SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Downloaden Sie, um offline zu lesen
1
ABDELAZIZ IBRAHIM ABDELAZIZ
13th, Darna Comp., Maadi, Cairo, Egypt
002- 0122 688 7178
aibrahim@qarun.net
abdelaziz.ebrahim@yahoo.com
abdelaziz.ibrahim2020@gmail.com
Qualifications
 B.SC in petroleum engineering.
 Al Azhar university, July 2006.
 Total grade : Excellent.
Experiences
9 years of petrolum engineering & PT.
Period Company Place Position Assignment
2-2015
Up to date
Qarun
Egypt
(Head Office)
BP
Application
Engineer
170 BP wells design, monitoring, tear down,repairing, failure
analysis, preparing inventory, purchasing new items, lead field
service crews, lead SR inspection crew, BP contract holder.
11-2013 to
1-2015
Egypt
(Fields)
BP
Operations
Supervisor
BP operations supervisor (technical support, tear down, repairing,
failure analysis, preparing inventory RIH witness, failure analysis,
hoists tracking, stock tracking, fluid level analysis +/- 170 wells.
2-2013 to
10-2013
Egypt
(Head Office)
Reservoir
Eng.
Performed some of the analytical reservoir engineering work
(Volumetric, Decline curve analysis, RFT analysis, open hole &
cased hole analysis)
2007 to 2012 Egypt
Field
petroleum
eng.
Field Petroleum engineer, dual job role 1- production engineer , 2-
process engineer.
Supervise all artificial lift works, witness work over job
replacement, fishing, periodic maintenace, supervise Lufkin crew,
SR inspection crew & production supervisor monitoring wells
production, tank gauging, oil transportation , oil processing stages
& water flooding stations.
Period: 2015 present
BP Application Engineer (Head Office) Qarun Petroleum Co (QPC).
Join venture of USA, Apache Co.
for oil and gas production, Egypt.
I worked in Qarun Petroleum Company (QPC) Head Office as a BP application engineer &
responsiable for fields having 170 Beam pumping and have the following responsibilities:
CC VV
2
 SR team leading for team consists of 3 engineers in office , 6 engineers in fields & Service crew
which consists of 16 members.
 Select SR proper pump size,surface unit & surface parameters to be used to match well
productivity using design equation & special softwares (SROD,QROD,LOAD CALC).
 Handling equipment, design, installation, lay down & optimization of new 30 sucker rod
installation & 40 sucker rod replacement.
 Review the BP spare parts inventory to get the action for repairing or purchasing the required
equipment.
 Co-ordinate and manage all interfaces in Day to Day operations and manage whole RRP processes
from design to data management.
 Promote technical information to develop RRP system solutions, including liaison with third party
vendors within scope of supply.
 Responsible for technical and commercial discussions to clarify contractual issue for an agreed
scope of work and basis of design.
 Review and analyze down hole data and the weekly monitoring report to timely alert on the
potential implications to the key parties for corrective actions.
 Lead BP field service team & Lufkin team whome responsible for pump shop tear down,cleaning,
inspection, testing, refurbishment & reporting all pump types(rod pump & tubing pump) , repair
mechanical tubing anchor in workshop, all RIH jobs & all surface unit optimization.
 Lead SR inspection team using API standards, review & approve inspection invoices.
 Follow-up the performance of the sucker-rod system (surface & downhole) through controllers
(lufkin SAM controller), interpretation of downhloe cards to analyse (surface & downhole) taken
from these controllers and take necessary actions if needed to help improve surface & downhole
equipements performance and increase well & equipment life time.
 Diagnose failures which occurred in rod string & pump to take necessary corrective actions to
further eliminate failures & increase run life.
 Work with two vendors (GE & Wetherford) in sales of all SR equipmnt either surface and/or
downhole to do plan for for all SR requirments every 6 month.
 Evaluating the new technology and how to use this technology to improve and optimize the
production
 Work on integrated team with drilling and to regularly review well and field performance, and
identify remedial opportunities where required.
 Carry out daily operational and engineering reports to evaluate performance and progress to ensure
that all operations are being carried out in accordance with the program
Period: 11-2013 to 1-2015
BP BP Operations Supervisor Qarun Petroleum Co (QPC).
Join venture of USA, Apache Co.
for oil and gas production, Egypt
I worked in Qarun Petroleum Company (QPC) Field as a BP Field Application engineer and have the
following responsibilities:
 Install and commission RRP System .These activities include but not limited to supervise, advice & check;
the sucker rods installation, sucker rod condition and make-up process. Prepare and make-up of downhole
pump & equipment to RIH by hoist.
 Witness all RIH jobs, fishing parted SR, fishing parted PR, back wash plugged pump, spacing pump &
troubleshooting.
 Monitor, troubleshoot, collect data included acoustic liquid level data measurement and test RRP System as
 Installation, dissassembly of surface unit & optimization using stroke up, down, SPM up & down.
 Supervise BP pump shop tear down,cleaning, inspection, testing, refurbishment & reporting all pump
types(rod pump & tubing pump) & repair mechanical tubing anchor in workshop.
 Supervise and direct workshop staffs
3
 Supervise SR inspection crew using API standards (11B & 11BR).
 Follow-up the performance of the sucker-rod system (surface & downhole) through controllers (lufkin
SAM controller), interpretation of downhloe cards (surface & downhole) taken from these controllers in
accordance with application engineer to take necessary actions if needed to help improvement of surface &
downhole equipements inorder to optimize performance and increase well & equipment life time.
 Tear down, diagnose BP failures which occurred in rod string & pump to take necessary corrective actions
to further eliminate these failures from reoccurence.
 All teardown and reporting
 Maintenance of spare parts
 Tracking the BP stock with materials department to check the incoming new materials quality, goods
cetrificates, update inventory, list the requirements for purchasing them & All RRP System stock and
inventory level
 Assist in installation, repair, troubleshoot and maintain all types of surface control switch gear, including
fixed speed switchboards, VFC and accessories.
 Ensure safety for Personnel & Equipment as per manufacturer recommendation or API guide line and as per
Company HSE Specifications. Maintain and manage workshop area
Period: 2-2013 to 10-2013
Rservoir Eng. (Head Office) Qarun Petroleum Co (QPC).
Join venture of USA, Apache Co.
for oil and gas production, Egypt.
I worked in Qarun Petroleum Company (QPC) Head Office as a Reservoir and have the following
responsibilities:
 Construct & update the copmlete production & reservoir data base.
 Evaluating well and field performance, recommended short, medium & long-term remedial actions where
possible.
 Developing & reviewing water injection project.
 Implementing production optimization reviews, well surveillance and recommending all possible
candidates for work overs.
 Implementing PLT design, execution & analysis.
 Executing reserve estimation & clasifications.
 Log interpretation & selecting completion zones.
 RFT job operation & data analysis.
 Production back allocation.
Period: 2007-2012
Field Petroleum Engineer Qarun Petroleum Co (QPC).
Join venture of USA, Apache Co.
for oil and gas production, Egypt.
I Worked in Qarun Petroleum Company (QPC) fields for 5 years as a afield engineer in fields having 500
wells into 7 fields including ESP, beam pumping , PCP wells & Oil processing plant and have the following
responsibilities:
 Supervising artificial lift wells ESP, SRP, PCP & troublehoot their problems as well.
 Commisioning, start up & suervising for remote fields.
 Peforming inspection for service Companies test package before working at the field.
 Analysis well test results and put troubleshooting plan.
 Supervising for (Fracturing, RFT, Perforation, coiled tubing, lifting with Nitrogen, injectivity & Slick Line
jobs).
 Measuring Dynamic Fluid Level in casing annulus (using echometer) as a reference for well performance
and to investigate well problems.
 Carry out in co-ordination with Chemists studies to highlight the corrosion, scale, and pour point problems
that may cause a bad effect on production & equipment and suggest the immediate solutions to overcome
these problems.
4
 Operating of oil plant equipments such as( separators , desalters , heater treater )
1- Two three phase separators from (Allen Tank, Inc.) separate 14MMSCFD gas, 27,000BPD
water and 10,000 BPD oil for each one.
2- Three desalters from (Natco) with capacity 25,000 BOPD for each one which desalting the oil
using dual current transformers to 22 PPM (Qarun oil spec. BS&W 0.2 % , SALT 22 PPM)
3- Three heater treaters from (Natco) which heated oil (direct heat) & dehydration it using dual
current transformers. Its capacity is 25,000 POPD.
 Preparing the Maintenance procedures of heater treaters (which carried out on year 2008,2010 )
respectively
 Preparing the Maintenance procedures of desalters.
 Responsible for disposal system which consists of :
1- Five disposal wells 2- Five injection pumps (each one inject +/-17,000 PWPD)
3- API separator which can separate the most escaped oil.
 Responsible for controlling the operation of oil plant through Delta V system and ensuring optimum
operating conditions.
 Carries out process engineering checks and evaluations on the Facilities and preparing the detail procedures
for isolation, venting and purging of the facilities and pipeline for oil plant for any operation and
emergency.
 Arrangement the procedures for preventive upgrading for DCS system.
 Operating R.O.(Reverse Osmoses unit) to produce 120 m3 of potable water
Personal informations
 Date of birth: Sep, 24, 1984
 Social status: Married.
Training & Courses
 Beam pumping system (Lufkin, Egypt).
 Electrial Submergible Pump System (Borets- Weatherford, Egypt).
 Water Flooding (Excellent, Egypt).
 North Africa Technical Conference 2012, Egypt.
 Hazard Opprobibility HAZOP (OGS, Egypt).
 SPE artificial lift workshops (Egypt).
Other information
 Computer : Windos, Office (Word, Excel & Power Point), Internet & Networks.
 Languages : Arabic- Native, English- very good

Weitere ähnliche Inhalte

Was ist angesagt?

CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)Ram Atta
 
Mechanical Maintenance Engineer
Mechanical Maintenance Engineer Mechanical Maintenance Engineer
Mechanical Maintenance Engineer VIVEK PANDEY
 
Rami lifting & hoisting supervisor cv
Rami lifting & hoisting supervisor cvRami lifting & hoisting supervisor cv
Rami lifting & hoisting supervisor cvRami Hakeem
 
Glossary of drilling report abbreviations
Glossary of drilling report abbreviationsGlossary of drilling report abbreviations
Glossary of drilling report abbreviationsDavid Gualteros
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.maqsood1459
 
50-Marco Casirati-Nord Stream Pre-Commissioning
50-Marco Casirati-Nord Stream Pre-Commissioning50-Marco Casirati-Nord Stream Pre-Commissioning
50-Marco Casirati-Nord Stream Pre-CommissioningJohn Grover
 
Mullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitroMullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitroJon Mullin
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation kaleem ullah
 
Offshore Drilling Rig Equipment
Offshore Drilling Rig EquipmentOffshore Drilling Rig Equipment
Offshore Drilling Rig EquipmentAijaz Ahmed
 
Tubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industryTubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industryPE Mahmoud Jad
 
Rotary drilling rig systems overview
Rotary drilling rig  systems overview Rotary drilling rig  systems overview
Rotary drilling rig systems overview Shaukat Ali
 

Was ist angesagt? (20)

CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)
 
NANIK COMMISSIONING
NANIK COMMISSIONINGNANIK COMMISSIONING
NANIK COMMISSIONING
 
Mechanical Maintenance Engineer
Mechanical Maintenance Engineer Mechanical Maintenance Engineer
Mechanical Maintenance Engineer
 
Rami lifting & hoisting supervisor cv
Rami lifting & hoisting supervisor cvRami lifting & hoisting supervisor cv
Rami lifting & hoisting supervisor cv
 
Glossary of drilling report abbreviations
Glossary of drilling report abbreviationsGlossary of drilling report abbreviations
Glossary of drilling report abbreviations
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.
 
50-Marco Casirati-Nord Stream Pre-Commissioning
50-Marco Casirati-Nord Stream Pre-Commissioning50-Marco Casirati-Nord Stream Pre-Commissioning
50-Marco Casirati-Nord Stream Pre-Commissioning
 
Mullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitroMullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitro
 
Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
 
Core cleaning
Core cleaningCore cleaning
Core cleaning
 
Well logging
Well loggingWell logging
Well logging
 
Well completion
Well completionWell completion
Well completion
 
Bits
BitsBits
Bits
 
Offshore Drilling Rig Equipment
Offshore Drilling Rig EquipmentOffshore Drilling Rig Equipment
Offshore Drilling Rig Equipment
 
Tubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industryTubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industry
 
Introduction to drilling
Introduction to drillingIntroduction to drilling
Introduction to drilling
 
Rotary drilling rig systems overview
Rotary drilling rig  systems overview Rotary drilling rig  systems overview
Rotary drilling rig systems overview
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 

Andere mochten auch

Software De Comunicacion[2]
Software De Comunicacion[2]Software De Comunicacion[2]
Software De Comunicacion[2]gueste5ddca0a
 
Turn Up The Heat On Customer Experience
Turn Up The Heat On Customer ExperienceTurn Up The Heat On Customer Experience
Turn Up The Heat On Customer ExperienceCX Netowrk
 
January 2015 Newsletter
January 2015 NewsletterJanuary 2015 Newsletter
January 2015 NewsletterMaureen Cooke
 
3 g 4g wireless mnvr mdvr for water conservancy solution
3 g 4g wireless mnvr mdvr for water conservancy solution3 g 4g wireless mnvr mdvr for water conservancy solution
3 g 4g wireless mnvr mdvr for water conservancy solutionCynthia Wang
 
Bucton presentation
Bucton presentationBucton presentation
Bucton presentationJohn_Rinell
 
LETTER_ADVOCACY_NICOLEJINN
LETTER_ADVOCACY_NICOLEJINNLETTER_ADVOCACY_NICOLEJINN
LETTER_ADVOCACY_NICOLEJINNNicole Jinn
 
Think Science: Suhail Arastu
Think Science: Suhail ArastuThink Science: Suhail Arastu
Think Science: Suhail ArastuNathan Cone
 
How to Manage a Hectic Workload
How to Manage a Hectic Workload How to Manage a Hectic Workload
How to Manage a Hectic Workload PROTRADE United
 
Konferencja Intratic Przyjazny SharePoint, Krzysztof Lis, Paweł Walczewski, N...
Konferencja Intratic Przyjazny SharePoint, Krzysztof Lis, Paweł Walczewski, N...Konferencja Intratic Przyjazny SharePoint, Krzysztof Lis, Paweł Walczewski, N...
Konferencja Intratic Przyjazny SharePoint, Krzysztof Lis, Paweł Walczewski, N...Grupa Unity
 

Andere mochten auch (17)

Mầm non thiên an
Mầm non thiên anMầm non thiên an
Mầm non thiên an
 
Gates Family Strategy
Gates Family StrategyGates Family Strategy
Gates Family Strategy
 
Software De Comunicacion[2]
Software De Comunicacion[2]Software De Comunicacion[2]
Software De Comunicacion[2]
 
Turn Up The Heat On Customer Experience
Turn Up The Heat On Customer ExperienceTurn Up The Heat On Customer Experience
Turn Up The Heat On Customer Experience
 
Comparatif des plateformes VOD 2014
Comparatif des plateformes VOD 2014Comparatif des plateformes VOD 2014
Comparatif des plateformes VOD 2014
 
January 2015 Newsletter
January 2015 NewsletterJanuary 2015 Newsletter
January 2015 Newsletter
 
3 g 4g wireless mnvr mdvr for water conservancy solution
3 g 4g wireless mnvr mdvr for water conservancy solution3 g 4g wireless mnvr mdvr for water conservancy solution
3 g 4g wireless mnvr mdvr for water conservancy solution
 
2016 03 05 Динамо Днипро
2016 03 05 Динамо Днипро 2016 03 05 Динамо Днипро
2016 03 05 Динамо Днипро
 
Bucton presentation
Bucton presentationBucton presentation
Bucton presentation
 
LETTER_ADVOCACY_NICOLEJINN
LETTER_ADVOCACY_NICOLEJINNLETTER_ADVOCACY_NICOLEJINN
LETTER_ADVOCACY_NICOLEJINN
 
Think Science: Suhail Arastu
Think Science: Suhail ArastuThink Science: Suhail Arastu
Think Science: Suhail Arastu
 
PUD
PUDPUD
PUD
 
How to Manage a Hectic Workload
How to Manage a Hectic Workload How to Manage a Hectic Workload
How to Manage a Hectic Workload
 
CCM FINAL PPT
CCM FINAL PPTCCM FINAL PPT
CCM FINAL PPT
 
Organizational culture
Organizational cultureOrganizational culture
Organizational culture
 
Konferencja Intratic Przyjazny SharePoint, Krzysztof Lis, Paweł Walczewski, N...
Konferencja Intratic Przyjazny SharePoint, Krzysztof Lis, Paweł Walczewski, N...Konferencja Intratic Przyjazny SharePoint, Krzysztof Lis, Paweł Walczewski, N...
Konferencja Intratic Przyjazny SharePoint, Krzysztof Lis, Paweł Walczewski, N...
 
Hello Cupcake Digital Strategy Plan
Hello Cupcake Digital Strategy PlanHello Cupcake Digital Strategy Plan
Hello Cupcake Digital Strategy Plan
 

Ähnlich wie BP Application Engineer resume title

Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.walaa ahmed ahmed attiia
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_gobinath gobinath
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CVkalki selvan
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiBhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiBhupat Kanani
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalprashant rai
 
Artificial lift engineer achievements
Artificial lift engineer achievementsArtificial lift engineer achievements
Artificial lift engineer achievementsJoseph Bracic
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CVRashid Iqbal
 
Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)Issam Khalil
 
Mohamed Ahmed Abdel Rahman
Mohamed Ahmed Abdel RahmanMohamed Ahmed Abdel Rahman
Mohamed Ahmed Abdel RahmanMohamed Ahmed
 

Ähnlich wie BP Application Engineer resume title (20)

Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CV
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
luai_cv
luai_cvluai_cv
luai_cv
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs final
 
Sr.Inst Tech
Sr.Inst TechSr.Inst Tech
Sr.Inst Tech
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
Artificial lift engineer achievements
Artificial lift engineer achievementsArtificial lift engineer achievements
Artificial lift engineer achievements
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
Abhishek
AbhishekAbhishek
Abhishek
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CV
 
Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)
 
Saurav Rawat CV
Saurav Rawat CVSaurav Rawat CV
Saurav Rawat CV
 
Mohamed Ahmed Abdel Rahman
Mohamed Ahmed Abdel RahmanMohamed Ahmed Abdel Rahman
Mohamed Ahmed Abdel Rahman
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Vijay cv
Vijay cvVijay cv
Vijay cv
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 

BP Application Engineer resume title

  • 1. 1 ABDELAZIZ IBRAHIM ABDELAZIZ 13th, Darna Comp., Maadi, Cairo, Egypt 002- 0122 688 7178 aibrahim@qarun.net abdelaziz.ebrahim@yahoo.com abdelaziz.ibrahim2020@gmail.com Qualifications  B.SC in petroleum engineering.  Al Azhar university, July 2006.  Total grade : Excellent. Experiences 9 years of petrolum engineering & PT. Period Company Place Position Assignment 2-2015 Up to date Qarun Egypt (Head Office) BP Application Engineer 170 BP wells design, monitoring, tear down,repairing, failure analysis, preparing inventory, purchasing new items, lead field service crews, lead SR inspection crew, BP contract holder. 11-2013 to 1-2015 Egypt (Fields) BP Operations Supervisor BP operations supervisor (technical support, tear down, repairing, failure analysis, preparing inventory RIH witness, failure analysis, hoists tracking, stock tracking, fluid level analysis +/- 170 wells. 2-2013 to 10-2013 Egypt (Head Office) Reservoir Eng. Performed some of the analytical reservoir engineering work (Volumetric, Decline curve analysis, RFT analysis, open hole & cased hole analysis) 2007 to 2012 Egypt Field petroleum eng. Field Petroleum engineer, dual job role 1- production engineer , 2- process engineer. Supervise all artificial lift works, witness work over job replacement, fishing, periodic maintenace, supervise Lufkin crew, SR inspection crew & production supervisor monitoring wells production, tank gauging, oil transportation , oil processing stages & water flooding stations. Period: 2015 present BP Application Engineer (Head Office) Qarun Petroleum Co (QPC). Join venture of USA, Apache Co. for oil and gas production, Egypt. I worked in Qarun Petroleum Company (QPC) Head Office as a BP application engineer & responsiable for fields having 170 Beam pumping and have the following responsibilities: CC VV
  • 2. 2  SR team leading for team consists of 3 engineers in office , 6 engineers in fields & Service crew which consists of 16 members.  Select SR proper pump size,surface unit & surface parameters to be used to match well productivity using design equation & special softwares (SROD,QROD,LOAD CALC).  Handling equipment, design, installation, lay down & optimization of new 30 sucker rod installation & 40 sucker rod replacement.  Review the BP spare parts inventory to get the action for repairing or purchasing the required equipment.  Co-ordinate and manage all interfaces in Day to Day operations and manage whole RRP processes from design to data management.  Promote technical information to develop RRP system solutions, including liaison with third party vendors within scope of supply.  Responsible for technical and commercial discussions to clarify contractual issue for an agreed scope of work and basis of design.  Review and analyze down hole data and the weekly monitoring report to timely alert on the potential implications to the key parties for corrective actions.  Lead BP field service team & Lufkin team whome responsible for pump shop tear down,cleaning, inspection, testing, refurbishment & reporting all pump types(rod pump & tubing pump) , repair mechanical tubing anchor in workshop, all RIH jobs & all surface unit optimization.  Lead SR inspection team using API standards, review & approve inspection invoices.  Follow-up the performance of the sucker-rod system (surface & downhole) through controllers (lufkin SAM controller), interpretation of downhloe cards to analyse (surface & downhole) taken from these controllers and take necessary actions if needed to help improve surface & downhole equipements performance and increase well & equipment life time.  Diagnose failures which occurred in rod string & pump to take necessary corrective actions to further eliminate failures & increase run life.  Work with two vendors (GE & Wetherford) in sales of all SR equipmnt either surface and/or downhole to do plan for for all SR requirments every 6 month.  Evaluating the new technology and how to use this technology to improve and optimize the production  Work on integrated team with drilling and to regularly review well and field performance, and identify remedial opportunities where required.  Carry out daily operational and engineering reports to evaluate performance and progress to ensure that all operations are being carried out in accordance with the program Period: 11-2013 to 1-2015 BP BP Operations Supervisor Qarun Petroleum Co (QPC). Join venture of USA, Apache Co. for oil and gas production, Egypt I worked in Qarun Petroleum Company (QPC) Field as a BP Field Application engineer and have the following responsibilities:  Install and commission RRP System .These activities include but not limited to supervise, advice & check; the sucker rods installation, sucker rod condition and make-up process. Prepare and make-up of downhole pump & equipment to RIH by hoist.  Witness all RIH jobs, fishing parted SR, fishing parted PR, back wash plugged pump, spacing pump & troubleshooting.  Monitor, troubleshoot, collect data included acoustic liquid level data measurement and test RRP System as  Installation, dissassembly of surface unit & optimization using stroke up, down, SPM up & down.  Supervise BP pump shop tear down,cleaning, inspection, testing, refurbishment & reporting all pump types(rod pump & tubing pump) & repair mechanical tubing anchor in workshop.  Supervise and direct workshop staffs
  • 3. 3  Supervise SR inspection crew using API standards (11B & 11BR).  Follow-up the performance of the sucker-rod system (surface & downhole) through controllers (lufkin SAM controller), interpretation of downhloe cards (surface & downhole) taken from these controllers in accordance with application engineer to take necessary actions if needed to help improvement of surface & downhole equipements inorder to optimize performance and increase well & equipment life time.  Tear down, diagnose BP failures which occurred in rod string & pump to take necessary corrective actions to further eliminate these failures from reoccurence.  All teardown and reporting  Maintenance of spare parts  Tracking the BP stock with materials department to check the incoming new materials quality, goods cetrificates, update inventory, list the requirements for purchasing them & All RRP System stock and inventory level  Assist in installation, repair, troubleshoot and maintain all types of surface control switch gear, including fixed speed switchboards, VFC and accessories.  Ensure safety for Personnel & Equipment as per manufacturer recommendation or API guide line and as per Company HSE Specifications. Maintain and manage workshop area Period: 2-2013 to 10-2013 Rservoir Eng. (Head Office) Qarun Petroleum Co (QPC). Join venture of USA, Apache Co. for oil and gas production, Egypt. I worked in Qarun Petroleum Company (QPC) Head Office as a Reservoir and have the following responsibilities:  Construct & update the copmlete production & reservoir data base.  Evaluating well and field performance, recommended short, medium & long-term remedial actions where possible.  Developing & reviewing water injection project.  Implementing production optimization reviews, well surveillance and recommending all possible candidates for work overs.  Implementing PLT design, execution & analysis.  Executing reserve estimation & clasifications.  Log interpretation & selecting completion zones.  RFT job operation & data analysis.  Production back allocation. Period: 2007-2012 Field Petroleum Engineer Qarun Petroleum Co (QPC). Join venture of USA, Apache Co. for oil and gas production, Egypt. I Worked in Qarun Petroleum Company (QPC) fields for 5 years as a afield engineer in fields having 500 wells into 7 fields including ESP, beam pumping , PCP wells & Oil processing plant and have the following responsibilities:  Supervising artificial lift wells ESP, SRP, PCP & troublehoot their problems as well.  Commisioning, start up & suervising for remote fields.  Peforming inspection for service Companies test package before working at the field.  Analysis well test results and put troubleshooting plan.  Supervising for (Fracturing, RFT, Perforation, coiled tubing, lifting with Nitrogen, injectivity & Slick Line jobs).  Measuring Dynamic Fluid Level in casing annulus (using echometer) as a reference for well performance and to investigate well problems.  Carry out in co-ordination with Chemists studies to highlight the corrosion, scale, and pour point problems that may cause a bad effect on production & equipment and suggest the immediate solutions to overcome these problems.
  • 4. 4  Operating of oil plant equipments such as( separators , desalters , heater treater ) 1- Two three phase separators from (Allen Tank, Inc.) separate 14MMSCFD gas, 27,000BPD water and 10,000 BPD oil for each one. 2- Three desalters from (Natco) with capacity 25,000 BOPD for each one which desalting the oil using dual current transformers to 22 PPM (Qarun oil spec. BS&W 0.2 % , SALT 22 PPM) 3- Three heater treaters from (Natco) which heated oil (direct heat) & dehydration it using dual current transformers. Its capacity is 25,000 POPD.  Preparing the Maintenance procedures of heater treaters (which carried out on year 2008,2010 ) respectively  Preparing the Maintenance procedures of desalters.  Responsible for disposal system which consists of : 1- Five disposal wells 2- Five injection pumps (each one inject +/-17,000 PWPD) 3- API separator which can separate the most escaped oil.  Responsible for controlling the operation of oil plant through Delta V system and ensuring optimum operating conditions.  Carries out process engineering checks and evaluations on the Facilities and preparing the detail procedures for isolation, venting and purging of the facilities and pipeline for oil plant for any operation and emergency.  Arrangement the procedures for preventive upgrading for DCS system.  Operating R.O.(Reverse Osmoses unit) to produce 120 m3 of potable water Personal informations  Date of birth: Sep, 24, 1984  Social status: Married. Training & Courses  Beam pumping system (Lufkin, Egypt).  Electrial Submergible Pump System (Borets- Weatherford, Egypt).  Water Flooding (Excellent, Egypt).  North Africa Technical Conference 2012, Egypt.  Hazard Opprobibility HAZOP (OGS, Egypt).  SPE artificial lift workshops (Egypt). Other information  Computer : Windos, Office (Word, Excel & Power Point), Internet & Networks.  Languages : Arabic- Native, English- very good