coun...Alternative sources of financing secondary school education in the rural coun...
Alternative sources of financing secondary school education in the rural coun...
 
Ability and willingness to pay for university education in calabar, nigeria
Ability and willingness to pay for university education in calabar, nigeriaAbility and willingness to pay for university education in calabar, nigeria
Ability and willingness to pay for university education in calabar, nigeria
 
Trends In Philippine Education
Trends In Philippine EducationTrends In Philippine Education
Trends In Philippine Education
 
Adult education and community development programmes as vital tool for transf...
Adult education and community development programmes as vital tool for transf...Adult education and community development programmes as vital tool for transf...
Adult education and community development programmes as vital tool for transf...
 
First africa forum on science, technology and innovation for youth employment...
First africa forum on science, technology and innovation for youth employment...First africa forum on science, technology and innovation for youth employment...
First africa forum on science, technology and innovation for youth employment...
 
Guidance high school graduation cermonies 5.1.20
Guidance  high school graduation cermonies 5.1.20Guidance  high school graduation cermonies 5.1.20
Guidance high school graduation cermonies 5.1.20
 
Challenges of human capacity development in federal universities in akwa ibom...
Challenges of human capacity development in federal universities in akwa ibom...Challenges of human capacity development in federal universities in akwa ibom...
Challenges of human capacity development in federal universities in akwa ibom...
 
Tertiary education trust fund intervention on academic staff capacity buildin...
Tertiary education trust fund intervention on academic staff capacity buildin...Tertiary education trust fund intervention on academic staff capacity buildin...
Tertiary education trust fund intervention on academic staff capacity buildin...
 
Ac4301157160
Ac4301157160Ac4301157160
Ac4301157160
 
Vilnius pres goolam mohamedbhai
Vilnius pres goolam mohamedbhaiVilnius pres goolam mohamedbhai
Vilnius pres goolam mohamedbhai
 
Financing Higher Education
Financing Higher EducationFinancing Higher Education
Financing Higher Education
 
Adult education organizations
Adult education organizationsAdult education organizations
Adult education organizations
 
Pondi me, dr.bk ravi - final (a2)
Pondi  me, dr.bk ravi - final (a2)Pondi  me, dr.bk ravi - final (a2)
Pondi me, dr.bk ravi - final (a2)
 
Ravi Bheemaiah Krishnan-Media Education and the marginalized-A critical study...
Ravi Bheemaiah Krishnan-Media Education and the marginalized-A critical study...Ravi Bheemaiah Krishnan-Media Education and the marginalized-A critical study...
Ravi Bheemaiah Krishnan-Media Education and the marginalized-A critical study...
 
Institutional accreditation
Institutional accreditationInstitutional accreditation
Institutional accreditation
 

Similar to Adult literacy campaign[1] : UDECHUKWU EMEKA EMMANUEL

YEP Final Evaluation 20 _Oct. 2013
YEP Final Evaluation 20 _Oct. 2013YEP Final Evaluation 20 _Oct. 2013
YEP Final Evaluation 20 _Oct. 2013Ayman Badr
 
Programme planning and evaluation in extension work
Programme planning and evaluation in extension workProgramme planning and evaluation in extension work
Programme planning and evaluation in extension workDegonto Islam
 
Amulya Project Briefs final
Amulya Project Briefs finalAmulya Project Briefs final
Amulya Project Briefs finalJoy Amulya
 
61250-URN_Framework_Plan_Sep_2014
61250-URN_Framework_Plan_Sep_201461250-URN_Framework_Plan_Sep_2014
61250-URN_Framework_Plan_Sep_2014Selena Ramkeesoon
 
Project Planning and Management (Presentation)
Project Planning and Management (Presentation)Project Planning and Management (Presentation)
Project Planning and Management (Presentation)Trokon Bryant
 
An overview of participatory m&e
An overview of participatory m&eAn overview of participatory m&e
An overview of participatory m&eMd. Nazmul Alam
 
4. Social and Institutional Analysis.pptx
4. Social and Institutional Analysis.pptx4. Social and Institutional Analysis.pptx
4. Social and Institutional Analysis.pptxReizleAnnBiCaddawan
 
Poverty project
Poverty projectPoverty project
Poverty projectSohal Shende
 
Apec workshop 2 presentation 14 meade goodwin apec workshop 2 (4)
Apec workshop 2 presentation 14 meade goodwin   apec workshop 2 (4)Apec workshop 2 presentation 14 meade goodwin   apec workshop 2 (4)
Apec workshop 2 presentation 14 meade goodwin apec workshop 2 (4)Global CCS Institute
 
Growing Conversations Phase 2 update presentation
Growing Conversations Phase 2 update presentationGrowing Conversations Phase 2 update presentation
Growing Conversations Phase 2 update presentationCity of Toronto Planning
 
OABC UG & PG PPT.pptx
OABC UG & PG PPT.pptxOABC UG & PG PPT.pptx
OABC UG & PG PPT.pptxbansalbookstore
 
Extension programme planning
Extension programme planningExtension programme planning
Extension programme planningJyothi P
 
A Step By Step Guide To Monitoring And Evaluation
A Step By Step Guide To Monitoring And EvaluationA Step By Step Guide To Monitoring And Evaluation
A Step By Step Guide To Monitoring And EvaluationHeather Strinden
 
Needs Assess Micro-Project General Report_Mahoney
Needs Assess Micro-Project General Report_MahoneyNeeds Assess Micro-Project General Report_Mahoney
Needs Assess Micro-Project General Report_MahoneyJoanna Mahoney
 
It resource needsassessment
It resource needsassessmentIt resource needsassessment
It resource needsassessmentMARIUM NASIR
 
he Project Plan and Intention of the Implementing Organization in Proposal D...
 he Project Plan and Intention of the Implementing Organization in Proposal D... he Project Plan and Intention of the Implementing Organization in Proposal D...
he Project Plan and Intention of the Implementing Organization in Proposal D...assignmentcafe1
 
Global Grants 101: Handout EN
Global Grants 101: Handout ENGlobal Grants 101: Handout EN
Global Grants 101: Handout ENRotary International
 

Similar to Adult literacy campaign[1] : UDECHUKWU EMEKA EMMANUEL (20)

YEP Final Evaluation 20 _Oct. 2013
YEP Final Evaluation 20 _Oct. 2013YEP Final Evaluation 20 _Oct. 2013
YEP Final Evaluation 20 _Oct. 2013
 
Programme planning and evaluation in extension work
Programme planning and evaluation in extension workProgramme planning and evaluation in extension work
Programme planning and evaluation in extension work
 
REMI-Project proposal.
REMI-Project proposal.REMI-Project proposal.
REMI-Project proposal.
 
Amulya Project Briefs final
Amulya Project Briefs finalAmulya Project Briefs final
Amulya Project Briefs final
 
61250-URN_Framework_Plan_Sep_2014
61250-URN_Framework_Plan_Sep_201461250-URN_Framework_Plan_Sep_2014
61250-URN_Framework_Plan_Sep_2014
 
Project Planning and Management (Presentation)
Project Planning and Management (Presentation)Project Planning and Management (Presentation)
Project Planning and Management (Presentation)
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
An overview of participatory m&e
An overview of participatory m&eAn overview of participatory m&e
An overview of participatory m&e
 
4. Social and Institutional Analysis.pptx
4. Social and Institutional Analysis.pptx4. Social and Institutional Analysis.pptx
4. Social and Institutional Analysis.pptx
 
Poverty project
Poverty projectPoverty project
Poverty project
 
Apec workshop 2 presentation 14 meade goodwin apec workshop 2 (4)
Apec workshop 2 presentation 14 meade goodwin   apec workshop 2 (4)Apec workshop 2 presentation 14 meade goodwin   apec workshop 2 (4)
Apec workshop 2 presentation 14 meade goodwin apec workshop 2 (4)
 
Growing Conversations Phase 2 update presentation
Growing Conversations Phase 2 update presentationGrowing Conversations Phase 2 update presentation
Growing Conversations Phase 2 update presentation
 
OABC UG & PG PPT.pptx
OABC UG & PG PPT.pptxOABC UG & PG PPT.pptx
OABC UG & PG PPT.pptx
 
EdTech 505 Evaluation Report
EdTech 505 Evaluation ReportEdTech 505 Evaluation Report
EdTech 505 Evaluation Report
 
Extension programme planning
Extension programme planningExtension programme planning
Extension programme planning
 
A Step By Step Guide To Monitoring And Evaluation
A Step By Step Guide To Monitoring And EvaluationA Step By Step Guide To Monitoring And Evaluation
A Step By Step Guide To Monitoring And Evaluation
 
Needs Assess Micro-Project General Report_Mahoney
Needs Assess Micro-Project General Report_MahoneyNeeds Assess Micro-Project General Report_Mahoney
Needs Assess Micro-Project General Report_Mahoney
 
It resource needsassessment
It resource needsassessmentIt resource needsassessment
It resource needsassessment
 
he Project Plan and Intention of the Implementing Organization in Proposal D...
 he Project Plan and Intention of the Implementing Organization in Proposal D... he Project Plan and Intention of the Implementing Organization in Proposal D...
he Project Plan and Intention of the Implementing Organization in Proposal D...
 
Global Grants 101: Handout EN
Global Grants 101: Handout ENGlobal Grants 101: Handout EN
Global Grants 101: Handout EN
 

Recently uploaded

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 

Recently uploaded (20)

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 

Adult literacy campaign[1] : UDECHUKWU EMEKA EMMANUEL

  • 1. UNIVERSITY OF NIGERIA, NSUKKA FACULTY OF EDUCATION DEPARTMENT OF ADULT EDUCATION AND EXTRA MURAL STUDIES LITERACY CAMPAIGN/SKILLS ACQUISITION A PROPOSAL SUBMITTED FOR APPROVAL AND AUTHORIZATION NOVEMBER 2015
  • 2. PROJECT TITLE: EMPOWERING ADULTS FOR SUSTAINABLE DEVELOPMENT
  • 3. PROJECT PROPOSAL PART I INTRODUCING THE PROJECT Problem Statement Project Background Objectives of the Project Expected Outcomes of the Project PART II PROJECTDESCRIPTION Target Group Implementation Strategy Resources and Facilities PART III PROJECTACTIVITIES Establishing an Organizational Structure for the Project Project AdvocacyVisit Assessment of Needs, Resources and Constraints Data and information gathering methods PART IV Project Work Plan Budget Breakdown Project Implementation Schedule Time Frame in days Supervision Evaluation
  • 4. PART I INTRODUCING THE PROJECT Problem Statement The majority of adults (male and female) in the rural areas do not have the literacy skills and functional skills require for survival and participation in the development process. A survey carried out shows that a number of them who were initially literate, after a while relapsed into illiteracy because there are no platforms for them to match theory with practice. Project Background Adult education as an academic field of study is one saddled with the responsibility of rebuilding the nation through the active process of sensitizing and also equipping the adult citizenry of the nation with the right tools for sustainable development. Adult educators are facilitators of change, and are hence referred to as change agents. However, a survey of the impact of adult education on development in contemporary times leaves much to be desired. It is on this premise that I document and submit this project proposal for due authorization and support. I, under the umbrella and auspices of the department, in collaboration with other departments from the university intend to teach for free, participants of the
  • 5. programme, various entrepreneurial skills that will help supplement their sources of income thereby reducing their dependency ratio and improve their standard of living. A survey was carried out in three separate locations viz.; ‘Ibagwa’, ‘Opi’ and ‘Obimo’ which are autonomous communities in Nsukka Local Government Area of Enugu state. The data obtained from the survey shows that the most likely suitable location for the project would be ‘Obimo’, hence I have chosen the community to be the launching site of the project. With the influence of some of my trusted friends and advocates who are natives of ‘Obimo’, mobilization in terms of man power and accommodation has been taking care of. Notwithstanding, there are other issues which if not properly tackled may hinder the success of the project. The issues perceived to deter the project from achieving its set aims and objectives include the following; i. Inadequate funding, ii. Low support services, iii. Shortage of human; and iv. Materials resources. This project is new and may have several shortcomings; it is therefore, in this regard, that I solicit for support and authorization.
  • 6. Objectives of the Project The objectives of this project are: i. To provide participants with basic literacy, functional and entrepreneurial skills which will enable them to participate effectively and benefit fully from the development programmes organized for them by government and development assistance agencies; ii. To organize educational, social and economic activities for participants from rural areas where they can learn and practice work skills to enable them embark on income – generating projects; iii. Availing them to the numerous opportunities inherent in their societies; iv. Reducing the menacing rate of illiteracy among the people; Expected Outcomes i. At each stage of the project execution, detailed reports will be made on project activities and research findings. ii. It is expected that during the baseline survey, detailed demographic and socio-economic data of the target groups, their literacy levels and socio- economic problems will be identified. iii. The project will provide vital information on daily life of different groups of participants as regards the range of activities performed, their life skills, the time demands of the various activities and the social constraints faced by them in carrying out these activities.
  • 7. PART II PROJECT DESCRIPTION Targetgroup The project is for all adults, basically those who are deficient in literacy and functional skills. The project will also cater for the needs of youths who are out of school. Implementation Strategies The first part of the project will be the preparatory activities, which will be followed by the training and teaching activities. The second part will be the training activities and the development of educational/learning materials to respond to identified learning needs and problems of the target group. The third part of the project will be the teaching of the relevant literacy and functional skills to the target group with the educational/learning materials developed. Resources and Facilities The project will use educational resources and facilities available in the community. Literacy classes and functional skills training sessions will be run simultaneously. Participants will choose their preferred classes based on their needs. Instructional materials to be used will be borrowed from the department’s library and returned at the completion of the project.
  • 8. PART III PROJECT ACTIVITIES Five major projects activities are envisaged. These are as are follows: a. Establishing an Organizational Structure for the Project b. Project AdvocacyVisit c. Assessment of Needs, Resources and Constraints d. Development of Educational/Learning Materials e. Teaching Literacy and Functional Skills Acquisition Establishing an Organizational Structure for the Project An organizational structure will be needed in order to determine who will implement the activities as well as to identify members of the operational bodies that will help to run the project. An awareness raising and public enlightenment workshop will be organized. Project Advocacy Visits The project focal persons ill visit the local government officials, local leaders and members of the community to brief them on the nature of the project and to seek their participation and support as the case may be.
  • 9. As the project continues, there will be regular visits to the project community and notable personalities. Project participants will be trained to keep records of relevant project events and activities. In this way, details of qualitative and quantitative changes in the overall project goals will be identified for project evaluation purposes. Expected Outcomes from visitations and mobilization The public will be sufficiently enlightened and mobilized about the project, and highly motivated groups will be identified. Needs Assessment A survey of the needs and problems of the target population and the resources available for and constraints against project implementation will be conducted. The survey activities which will be carried out will include:  Assessment of the demographic, socio-economic characteristics, educational needs and problems of the population.  Vocabulary search to identify key words used by the target population in connection with the identified needs and problems.  Literacy and functional skills.  Standard of living of the average community members.
  • 10. Data and Information Gathering Methods The following methods were used in gathering information and data: questionnaire, focus group discussion, participants’ observations, and structured interviews. Table 1. Respondents’ views on problems facing the community in terms of development. S/N Items SA (4) A (3) D (2) SD (1) U (1) Total 1. Lack of political will to fund community development programmes 5 30 25 35 5 100 2. High illiteracy level 25 12 3 50 10 100 3. Inadequate and inexperienced capital and human resources. 45 15 100 4. Environmental factors such as natural disasters (flood, storms, drought, rain etc.) 100 5. Youth unemployment 100 Table 2. Analysis of respondents’ views S/ N Items SA (4) A (3) D (2) SD (1) U (1) Tot al Mean Inter- pretation 1. Lack of political will to fund community development programmes 2. High illiteracy level 3. Inadequate and inexperienced capital and human resources. 4. Environmental factors such as natural disasters (flood, storms, drought, rain etc.) 5. Youth unemployment
  • 11. PART IV THE PROJECT WORK PLAN Table 3. Projectline of activities ACTIVITY SEQUENCE OF ACTIVITIES 1. Study and analysis of the existing social system in the project area of location. Preparation of organization profiles community profiles, matrices of services and institutional relationships. 2. Project advocacy visit (mobilization) Identification of potential partners, community forum, face-to-face visits 3. Progress evaluation 4. Launching of the project Short speeches by invited dignitaries, lecturers present and pioneers of the project 5. Literacy Education Series of talks, lectures and discussion classes shall be held on the need for education. Basic literacy skills shall be taught. 6. Skills acquisition Bead making, baking of cakes, entrepreneurial development training, network marketing investment and savings. 7. Monitoring, evaluation and Daily project support activities, back up
  • 12. report writing on group activities and projects. training, formative evaluation, report writing Project Implementation Schedule Time Frame in days Days ACTIVITIES 1 2 3 4 5 I. Establishing An Organizational Structure Drawing up workshop programmes Inviting participants and consultants Conducting the workshop Selecting potential project Writing the report II. Project Advocacy Visit Meeting with the community leaders and members Meeting with the LGA officials Writing report III. Needs Assessment Survey Preparing the instruments Identifying and training field assistance Conducting the survey
  • 13. Data analysis Writing report Iv. Training Activities Meeting of project team to discuss survey results Prioritizing areas of need Preparing training programme and schedule Arranging the venue Preparing training materials Inviting Trainees Facilitating and conducting the learning and training Budget Breakdown Itemized Budget i. Mobilization and mobilization materials ii. Material resources Activity Cost (N) Project Advocacy visits 3 bottles of Aromatic schnapps…………………… 2,100 Transportation……………………………………… 500 Organizing public address…………………………. 2,000 Production of banners and fliers………………….. 3,000 Sub-total……………………………………………. 7,600 Project set up, Literacy materials and skills acquisition equipments Handouts, chalk board, chalks………..…………… 3,000
  • 14. iii. Invitations iv. facilitators welfare Photographing of events…………………………… 2,000 Rental of baking and other kitchen utensils……… 1,500 Rental of canopies and chairs (3,000 X 4days).… 12,000 Sub-total…………………………………………… 14,500 Letters and gifts to be given to supporters and collaborating departments and other bodies Drafting of letters and printing of letters (10 copies X 10N)……………………..…………….. 200 Eva wine (6 pieces X 600N)………………………… 3,600 Chivita fruit drink (6 pieces X 250)………………… 1,500 Sub-total……………………………………………… 5,300 Transportation and feeding Transportation to and fro target location (200 X 10 project assistants)(2000 X 3days)……… 6,000 4 bags of sachet water.……………………………… 320 Snacks……………………………………………….. 1,500 Sub-total……………………………………………... 7,820 GRAND TOTAL N 39,220 Supervision Members of the project team will supervise the teaching learning sessions and may therefore have to visit three of the participants before the end of the project. Review meeting will be held with the project assistants at least twice. Evaluation The project will be evaluated both formally and informally. Evaluation will be carried out through measurements, questionnaires, focus group discussions,
  • 15. observations and interviews. Also evaluation processes will be on a daily basis. Process documentation as an action-research technique, will also be used.