The Wheel andAxle plantatBangalore wasfoundedin1984 to cater to the massive needsof
the IndianRailroadIndustryasIndiahad to be self sufficienttoeffectivelymanage the largestrailroad
networkitwouldgrowto be inthe comingyears.True to itsvisionthe IndianRailwaystodayhasa
~38,000 km rail networkaroundthe country whichmakesitan absolute lifelinetoIndia.Itwaslater
renamedasthe IndianRail Wheel Factory(RWF) aswe know it today. It isspreadoveran area of 119
acres of lushgreenlandwhichmake itone of the most eco-friendlyfactoriesinIndia.Also,notto
mentionthatwithinthe factorythere are twowatertankerswhichare the largestwatertankersin
south-eastAsia.
We,as youngengineersandthe future generation citizenof Indiawere giventhiswonderful
opportunitytovisitthisState-of-the-artmanufacturingandproductionunitof the IndianRailwaysand
interactwiththe engineersandemployeeswhoperformthistideoustaskwithutmostprecisionand
accuracy and are able to supplywheelsandaxlesof magnificentquality,durabilityanddependability.
These materialsare processedthroughrigoroustestingmutiple timesthroughoutthe entire
manufacturingperiodsandverystrictqualitycheckskeeperroneousproducts atbay.It was trulyan
amazingfirsthandexperience of the methodsusedinindustrial manufacturing.Oursafetywaswell
takencare of and we were providedwithall the necessaryandrequired safetygeartoface any
enentualityincase of an emergency .Here on,I’dlike toproduce an insighttothe technical aspectsof
the factory.
There are mainly3 divisionsof the RWF, theyare Wheel Shop,Axle Shopandthe Assembly
station.The RWF produces~1,50,000 wheelsand~48,000 axlesof differentguage lengths(narrow
gauge,broadgauge,etc.) forvariouspurposes.Unlike the Europiancountrieswhere the wheelsare
forged(suitableforhighspeeds),the wheelsrequiredbythe IndianRailwaysare casted(suitable to
sustainmore loads) asdue to the huge economyof Indiathe Railwaysare the primarytransport for
passengersaswell asgoodsand alsobecause castingiseconomical ascomparedtoforging.
13th
August, 2016 (Copyright 13/08/16 Abhigyan nath)
Wheel Shop:-
We were introducedtothe cope and drag forthe wheels,theUHPF(UltraHighPowerFurnaces),
the sand usedforthe mouldand were alsoshownhow the massive cranesbringthe moltenmetal in
huge laddlesandpourthemintothe JohnMohr pits,thenthey are made airtightandpressure inapplied
so that the moltenmetal flowsuniformlyintothe mould,thespruesare removedbyusingoxy-acetylene
flame,thenthe risersare usedtoput these freshlycastedwheel ontothe conveyorforfurtherrefining
processes(heattreatment,PrimaryRotaryFurnace).Ittakes9 hrs for a wheel tocome outof the
primaryrotary furnace.The metal meltsaround1700*c and the temperature istriedtobe maintained
till a certainpoint.Thenthe wheel isputtopriliminarysurface finishprocesses.(Bombardingof the
curvedsurface withsmall castmetal ballsat highspeeds) asCNCmachinigof these surfacesare not
recommended.Thenthe wheelistestedforinternal andexternal ruptures,cracksbyUltrasonicand
Magna glowtestingsrespectively.The core of the wheel hastomaintainitssoftnesswhereasthe outer
rim of the wheelshastobe hardened,thisisachievedbyQuenchingof the wheel (suddenabsolute
cooling).Thenthe wheelmovestothe Brinell andRockwell Hardnesstestingshop.Thesewheelsare
alsotestedforBendingandelasticity.Thenthe final surface finishisgiven.The final checksare then
performedonthe wheelsbythe employees,if theyare notsatisfactorythenthe whole wheel issentfor
meltingandthe whole processisrepeated.If theyholdgoodtheyare allowedtocool.Thatishow the
wheel shopfunctions.Generallythe wheelsare remade fromthe scrapmetal receivedfromvarious
parts of the country.The wheelsare made outof cast steel.
Axle Shop:-
The Axle shopmanufacturesavarietyof axlesasrequestedbythe IndianRailwaysandwheels
specifictoeach(TATA steel)axle are pairedtogether.The axlesare made outof freshmetal produced
directlybysteel plants,theycome intothe RWF as blooms.These bloomsare thentreateduponbyLPG
flamestocut these bloomsintobilletsof the requiredsized,thesehappenundercontrolled
circumstancesandunderthe supervisionof trainedengineers.Thenthenthesebilletsare sentintoa
secondaryrotaryfurnace for meltingandheattreatment,after4hrs the billetsat~1500*c come out of
the furnace and theyare actuallyassoftas a sponge.Thenthese billetsare fedintoahammerforge
where eachjabberexertsaforce of 8 tonneson eachblow to beatthe billetintothe shape of anaxle,
these axlesare inspected.Theygothrougha screwingprocessforthe fittingof wheels,aroughrollingto
getrid of most external roughsurfaces,thenCNCmachiningforthe wheel seats, lubricantsandanti-rust
fluidissprayedandpainteduponthe axles,thenthere isthe final Rollingwhichtakesthe precisionand
accuracy upto ~0.5-0.05mm. Thenthere isa heat treatmentandthe axlesare quenchedforhardness.
Thenthese axlesare lefttocool underthe atmosheric(natural) air.Thenqualitychecksare performed,
if it comesoutsatisfactoryitis passedelse itisrejectedandsentback.
13th
August, 2016 (Copyright 13/08/16 Abhigyan nath)
Assembly Station:-
For locomotive enginesthe wheelsare notassembledwiththe axlesasthere are couplings
th0at needto be attachedto the axlesandaccordinglyeachlocomotive axleisgivenalargeror smaller
wheel seatdependingonthe requirements(aspowerneedstobe generatedbythe engine).Butforthe
coachesand bogeysthe wheelsandaxlesare assembledtogetherbymeansof pressure fittings,namely
interference fit,clearancefitandabsolute fit.Interferencefitisrecommendedasafterthisthe wheel is
rigidlymountedonthe axle.Hydraulicsystemsare usedtoapplythese massivepressures.Reminding,
properthreadinghasbeenperformedonbothwheelsandaxlesandsufficientcorrosionresistance has
beenimpartedtoboththe products.By thistime the manufacturedwheelsandaxlesare readytobe
put inservice of the IndianRailways.
Overall ithasbeenanoverwhelmingexperience forall of us, to know that
such facilitiesexistinthe vicinityof oursurroundingsinitself inducesasense of pride andjoy. The
IndianRailwaysisthe largestrecruiterwithover~1.4millionemployeesandstill growingfarandwide.
The RWF isjusta productionunitamongall the variousfactoriesunderthe IndianRailways.Fresh
graduatescan serve the IndianRailwayseither bythe RRB(RailwayRecruitmentBoard) Entryor through
the ESE (EngineeringServicesExaminations)andjointhe workforce.Withinthe factorythere isalsoa
MaterialsTestinglabanda ResearchandDevelopmentLab.Inthe near future the IndianRailways isalso
workingtowardsa highspeedrail projectinspiredfromotherdevelopednation.We are absolutelysure
that the IndianRailwayswill achievethistargetina shortspan of time.
-Report produced by
Abhigyan Nath
IEEE- #93595541
(B.E.)Mechanical Engineering ,
PES University,100 ft ring road,Banashankari 3rd stage,
Hosakerehalli,Bangalore-560085
Email- abhigyan.nath.in@ieee.org
Contact- +91-9502923892
13th
August, 2016 (Copyright 13/08/16 Abhigyan nath)

More Related Content

What's hot

RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPTSahil arora
 
Summer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, AssamSummer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, AssamDeepjyoti Patowary
 
Internship report file on Rail Wheel Plant
Internship report file on Rail Wheel PlantInternship report file on Rail Wheel Plant
Internship report file on Rail Wheel PlantShani Kumar Singh
 
BWEL Project Report
BWEL Project ReportBWEL Project Report
BWEL Project ReportASHISH KUMAR
 
Vocational traning report on Railways Workshop
Vocational traning report on Railways WorkshopVocational traning report on Railways Workshop
Vocational traning report on Railways WorkshopAnand Mohan
 
Analysis of Power Generation Plant at Pakistan Steel Mills
Analysis of Power Generation Plant at Pakistan Steel MillsAnalysis of Power Generation Plant at Pakistan Steel Mills
Analysis of Power Generation Plant at Pakistan Steel MillsDanial Sohail
 
Indian railway Mechanical workshop Gorakhpur ppt
Indian railway Mechanical workshop  Gorakhpur pptIndian railway Mechanical workshop  Gorakhpur ppt
Indian railway Mechanical workshop Gorakhpur pptSandeep Yadav
 
DLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indoreDLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indoreSANJEET KUMAR
 
Ind training ppt
Ind training pptInd training ppt
Ind training pptyamipatel
 
A presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayA presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayGALGOTIAS UNIVERSITY
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)anand prasad
 
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)SolidWorks Freelance
 
Loesche Mill for Solid Fuels
Loesche Mill for Solid FuelsLoesche Mill for Solid Fuels
Loesche Mill for Solid FuelsLOESCHE
 
Ppt of training dlw varanasi
Ppt of training dlw varanasiPpt of training dlw varanasi
Ppt of training dlw varanasiRam Bahadur
 

What's hot (20)

Dlw training session
Dlw training sessionDlw training session
Dlw training session
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
 
Training report
Training reportTraining report
Training report
 
Summer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, AssamSummer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
 
Internship report file on Rail Wheel Plant
Internship report file on Rail Wheel PlantInternship report file on Rail Wheel Plant
Internship report file on Rail Wheel Plant
 
BWEL Project Report
BWEL Project ReportBWEL Project Report
BWEL Project Report
 
Vocational traning report on Railways Workshop
Vocational traning report on Railways WorkshopVocational traning report on Railways Workshop
Vocational traning report on Railways Workshop
 
Analysis of Power Generation Plant at Pakistan Steel Mills
Analysis of Power Generation Plant at Pakistan Steel MillsAnalysis of Power Generation Plant at Pakistan Steel Mills
Analysis of Power Generation Plant at Pakistan Steel Mills
 
Bwel presentation
Bwel presentationBwel presentation
Bwel presentation
 
Indian railway Mechanical workshop Gorakhpur ppt
Indian railway Mechanical workshop  Gorakhpur pptIndian railway Mechanical workshop  Gorakhpur ppt
Indian railway Mechanical workshop Gorakhpur ppt
 
DLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indoreDLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indore
 
Ind training ppt
Ind training pptInd training ppt
Ind training ppt
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
A presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayA presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railway
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
 
integral coach factory report
integral coach factory report integral coach factory report
integral coach factory report
 
Loesche Mill for Solid Fuels
Loesche Mill for Solid FuelsLoesche Mill for Solid Fuels
Loesche Mill for Solid Fuels
 
Ppt of training dlw varanasi
Ppt of training dlw varanasiPpt of training dlw varanasi
Ppt of training dlw varanasi
 
Wheel Defects
Wheel DefectsWheel Defects
Wheel Defects
 

Viewers also liked

Industrial visit
Industrial visitIndustrial visit
Industrial visitLavazza
 
Volvo Link500 - Project Report
Volvo Link500 - Project ReportVolvo Link500 - Project Report
Volvo Link500 - Project Reportpawarap
 
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERSANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERSAbba Hassan Musa
 
ppt on 4g
ppt on 4gppt on 4g
ppt on 4gPPT4U
 
A project report on training and development with reference to hal
A project report on training and development with reference to halA project report on training and development with reference to hal
A project report on training and development with reference to halProjects Kart
 
49368010 project-report-on-training-and-development
49368010 project-report-on-training-and-development49368010 project-report-on-training-and-development
49368010 project-report-on-training-and-developmentsagarkirti
 
HOW TO BUILD YOUR PROBLEM STATEMENT
HOW TO BUILD YOUR PROBLEM STATEMENTHOW TO BUILD YOUR PROBLEM STATEMENT
HOW TO BUILD YOUR PROBLEM STATEMENTRoberto Rocco
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accountingashu1983
 

Viewers also liked (12)

Industrial visit
Industrial visitIndustrial visit
Industrial visit
 
Volvo Link500 - Project Report
Volvo Link500 - Project ReportVolvo Link500 - Project Report
Volvo Link500 - Project Report
 
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERSANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
ANALYSIS AND DESIGN OF PRESTRESSED SLEEPERS
 
3g & 4g technology
3g & 4g technology3g & 4g technology
3g & 4g technology
 
ppt on 4g
ppt on 4gppt on 4g
ppt on 4g
 
4g technology
4g technology4g technology
4g technology
 
A project report on training and development with reference to hal
A project report on training and development with reference to halA project report on training and development with reference to hal
A project report on training and development with reference to hal
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
49368010 project-report-on-training-and-development
49368010 project-report-on-training-and-development49368010 project-report-on-training-and-development
49368010 project-report-on-training-and-development
 
HOW TO BUILD YOUR PROBLEM STATEMENT
HOW TO BUILD YOUR PROBLEM STATEMENTHOW TO BUILD YOUR PROBLEM STATEMENT
HOW TO BUILD YOUR PROBLEM STATEMENT
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
 
How to write a statement problem
How to write a statement problemHow to write a statement problem
How to write a statement problem
 

Similar to RWF Report

DESIGN AND FABRICATION OF AN INDIAN ARMY VEHICLE (A CAR FOR THE CIVIL AREA WA...
DESIGN AND FABRICATION OF AN INDIAN ARMY VEHICLE (A CAR FOR THE CIVIL AREA WA...DESIGN AND FABRICATION OF AN INDIAN ARMY VEHICLE (A CAR FOR THE CIVIL AREA WA...
DESIGN AND FABRICATION OF AN INDIAN ARMY VEHICLE (A CAR FOR THE CIVIL AREA WA...ijmech
 
Techno Aid Full Presentation
Techno Aid Full PresentationTechno Aid Full Presentation
Techno Aid Full Presentationteknoaid
 
Types of locomotives in indian railways
Types of locomotives in indian railwaysTypes of locomotives in indian railways
Types of locomotives in indian railwaysSrinivasaRao Guduru
 
Nano IC Engine
Nano IC EngineNano IC Engine
Nano IC EngineVMS Group
 
Hindustan Zinc Limited,Bhilwara
Hindustan Zinc Limited,BhilwaraHindustan Zinc Limited,Bhilwara
Hindustan Zinc Limited,BhilwaraRavi Vaishnav
 
Diesel locomotive workshop
Diesel locomotive workshopDiesel locomotive workshop
Diesel locomotive workshopHome
 
DSP VT REPORT.pdf
DSP VT REPORT.pdfDSP VT REPORT.pdf
DSP VT REPORT.pdfCricketFan5
 
Dlw varanasi training ppt
Dlw varanasi training pptDlw varanasi training ppt
Dlw varanasi training pptPraveen Tiwari
 
Ppt on Gorakhpur railway station
Ppt on Gorakhpur railway stationPpt on Gorakhpur railway station
Ppt on Gorakhpur railway stationdurgesh pathak
 
IRJET- Torsional Behaviour of a Propeller Shaft Material and its Optimiza...
IRJET-  	  Torsional Behaviour of a Propeller Shaft Material and its Optimiza...IRJET-  	  Torsional Behaviour of a Propeller Shaft Material and its Optimiza...
IRJET- Torsional Behaviour of a Propeller Shaft Material and its Optimiza...IRJET Journal
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaArjun Gaur
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaArjun Gaur
 
Ampair 6kW - sales brochure
Ampair 6kW - sales brochureAmpair 6kW - sales brochure
Ampair 6kW - sales brochureDaniel Coelho
 
OBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANTOBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANTFaraz Khan
 
UNDERSTANDING ADI PART 4 AS PUBLISHED
UNDERSTANDING ADI PART 4 AS PUBLISHEDUNDERSTANDING ADI PART 4 AS PUBLISHED
UNDERSTANDING ADI PART 4 AS PUBLISHEDPratap Ghorpade
 
2015 Kawasaki Ninja ZX14R Brochure
2015 Kawasaki Ninja ZX14R Brochure2015 Kawasaki Ninja ZX14R Brochure
2015 Kawasaki Ninja ZX14R BrochureRushLane
 
Eckstein, Nathan Resume Portfolio Doc
Eckstein, Nathan Resume Portfolio DocEckstein, Nathan Resume Portfolio Doc
Eckstein, Nathan Resume Portfolio DocNathan Eckstein
 

Similar to RWF Report (20)

DESIGN AND FABRICATION OF AN INDIAN ARMY VEHICLE (A CAR FOR THE CIVIL AREA WA...
DESIGN AND FABRICATION OF AN INDIAN ARMY VEHICLE (A CAR FOR THE CIVIL AREA WA...DESIGN AND FABRICATION OF AN INDIAN ARMY VEHICLE (A CAR FOR THE CIVIL AREA WA...
DESIGN AND FABRICATION OF AN INDIAN ARMY VEHICLE (A CAR FOR THE CIVIL AREA WA...
 
Techno Aid Full Presentation
Techno Aid Full PresentationTechno Aid Full Presentation
Techno Aid Full Presentation
 
Types of locomotives in indian railways
Types of locomotives in indian railwaysTypes of locomotives in indian railways
Types of locomotives in indian railways
 
Nano IC Engine
Nano IC EngineNano IC Engine
Nano IC Engine
 
Hindustan Zinc Limited,Bhilwara
Hindustan Zinc Limited,BhilwaraHindustan Zinc Limited,Bhilwara
Hindustan Zinc Limited,Bhilwara
 
project report
project reportproject report
project report
 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
 
Diesel locomotive workshop
Diesel locomotive workshopDiesel locomotive workshop
Diesel locomotive workshop
 
DSP VT REPORT
DSP VT REPORTDSP VT REPORT
DSP VT REPORT
 
DSP VT REPORT.pdf
DSP VT REPORT.pdfDSP VT REPORT.pdf
DSP VT REPORT.pdf
 
Dlw varanasi training ppt
Dlw varanasi training pptDlw varanasi training ppt
Dlw varanasi training ppt
 
Ppt on Gorakhpur railway station
Ppt on Gorakhpur railway stationPpt on Gorakhpur railway station
Ppt on Gorakhpur railway station
 
IRJET- Torsional Behaviour of a Propeller Shaft Material and its Optimiza...
IRJET-  	  Torsional Behaviour of a Propeller Shaft Material and its Optimiza...IRJET-  	  Torsional Behaviour of a Propeller Shaft Material and its Optimiza...
IRJET- Torsional Behaviour of a Propeller Shaft Material and its Optimiza...
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 
Ampair 6kW - sales brochure
Ampair 6kW - sales brochureAmpair 6kW - sales brochure
Ampair 6kW - sales brochure
 
OBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANTOBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANT
 
UNDERSTANDING ADI PART 4 AS PUBLISHED
UNDERSTANDING ADI PART 4 AS PUBLISHEDUNDERSTANDING ADI PART 4 AS PUBLISHED
UNDERSTANDING ADI PART 4 AS PUBLISHED
 
2015 Kawasaki Ninja ZX14R Brochure
2015 Kawasaki Ninja ZX14R Brochure2015 Kawasaki Ninja ZX14R Brochure
2015 Kawasaki Ninja ZX14R Brochure
 
Eckstein, Nathan Resume Portfolio Doc
Eckstein, Nathan Resume Portfolio DocEckstein, Nathan Resume Portfolio Doc
Eckstein, Nathan Resume Portfolio Doc
 

RWF Report

  • 1. 13th August, 2016 (Copyright 13/08/16 Abhigyan nath) A brief report on the industrial visitto the Indian Rail Wheel Factory (RWF),Yelankha,Bangalore-560084 -Conducted by the IEEE young professionals (Bangalore section) The Wheel andAxle plantatBangalore wasfoundedin1984 to cater to the massive needsof the IndianRailroadIndustryasIndiahad to be self sufficienttoeffectivelymanage the largestrailroad networkitwouldgrowto be inthe comingyears.True to itsvisionthe IndianRailwaystodayhasa ~38,000 km rail networkaroundthe country whichmakesitan absolute lifelinetoIndia.Itwaslater renamedasthe IndianRail Wheel Factory(RWF) aswe know it today. It isspreadoveran area of 119 acres of lushgreenlandwhichmake itone of the most eco-friendlyfactoriesinIndia.Also,notto mentionthatwithinthe factorythere are twowatertankerswhichare the largestwatertankersin south-eastAsia. We,as youngengineersandthe future generation citizenof Indiawere giventhiswonderful opportunitytovisitthisState-of-the-artmanufacturingandproductionunitof the IndianRailwaysand interactwiththe engineersandemployeeswhoperformthistideoustaskwithutmostprecisionand accuracy and are able to supplywheelsandaxlesof magnificentquality,durabilityanddependability. These materialsare processedthroughrigoroustestingmutiple timesthroughoutthe entire manufacturingperiodsandverystrictqualitycheckskeeperroneousproducts atbay.It was trulyan amazingfirsthandexperience of the methodsusedinindustrial manufacturing.Oursafetywaswell takencare of and we were providedwithall the necessaryandrequired safetygeartoface any enentualityincase of an emergency .Here on,I’dlike toproduce an insighttothe technical aspectsof the factory. There are mainly3 divisionsof the RWF, theyare Wheel Shop,Axle Shopandthe Assembly station.The RWF produces~1,50,000 wheelsand~48,000 axlesof differentguage lengths(narrow gauge,broadgauge,etc.) forvariouspurposes.Unlike the Europiancountrieswhere the wheelsare forged(suitableforhighspeeds),the wheelsrequiredbythe IndianRailwaysare casted(suitable to sustainmore loads) asdue to the huge economyof Indiathe Railwaysare the primarytransport for passengersaswell asgoodsand alsobecause castingiseconomical ascomparedtoforging.
  • 2. 13th August, 2016 (Copyright 13/08/16 Abhigyan nath) Wheel Shop:- We were introducedtothe cope and drag forthe wheels,theUHPF(UltraHighPowerFurnaces), the sand usedforthe mouldand were alsoshownhow the massive cranesbringthe moltenmetal in huge laddlesandpourthemintothe JohnMohr pits,thenthey are made airtightandpressure inapplied so that the moltenmetal flowsuniformlyintothe mould,thespruesare removedbyusingoxy-acetylene flame,thenthe risersare usedtoput these freshlycastedwheel ontothe conveyorforfurtherrefining processes(heattreatment,PrimaryRotaryFurnace).Ittakes9 hrs for a wheel tocome outof the primaryrotary furnace.The metal meltsaround1700*c and the temperature istriedtobe maintained till a certainpoint.Thenthe wheel isputtopriliminarysurface finishprocesses.(Bombardingof the curvedsurface withsmall castmetal ballsat highspeeds) asCNCmachinigof these surfacesare not recommended.Thenthe wheelistestedforinternal andexternal ruptures,cracksbyUltrasonicand Magna glowtestingsrespectively.The core of the wheel hastomaintainitssoftnesswhereasthe outer rim of the wheelshastobe hardened,thisisachievedbyQuenchingof the wheel (suddenabsolute cooling).Thenthe wheelmovestothe Brinell andRockwell Hardnesstestingshop.Thesewheelsare alsotestedforBendingandelasticity.Thenthe final surface finishisgiven.The final checksare then performedonthe wheelsbythe employees,if theyare notsatisfactorythenthe whole wheel issentfor meltingandthe whole processisrepeated.If theyholdgoodtheyare allowedtocool.Thatishow the wheel shopfunctions.Generallythe wheelsare remade fromthe scrapmetal receivedfromvarious parts of the country.The wheelsare made outof cast steel. Axle Shop:- The Axle shopmanufacturesavarietyof axlesasrequestedbythe IndianRailwaysandwheels specifictoeach(TATA steel)axle are pairedtogether.The axlesare made outof freshmetal produced directlybysteel plants,theycome intothe RWF as blooms.These bloomsare thentreateduponbyLPG flamestocut these bloomsintobilletsof the requiredsized,thesehappenundercontrolled circumstancesandunderthe supervisionof trainedengineers.Thenthenthesebilletsare sentintoa secondaryrotaryfurnace for meltingandheattreatment,after4hrs the billetsat~1500*c come out of the furnace and theyare actuallyassoftas a sponge.Thenthese billetsare fedintoahammerforge where eachjabberexertsaforce of 8 tonneson eachblow to beatthe billetintothe shape of anaxle, these axlesare inspected.Theygothrougha screwingprocessforthe fittingof wheels,aroughrollingto getrid of most external roughsurfaces,thenCNCmachiningforthe wheel seats, lubricantsandanti-rust fluidissprayedandpainteduponthe axles,thenthere isthe final Rollingwhichtakesthe precisionand accuracy upto ~0.5-0.05mm. Thenthere isa heat treatmentandthe axlesare quenchedforhardness. Thenthese axlesare lefttocool underthe atmosheric(natural) air.Thenqualitychecksare performed, if it comesoutsatisfactoryitis passedelse itisrejectedandsentback.
  • 3. 13th August, 2016 (Copyright 13/08/16 Abhigyan nath) Assembly Station:- For locomotive enginesthe wheelsare notassembledwiththe axlesasthere are couplings th0at needto be attachedto the axlesandaccordinglyeachlocomotive axleisgivenalargeror smaller wheel seatdependingonthe requirements(aspowerneedstobe generatedbythe engine).Butforthe coachesand bogeysthe wheelsandaxlesare assembledtogetherbymeansof pressure fittings,namely interference fit,clearancefitandabsolute fit.Interferencefitisrecommendedasafterthisthe wheel is rigidlymountedonthe axle.Hydraulicsystemsare usedtoapplythese massivepressures.Reminding, properthreadinghasbeenperformedonbothwheelsandaxlesandsufficientcorrosionresistance has beenimpartedtoboththe products.By thistime the manufacturedwheelsandaxlesare readytobe put inservice of the IndianRailways. Overall ithasbeenanoverwhelmingexperience forall of us, to know that such facilitiesexistinthe vicinityof oursurroundingsinitself inducesasense of pride andjoy. The IndianRailwaysisthe largestrecruiterwithover~1.4millionemployeesandstill growingfarandwide. The RWF isjusta productionunitamongall the variousfactoriesunderthe IndianRailways.Fresh graduatescan serve the IndianRailwayseither bythe RRB(RailwayRecruitmentBoard) Entryor through the ESE (EngineeringServicesExaminations)andjointhe workforce.Withinthe factorythere isalsoa MaterialsTestinglabanda ResearchandDevelopmentLab.Inthe near future the IndianRailways isalso workingtowardsa highspeedrail projectinspiredfromotherdevelopednation.We are absolutelysure that the IndianRailwayswill achievethistargetina shortspan of time. -Report produced by Abhigyan Nath IEEE- #93595541 (B.E.)Mechanical Engineering , PES University,100 ft ring road,Banashankari 3rd stage, Hosakerehalli,Bangalore-560085 Email- abhigyan.nath.in@ieee.org Contact- +91-9502923892
  • 4. 13th August, 2016 (Copyright 13/08/16 Abhigyan nath)