Power Factor
Correction
ABDUR REHMAN
13004102003
Objectives
•Define power factor.
•Calculate the capacitor value required to correct AC
series parallel networks to the desired apparent power.
•Compare currents, voltages, and power in AC series
parallel networks before and after power factor
correction.
Importance of Power Factor
•Consider the following example: A generator is
rated at 600 V and supplies one of two possible
loads.
•
Load 1: P = 120 kW, P.F = 1
Load 2: P = 120 kW, P.F = 0.6
•Generator current required to supplythe load
Importance of Power Factor
• For the load with Fp = 0.6, the generator
had to supply 133 more amperes in order to
do the same work .
• Larger current means larger equipment
(wires, transformers, generators) which cost
more.
• Larger current also means larger
transmission losses (think I2
R).
POWER-FACTOR CORRECTION
FIG. shows the impact of power-factor
correction on the power triangle.
Power factor correction capacitors for A, B, and C
phases at the Crofton , MD substation
Rating: 230 kV, 360 MVAR
size comparison Capacitor banks
Power Factor Correction
•Almost all loads are inductive.
•To cancel the reactive component of power, we
must add reactance of the opposite type. This is
called power factor correction.
Capacitor bank in
shipboard power panel
for FP correction
Power Factor Correction
•Almost all loads (commercial, industrial and
residential) look inductive (due to motors,
fluorescent lamp).
•Hence, almost all power factor correction consists of
adding capacitance.
Power Factor Correction Solution Steps
1. Calculate the reactive power (Q) of the load
2. Insert a component in parallel of the load that will cancel out that
reactive power
e.g. If the load has QLD=512 VAR, insert a capacitor with QC=-512
VAR.
3. Calculate the reactance (X) that will give this value of Q
Q=V2
/X
1. Calculate the component value (F ) required to provide that
reactance.
Power Factor Correction
•Transmission lines and generators must be sized to
handle the larger current requirements of an
unbalanced load.
•Industrial customers are frequently fined by the
utility if their power factor deviates from the
prescribed value established by the utility.
Thank you

More Related Content

What's hot

What's hot (20)

High voltage
High voltageHigh voltage
High voltage
 
Power factor presentation
Power factor presentationPower factor presentation
Power factor presentation
 
Electric substation
Electric substation Electric substation
Electric substation
 
Power factor improvement
Power factor improvement Power factor improvement
Power factor improvement
 
Generator Transformer Protections.
Generator Transformer  Protections.Generator Transformer  Protections.
Generator Transformer Protections.
 
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Power systems symmetrical components
Power systems symmetrical componentsPower systems symmetrical components
Power systems symmetrical components
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
A Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv SubstationA Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv Substation
 
Full transformer
Full transformerFull transformer
Full transformer
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
 
Power supplies & regulators
Power supplies & regulatorsPower supplies & regulators
Power supplies & regulators
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 
Ct & pt
Ct & pt Ct & pt
Ct & pt
 
Power transformer
Power transformerPower transformer
Power transformer
 
Introduction
IntroductionIntroduction
Introduction
 
Transformer
TransformerTransformer
Transformer
 
Selection Of Circuit Breaker
Selection Of Circuit BreakerSelection Of Circuit Breaker
Selection Of Circuit Breaker
 
Hv module 3 Impulse voltage generation
Hv module 3 Impulse voltage generationHv module 3 Impulse voltage generation
Hv module 3 Impulse voltage generation
 

Viewers also liked

Presentation training
Presentation trainingPresentation training
Presentation training
Srajan Raj
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
Jamilah Abbas
 
Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051
Neehar NLN
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
guestecdd58
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
Ishank Ranjan
 

Viewers also liked (20)

Chapter 4 (power factor correction)
Chapter 4 (power factor correction)Chapter 4 (power factor correction)
Chapter 4 (power factor correction)
 
Power Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction PresentationPower Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction Presentation
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
System Works Knowledge Sharing
System Works Knowledge SharingSystem Works Knowledge Sharing
System Works Knowledge Sharing
 
Presentation training
Presentation trainingPresentation training
Presentation training
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
A guide to power factor correction for the plant engineer
A guide to power factor correction for the plant engineerA guide to power factor correction for the plant engineer
A guide to power factor correction for the plant engineer
 
Mohsin rana
Mohsin ranaMohsin rana
Mohsin rana
 
Mit ppt 132/33kv ppt
Mit ppt 132/33kv pptMit ppt 132/33kv ppt
Mit ppt 132/33kv ppt
 
Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
Micro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportMicro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System Report
 
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurTraining from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Power factor
Power factorPower factor
Power factor
 
Substation overview
Substation overviewSubstation overview
Substation overview
 

Similar to Power factor correction

Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
PoojaAnupGarg
 
1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500
Navyasri Jiguru
 
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur AreaReactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
ijceronline
 

Similar to Power factor correction (20)

Power Factor : Basics and Benefits of Improvement
Power Factor : Basics and  Benefits of ImprovementPower Factor : Basics and  Benefits of Improvement
Power Factor : Basics and Benefits of Improvement
 
EDS Unit 5.pptx
EDS Unit 5.pptxEDS Unit 5.pptx
EDS Unit 5.pptx
 
REACTIVE POWER
REACTIVE POWERREACTIVE POWER
REACTIVE POWER
 
Reactive Power : Problems and Solutions
Reactive Power : Problems and SolutionsReactive Power : Problems and Solutions
Reactive Power : Problems and Solutions
 
Improvement of Load Power Factor by Using Capacitor
Improvement of Load Power Factor by Using CapacitorImprovement of Load Power Factor by Using Capacitor
Improvement of Load Power Factor by Using Capacitor
 
Power factor and its importance
Power factor and its importancePower factor and its importance
Power factor and its importance
 
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUESpower factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
 
power factor correction soham+niraj
power factor correction soham+nirajpower factor correction soham+niraj
power factor correction soham+niraj
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
 
capacitors
capacitorscapacitors
capacitors
 
2011 ced capacitors
2011 ced capacitors2011 ced capacitors
2011 ced capacitors
 
power-factor-correction.pptx
power-factor-correction.pptxpower-factor-correction.pptx
power-factor-correction.pptx
 
Power Factor Improvement.pptx
Power Factor Improvement.pptxPower Factor Improvement.pptx
Power Factor Improvement.pptx
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
IARE_RPCM_PPT_0.pdf
IARE_RPCM_PPT_0.pdfIARE_RPCM_PPT_0.pdf
IARE_RPCM_PPT_0.pdf
 
Automatic power factor correction and its advantage
Automatic power factor correction and its advantageAutomatic power factor correction and its advantage
Automatic power factor correction and its advantage
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500
 
Power Factor Improvement
Power Factor ImprovementPower Factor Improvement
Power Factor Improvement
 
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur AreaReactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
 

More from Abdur rehman (8)

PAKISTAN AS A GEO THERMAL COUNTRY
PAKISTAN AS A GEO THERMAL COUNTRYPAKISTAN AS A GEO THERMAL COUNTRY
PAKISTAN AS A GEO THERMAL COUNTRY
 
Habits of HAZRAT MUHAMMAD (P.B.U.H)
Habits of HAZRAT MUHAMMAD (P.B.U.H) Habits of HAZRAT MUHAMMAD (P.B.U.H)
Habits of HAZRAT MUHAMMAD (P.B.U.H)
 
child labour
child labourchild labour
child labour
 
Personal writing
Personal writingPersonal writing
Personal writing
 
Marketing strategies
Marketing strategiesMarketing strategies
Marketing strategies
 
Negative effects-of-technology
Negative effects-of-technologyNegative effects-of-technology
Negative effects-of-technology
 
Types of relay
Types of relayTypes of relay
Types of relay
 
Irrigation methods
 Irrigation methods Irrigation methods
Irrigation methods
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Recently uploaded (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 

Power factor correction

  • 2. Objectives •Define power factor. •Calculate the capacitor value required to correct AC series parallel networks to the desired apparent power. •Compare currents, voltages, and power in AC series parallel networks before and after power factor correction.
  • 3. Importance of Power Factor •Consider the following example: A generator is rated at 600 V and supplies one of two possible loads. • Load 1: P = 120 kW, P.F = 1 Load 2: P = 120 kW, P.F = 0.6 •Generator current required to supplythe load
  • 4. Importance of Power Factor • For the load with Fp = 0.6, the generator had to supply 133 more amperes in order to do the same work . • Larger current means larger equipment (wires, transformers, generators) which cost more. • Larger current also means larger transmission losses (think I2 R).
  • 5. POWER-FACTOR CORRECTION FIG. shows the impact of power-factor correction on the power triangle.
  • 6. Power factor correction capacitors for A, B, and C phases at the Crofton , MD substation Rating: 230 kV, 360 MVAR size comparison Capacitor banks
  • 7. Power Factor Correction •Almost all loads are inductive. •To cancel the reactive component of power, we must add reactance of the opposite type. This is called power factor correction. Capacitor bank in shipboard power panel for FP correction
  • 8. Power Factor Correction •Almost all loads (commercial, industrial and residential) look inductive (due to motors, fluorescent lamp). •Hence, almost all power factor correction consists of adding capacitance.
  • 9. Power Factor Correction Solution Steps 1. Calculate the reactive power (Q) of the load 2. Insert a component in parallel of the load that will cancel out that reactive power e.g. If the load has QLD=512 VAR, insert a capacitor with QC=-512 VAR. 3. Calculate the reactance (X) that will give this value of Q Q=V2 /X 1. Calculate the component value (F ) required to provide that reactance.
  • 10. Power Factor Correction •Transmission lines and generators must be sized to handle the larger current requirements of an unbalanced load. •Industrial customers are frequently fined by the utility if their power factor deviates from the prescribed value established by the utility.