Six Sigma Project Overview
       Final Report

 Mack Operations Focus

         Duration of Project:
          May ~ July 2004
            Craig Lester
 Continuous Improvement Manager
       Iverson Industries Inc.
DEFINE

                 Team Members
 TEAM LEADER
 Craig Lester – Continuous Improvement
 Manager

 TEAM MEMBERS
 *Michael Iverson - Engineering Manager
 *Bill D. - Maintenance Supervisor

 Cross Functional Core Team
 *Jim T. - Process Engineer
 *Wayne R. / Brenda P. - Quality Engineer
 *Jim A. / Ali A. - Production Supervisor
 *Manufacturing Associates
DEFINE
         Define Problem Statement
 The Mack operation is not meeting Customer Demand for
Delivery and Quality. Labor costs are excessive due to
Overtime consumption.
The Mack operation is NOT Balanced
Labor is @ 150% of the quoted level
Delivery is below forecast levels +/- 89%.
Customer Quality is unsatisfactory – Repeat Rejections
Changeovers are Lengthy and Costly
                    Project Goals
                 Reduce labor costs by 25%
                 Improve OEE ratings by 25%
                 Improve Line Balance
                 Eliminate Customer Defects
                 Reduce Internal Quality rejects
                  Achieve Production Yield Goals
                 SMED for Changeover Reduction
MEASURE
                      Op 10 AB - Process Measure

                  Mack Job #2800 - Monthly Production Averages
                                    Op 10AB
          18
                                          16.9
                                                            16.4
                           16.116.5           16.5              16.5
          16
               14.4
          14       14


          12


          10


          8




                                                                       %
                                                                       G
                                                                       o
                                                                       a
                                                                       f
                                                                       l
          6


          4
      H
      A
      P
      d
      u
      o
      p
      g
      c
      e
      s
      a
      v
      r
      t
      .




          2


          0

               April       May          June                July

                                      Month
                                      Monthly Avg.   Goal
MEASURE
                   Op 10 CD - Process Measure

                  Mack Job #2800 - Monthly Production Averages
                                    Op 10CD

          18


          16                                                   16
                            14.7           14.9            14.8
                                15             15
          14
               12.6
                   12.5
          12


          10


          8




                                                                    %
                                                                    G
                                                                    o
                                                                    a
                                                                    f
                                                                    l
          6


          4
      H
      A
      P
      d
      u
      o
      p
      g
      c
      e
      s
      a
      v
      r
      t
      .




          2


          0
               April       May            June             July
                                        Month
                                     Monthly Avg.   Goal
MEASURE
                     Op 20 AB - Process Measure

                  Mack Job #2800 - Monthly Production Averages
                             Op 20AB - 2 Operators

          30


                            25.6
          25


                21

          20                               18.8            18.9
                                               19              19
                     18        18


          15




                                                                    %
                                                                    G
                                                                    o
                                                                    a
                                                                    f
                                                                    l
          10
      H
      A
      P
      d
      u
      o
      p
      g
      c
      e
      s
      a
      v
      r
      t
      .




           5




           0
               April        May           June             July
                                        Month
                                    Monthly Avg.    Goal
MEASURE
                      Op 20 A/B - Process Measure
                            Mack Job #2800 - S.M.E.D.
                         Apex Broach Changeover - Op# 20
          9
                  8.5
          8


          7


          6


          5                  5


          4                                4


          3
      m
      C
      T
      o
      g
      n
      h
      v
      e
      a
      r
      i




                                                                2.25
          2       2          2             2                    2


          1


          0

              April        May        June                   July
                                       Month
                                     APEX Changeover Tim e
                                     goal
MEASURE
                     Op 30 / 40 - Process Measure

                     Mack Job #2800 - Monthly Production Averages
                               Op 30 Drill - Op40 Shape

          20
                                             18.8            18.9
                              18.0               19              19
          18         18           18

          16

                14
          14


          12


          10




                                                                      %
                                                                      G
                                                                      o
                                                                      a
          8




                                                                      f
                                                                      l
          6


          4
      H
      A
      P
      d
      u
      o
      p
      g
      c
      e
      s
      a
      v
      r
      t
      .




          2


          0
               April          May           June             July
                                          Month
                                       Monthly Avg.   Goal
ANALYZE
          Analysis – Downtime and Scrap
ANALYZE                                                                                                                                                  Job #2800 – P/N 30KH430
                                                                 Iverson Ind.
                                                              Production Control
Wapauca                                                                                                                                                  Weekly/Monthly
Foundry.                                                                                                           Daily Update –                           Release
                                                                                                                       Email



      Days -                                                               Weekly Schedule                                                                    Arvin Meritor
      Lead




                                                                                                                                Daily Ship
                                                                                                                                Schedule




                                                                                                                                                                                            and
                                                           Chg. Over
                              Chg. Over                                                     Chg. Over
                                                                                                                                    Chg. Over


                         Rough Turn – Op              Finish Turn – Op 10C,D                   Slot Broach Op 20                                Drill Op 30
                             10A,B
                                                                                                                                               Shape Op 40

   Bulk
  Storage
                      Cut Time (incl. Load) =         Cut Time (incl. Load) =                Cut Time (incl. Load) =                 Cut Time (incl. Load). = 150 sec
                      157 sec.                        191 sec.                               60 sec.

                        Chg./O Time = 30                Chg./O Time = 30                       Chg./O Time = 1hr                       Chg./O Time = 1hr – 4 hr
                        min.                            min.                                   – 4 hr

                        Avg. Uptime =                   Avg. Uptime =                          Avg. Downtime =                         Avg. Uptime =
                                                                                                                                                                           Final Insp.    Shipping
                        2 - 10 hr Shifts                2 – 10 hr Shifts                       2 – 10hr Shifts                         2 – 10hr Shifts
                                                                                                                                                                          1 pc / pallet



               127             100              191         70                        40                                                        90                  120       90
               sec             sec              sec         sec                       sec                                                       sec                 sec       sec

                30             30               30          30                        20                                                        30                  30
                sec            sec              sec         sec                       sec                                                       sec                 sec
IMPROVE
                         Improve Op 10 A/B/C/D
 Op 10 A/B Rough Turn
  Balance 10A and 10B cycle times by moving excess turning to the opposite operation to
 achieve balance.
  Revise and Retrain Operator Standards based upon a 100% target derived from actual
 cycle time.
  Measure and react to Downtime and First Time Quality negatives.

 Op 10 C/D Finish Turn
  Balance 10C and 10D cycle times by moving excess turning to the opposite operation to
 achieve balance.
  Revise and Retrain Operator Standards based upon a 100% target derived from actual
 cycle time.
  Measure and react to Downtime and First Time Quality negatives.
IMPROVE
                             Improve Op 20 A / B
 Op 20 A/B Broach – Throughput

  There is NO opportunity to improve operator efficiency without adding headcount.
  Temporarily add 1 to 2 per shift

  Follow Up project will pursue Material Handling Assistance to break this constraint and
 allow headcount reduction to 1.

 Op 20 A/B Broach – S.M.E.D. Changeover Reduction Phase 1

   Project Start – Changeover averaged 8.5 hours at this Operation.
   End of Project – 3 subsequent Changeovers have been completed with 1st piece approval
 in 2.25 hours or less. A 73% Reduction
IMPROVE
                 Improve Op 30 Drill / Op 40 Shape
 Op 30 Drill / Op 40 Shape
  Throughput increased from 14 parts per hour to 18.8 parts per hour.
 A 34% Improvement

  Rewrite the program for the Mitsubishi Shaper to reduce Constraint cycle time.
 Completed w/ 50% Reduction.

 Op 30 Drill / Op 40 Shape – S.M.E.D. Changeover Reduction Phase 1

   Project Start – Changeover averaged 3.6 hours at this Operation.
   End of Project – 2 subsequent Changeovers have been completed with 1st piece approval
 in 1.5 hours or less. A 42% Reduction

 Op 30 Drill / Op 40 Shape – Setup Scrap Reduction Phase 1

  Project Start – Changeover averaged 3 pieces at setup at this Operation.
  End of Project – 2 subsequent Changeovers have been completed with 1st piece approval
 on the first part (Zero setup scrap).
CONTROL

             Control – Control Plans, LPA's
     • Control Plans
     –The Mack Control Plans have been thoroughly reviewed and scrutinized in
     conjunction with PFMEA and Customer Feedback.
     All revisions have been completed through document control.
     Each Corrective Action (Internal / External) requires C.P. / PFMEA review.




      • Layered Process Audits
      Layered Audits are utilized to determine if Controls are adequate.

      Layered Audits are supported and driven by Executive Management
                     Monthly Compliance Report - Layered Process Audit
    120.0%

    100.0%
                                            LPA
     80.0%                             Implementation




                                                                                                          G
                                                                                                          o
                                                                                                          a
     60.0%




                                                                                                          l
                       90.9%                   96.3%    95.7%
                               89.2%   87.4%
     40.0%

     20.0%
              0.0%                                              0.0%   0.0%   0.0%   0.0%   0.0%   0.0%
m
%
C
A




     0.0%
p
h
n
o
y
a
e
s
t
f
l
'




               JAN      FEB     MAR    APR     MAY      JUNE    JUL    AUG    SEP    OCT    NOV    DEC
      % OF C OMPLIAN C E:      Goal                  Mack Truck
CONTROL

      Control – Management Review
  • Management Review
  –The Mack project has been driven by weekly Management Review and
  Action Assignment Sessions. Example
Project Summary
• Problem
–The Mack operation is not performing @ acceptable cost and / or
performance levels.
• Analysis and Solution
– The Mack Line as a whole is not well balanced. Individual Operations are
also imbalanced creating NVA wait time.
  Post and Coach updated Targets for maximum throughput.
  Re-Balance each operation to improve flow and throughput
  Re-write machine programs to reduce cycle time and eliminate dead air
time with the tools.
• Results and Business Benefit(s)
– Op 10 A/B increased throughput 2.5 parts per hour or 17%
_ Op 10 C/D increased throughput 2.3 parts per hour or 18%
_ Op 20A/B – Decreased Changeover time by 73% (6.25 hours)
_ Op 30 / 40 increased throughput by 4.9 parts per hour or 35%
PROJECT SCORECARD
                                  Productivity Improvement Report
                                   Mack Line - Job # 2800 - P/N - 30KH 430
                                      Parts Per Hour                         PPH
                           April     May     June   July    August       Change        ∆
    10 AB Rough Turn       14.4       16.1   16.9    16.9    16.8            2.5     17.4%
    10 CD Finish Turn      12.6       14.7   14.9    14.8    14.8            2.3     18.3%
    20 AB Slot Broach       21        25.6   18.8    18.9     21
       20 AB 3 Oper.s                 44.0   44.0    44.0    44.0
                30 Drill    14        18.0   18.8    18.9     19              4.9    35.0%
             40 Shape      14.0       18.0   18.8    18.9    18.8             4.9    35.0%
APEX Changeover Time        8.5        5      5       3.5    2.25            -6.25   -73.5%
     (Stick & Fixtures)

Weitere ähnliche Inhalte

Andere mochten auch

Bioethanol Industrial-Adhelia
Bioethanol Industrial-AdheliaBioethanol Industrial-Adhelia
Bioethanol Industrial-AdheliaAdhelia
 
Natm business travel 2.0
Natm business travel 2.0 Natm business travel 2.0
Natm business travel 2.0 Vincent Everts
 
Libros adquiridos dic 2010
Libros adquiridos dic 2010Libros adquiridos dic 2010
Libros adquiridos dic 2010anasuarez
 
Harrison Logos
Harrison LogosHarrison Logos
Harrison Logoscharrchr
 
Ano Novo Vida Nova 1
Ano Novo Vida Nova 1Ano Novo Vida Nova 1
Ano Novo Vida Nova 1Ruben Laborda
 

Andere mochten auch (7)

My Hobby AM
My Hobby AMMy Hobby AM
My Hobby AM
 
Bioethanol Industrial-Adhelia
Bioethanol Industrial-AdheliaBioethanol Industrial-Adhelia
Bioethanol Industrial-Adhelia
 
Natm business travel 2.0
Natm business travel 2.0 Natm business travel 2.0
Natm business travel 2.0
 
Libros adquiridos dic 2010
Libros adquiridos dic 2010Libros adquiridos dic 2010
Libros adquiridos dic 2010
 
Harrison Logos
Harrison LogosHarrison Logos
Harrison Logos
 
Ano Novo Vida Nova 1
Ano Novo Vida Nova 1Ano Novo Vida Nova 1
Ano Novo Vida Nova 1
 
12 23 08
12 23 0812 23 08
12 23 08
 

Mehr von Adhelia

Project of Rebranding "Jembatan Suramadu"/Adhelia
Project of Rebranding "Jembatan Suramadu"/AdheliaProject of Rebranding "Jembatan Suramadu"/Adhelia
Project of Rebranding "Jembatan Suramadu"/AdheliaAdhelia
 
Performance Management Project By Adhelia
Performance Management Project By AdheliaPerformance Management Project By Adhelia
Performance Management Project By AdheliaAdhelia
 
Performance Management Project
Performance Management ProjectPerformance Management Project
Performance Management ProjectAdhelia
 
Project of Business Process Management
Project of Business Process ManagementProject of Business Process Management
Project of Business Process ManagementAdhelia
 
Adeptia Flowchart BPM
Adeptia Flowchart BPMAdeptia Flowchart BPM
Adeptia Flowchart BPMAdhelia
 
MBTI test - by Adhelia
MBTI test - by AdheliaMBTI test - by Adhelia
MBTI test - by AdheliaAdhelia
 
Personality Leadership - Adhelia
Personality Leadership - AdheliaPersonality Leadership - Adhelia
Personality Leadership - AdheliaAdhelia
 
Personality Leadership - Adhelia
Personality Leadership - AdheliaPersonality Leadership - Adhelia
Personality Leadership - AdheliaAdhelia
 
Personality Leadership - Adhelia
Personality Leadership - AdheliaPersonality Leadership - Adhelia
Personality Leadership - AdheliaAdhelia
 
Café Adhelia Swot Analysis
Café Adhelia Swot AnalysisCafé Adhelia Swot Analysis
Café Adhelia Swot AnalysisAdhelia
 
Palm Oil Industrial ( Presentation )
Palm  Oil  Industrial ( Presentation )Palm  Oil  Industrial ( Presentation )
Palm Oil Industrial ( Presentation )Adhelia
 
Biodiesel Production 2007-2008
Biodiesel Production 2007-2008Biodiesel Production 2007-2008
Biodiesel Production 2007-2008Adhelia
 

Mehr von Adhelia (12)

Project of Rebranding "Jembatan Suramadu"/Adhelia
Project of Rebranding "Jembatan Suramadu"/AdheliaProject of Rebranding "Jembatan Suramadu"/Adhelia
Project of Rebranding "Jembatan Suramadu"/Adhelia
 
Performance Management Project By Adhelia
Performance Management Project By AdheliaPerformance Management Project By Adhelia
Performance Management Project By Adhelia
 
Performance Management Project
Performance Management ProjectPerformance Management Project
Performance Management Project
 
Project of Business Process Management
Project of Business Process ManagementProject of Business Process Management
Project of Business Process Management
 
Adeptia Flowchart BPM
Adeptia Flowchart BPMAdeptia Flowchart BPM
Adeptia Flowchart BPM
 
MBTI test - by Adhelia
MBTI test - by AdheliaMBTI test - by Adhelia
MBTI test - by Adhelia
 
Personality Leadership - Adhelia
Personality Leadership - AdheliaPersonality Leadership - Adhelia
Personality Leadership - Adhelia
 
Personality Leadership - Adhelia
Personality Leadership - AdheliaPersonality Leadership - Adhelia
Personality Leadership - Adhelia
 
Personality Leadership - Adhelia
Personality Leadership - AdheliaPersonality Leadership - Adhelia
Personality Leadership - Adhelia
 
Café Adhelia Swot Analysis
Café Adhelia Swot AnalysisCafé Adhelia Swot Analysis
Café Adhelia Swot Analysis
 
Palm Oil Industrial ( Presentation )
Palm  Oil  Industrial ( Presentation )Palm  Oil  Industrial ( Presentation )
Palm Oil Industrial ( Presentation )
 
Biodiesel Production 2007-2008
Biodiesel Production 2007-2008Biodiesel Production 2007-2008
Biodiesel Production 2007-2008
 

Kürzlich hochgeladen

Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 

Kürzlich hochgeladen (20)

Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 

Six Sigma Project-Iverson

  • 1. Six Sigma Project Overview Final Report Mack Operations Focus Duration of Project: May ~ July 2004 Craig Lester Continuous Improvement Manager Iverson Industries Inc.
  • 2. DEFINE Team Members TEAM LEADER Craig Lester – Continuous Improvement Manager TEAM MEMBERS *Michael Iverson - Engineering Manager *Bill D. - Maintenance Supervisor Cross Functional Core Team *Jim T. - Process Engineer *Wayne R. / Brenda P. - Quality Engineer *Jim A. / Ali A. - Production Supervisor *Manufacturing Associates
  • 3. DEFINE Define Problem Statement The Mack operation is not meeting Customer Demand for Delivery and Quality. Labor costs are excessive due to Overtime consumption. The Mack operation is NOT Balanced Labor is @ 150% of the quoted level Delivery is below forecast levels +/- 89%. Customer Quality is unsatisfactory – Repeat Rejections Changeovers are Lengthy and Costly Project Goals Reduce labor costs by 25% Improve OEE ratings by 25% Improve Line Balance Eliminate Customer Defects Reduce Internal Quality rejects Achieve Production Yield Goals SMED for Changeover Reduction
  • 4. MEASURE Op 10 AB - Process Measure Mack Job #2800 - Monthly Production Averages Op 10AB 18 16.9 16.4 16.116.5 16.5 16.5 16 14.4 14 14 12 10 8 % G o a f l 6 4 H A P d u o p g c e s a v r t . 2 0 April May June July Month Monthly Avg. Goal
  • 5. MEASURE Op 10 CD - Process Measure Mack Job #2800 - Monthly Production Averages Op 10CD 18 16 16 14.7 14.9 14.8 15 15 14 12.6 12.5 12 10 8 % G o a f l 6 4 H A P d u o p g c e s a v r t . 2 0 April May June July Month Monthly Avg. Goal
  • 6. MEASURE Op 20 AB - Process Measure Mack Job #2800 - Monthly Production Averages Op 20AB - 2 Operators 30 25.6 25 21 20 18.8 18.9 19 19 18 18 15 % G o a f l 10 H A P d u o p g c e s a v r t . 5 0 April May June July Month Monthly Avg. Goal
  • 7. MEASURE Op 20 A/B - Process Measure Mack Job #2800 - S.M.E.D. Apex Broach Changeover - Op# 20 9 8.5 8 7 6 5 5 4 4 3 m C T o g n h v e a r i 2.25 2 2 2 2 2 1 0 April May June July Month APEX Changeover Tim e goal
  • 8. MEASURE Op 30 / 40 - Process Measure Mack Job #2800 - Monthly Production Averages Op 30 Drill - Op40 Shape 20 18.8 18.9 18.0 19 19 18 18 18 16 14 14 12 10 % G o a 8 f l 6 4 H A P d u o p g c e s a v r t . 2 0 April May June July Month Monthly Avg. Goal
  • 9. ANALYZE Analysis – Downtime and Scrap
  • 10. ANALYZE Job #2800 – P/N 30KH430 Iverson Ind. Production Control Wapauca Weekly/Monthly Foundry. Daily Update – Release Email Days - Weekly Schedule Arvin Meritor Lead Daily Ship Schedule and Chg. Over Chg. Over Chg. Over Chg. Over Rough Turn – Op Finish Turn – Op 10C,D Slot Broach Op 20 Drill Op 30 10A,B Shape Op 40 Bulk Storage Cut Time (incl. Load) = Cut Time (incl. Load) = Cut Time (incl. Load) = Cut Time (incl. Load). = 150 sec 157 sec. 191 sec. 60 sec. Chg./O Time = 30 Chg./O Time = 30 Chg./O Time = 1hr Chg./O Time = 1hr – 4 hr min. min. – 4 hr Avg. Uptime = Avg. Uptime = Avg. Downtime = Avg. Uptime = Final Insp. Shipping 2 - 10 hr Shifts 2 – 10 hr Shifts 2 – 10hr Shifts 2 – 10hr Shifts 1 pc / pallet 127 100 191 70 40 90 120 90 sec sec sec sec sec sec sec sec 30 30 30 30 20 30 30 sec sec sec sec sec sec sec
  • 11. IMPROVE Improve Op 10 A/B/C/D Op 10 A/B Rough Turn Balance 10A and 10B cycle times by moving excess turning to the opposite operation to achieve balance. Revise and Retrain Operator Standards based upon a 100% target derived from actual cycle time. Measure and react to Downtime and First Time Quality negatives. Op 10 C/D Finish Turn Balance 10C and 10D cycle times by moving excess turning to the opposite operation to achieve balance. Revise and Retrain Operator Standards based upon a 100% target derived from actual cycle time. Measure and react to Downtime and First Time Quality negatives.
  • 12. IMPROVE Improve Op 20 A / B Op 20 A/B Broach – Throughput There is NO opportunity to improve operator efficiency without adding headcount. Temporarily add 1 to 2 per shift Follow Up project will pursue Material Handling Assistance to break this constraint and allow headcount reduction to 1. Op 20 A/B Broach – S.M.E.D. Changeover Reduction Phase 1 Project Start – Changeover averaged 8.5 hours at this Operation. End of Project – 3 subsequent Changeovers have been completed with 1st piece approval in 2.25 hours or less. A 73% Reduction
  • 13. IMPROVE Improve Op 30 Drill / Op 40 Shape Op 30 Drill / Op 40 Shape Throughput increased from 14 parts per hour to 18.8 parts per hour. A 34% Improvement Rewrite the program for the Mitsubishi Shaper to reduce Constraint cycle time. Completed w/ 50% Reduction. Op 30 Drill / Op 40 Shape – S.M.E.D. Changeover Reduction Phase 1 Project Start – Changeover averaged 3.6 hours at this Operation. End of Project – 2 subsequent Changeovers have been completed with 1st piece approval in 1.5 hours or less. A 42% Reduction Op 30 Drill / Op 40 Shape – Setup Scrap Reduction Phase 1 Project Start – Changeover averaged 3 pieces at setup at this Operation. End of Project – 2 subsequent Changeovers have been completed with 1st piece approval on the first part (Zero setup scrap).
  • 14. CONTROL Control – Control Plans, LPA's • Control Plans –The Mack Control Plans have been thoroughly reviewed and scrutinized in conjunction with PFMEA and Customer Feedback. All revisions have been completed through document control. Each Corrective Action (Internal / External) requires C.P. / PFMEA review. • Layered Process Audits Layered Audits are utilized to determine if Controls are adequate. Layered Audits are supported and driven by Executive Management Monthly Compliance Report - Layered Process Audit 120.0% 100.0% LPA 80.0% Implementation G o a 60.0% l 90.9% 96.3% 95.7% 89.2% 87.4% 40.0% 20.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% m % C A 0.0% p h n o y a e s t f l ' JAN FEB MAR APR MAY JUNE JUL AUG SEP OCT NOV DEC % OF C OMPLIAN C E: Goal Mack Truck
  • 15. CONTROL Control – Management Review • Management Review –The Mack project has been driven by weekly Management Review and Action Assignment Sessions. Example
  • 16. Project Summary • Problem –The Mack operation is not performing @ acceptable cost and / or performance levels. • Analysis and Solution – The Mack Line as a whole is not well balanced. Individual Operations are also imbalanced creating NVA wait time. Post and Coach updated Targets for maximum throughput. Re-Balance each operation to improve flow and throughput Re-write machine programs to reduce cycle time and eliminate dead air time with the tools. • Results and Business Benefit(s) – Op 10 A/B increased throughput 2.5 parts per hour or 17% _ Op 10 C/D increased throughput 2.3 parts per hour or 18% _ Op 20A/B – Decreased Changeover time by 73% (6.25 hours) _ Op 30 / 40 increased throughput by 4.9 parts per hour or 35%
  • 17. PROJECT SCORECARD Productivity Improvement Report Mack Line - Job # 2800 - P/N - 30KH 430 Parts Per Hour PPH April May June July August Change ∆ 10 AB Rough Turn 14.4 16.1 16.9 16.9 16.8 2.5 17.4% 10 CD Finish Turn 12.6 14.7 14.9 14.8 14.8 2.3 18.3% 20 AB Slot Broach 21 25.6 18.8 18.9 21 20 AB 3 Oper.s 44.0 44.0 44.0 44.0 30 Drill 14 18.0 18.8 18.9 19 4.9 35.0% 40 Shape 14.0 18.0 18.8 18.9 18.8 4.9 35.0% APEX Changeover Time 8.5 5 5 3.5 2.25 -6.25 -73.5% (Stick & Fixtures)