Arc-flashanalysis
Collecteddatausedtocomplete anarc-flashanalysisforthe hospital.Analysisresultswerethenusedto
properlylabel powerdistributionequipmentwiththe appropriatewarning labels.Staff PPEwas
reevaluatedbasedonresults.
Benefitwasincreasedsafety formaintenance staff.ProperlyratedHRCclothingwasissuedtostaff
basedon jobduties.The studyalsojustifiedthe purchase of specializedPPEandtools.Examples:
Certified/ratedinsulatedtoolsforhotwork.Arc-flashratedhood,suit,glovesandbootsfor
maintenance performedonswitchgears.
Organization of facilitypreventive maintenance logs
Restructuring,reorganizingthe preventive maintenance logstomeetThe JointCommissionstandards.
AlsorecordedanymissinginformationorPMs.Createda simple database referencingthe missing
material withitsidentification,brief descriptionanddate foundmissing.Thiswasaddedtoeverynew
logcreated.All PMs olderthanone yearwere discardedandfolderswere arrangedsothatall
subsequentPMswouldbe replacedwiththeirnewercounterpart.
Our proactive andhonestapproachto the restructuring,reorganizingthe preventive maintenance logs
mostlikelysavedthe hospitalmoneyinthe formof finesatthe nextJointCommissionandstate
inspection.Wasinformedthatinbothinspectionsthe surveyorswere impressedwiththe easyto
reference formatandour“up front”approach to the missingPMs.Theywere satisfiedthat we hadfixed
any priorissuesandthat we were dedicatedtomaintainingournew systemof documentation.
PM improvementand standardization
In the processof PM reorganization,itwasdiscoveredthatmanyPMswere ethernotstandardized,
NFPA compliant,manufacture recommendedorsome combinationof.All PMswere reviewedandany
foundlackingwere replacedwithmanufacture recommendedprocedures.AnyPMnot well definedwas
rewritteninaclear andconcise format.Prints,diagrams,checklistsandlocation chartswere addedas
neededsothateverypiece of equipmentwasinspectedandall keypointsinthe PMwere covered.
Possiblysavedmoneyinfines.Equipmentwasbettermaintained,sopotentiallystayedinservice longer
and performedwithahigherrate of reliability.Betterpatientcare wasobtainedbynotinterruptingthe
healingprocessthroughfewerbreakdowns.Thiswill inturnleadtohighersatisfactionrates.
Passive Fire Protection Evaluation
Involvedinthe evaluationof all the passive fire protectionsystemswithinthe hospital. Thisincluded
but notlimitedto:panichardware,dooroperation, doorratings,NFPA egresscompliance,fire wall
ratingsand identification,fire wall integrity,fire stopmeetingthe ASTME 814 (UL 1479) & CAN/ULC
S115 standards.
Studyfoundmajorlife safetyviolationsthatendangeredthe occupantsof the building.Especiallyif
there hadbeena fire incertainareas of the buildingasthere were entire sectionsof fire wall rated
assemblies missingornotcompleted.New wallpenetrationshadnotbeenproperlyprotectedforyears.
Thisleadto the repairof all violationsandthe retrainingof staff inNFPA/IBCconstructioncompliance.
Contractor Supervision/Life SafetyCompliance
It shouldbe notedthatthe Passive Fire ProtectionEvaluation alsorevealednon-compliancebymanyof
the sub-contractorsusedbyTHRH. A pre-joblife safetyreview andtrainingprogramwasthemcreated
by the directorto helpcombat the lack of non-compliantperformance fromcontractors.Iwas
responsible forthe dailytaskof coveringmaterial such asproperfire wall penetrationmethodsto
properhandlingof debris andcontaminantcontrol.Iwasalsotaskedto performrandomdaily
inspectionsof workperformedandworksite life safety compliance.Examplesincluded dustbarrier
integrity,stickymatusage andproperinstallationandmaintenanceof roomnegative airmachines.

More Related Content

Similar to Project Accomplishments

Summer Internship Project
Summer Internship ProjectSummer Internship Project
Summer Internship ProjectAlexisAlburo
 
ADEPP & Other Software
ADEPP & Other SoftwareADEPP & Other Software
ADEPP & Other SoftwareFabienne Salimi
 
Technology audit presentation
Technology audit presentationTechnology audit presentation
Technology audit presentationArish Roy
 
Technology Audit
Technology AuditTechnology Audit
Technology AuditArish Roy
 
Technology Audit
Technology AuditTechnology Audit
Technology AuditArish Roy
 
Ocs training calendar 2022
Ocs training calendar 2022Ocs training calendar 2022
Ocs training calendar 2022Muanisa Waras
 
Forensic laboratory setup requirements
Forensic laboratory setup  requirements Forensic laboratory setup  requirements
Forensic laboratory setup requirements Sonali Parab
 
Summer internship project
Summer internship projectSummer internship project
Summer internship projectIsabelDueas3
 
Summer internship project
Summer internship projectSummer internship project
Summer internship projectIsabelDueas3
 
RESUME2015 personal
RESUME2015 personalRESUME2015 personal
RESUME2015 personalDale Baade
 
Data Center Best Practice and Architecture
Data Center Best Practice and ArchitectureData Center Best Practice and Architecture
Data Center Best Practice and Architecturebutest
 
Richard Armijo - Resume
Richard Armijo - ResumeRichard Armijo - Resume
Richard Armijo - ResumeRichard Armijo
 
HAZOP ppt for chambal urea -1.pptx
HAZOP ppt for chambal urea -1.pptxHAZOP ppt for chambal urea -1.pptx
HAZOP ppt for chambal urea -1.pptxvidhyasagarverma
 
Streamlining R&D Case Files at the AFRL
Streamlining R&D Case Files at the AFRLStreamlining R&D Case Files at the AFRL
Streamlining R&D Case Files at the AFRLcjoesten
 
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...Yokogawa1
 

Similar to Project Accomplishments (20)

Summer Internship Project
Summer Internship ProjectSummer Internship Project
Summer Internship Project
 
Vg (2)
Vg (2)Vg (2)
Vg (2)
 
ADEPP & Other Software
ADEPP & Other SoftwareADEPP & Other Software
ADEPP & Other Software
 
Technology audit presentation
Technology audit presentationTechnology audit presentation
Technology audit presentation
 
Technology Audit
Technology AuditTechnology Audit
Technology Audit
 
Technology Audit
Technology AuditTechnology Audit
Technology Audit
 
Ocs training calendar 2022
Ocs training calendar 2022Ocs training calendar 2022
Ocs training calendar 2022
 
13680904.ppt
13680904.ppt13680904.ppt
13680904.ppt
 
Sat Singh Fac Mgt
Sat Singh Fac MgtSat Singh Fac Mgt
Sat Singh Fac Mgt
 
Forensic laboratory setup requirements
Forensic laboratory setup  requirements Forensic laboratory setup  requirements
Forensic laboratory setup requirements
 
Summer internship project
Summer internship projectSummer internship project
Summer internship project
 
Summer internship project
Summer internship projectSummer internship project
Summer internship project
 
RESUME2015 personal
RESUME2015 personalRESUME2015 personal
RESUME2015 personal
 
RobertoRReyesResume
RobertoRReyesResumeRobertoRReyesResume
RobertoRReyesResume
 
Data Center Best Practice and Architecture
Data Center Best Practice and ArchitectureData Center Best Practice and Architecture
Data Center Best Practice and Architecture
 
VinceResume2016.7
VinceResume2016.7VinceResume2016.7
VinceResume2016.7
 
Richard Armijo - Resume
Richard Armijo - ResumeRichard Armijo - Resume
Richard Armijo - Resume
 
HAZOP ppt for chambal urea -1.pptx
HAZOP ppt for chambal urea -1.pptxHAZOP ppt for chambal urea -1.pptx
HAZOP ppt for chambal urea -1.pptx
 
Streamlining R&D Case Files at the AFRL
Streamlining R&D Case Files at the AFRLStreamlining R&D Case Files at the AFRL
Streamlining R&D Case Files at the AFRL
 
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
 

Project Accomplishments

  • 1. A Few Project Accomplishments at Terre Haute Regional Arc-flashanalysis Collecteddatausedtocomplete anarc-flashanalysisforthe hospital.Analysisresultswerethenusedto properlylabel powerdistributionequipmentwiththe appropriatewarning labels.Staff PPEwas reevaluatedbasedonresults. Benefitwasincreasedsafety formaintenance staff.ProperlyratedHRCclothingwasissuedtostaff basedon jobduties.The studyalsojustifiedthe purchase of specializedPPEandtools.Examples: Certified/ratedinsulatedtoolsforhotwork.Arc-flashratedhood,suit,glovesandbootsfor maintenance performedonswitchgears. Organization of facilitypreventive maintenance logs Restructuring,reorganizingthe preventive maintenance logstomeetThe JointCommissionstandards. AlsorecordedanymissinginformationorPMs.Createda simple database referencingthe missing material withitsidentification,brief descriptionanddate foundmissing.Thiswasaddedtoeverynew logcreated.All PMs olderthanone yearwere discardedandfolderswere arrangedsothatall subsequentPMswouldbe replacedwiththeirnewercounterpart. Our proactive andhonestapproachto the restructuring,reorganizingthe preventive maintenance logs mostlikelysavedthe hospitalmoneyinthe formof finesatthe nextJointCommissionandstate inspection.Wasinformedthatinbothinspectionsthe surveyorswere impressedwiththe easyto reference formatandour“up front”approach to the missingPMs.Theywere satisfiedthat we hadfixed any priorissuesandthat we were dedicatedtomaintainingournew systemof documentation. PM improvementand standardization In the processof PM reorganization,itwasdiscoveredthatmanyPMswere ethernotstandardized, NFPA compliant,manufacture recommendedorsome combinationof.All PMswere reviewedandany foundlackingwere replacedwithmanufacture recommendedprocedures.AnyPMnot well definedwas rewritteninaclear andconcise format.Prints,diagrams,checklistsandlocation chartswere addedas neededsothateverypiece of equipmentwasinspectedandall keypointsinthe PMwere covered. Possiblysavedmoneyinfines.Equipmentwasbettermaintained,sopotentiallystayedinservice longer and performedwithahigherrate of reliability.Betterpatientcare wasobtainedbynotinterruptingthe healingprocessthroughfewerbreakdowns.Thiswill inturnleadtohighersatisfactionrates. Passive Fire Protection Evaluation Involvedinthe evaluationof all the passive fire protectionsystemswithinthe hospital. Thisincluded but notlimitedto:panichardware,dooroperation, doorratings,NFPA egresscompliance,fire wall ratingsand identification,fire wall integrity,fire stopmeetingthe ASTME 814 (UL 1479) & CAN/ULC S115 standards.
  • 2. Studyfoundmajorlife safetyviolationsthatendangeredthe occupantsof the building.Especiallyif there hadbeena fire incertainareas of the buildingasthere were entire sectionsof fire wall rated assemblies missingornotcompleted.New wallpenetrationshadnotbeenproperlyprotectedforyears. Thisleadto the repairof all violationsandthe retrainingof staff inNFPA/IBCconstructioncompliance. Contractor Supervision/Life SafetyCompliance It shouldbe notedthatthe Passive Fire ProtectionEvaluation alsorevealednon-compliancebymanyof the sub-contractorsusedbyTHRH. A pre-joblife safetyreview andtrainingprogramwasthemcreated by the directorto helpcombat the lack of non-compliantperformance fromcontractors.Iwas responsible forthe dailytaskof coveringmaterial such asproperfire wall penetrationmethodsto properhandlingof debris andcontaminantcontrol.Iwasalsotaskedto performrandomdaily inspectionsof workperformedandworksite life safety compliance.Examplesincluded dustbarrier integrity,stickymatusage andproperinstallationandmaintenanceof roomnegative airmachines.