THE MANUFACTURE OF STEEL 
Steel refers to any iron-carbon alloy, although steels usually contain other elements as 
well. In New Zealand steel is made by BHP NZ at Glenbrook, where about 90% of New 
Zealand’s annual steel requirements are produced. 
Iron occurs mainly as oxide ores, though it is also found in smaller quantities as its sulfide 
and carbonate. These other ores are usually first roasted to convert them into the oxide. 
On a world scale the most important ore is haematite (Fe2O3), but in New Zealand the 
starting materials are magnetite (Fe3O4) and titanomagnetite (Fe2TiO4). The oxides are 
reduced with carbon from coal, through the intermediate production of carbon monoxide. 
The carbon initially burns in air to give carbon dioxide and the heat, which is necessary for 
the process. The carbon dioxide then undergoes an endothermic reaction with more 
carbon to yield carbon monoxide: 
C + O2 → CO2 ΔH = -393 kJ mol-1 
C + CO2 → 2CO ΔH = +171 kJ mol-1 
The oxide ores are then principally reduced by the carbon monoxide produced in this 
reaction, the reactions involving very small enthalpy changes: 
Fe2O3 + 3CO → 2Fe + 3CO2 ΔH = -22 kJ mol-1 
Fe3O4 + 4CO → 3Fe + 4CO2 ΔH = -10 kJ mol-1 
In conventional ironmaking this reduction occurs in a blast furnace, whereas in New 
Zealand a rotary kiln is employed for direct reduction, followed by indirect reduction in an 
electric melter. This technology is used because the titanium dioxide present in the ore 
produces a slag which blocks conventional blast furnaces as it has a high melting point. 
The iron produced in this way always contains high levels of impurities making it very 
brittle. Steel making is mainly concerned with the removal of these impurities. This is 
done by oxidising the elements concerned by blowing pure oxygen through a lance 
inserted into the molten alloy. The KOBM (Klockner Oxygen Blown Maxhutte) used for 
this in New Zealand is unusual because oxygen is also blown through holes in the base of 
the converter. The oxides produced are either evolved as gases, or combine with 
limestone to form an immiscible slag which floats on the surface of the liquid metal and so 
is easily separated. 
INTRODUCTION 
Steel is a term given to alloys containing a high proportion of iron with some carbon. Other 
alloying elements may also be present in varying proportions. The properties of steel are 
highly dependent on the proportions of alloying elements, so that their levels are closely 
controlled during its manufacture. The properties of steel also depend on the heat treatment 
of the metal. 
Steel is by far the most important metal, in tonnage terms, in the modern world, with the 
annual global production of over 700 million tonnes dwarfing the approximately 17 million 
tonnes of the next most prolific, aluminium. The low price and high strength of steel means 
that it is used structurally in many buildings and as sheet steel it is the major component of 
VIII-Metals-A-Steel-1
motor vehicles and domestic appliances. The major disadvantage of steel is that it will 
oxidise under moist conditions to form rust. A typical steel would have a density of about 7.7 
g cm-3 and a melting point of about 1650oC. 
The New Zealand production of about 650 000 tonnes per year at Glenbrook, 40 km south-west 
of Auckland, is minimal on a world scale, being less than 1% the output of the major 
producing countries. However, the two main stages in the production of steel in New 
Zealand are both unusual, making the overall process almost unique. New Zealand is also 
one of the few countries that has increased steel production over the last decade. Its current 
share of the domestic steel market is about 90%. 
THE MANUFACTURING PROCESS 
Iron ore is converted to steel via two main steps. The first involves the production of molten 
iron and the second is that of actual steel manufacture. The details of these steps are outlined 
below. 
Step 1 - The production of molten iron 
The Primary Concentrate is mixed with limestone and coal and heated. The iron oxides are 
reduced in the solid state to metallic iron, which then melts, and the impurities are removed 
either as slag or gas. The flow diagram for this process is shown in Figure 1. 
magnetic 
separator 
VIII-Metals-A-Steel-2 
slag 
CO and other gases 
electric 
melter 
volatile coal components 
CO2 and 
waste gases 
rotary kiln RPCC 
limestone 
multi-hearth 
furnaces 
devolatilised 
PC coal and PC 
impurities 
(e.g. sand, clay) 
Coal 
Ironsand 
Molten iron 
Figure 1 - The production of molten iron 
The multi-hearth furnaces 
There are four multi-hearth furnaces, each of which feeds a rotary kiln. The furnaces preheat 
the materials fed into the rotary kiln and reduce the amount of volatile matter present in the 
coal from about 44% to about 9%. This is important because the large volumes of gas 
produced during the emission of the volatile matter would otherwise interfere with the 
processes in the rotary kiln. 
There are 12 hearths in each furnace and the feedstock passes down through these. In the 
first three hearths, hot gases from the lower stages preheat the material in the absence of air 
to about 450oC. Air is introduced in hearths 4 to 9 to allow combustion of the volatile
material, so as to increase the temperature to about 650oC. The supply of air is adjusted to 
control the percentage of residual volatiles and coal char in the product. In the final hearths 
(10 - 12) the char and the primary concentrate equilibrate and the final temperature is 
adjusted to 620oC. The total residence time in the multi-hearth furnace is 30 - 40 minutes. 
The multi-hearth furnaces also have natural gas burners at various levels. These are used to 
restart the furnace after shutdown and to maintain the temperature if the supply of materials is 
interrupted. 
The waste gas from the multi-hearth furnace contains water vapour and other volatile 
compounds from the coal (e.g. carbon dioxide, carbon monoxide and other combustion 
products) as well as suspended coal and primary concentrate dust particles. These solids are 
removed and returned to the furnace. This gas along with gas from the melter (mainly carbon 
monoxide) is mixed with air and burnt. The heat so produced is used to raise steam for the 
production of electricity. As well as providing a valuable source of energy, this combustion 
of the waste gases is necessary to meet emission controls. 
The rotary kilns 
There are four rotary kilns. Here about 80% of the iron of the primary concentrate is reduced 
to metallic iron over a 12 hour period. The kilns are 65 m long and have a diameter of 4.6 m, 
closely resembling those used for cement production. 
The pre-heated coal char and primary concentrate from the furnaces is mixed with limestone 
and fed into the kiln. In the first third of the kiln, known as the pre-heating zone, the feed 
from the multi-hearth furnace is further heated to 900 - 1000oC. This increase in temperature 
is partly a result of the passage of hot gases from further along the kiln and partly a result of 
the combustion of the remaining volatile matter in the coal. 
The last two-thirds of the kiln is known as the reduction zone, and is where the solid iron 
oxides are reduced to metallic iron. In this region the air reacts with the carbon from the coal 
to produce carbon dioxide and heat: 
C + O2 → CO2 ΔH = -393 kJ mol-1 
The carbon dioxide then reacts with more carbon to produce carbon monoxide, the principal 
reductant, in an exothermic reaction: 
C + CO2 → 2CO ΔH = +171 kJ mol-1 
Some of the carbon monoxide burns with the oxygen to produce heat, whilst the remainder 
reduces the magnetite1 to iron in a reaction that is almost thermochemically neutral. 
2CO + O2 → 2CO2 ΔH = -564 kJ mol-1 
Fe3O4 + 4CO → 3Fe + 4CO2 ΔH = -10 kJ mol-1 
1Magnetite can be regarded as 1:1 combination of wustite (FeO) and haematite (Fe2O3). The separate 
VIII-Metals-A-Steel-3 
reduction processes from these two components are: 
FeO + CO → Fe + CO2 ΔH = -10 kJ mol-1 
Fe2O3 + 3CO → 2Fe + 3CO2 ΔH = -22kJ mol-1
In a similar manner the titanomagnetite is reduced to iron and titanium dioxide. The product 
from the kiln is known as Reduced Primary Concentrate and Char (RPCC) and is nearly 70% 
metallic iron. Unchanged ore, unburnt char, titanium oxide and coal ash accout for the rest of 
the mixture. This hot (950oC) mixture is then discharged to the melters. 
In this latter part of the kiln the temperatures can reach 1100oC. Higher temperatures would 
lead to an increase in the percentage reduction of the concentrate, but unfortunately they also 
produce accretions of solids on the walls of the kiln which reduce its efficiency and damage 
the refractory lining. 
Air is injected into the kiln at nine evenly spaced points along its length. In the kiln the 
limestone is converted to lime (calcium oxide) which then acts as a flux in the melters. The 
waste gases from the kiln are scrubbed to remove solids and burnt to remove any flammable 
compounds before being vented to the air. There are currently plans to use the energy from 
this process for the co-generation of electricity. 
The melters 
The hot reduced primary concentrate from the kilns is fed into two melters. These are about 
27 m by 12 m and hold a total charge of 1000 tonnes of iron and 900 tonnes of slag. Lime 
and primary concentrate may also be added to control the composition of liquid iron in the 
melter. The lime reacts predominantly with sulfur from the coal. Power is supplied by three 
continuously renewed carbon electrode pairs, which pass a large three-phase a.c. current 
through the contents of the melter. The potential difference across an electrode pair is 300 V 
and current is typically 60 kA. 
The temperature in the melters rises to 1500oC, and this causes the reduced primary 
concentrate to melt and form two layers. The lower layer is of molten iron with some 
elements, especially carbon, dissoved in it. The upper layer is liquid oxide slag and this 
supports the solid feed. During the melting process reduction of the remaining iron 
containing compounds occurs. The electrodes are immersed in the molten slag and, becasue 
its electrical resistance is much greater than that of iron, most of the heat is generated in this 
layer. 
One problem affecting the melters is that the refractory lining is subject to attack by the 
molten slag. In order to combat this, the solid feed in introduced around the perimeter of the 
melter to provide a protective barrier. The gas produced in the melter is mainly carbon 
monoxide and this presents both toxic and explosion hazards. It is recovered and burnt for 
co-generation of electricity. 
Molten iron and slag are both tapped periodically by drilling a hole through the refractory 
sidewalls at special tapping points, higher up for the slag and lower down on the opposite 
side for the molten iron. The slag from the melter is approximately 40% TiO2, 20% Al2O3, 
15% MgO, 10% CaO and 10% SiO2 with smaller amounts of sulfides and oxides of iron, 
manganese and vanadium. 
After cooling and the recovery of the metal trapped in it, the slag is sold. It is mainly used as 
a substitute for quarried rock in applications such as road construction. 
VIII-Metals-A-Steel-4
VIII-Metals-A-Steel-5 
vanadium 
recovery 
vanadium-rich slag 
O2 
O2 
KOBM 
process 
slag 
molten steel 
alloying element 
(if required) 
ladle 
treatment 
Molten iron 
Steel 
casting 
machine 
O2 
Argon 
Figure 2 - The steel making process 
Step 2 - Steel making 
The steel making process is shown in Figure 2. 
Vanadium recovery 
Before conversion into steel, vanadium is recovered from the molten iron. This is done 
firstly because of the value of the vanadium rich slag produced (15% vanadium as V2O5) and 
secondly because a high vanadium content can make the steel too hard. 
In the vanadium recovery unit a ladle containing 75 tonnes of molten iron has oxygen blown 
over the surface, where it oxidises silicon, titanium, manganese and vanadium to form a slag 
that floats on the surface. At the same time argon is blown through the molten metal to stir it. 
When the composition of the molten metal has reached the required vanadium specification, 
the slag is scraped off, cooled and crushed. 
Additional advantages of this pre-treatment are that it causes the molten metal to reheat, so 
permitting temperature control, and, if required, the procedure can be modified by the 
addition of lime to reduce sulfur levels. 
The Klockner Oxygen Blown Maxhutte process 
The KOBM steel making process, like most modern processes involves oxidising dissolved 
impurities by blowing oxygen through the molten metal. The KOBM is unusual in that it 
blows oxygen through the bottom of the furnace as well as through a lance inserted from the 
top. This type of furnace was selected for Glenbrook becasue of its capacity to cope with 
high levels of titanium and vanadium coupled with its very fast turn round time. The 
disadvantage of this type of furnace is that it is technically rather more complex than those 
that are blown only by a lance. 
The KOBM is initially charged with about 6 tonnes of scrap steel. 70 tonnes of molten metal 
from the vanadium recovery unit is then added. Oxygen is then blown through six holes in 
the base of the furnace, at a total rate of about 1500 litres per second. Oxygen is also blown 
through a lance inserted from the top of the furnace at a rate of over 2500 litres per second.
The oxygen oxidises the elements other than iron (including any free carbon) to their oxides. 
In this way contaminants are removed as the oxides form a slag which floats on the surface of 
the molten metal. Powdered lime is blown in to help with slag formation and this particularly 
reduces the levels of sulfur and phosphorous by combining with their acidic oxides. Due to 
its low melting point, iron(II) sulfide (FeS) is particularly harmful to the high temperature 
properties of steel. So sulfur level must be reduced before further processing. Typical levels 
of the major elements in the metal fed into the furnace and in a typical steel are shown in 
Table 1. 
Table 1 - Compositions of steel and the metal from which it is made 
VIII-Metals-A-Steel-6 
C S P Ti Si V 
Hot metal 3% 
0.04% 
0.07% 
0.8% 
0.08% 
0.3% 
Steel 0.03% 
0.02% 
0.01% 
nil 
nil 
0.005% 
The molten iron is analysed just before being added to the furnace and the temperature taken. 
This determines the length of the oxygen blow and it also to a certain extent affects the 
amount and composition of the scrap added. The length of the oxygen blow required is also 
judged by moitoring the CO:CO2 ration in the gases from the furnace. Blow times vary, but 
15 minutes would be typical. During the oxygen blow the temperature would typically rise 
from 1500oC to 1700oC owing to the exothermic reactions that are occuring. 
The slag is firstly tipped off and, after cooling, it is broken up so that the iron trapped in it 
can be recovered magnetically. The slag, which contains sulfur and phosphorous and has a 
high lime content, is then sold for agricultural use. Aluminium, which removes excess 
dissolved oxygen, and alloying materials, such as ferro-silicon and ferro-manganese (which 
increase the hardness of the steel) are added at this point so that they are well mixed as the 
molten metal is tipped into a ladle. The whole cycle in the KOBM takes about 30 minutes. 
The Glenbrook site also has an electric arc furnace for steel making, the feed for this being 
mainly scrap steel. The cycle time for the final charge of 75 tonne is about 3½ hours, so that 
is is only responsible for a small fraction of the total steel production. It is, however, a very 
flexible process and it may be economically used to produce small batches of specialised 
steel. 
Ladle treatment 
The final stage of steel making is the ladle treatment. This is when fine adjustments are made 
to bring the composition of the molten steel, from either furnace, into line with the required 
composition. The bulk of the alloying elements are added in the furnace and, after blowing 
argon hrough the molten metal to ensure homogeneity, the temperature is measured and a 
sample removed for analysis after stirring. The analysis by optical emission spectrometry, 
which measures the levels of 15 elements, takes about five minutes. Alloying materials are 
added to adjust the composition. If the metal requires cooling, scrap steel is added. If the 
temperature is too low, aluminium is added and oxygen blown through. When all 
adjustments are complete argon is blown through once again to ensure mixing and the ladle 
taken to the continuous casting machine. Here it is cast into slabs of 210 mm thickness and a 
width of between 800 and 1550 mm. This slab is cut into lengths of from 4.5 m to 10 m and 
sent for further processing. Most of the production is converted to steel coil.
ANCILLARY PROCESSES 
The major ancillary processes carried out by the plant involve the supply of raw materials, 
the processing of waste and the production of electricity. Even though waste heat is used to 
co-generate electricity on site, this only amounts to about 12½% of total consumption, so 
large amounts of electricity are purchased. Natural gas is also used as a minor energy source 
and this is brought to the site from Taranaki through a pipeline. 
Iron primary concentrate mining 
This is obtained from the ironsand mine at Waikato North Head and is a mixture of magnetite 
(Fe3O4) and titanomagnetite (Fe2TiO4), and is thought to originate from the volcanic 
eruptions of Mt. Taranaki. It is mined by standard open cast methods and suspended as an 
aqueous slurry. The ironsand is a low grade ore, with sand and clay being the major 
impurities. The concentrated material typically contains 58% iron (i.e. 80% Fe3O4), 8% TiO, 
4% Al2O3, 3½% SiO2 and 3% MgO by mass with smaller quantites of calcium, phophorous 
and sulfur. Initial separation is effected by magnetic separators which rely on the magnetic 
properties of magnetite and tintanomagnetite. Further concentration is then achieved by 
gravity separators because these minerals are denser than most impurities. The slurry is then 
pumped though a 21 km long, 200 mm diameter pipeline to Glenbrook at a rate of 300 tonnes 
per hour. Here it is dewatered to a moisture level of ca. 5% and discharged onto a stockpile. 
Annual production of this material, known as Primary Concentrate (PC), is about 1.2 million 
tonnes. 
Coal preparation 
This is sub-bituminous B and C grade mined by both open cast and underground methods at 
Huntly. The annual consumption of 750 000 tonnes per year is delivered by rail to 
Glenbrook. Here it is stored on a stockpile and then blended with primary concentrate as the 
feedstock for the multihearth furnaces. The aim of the blending is to achieve a consistent 
carbon-iron ratio. 
Scrap steel recycling 
Much of the scrap steel used is waste from the production process. Steel is also purchased 
from scrap metal dealers, though it must be free from copper which is difficult to remove 
from molten steel and adversely affects its properties. The scrap steel is sorted into different 
grades according to alloy content. 
Limestone mining 
This is mined near Otorohanga. Limestone chip is blended with the coal and primary 
concentrate to help form a slag in the reduction of the iron oxide. Some is also supplied in 
the form of lime (calcium oxide) for use in steel making. 
Oxygen production 
This is manufactured by the fractional distillation of liquid air, which also produces nitrogen 
and argon. About 4000 m3 of oxygen is consumed for each 75 tonne load of steel, giving an 
annual consumption of about 75 000 tonnes. Some of the nitrogen and argon is used in 
steelmaking. The excess liquid nitrogen is sold for freeze drying foods and the excess argon 
is mainly sold for use as a gas shield for welding processes. 
VIII-Metals-A-Steel-7
Electricity 
The total annual consumption of electricity is 1000 GWh, the typical power demand being 
130 MW. This is purchased from Electrocorp and brought to the site through overhead 
power lines operating at 110 kV. 
The waste gases from various processes, particularly the multi-hearth furnaces and the melter 
are burnt to raise steam in four boilers. The steam is used to power two turbines each rated at 
18 MW, which produce 12½ % of the electricity needed by the plant. 
In the near future the on site generation of electrical power is to be considerably expanded 
and greater use made of waste gases from the rotary kilns. This will enable the plant to 
produce over half the total electrical power consumed. 
THE ROLE OF THE LABORATORY 
In general the laboratory is responsible for quality control of the various stages of production 
and of the end product. The laboratory uses optical emission spectroscopy2 to determine the 
sample composition of the molten metal in the melter, vanadium recovery unit, K.O.B.M. 
unit and casting machine and during the ladle treatment stage. The levels of carbon, silicon, 
manganese, tin, vanadium, sulfur, phosphorus, aluminium and nitrogen are closely 
monitored. The test only takes four minutes, enabling operators to adjust process parameters 
on the basis of test reports before problems become serious. 
The nitrogen content in steel can also be found by heating the steel in a helium flushed 
electric furnace. As the temperature increases any nitrogen in the sample comes off and 
mixes with the helium carrier gas. The gas mixture is analysed by a thermal conductivity cell 
at the gas outlet. 
Samples of ironsand and slag are analysed with X-ray fluorescence spectroscopy. The slag 
samples are fused with boron before testing. 
The laboratory is also involved in daily testing of effluent water to ensure that all water 
released into the environment is safe. 
ENVIRONMENTAL IMPLICATIONS 
Due to the nature of the steel making process, large amounts of solid, liquid and gaseous 
wastes are generated in the steel plant. Careful planning is necessary to ensure that these do 
not have a negative impact on the environment. 
2Optical emission spectrometry is also called atomic emission spectroscopy and is described in the sewage 
treatment article. 
VIII-Metals-A-Steel-8
The steel mill requires 1.2 to 1.4 million tonnes of ironsand each year, which means that up 
to 10 million tonnes of pure sand must be mined. The non-magnetic sand is returned to the 
area from which it was mined, and marram grass and radiata pines planted to stabilise the 
deposits. 
Wet scrubbers and baghouses are the principal means of controlling air pollution. The wet 
scrubbers (see oil refining article) wash the dust out of the hot process waste gases which 
result from iron and steel making while the cloth bags inside a baghouse filter dust out of the 
gas. The dust collection system is shared by the steel production and steel processing 
sections, and collects a total of between five and ten tonnes of dust every hour. 
Extensive water recycling is used in the plant to minimise the quantity of waste water 
produced, and all waste water and stormwater is treated in settling ponds on site before being 
discharged into the Waiuku Estuary. 
Article written by John Green (Kristin School) and Jeremy Batchelor (BHP NZ Steel) with 
additions by David Yuen following a visit to BHP NZ Steel. 
VIII-Metals-A-Steel-9

More Related Content

What's hot

Metallurgical coke
Metallurgical cokeMetallurgical coke
Metallurgical cokeKhhushbakht
 
coke and metallurgical coal
coke and metallurgical coalcoke and metallurgical coal
coke and metallurgical coalknowledge1995
 
Iron making
Iron makingIron making
Iron makingguddu_92
 
Fuels & fueling methods used in the blast furnace
Fuels & fueling methods used in the blast furnaceFuels & fueling methods used in the blast furnace
Fuels & fueling methods used in the blast furnaceAbhijeet Singh
 
Blast furnace
Blast furnaceBlast furnace
Blast furnaceMD Raza
 
blast furnace, done by ahan m r , delhi public school bangalore
  blast furnace, done by ahan m r , delhi public school bangalore  blast furnace, done by ahan m r , delhi public school bangalore
blast furnace, done by ahan m r , delhi public school bangaloreAhan M R
 
Removal of impurities in steel making
Removal of impurities in steel makingRemoval of impurities in steel making
Removal of impurities in steel makingaravindmme
 
Corex Process in Iron Making
Corex Process in Iron MakingCorex Process in Iron Making
Corex Process in Iron MakingAditya Singh
 
Manufacturing of steel
Manufacturing of steelManufacturing of steel
Manufacturing of steelCholan PK
 
Fundamentals of Stainless steel melting
Fundamentals of Stainless steel melting Fundamentals of Stainless steel melting
Fundamentals of Stainless steel melting Amartya Talukdar
 
PERUMIN 31: Pyrometallurgical Processing Technologies for Treating High Arsen...
PERUMIN 31: Pyrometallurgical Processing Technologies for Treating High Arsen...PERUMIN 31: Pyrometallurgical Processing Technologies for Treating High Arsen...
PERUMIN 31: Pyrometallurgical Processing Technologies for Treating High Arsen...PERUMIN - Convención Minera
 
blast-furnace-and-basic-oxygen-process
 blast-furnace-and-basic-oxygen-process blast-furnace-and-basic-oxygen-process
blast-furnace-and-basic-oxygen-processAchmad Shofi
 
Secondary steel making
Secondary steel makingSecondary steel making
Secondary steel makingLài Trần
 
Production of iron and steel
Production of iron and steelProduction of iron and steel
Production of iron and steeltemkin abdlkader
 

What's hot (20)

Metallurgical coke
Metallurgical cokeMetallurgical coke
Metallurgical coke
 
coke and metallurgical coal
coke and metallurgical coalcoke and metallurgical coal
coke and metallurgical coal
 
Lec Smelting Of Iron
Lec  Smelting Of IronLec  Smelting Of Iron
Lec Smelting Of Iron
 
Iron making
Iron makingIron making
Iron making
 
Fuels & fueling methods used in the blast furnace
Fuels & fueling methods used in the blast furnaceFuels & fueling methods used in the blast furnace
Fuels & fueling methods used in the blast furnace
 
Blast furnace
Blast furnaceBlast furnace
Blast furnace
 
blast furnace, done by ahan m r , delhi public school bangalore
  blast furnace, done by ahan m r , delhi public school bangalore  blast furnace, done by ahan m r , delhi public school bangalore
blast furnace, done by ahan m r , delhi public school bangalore
 
Removal of impurities in steel making
Removal of impurities in steel makingRemoval of impurities in steel making
Removal of impurities in steel making
 
Corex Process in Iron Making
Corex Process in Iron MakingCorex Process in Iron Making
Corex Process in Iron Making
 
Sponge iron making process
Sponge iron making processSponge iron making process
Sponge iron making process
 
Blast furnace
Blast furnaceBlast furnace
Blast furnace
 
Reduction of skull in the ladle
Reduction of skull in the ladleReduction of skull in the ladle
Reduction of skull in the ladle
 
Manufacturing of steel
Manufacturing of steelManufacturing of steel
Manufacturing of steel
 
Midrex shaft process
Midrex shaft processMidrex shaft process
Midrex shaft process
 
Fundamentals of Stainless steel melting
Fundamentals of Stainless steel melting Fundamentals of Stainless steel melting
Fundamentals of Stainless steel melting
 
Steel Making: Lecture AOD
Steel Making: Lecture AOD Steel Making: Lecture AOD
Steel Making: Lecture AOD
 
PERUMIN 31: Pyrometallurgical Processing Technologies for Treating High Arsen...
PERUMIN 31: Pyrometallurgical Processing Technologies for Treating High Arsen...PERUMIN 31: Pyrometallurgical Processing Technologies for Treating High Arsen...
PERUMIN 31: Pyrometallurgical Processing Technologies for Treating High Arsen...
 
blast-furnace-and-basic-oxygen-process
 blast-furnace-and-basic-oxygen-process blast-furnace-and-basic-oxygen-process
blast-furnace-and-basic-oxygen-process
 
Secondary steel making
Secondary steel makingSecondary steel making
Secondary steel making
 
Production of iron and steel
Production of iron and steelProduction of iron and steel
Production of iron and steel
 

Viewers also liked

Soccnx III - Measure, reward , enhance: leverage user adoption with gamification
Soccnx III - Measure, reward , enhance: leverage user adoption with gamificationSoccnx III - Measure, reward , enhance: leverage user adoption with gamification
Soccnx III - Measure, reward , enhance: leverage user adoption with gamificationLetsConnect
 
MCD Outdoor Advertisement Policy
MCD Outdoor Advertisement PolicyMCD Outdoor Advertisement Policy
MCD Outdoor Advertisement PolicyJaspal Singh
 
Proiectare, prelucrare și control, integrate. Noutăți DELCAM 2013
Proiectare, prelucrare și control, integrate. Noutăți DELCAM 2013Proiectare, prelucrare și control, integrate. Noutăți DELCAM 2013
Proiectare, prelucrare și control, integrate. Noutăți DELCAM 2013ttehnologie
 
soalan Bm 2 semester 2 2013
soalan Bm 2 semester 2 2013soalan Bm 2 semester 2 2013
soalan Bm 2 semester 2 2013Shika Nara
 
MotoCalc
MotoCalcMotoCalc
MotoCalcWooFoo
 
培训第一周
培训第一周培训第一周
培训第一周SDtoo
 
2009 q3 md&a & interim financial statements
2009 q3 md&a & interim financial statements2009 q3 md&a & interim financial statements
2009 q3 md&a & interim financial statementsProphecy Corp
 
Bmr tendinte moderne in piata muncii din domeniul ingineriei in automotive
Bmr tendinte moderne in piata muncii din domeniul ingineriei in automotiveBmr tendinte moderne in piata muncii din domeniul ingineriei in automotive
Bmr tendinte moderne in piata muncii din domeniul ingineriei in automotivettehnologie
 
2008 Q3 interim financial statements
2008 Q3 interim financial statements2008 Q3 interim financial statements
2008 Q3 interim financial statementsProphecy Corp
 
Iq' rum buku tulis
Iq' rum buku tulisIq' rum buku tulis
Iq' rum buku tulisShika Nara
 
드림트리 현장교육슬라이드 (공유용 앞부분)
드림트리 현장교육슬라이드 (공유용 앞부분)드림트리 현장교육슬라이드 (공유용 앞부분)
드림트리 현장교육슬라이드 (공유용 앞부분)Yun Jeong Jang
 
Webpage announcement v-no_june
Webpage announcement v-no_juneWebpage announcement v-no_june
Webpage announcement v-no_junemjhjason
 
Chandgana Presentation
Chandgana PresentationChandgana Presentation
Chandgana PresentationProphecy Corp
 
გიორგი კორნაპელი
გიორგი კორნაპელიგიორგი კორნაპელი
გიორგი კორნაპელიNino Chipashvili
 
2008 annual audited financial statements
2008 annual audited financial statements2008 annual audited financial statements
2008 annual audited financial statementsProphecy Corp
 

Viewers also liked (20)

Soccnx III - Measure, reward , enhance: leverage user adoption with gamification
Soccnx III - Measure, reward , enhance: leverage user adoption with gamificationSoccnx III - Measure, reward , enhance: leverage user adoption with gamification
Soccnx III - Measure, reward , enhance: leverage user adoption with gamification
 
MCD Outdoor Advertisement Policy
MCD Outdoor Advertisement PolicyMCD Outdoor Advertisement Policy
MCD Outdoor Advertisement Policy
 
Proiectare, prelucrare și control, integrate. Noutăți DELCAM 2013
Proiectare, prelucrare și control, integrate. Noutăți DELCAM 2013Proiectare, prelucrare și control, integrate. Noutăți DELCAM 2013
Proiectare, prelucrare și control, integrate. Noutăți DELCAM 2013
 
soalan Bm 2 semester 2 2013
soalan Bm 2 semester 2 2013soalan Bm 2 semester 2 2013
soalan Bm 2 semester 2 2013
 
MotoCalc
MotoCalcMotoCalc
MotoCalc
 
培训第一周
培训第一周培训第一周
培训第一周
 
2007 Q1 md&a
2007 Q1 md&a2007 Q1 md&a
2007 Q1 md&a
 
2009 q3 md&a & interim financial statements
2009 q3 md&a & interim financial statements2009 q3 md&a & interim financial statements
2009 q3 md&a & interim financial statements
 
Bmr tendinte moderne in piata muncii din domeniul ingineriei in automotive
Bmr tendinte moderne in piata muncii din domeniul ingineriei in automotiveBmr tendinte moderne in piata muncii din domeniul ingineriei in automotive
Bmr tendinte moderne in piata muncii din domeniul ingineriei in automotive
 
2008 Q3 interim financial statements
2008 Q3 interim financial statements2008 Q3 interim financial statements
2008 Q3 interim financial statements
 
Iq' rum buku tulis
Iq' rum buku tulisIq' rum buku tulis
Iq' rum buku tulis
 
드림트리 현장교육슬라이드 (공유용 앞부분)
드림트리 현장교육슬라이드 (공유용 앞부분)드림트리 현장교육슬라이드 (공유용 앞부분)
드림트리 현장교육슬라이드 (공유용 앞부분)
 
2008 Q3 md&a
2008 Q3 md&a2008 Q3 md&a
2008 Q3 md&a
 
Webpage announcement v-no_june
Webpage announcement v-no_juneWebpage announcement v-no_june
Webpage announcement v-no_june
 
2009 Q1 md&a
2009 Q1 md&a2009 Q1 md&a
2009 Q1 md&a
 
power point musicaid
power point musicaidpower point musicaid
power point musicaid
 
Manns music #3 -rev. 3-11-14
Manns music #3 -rev. 3-11-14Manns music #3 -rev. 3-11-14
Manns music #3 -rev. 3-11-14
 
Chandgana Presentation
Chandgana PresentationChandgana Presentation
Chandgana Presentation
 
გიორგი კორნაპელი
გიორგი კორნაპელიგიორგი კორნაპელი
გიორგი კორნაპელი
 
2008 annual audited financial statements
2008 annual audited financial statements2008 annual audited financial statements
2008 annual audited financial statements
 

Similar to Manu

Ppt_on_steel_making.ppt
Ppt_on_steel_making.pptPpt_on_steel_making.ppt
Ppt_on_steel_making.pptkayow1
 
Stainless steel making.pptx
Stainless steel making.pptxStainless steel making.pptx
Stainless steel making.pptxGirishRoy3
 
Manufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggyManufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggyteddiyfentaw
 
Chapter 7 - Coal.pptx
Chapter 7 - Coal.pptxChapter 7 - Coal.pptx
Chapter 7 - Coal.pptxAkramMusa5
 
Industrial chemistry
Industrial chemistryIndustrial chemistry
Industrial chemistrycartlidge
 
Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02Cleophas Rwemera
 
Chapter 2: Ferrous Material
Chapter 2: Ferrous MaterialChapter 2: Ferrous Material
Chapter 2: Ferrous Materialsyar 2604
 
Iron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptxIron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptx029DevendraKumarSing
 
Final Design Report Steelmaking
Final Design Report SteelmakingFinal Design Report Steelmaking
Final Design Report SteelmakingDevin Rowe
 
Blast furnace fuel.pptxhbgggjjiiikkkkkkkkk
Blast furnace fuel.pptxhbgggjjiiikkkkkkkkkBlast furnace fuel.pptxhbgggjjiiikkkkkkkkk
Blast furnace fuel.pptxhbgggjjiiikkkkkkkkkshesadebmahanta1
 
Products from rocks (summary of the AQA module)
Products from rocks (summary of the AQA module)Products from rocks (summary of the AQA module)
Products from rocks (summary of the AQA module)dhmcmillan
 
A VOCATIONAL TRAINNING REPORT_aman
A  VOCATIONAL TRAINNING REPORT_amanA  VOCATIONAL TRAINNING REPORT_aman
A VOCATIONAL TRAINNING REPORT_amanAMAN KESARI
 
OVERVIEW OF STEEL PLANT AND STEEL MANUFACTURING
OVERVIEW OF STEEL PLANT AND STEEL MANUFACTURINGOVERVIEW OF STEEL PLANT AND STEEL MANUFACTURING
OVERVIEW OF STEEL PLANT AND STEEL MANUFACTURINGAbhishek Saha
 
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...029DevendraKumarSing
 
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjjSteel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjjteddiyfentaw
 

Similar to Manu (20)

Ppt_on_steel_making.ppt
Ppt_on_steel_making.pptPpt_on_steel_making.ppt
Ppt_on_steel_making.ppt
 
Iron.steel
Iron.steelIron.steel
Iron.steel
 
Stainless steel making.pptx
Stainless steel making.pptxStainless steel making.pptx
Stainless steel making.pptx
 
Manufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggyManufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggy
 
Bos
BosBos
Bos
 
Chapter 7 - Coal.pptx
Chapter 7 - Coal.pptxChapter 7 - Coal.pptx
Chapter 7 - Coal.pptx
 
Industrial chemistry
Industrial chemistryIndustrial chemistry
Industrial chemistry
 
Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02
 
Chapter 2: Ferrous Material
Chapter 2: Ferrous MaterialChapter 2: Ferrous Material
Chapter 2: Ferrous Material
 
Electric arc furnace
Electric arc furnaceElectric arc furnace
Electric arc furnace
 
Iron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptxIron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptx
 
Final Design Report Steelmaking
Final Design Report SteelmakingFinal Design Report Steelmaking
Final Design Report Steelmaking
 
Blast furnace fuel.pptxhbgggjjiiikkkkkkkkk
Blast furnace fuel.pptxhbgggjjiiikkkkkkkkkBlast furnace fuel.pptxhbgggjjiiikkkkkkkkk
Blast furnace fuel.pptxhbgggjjiiikkkkkkkkk
 
Chapter2 (JF302)
Chapter2 (JF302)Chapter2 (JF302)
Chapter2 (JF302)
 
lECTURE 1.ppt
lECTURE 1.pptlECTURE 1.ppt
lECTURE 1.ppt
 
Products from rocks (summary of the AQA module)
Products from rocks (summary of the AQA module)Products from rocks (summary of the AQA module)
Products from rocks (summary of the AQA module)
 
A VOCATIONAL TRAINNING REPORT_aman
A  VOCATIONAL TRAINNING REPORT_amanA  VOCATIONAL TRAINNING REPORT_aman
A VOCATIONAL TRAINNING REPORT_aman
 
OVERVIEW OF STEEL PLANT AND STEEL MANUFACTURING
OVERVIEW OF STEEL PLANT AND STEEL MANUFACTURINGOVERVIEW OF STEEL PLANT AND STEEL MANUFACTURING
OVERVIEW OF STEEL PLANT AND STEEL MANUFACTURING
 
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
 
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjjSteel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjj
 

Recently uploaded

➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...amitlee9823
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationZenSeloveres
 
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLHingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLNitya salvi
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja Nehwal
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...RitikaRoy32
 
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )gajnagarg
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja Nehwal
 
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...amitlee9823
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service AvailableCall Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service AvailableNitya salvi
 
Vip Mumbai Call Girls Borivali Call On 9920725232 With Body to body massage w...
Vip Mumbai Call Girls Borivali Call On 9920725232 With Body to body massage w...Vip Mumbai Call Girls Borivali Call On 9920725232 With Body to body massage w...
Vip Mumbai Call Girls Borivali Call On 9920725232 With Body to body massage w...amitlee9823
 
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024Ilham Brata
 
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...amitlee9823
 
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.Nitya salvi
 
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men 🔝dehradun🔝 Escor...
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men  🔝dehradun🔝   Escor...➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men  🔝dehradun🔝   Escor...
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men 🔝dehradun🔝 Escor...amitlee9823
 
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...Nitya salvi
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Servicemeghakumariji156
 

Recently uploaded (20)

➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLHingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
 
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service AvailableCall Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
 
Vip Mumbai Call Girls Borivali Call On 9920725232 With Body to body massage w...
Vip Mumbai Call Girls Borivali Call On 9920725232 With Body to body massage w...Vip Mumbai Call Girls Borivali Call On 9920725232 With Body to body massage w...
Vip Mumbai Call Girls Borivali Call On 9920725232 With Body to body massage w...
 
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024
 
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
 
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
 
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men 🔝dehradun🔝 Escor...
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men  🔝dehradun🔝   Escor...➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men  🔝dehradun🔝   Escor...
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men 🔝dehradun🔝 Escor...
 
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 

Manu

  • 1. THE MANUFACTURE OF STEEL Steel refers to any iron-carbon alloy, although steels usually contain other elements as well. In New Zealand steel is made by BHP NZ at Glenbrook, where about 90% of New Zealand’s annual steel requirements are produced. Iron occurs mainly as oxide ores, though it is also found in smaller quantities as its sulfide and carbonate. These other ores are usually first roasted to convert them into the oxide. On a world scale the most important ore is haematite (Fe2O3), but in New Zealand the starting materials are magnetite (Fe3O4) and titanomagnetite (Fe2TiO4). The oxides are reduced with carbon from coal, through the intermediate production of carbon monoxide. The carbon initially burns in air to give carbon dioxide and the heat, which is necessary for the process. The carbon dioxide then undergoes an endothermic reaction with more carbon to yield carbon monoxide: C + O2 → CO2 ΔH = -393 kJ mol-1 C + CO2 → 2CO ΔH = +171 kJ mol-1 The oxide ores are then principally reduced by the carbon monoxide produced in this reaction, the reactions involving very small enthalpy changes: Fe2O3 + 3CO → 2Fe + 3CO2 ΔH = -22 kJ mol-1 Fe3O4 + 4CO → 3Fe + 4CO2 ΔH = -10 kJ mol-1 In conventional ironmaking this reduction occurs in a blast furnace, whereas in New Zealand a rotary kiln is employed for direct reduction, followed by indirect reduction in an electric melter. This technology is used because the titanium dioxide present in the ore produces a slag which blocks conventional blast furnaces as it has a high melting point. The iron produced in this way always contains high levels of impurities making it very brittle. Steel making is mainly concerned with the removal of these impurities. This is done by oxidising the elements concerned by blowing pure oxygen through a lance inserted into the molten alloy. The KOBM (Klockner Oxygen Blown Maxhutte) used for this in New Zealand is unusual because oxygen is also blown through holes in the base of the converter. The oxides produced are either evolved as gases, or combine with limestone to form an immiscible slag which floats on the surface of the liquid metal and so is easily separated. INTRODUCTION Steel is a term given to alloys containing a high proportion of iron with some carbon. Other alloying elements may also be present in varying proportions. The properties of steel are highly dependent on the proportions of alloying elements, so that their levels are closely controlled during its manufacture. The properties of steel also depend on the heat treatment of the metal. Steel is by far the most important metal, in tonnage terms, in the modern world, with the annual global production of over 700 million tonnes dwarfing the approximately 17 million tonnes of the next most prolific, aluminium. The low price and high strength of steel means that it is used structurally in many buildings and as sheet steel it is the major component of VIII-Metals-A-Steel-1
  • 2. motor vehicles and domestic appliances. The major disadvantage of steel is that it will oxidise under moist conditions to form rust. A typical steel would have a density of about 7.7 g cm-3 and a melting point of about 1650oC. The New Zealand production of about 650 000 tonnes per year at Glenbrook, 40 km south-west of Auckland, is minimal on a world scale, being less than 1% the output of the major producing countries. However, the two main stages in the production of steel in New Zealand are both unusual, making the overall process almost unique. New Zealand is also one of the few countries that has increased steel production over the last decade. Its current share of the domestic steel market is about 90%. THE MANUFACTURING PROCESS Iron ore is converted to steel via two main steps. The first involves the production of molten iron and the second is that of actual steel manufacture. The details of these steps are outlined below. Step 1 - The production of molten iron The Primary Concentrate is mixed with limestone and coal and heated. The iron oxides are reduced in the solid state to metallic iron, which then melts, and the impurities are removed either as slag or gas. The flow diagram for this process is shown in Figure 1. magnetic separator VIII-Metals-A-Steel-2 slag CO and other gases electric melter volatile coal components CO2 and waste gases rotary kiln RPCC limestone multi-hearth furnaces devolatilised PC coal and PC impurities (e.g. sand, clay) Coal Ironsand Molten iron Figure 1 - The production of molten iron The multi-hearth furnaces There are four multi-hearth furnaces, each of which feeds a rotary kiln. The furnaces preheat the materials fed into the rotary kiln and reduce the amount of volatile matter present in the coal from about 44% to about 9%. This is important because the large volumes of gas produced during the emission of the volatile matter would otherwise interfere with the processes in the rotary kiln. There are 12 hearths in each furnace and the feedstock passes down through these. In the first three hearths, hot gases from the lower stages preheat the material in the absence of air to about 450oC. Air is introduced in hearths 4 to 9 to allow combustion of the volatile
  • 3. material, so as to increase the temperature to about 650oC. The supply of air is adjusted to control the percentage of residual volatiles and coal char in the product. In the final hearths (10 - 12) the char and the primary concentrate equilibrate and the final temperature is adjusted to 620oC. The total residence time in the multi-hearth furnace is 30 - 40 minutes. The multi-hearth furnaces also have natural gas burners at various levels. These are used to restart the furnace after shutdown and to maintain the temperature if the supply of materials is interrupted. The waste gas from the multi-hearth furnace contains water vapour and other volatile compounds from the coal (e.g. carbon dioxide, carbon monoxide and other combustion products) as well as suspended coal and primary concentrate dust particles. These solids are removed and returned to the furnace. This gas along with gas from the melter (mainly carbon monoxide) is mixed with air and burnt. The heat so produced is used to raise steam for the production of electricity. As well as providing a valuable source of energy, this combustion of the waste gases is necessary to meet emission controls. The rotary kilns There are four rotary kilns. Here about 80% of the iron of the primary concentrate is reduced to metallic iron over a 12 hour period. The kilns are 65 m long and have a diameter of 4.6 m, closely resembling those used for cement production. The pre-heated coal char and primary concentrate from the furnaces is mixed with limestone and fed into the kiln. In the first third of the kiln, known as the pre-heating zone, the feed from the multi-hearth furnace is further heated to 900 - 1000oC. This increase in temperature is partly a result of the passage of hot gases from further along the kiln and partly a result of the combustion of the remaining volatile matter in the coal. The last two-thirds of the kiln is known as the reduction zone, and is where the solid iron oxides are reduced to metallic iron. In this region the air reacts with the carbon from the coal to produce carbon dioxide and heat: C + O2 → CO2 ΔH = -393 kJ mol-1 The carbon dioxide then reacts with more carbon to produce carbon monoxide, the principal reductant, in an exothermic reaction: C + CO2 → 2CO ΔH = +171 kJ mol-1 Some of the carbon monoxide burns with the oxygen to produce heat, whilst the remainder reduces the magnetite1 to iron in a reaction that is almost thermochemically neutral. 2CO + O2 → 2CO2 ΔH = -564 kJ mol-1 Fe3O4 + 4CO → 3Fe + 4CO2 ΔH = -10 kJ mol-1 1Magnetite can be regarded as 1:1 combination of wustite (FeO) and haematite (Fe2O3). The separate VIII-Metals-A-Steel-3 reduction processes from these two components are: FeO + CO → Fe + CO2 ΔH = -10 kJ mol-1 Fe2O3 + 3CO → 2Fe + 3CO2 ΔH = -22kJ mol-1
  • 4. In a similar manner the titanomagnetite is reduced to iron and titanium dioxide. The product from the kiln is known as Reduced Primary Concentrate and Char (RPCC) and is nearly 70% metallic iron. Unchanged ore, unburnt char, titanium oxide and coal ash accout for the rest of the mixture. This hot (950oC) mixture is then discharged to the melters. In this latter part of the kiln the temperatures can reach 1100oC. Higher temperatures would lead to an increase in the percentage reduction of the concentrate, but unfortunately they also produce accretions of solids on the walls of the kiln which reduce its efficiency and damage the refractory lining. Air is injected into the kiln at nine evenly spaced points along its length. In the kiln the limestone is converted to lime (calcium oxide) which then acts as a flux in the melters. The waste gases from the kiln are scrubbed to remove solids and burnt to remove any flammable compounds before being vented to the air. There are currently plans to use the energy from this process for the co-generation of electricity. The melters The hot reduced primary concentrate from the kilns is fed into two melters. These are about 27 m by 12 m and hold a total charge of 1000 tonnes of iron and 900 tonnes of slag. Lime and primary concentrate may also be added to control the composition of liquid iron in the melter. The lime reacts predominantly with sulfur from the coal. Power is supplied by three continuously renewed carbon electrode pairs, which pass a large three-phase a.c. current through the contents of the melter. The potential difference across an electrode pair is 300 V and current is typically 60 kA. The temperature in the melters rises to 1500oC, and this causes the reduced primary concentrate to melt and form two layers. The lower layer is of molten iron with some elements, especially carbon, dissoved in it. The upper layer is liquid oxide slag and this supports the solid feed. During the melting process reduction of the remaining iron containing compounds occurs. The electrodes are immersed in the molten slag and, becasue its electrical resistance is much greater than that of iron, most of the heat is generated in this layer. One problem affecting the melters is that the refractory lining is subject to attack by the molten slag. In order to combat this, the solid feed in introduced around the perimeter of the melter to provide a protective barrier. The gas produced in the melter is mainly carbon monoxide and this presents both toxic and explosion hazards. It is recovered and burnt for co-generation of electricity. Molten iron and slag are both tapped periodically by drilling a hole through the refractory sidewalls at special tapping points, higher up for the slag and lower down on the opposite side for the molten iron. The slag from the melter is approximately 40% TiO2, 20% Al2O3, 15% MgO, 10% CaO and 10% SiO2 with smaller amounts of sulfides and oxides of iron, manganese and vanadium. After cooling and the recovery of the metal trapped in it, the slag is sold. It is mainly used as a substitute for quarried rock in applications such as road construction. VIII-Metals-A-Steel-4
  • 5. VIII-Metals-A-Steel-5 vanadium recovery vanadium-rich slag O2 O2 KOBM process slag molten steel alloying element (if required) ladle treatment Molten iron Steel casting machine O2 Argon Figure 2 - The steel making process Step 2 - Steel making The steel making process is shown in Figure 2. Vanadium recovery Before conversion into steel, vanadium is recovered from the molten iron. This is done firstly because of the value of the vanadium rich slag produced (15% vanadium as V2O5) and secondly because a high vanadium content can make the steel too hard. In the vanadium recovery unit a ladle containing 75 tonnes of molten iron has oxygen blown over the surface, where it oxidises silicon, titanium, manganese and vanadium to form a slag that floats on the surface. At the same time argon is blown through the molten metal to stir it. When the composition of the molten metal has reached the required vanadium specification, the slag is scraped off, cooled and crushed. Additional advantages of this pre-treatment are that it causes the molten metal to reheat, so permitting temperature control, and, if required, the procedure can be modified by the addition of lime to reduce sulfur levels. The Klockner Oxygen Blown Maxhutte process The KOBM steel making process, like most modern processes involves oxidising dissolved impurities by blowing oxygen through the molten metal. The KOBM is unusual in that it blows oxygen through the bottom of the furnace as well as through a lance inserted from the top. This type of furnace was selected for Glenbrook becasue of its capacity to cope with high levels of titanium and vanadium coupled with its very fast turn round time. The disadvantage of this type of furnace is that it is technically rather more complex than those that are blown only by a lance. The KOBM is initially charged with about 6 tonnes of scrap steel. 70 tonnes of molten metal from the vanadium recovery unit is then added. Oxygen is then blown through six holes in the base of the furnace, at a total rate of about 1500 litres per second. Oxygen is also blown through a lance inserted from the top of the furnace at a rate of over 2500 litres per second.
  • 6. The oxygen oxidises the elements other than iron (including any free carbon) to their oxides. In this way contaminants are removed as the oxides form a slag which floats on the surface of the molten metal. Powdered lime is blown in to help with slag formation and this particularly reduces the levels of sulfur and phosphorous by combining with their acidic oxides. Due to its low melting point, iron(II) sulfide (FeS) is particularly harmful to the high temperature properties of steel. So sulfur level must be reduced before further processing. Typical levels of the major elements in the metal fed into the furnace and in a typical steel are shown in Table 1. Table 1 - Compositions of steel and the metal from which it is made VIII-Metals-A-Steel-6 C S P Ti Si V Hot metal 3% 0.04% 0.07% 0.8% 0.08% 0.3% Steel 0.03% 0.02% 0.01% nil nil 0.005% The molten iron is analysed just before being added to the furnace and the temperature taken. This determines the length of the oxygen blow and it also to a certain extent affects the amount and composition of the scrap added. The length of the oxygen blow required is also judged by moitoring the CO:CO2 ration in the gases from the furnace. Blow times vary, but 15 minutes would be typical. During the oxygen blow the temperature would typically rise from 1500oC to 1700oC owing to the exothermic reactions that are occuring. The slag is firstly tipped off and, after cooling, it is broken up so that the iron trapped in it can be recovered magnetically. The slag, which contains sulfur and phosphorous and has a high lime content, is then sold for agricultural use. Aluminium, which removes excess dissolved oxygen, and alloying materials, such as ferro-silicon and ferro-manganese (which increase the hardness of the steel) are added at this point so that they are well mixed as the molten metal is tipped into a ladle. The whole cycle in the KOBM takes about 30 minutes. The Glenbrook site also has an electric arc furnace for steel making, the feed for this being mainly scrap steel. The cycle time for the final charge of 75 tonne is about 3½ hours, so that is is only responsible for a small fraction of the total steel production. It is, however, a very flexible process and it may be economically used to produce small batches of specialised steel. Ladle treatment The final stage of steel making is the ladle treatment. This is when fine adjustments are made to bring the composition of the molten steel, from either furnace, into line with the required composition. The bulk of the alloying elements are added in the furnace and, after blowing argon hrough the molten metal to ensure homogeneity, the temperature is measured and a sample removed for analysis after stirring. The analysis by optical emission spectrometry, which measures the levels of 15 elements, takes about five minutes. Alloying materials are added to adjust the composition. If the metal requires cooling, scrap steel is added. If the temperature is too low, aluminium is added and oxygen blown through. When all adjustments are complete argon is blown through once again to ensure mixing and the ladle taken to the continuous casting machine. Here it is cast into slabs of 210 mm thickness and a width of between 800 and 1550 mm. This slab is cut into lengths of from 4.5 m to 10 m and sent for further processing. Most of the production is converted to steel coil.
  • 7. ANCILLARY PROCESSES The major ancillary processes carried out by the plant involve the supply of raw materials, the processing of waste and the production of electricity. Even though waste heat is used to co-generate electricity on site, this only amounts to about 12½% of total consumption, so large amounts of electricity are purchased. Natural gas is also used as a minor energy source and this is brought to the site from Taranaki through a pipeline. Iron primary concentrate mining This is obtained from the ironsand mine at Waikato North Head and is a mixture of magnetite (Fe3O4) and titanomagnetite (Fe2TiO4), and is thought to originate from the volcanic eruptions of Mt. Taranaki. It is mined by standard open cast methods and suspended as an aqueous slurry. The ironsand is a low grade ore, with sand and clay being the major impurities. The concentrated material typically contains 58% iron (i.e. 80% Fe3O4), 8% TiO, 4% Al2O3, 3½% SiO2 and 3% MgO by mass with smaller quantites of calcium, phophorous and sulfur. Initial separation is effected by magnetic separators which rely on the magnetic properties of magnetite and tintanomagnetite. Further concentration is then achieved by gravity separators because these minerals are denser than most impurities. The slurry is then pumped though a 21 km long, 200 mm diameter pipeline to Glenbrook at a rate of 300 tonnes per hour. Here it is dewatered to a moisture level of ca. 5% and discharged onto a stockpile. Annual production of this material, known as Primary Concentrate (PC), is about 1.2 million tonnes. Coal preparation This is sub-bituminous B and C grade mined by both open cast and underground methods at Huntly. The annual consumption of 750 000 tonnes per year is delivered by rail to Glenbrook. Here it is stored on a stockpile and then blended with primary concentrate as the feedstock for the multihearth furnaces. The aim of the blending is to achieve a consistent carbon-iron ratio. Scrap steel recycling Much of the scrap steel used is waste from the production process. Steel is also purchased from scrap metal dealers, though it must be free from copper which is difficult to remove from molten steel and adversely affects its properties. The scrap steel is sorted into different grades according to alloy content. Limestone mining This is mined near Otorohanga. Limestone chip is blended with the coal and primary concentrate to help form a slag in the reduction of the iron oxide. Some is also supplied in the form of lime (calcium oxide) for use in steel making. Oxygen production This is manufactured by the fractional distillation of liquid air, which also produces nitrogen and argon. About 4000 m3 of oxygen is consumed for each 75 tonne load of steel, giving an annual consumption of about 75 000 tonnes. Some of the nitrogen and argon is used in steelmaking. The excess liquid nitrogen is sold for freeze drying foods and the excess argon is mainly sold for use as a gas shield for welding processes. VIII-Metals-A-Steel-7
  • 8. Electricity The total annual consumption of electricity is 1000 GWh, the typical power demand being 130 MW. This is purchased from Electrocorp and brought to the site through overhead power lines operating at 110 kV. The waste gases from various processes, particularly the multi-hearth furnaces and the melter are burnt to raise steam in four boilers. The steam is used to power two turbines each rated at 18 MW, which produce 12½ % of the electricity needed by the plant. In the near future the on site generation of electrical power is to be considerably expanded and greater use made of waste gases from the rotary kilns. This will enable the plant to produce over half the total electrical power consumed. THE ROLE OF THE LABORATORY In general the laboratory is responsible for quality control of the various stages of production and of the end product. The laboratory uses optical emission spectroscopy2 to determine the sample composition of the molten metal in the melter, vanadium recovery unit, K.O.B.M. unit and casting machine and during the ladle treatment stage. The levels of carbon, silicon, manganese, tin, vanadium, sulfur, phosphorus, aluminium and nitrogen are closely monitored. The test only takes four minutes, enabling operators to adjust process parameters on the basis of test reports before problems become serious. The nitrogen content in steel can also be found by heating the steel in a helium flushed electric furnace. As the temperature increases any nitrogen in the sample comes off and mixes with the helium carrier gas. The gas mixture is analysed by a thermal conductivity cell at the gas outlet. Samples of ironsand and slag are analysed with X-ray fluorescence spectroscopy. The slag samples are fused with boron before testing. The laboratory is also involved in daily testing of effluent water to ensure that all water released into the environment is safe. ENVIRONMENTAL IMPLICATIONS Due to the nature of the steel making process, large amounts of solid, liquid and gaseous wastes are generated in the steel plant. Careful planning is necessary to ensure that these do not have a negative impact on the environment. 2Optical emission spectrometry is also called atomic emission spectroscopy and is described in the sewage treatment article. VIII-Metals-A-Steel-8
  • 9. The steel mill requires 1.2 to 1.4 million tonnes of ironsand each year, which means that up to 10 million tonnes of pure sand must be mined. The non-magnetic sand is returned to the area from which it was mined, and marram grass and radiata pines planted to stabilise the deposits. Wet scrubbers and baghouses are the principal means of controlling air pollution. The wet scrubbers (see oil refining article) wash the dust out of the hot process waste gases which result from iron and steel making while the cloth bags inside a baghouse filter dust out of the gas. The dust collection system is shared by the steel production and steel processing sections, and collects a total of between five and ten tonnes of dust every hour. Extensive water recycling is used in the plant to minimise the quantity of waste water produced, and all waste water and stormwater is treated in settling ponds on site before being discharged into the Waiuku Estuary. Article written by John Green (Kristin School) and Jeremy Batchelor (BHP NZ Steel) with additions by David Yuen following a visit to BHP NZ Steel. VIII-Metals-A-Steel-9