SUBMITTED TO
ASTT. PROF. ANITA KURADIYA
MECHANICAL DEPARTMENT
(COLLEGE OF ENGINEERING &
TECHNOLOGY BIKANER)
SUBMITTED BY
AMITRAJ
13ECTME007
About The “Lalgarh Railway Workshop”
• Foundation : Maharaja Ganga Singh Ji Bahadur on 18th
March,1925
• Location: Outskirt of Bikaner town known as Lalgarh
• Plant started: 1st March,1927
• Total area: 141226 meter sq.
• Machinery in plant:232
• Track inside plant:2.6 km
PERIODIC-OVERHAULING
Periodic-overhauling(POH): It is a process of 8 days during
which checking & repairing/replacement of train’s parts take
place.
Time Period Of POH:
Mail/Express train: POH after 12 months
Passenger Train : POH after 18 months
Procedures of POH
DAY 1st : Disassembly of electrical components
DAY 2nd : Lift/Lowering
DAY 3rd : Body repair
DAY 4th : Carpenter work
DAY 5th : Painting
DAY 6th : Electrical component fitting
DAY 7th : Adjustment of all parts
DAY 8th : Vacuum testing
LIST OF SHOPS
• Carriage shop
• Carpenter shop
• Corrosion shop
• Painting & Trimming shop
• Wagon shop
• Wheel shop
• Tool shop
• Mill right shop
• Bogie IOH shop
CARRIAGE SHOP
• Purpose: To repair coaches
Parts of coaches which get repaired in
carriage shop
• Dash port Spring: It act as shock absorber.
• Bdl’ster: Mounted between lower and upper shock absorber &
also called secondary shock absorber.
• Brake block: Hold the brake frame & coach beam together.
• Equalizing stray: This also hold coach beam & brake frame
together.
• Brake shoe key : Stop the brake shoe from running out.
• Bearing pieces: Component on which coaches turn.
• Pivot seat: Control running of train.
• Anchor link: Control movement of coaches.
CARPENTRY SHOP
In this shop wooden fitting of pipes on walls, floors etc are
done.
Machines available/used in the carpentry
shop of this plant:
• Circular saw machine -2
• Body band saw machine -1
• Vertical band saw machine-2
• Planer machine-1
CORROSION SHOP
• Purpose: To repair corroded parts mainly head stock,
coaching stock, sole bar and cross bar.
C-schedule in corrosion shop
DAY 1st : Cleaning with soap sol. & touch up damage
part with primer.
DAY 2nd : Spot putty.
DAY 3rd : Flat with silicon carbide & finish coat with
enamel.
DAY 4th : Apply second coat of enamel.
DAY 5th : Lettering with golden yellow color &
miscellaneous work.
PAINTING SHOP
• Painting & External maintenance is done in this shop.
• These are done in two schedule:
• A-schedule(9 days): for maintenance
• C-schedule(5 days): for final painting
Painting done in this shop:
• Side painting : Smoke grey paint
• Under frame : Bituminous Paint
• Internal painting : White enamel paint
• End panel : Black enamel paint
• Trolley : Bituminous paint
• Roof : Aluminium paint
TRIMMING SHOP
• Final stages of basic rebuilding as assembly of seats,
painting & stiching are completed.
• Seats are repaired and reassembled.
WAGON SHOP
Works done in wagon shop:
• Super structure attached to the under frame of a wagon is
called ‘WAGON BODY’.
• In this shop,the body,underframe of a Wagon are repaired.
• Proper numbers of doors, pillers etc. are attached.
• Wagon Air Brake Testing are done in this shop.
WHEEL SHOP
• New wheel undergo various operations for testing so
wheel shop has various section
• Axle passing section : Axle and tyre received from
companies and reassembled.
• Tyre section : Diameter of tyre reduced
MILL WRIGHT SHOP
• Millwright shop has three sections:
• Machine maintenance section
• Transport section
• Compressor section
• Maintenance section: All the machine parts are repaired.
• Transportation Section: Transportation of goods are taken by
some machine to reduce place and component transported
from one place to another.
• Compressor section: The screw type air compressor is a
positive displacement machine of reciprocative type.
.
BOGIE IOH SHOP
In this shop all the component of a bogie is fitted or
welded and finally railway coaches is formed.
COMPONENTS OF RAILWAY BOGIE:
• Bogie Transom
• Bogie Cylinder
• Primary Suspension Coil
• Motor Suspension Tube
• Gear Box
• Lifting Box
• Neutral section switch detector
• Secondary suspension air bag
• Shock absorber
• Axle box cover
• Bogie bolster
• Center pivot pin
Shock absorber
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ

Weitere ähnliche Inhalte

Was ist angesagt?

locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.Mukesh Maurya
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagonAjeet Kumar
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship reportrahul waghmare
 
Mechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training reportMechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training reporthmthimanshu
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway Mohammad Adnan
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)anand prasad
 
central Railway project report
central Railway project report central Railway project report
central Railway project report akshay ghanwat
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentationTURENDARSAHU
 
PPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDPPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDTarang Mittal
 
PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)kalyan kumar
 
Summer training from Indian Railway ppt (2)
Summer training from Indian Railway ppt (2)Summer training from Indian Railway ppt (2)
Summer training from Indian Railway ppt (2)Kumud Khandelwal
 
Inplant Training - Integral Coach Factory
Inplant Training - Integral Coach FactoryInplant Training - Integral Coach Factory
Inplant Training - Integral Coach FactorySudarshan Mohan
 
A presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayA presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayGALGOTIAS UNIVERSITY
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive pptShrey Sandiman
 
railway workshop jodhpur
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur kalumutha
 
Industrial training report on samastipur railway workshop
Industrial training report on samastipur railway workshopIndustrial training report on samastipur railway workshop
Industrial training report on samastipur railway workshopaman261994
 

Was ist angesagt? (20)

integral coach factory report
integral coach factory report integral coach factory report
integral coach factory report
 
locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagon
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
 
Mechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training reportMechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training report
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 
central Railway project report
central Railway project report central Railway project report
central Railway project report
 
RWFfinal
RWFfinalRWFfinal
RWFfinal
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
 
PPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDPPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHED
 
PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)
 
Summer training from Indian Railway ppt (2)
Summer training from Indian Railway ppt (2)Summer training from Indian Railway ppt (2)
Summer training from Indian Railway ppt (2)
 
liluahworkshop
liluahworkshopliluahworkshop
liluahworkshop
 
Inplant Training - Integral Coach Factory
Inplant Training - Integral Coach FactoryInplant Training - Integral Coach Factory
Inplant Training - Integral Coach Factory
 
A presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayA presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railway
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
 
LOCO TRAINING REPORT
LOCO TRAINING REPORTLOCO TRAINING REPORT
LOCO TRAINING REPORT
 
railway workshop jodhpur
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur
 
Industrial training report on samastipur railway workshop
Industrial training report on samastipur railway workshopIndustrial training report on samastipur railway workshop
Industrial training report on samastipur railway workshop
 

Ähnlich wie Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ

Suzuki
SuzukiSuzuki
SuzukiHome
 
Industrial training report with Mechnaical Engineering department Kashmir
Industrial training report with Mechnaical Engineering department KashmirIndustrial training report with Mechnaical Engineering department Kashmir
Industrial training report with Mechnaical Engineering department KashmirNauman Wani
 
Ppt on Gorakhpur railway station
Ppt on Gorakhpur railway stationPpt on Gorakhpur railway station
Ppt on Gorakhpur railway stationdurgesh pathak
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentationahmedalvi01
 
bottle neck operation through critical path method
bottle neck operation through critical path methodbottle neck operation through critical path method
bottle neck operation through critical path methodSaurav Kumar
 
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...Toukir Ahmed Chowdhury
 
Ksrtc central works INDUSTRIAL VISIT REPORT
Ksrtc central works INDUSTRIAL VISIT REPORTKsrtc central works INDUSTRIAL VISIT REPORT
Ksrtc central works INDUSTRIAL VISIT REPORTGeorge Jose
 
HMT TRACTORS LIMITED
HMT TRACTORS LIMITEDHMT TRACTORS LIMITED
HMT TRACTORS LIMITEDDeepak kango
 
Amresh kumar ppt.(2017) (1)
Amresh kumar ppt.(2017) (1)Amresh kumar ppt.(2017) (1)
Amresh kumar ppt.(2017) (1)Amresh0024
 
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODY
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODYPRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODY
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODYSyedYahya4
 
Design & Manufacturing of Metro Car Body.pdf
Design & Manufacturing of Metro Car Body.pdfDesign & Manufacturing of Metro Car Body.pdf
Design & Manufacturing of Metro Car Body.pdfravibhaknp
 
N.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPTN.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPTANAND kumar
 
Internship at Pakistan Railways
Internship at Pakistan RailwaysInternship at Pakistan Railways
Internship at Pakistan RailwaysMuhammad Usman
 
Nw railway by suresh bose
Nw railway  by suresh boseNw railway  by suresh bose
Nw railway by suresh boseSuresh Bose
 
Automotive Manufacturing Process Overview
Automotive Manufacturing Process OverviewAutomotive Manufacturing Process Overview
Automotive Manufacturing Process OverviewTal Vagman
 

Ähnlich wie Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ (20)

Suzuki
SuzukiSuzuki
Suzuki
 
Industrial training report with Mechnaical Engineering department Kashmir
Industrial training report with Mechnaical Engineering department KashmirIndustrial training report with Mechnaical Engineering department Kashmir
Industrial training report with Mechnaical Engineering department Kashmir
 
Bwel presentation
Bwel presentationBwel presentation
Bwel presentation
 
Ppt on Gorakhpur railway station
Ppt on Gorakhpur railway stationPpt on Gorakhpur railway station
Ppt on Gorakhpur railway station
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentation
 
bottle neck operation through critical path method
bottle neck operation through critical path methodbottle neck operation through critical path method
bottle neck operation through critical path method
 
Prince ppt
Prince pptPrince ppt
Prince ppt
 
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...
Bangladesh Railway Industrial Training (Pahartali Carriage and Wagon Workshop...
 
Ksrtc central works INDUSTRIAL VISIT REPORT
Ksrtc central works INDUSTRIAL VISIT REPORTKsrtc central works INDUSTRIAL VISIT REPORT
Ksrtc central works INDUSTRIAL VISIT REPORT
 
HMT TRACTORS LIMITED
HMT TRACTORS LIMITEDHMT TRACTORS LIMITED
HMT TRACTORS LIMITED
 
Amresh kumar ppt.(2017) (1)
Amresh kumar ppt.(2017) (1)Amresh kumar ppt.(2017) (1)
Amresh kumar ppt.(2017) (1)
 
RAILWAY PPT
RAILWAY PPTRAILWAY PPT
RAILWAY PPT
 
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODY
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODYPRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODY
PRESENTATION ON DESIGN AND MANUFACTURE OF METRO CAR BODY
 
Design & Manufacturing of Metro Car Body.pdf
Design & Manufacturing of Metro Car Body.pdfDesign & Manufacturing of Metro Car Body.pdf
Design & Manufacturing of Metro Car Body.pdf
 
N.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPTN.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPT
 
automotivemanufacturingprocessesoverviewtvjan2016updated-160106163635 (1).pdf
automotivemanufacturingprocessesoverviewtvjan2016updated-160106163635 (1).pdfautomotivemanufacturingprocessesoverviewtvjan2016updated-160106163635 (1).pdf
automotivemanufacturingprocessesoverviewtvjan2016updated-160106163635 (1).pdf
 
Internship at Pakistan Railways
Internship at Pakistan RailwaysInternship at Pakistan Railways
Internship at Pakistan Railways
 
Nw railway by suresh bose
Nw railway  by suresh boseNw railway  by suresh bose
Nw railway by suresh bose
 
Automotive Manufacturing Process Overview
Automotive Manufacturing Process OverviewAutomotive Manufacturing Process Overview
Automotive Manufacturing Process Overview
 
Bogie
BogieBogie
Bogie
 

Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ

  • 1. SUBMITTED TO ASTT. PROF. ANITA KURADIYA MECHANICAL DEPARTMENT (COLLEGE OF ENGINEERING & TECHNOLOGY BIKANER) SUBMITTED BY AMITRAJ 13ECTME007
  • 2. About The “Lalgarh Railway Workshop” • Foundation : Maharaja Ganga Singh Ji Bahadur on 18th March,1925 • Location: Outskirt of Bikaner town known as Lalgarh • Plant started: 1st March,1927 • Total area: 141226 meter sq. • Machinery in plant:232 • Track inside plant:2.6 km
  • 3. PERIODIC-OVERHAULING Periodic-overhauling(POH): It is a process of 8 days during which checking & repairing/replacement of train’s parts take place. Time Period Of POH: Mail/Express train: POH after 12 months Passenger Train : POH after 18 months
  • 4. Procedures of POH DAY 1st : Disassembly of electrical components DAY 2nd : Lift/Lowering DAY 3rd : Body repair DAY 4th : Carpenter work DAY 5th : Painting DAY 6th : Electrical component fitting DAY 7th : Adjustment of all parts DAY 8th : Vacuum testing
  • 5. LIST OF SHOPS • Carriage shop • Carpenter shop • Corrosion shop • Painting & Trimming shop • Wagon shop • Wheel shop • Tool shop • Mill right shop • Bogie IOH shop
  • 6. CARRIAGE SHOP • Purpose: To repair coaches
  • 7. Parts of coaches which get repaired in carriage shop • Dash port Spring: It act as shock absorber. • Bdl’ster: Mounted between lower and upper shock absorber & also called secondary shock absorber. • Brake block: Hold the brake frame & coach beam together. • Equalizing stray: This also hold coach beam & brake frame together.
  • 8. • Brake shoe key : Stop the brake shoe from running out. • Bearing pieces: Component on which coaches turn. • Pivot seat: Control running of train. • Anchor link: Control movement of coaches.
  • 9. CARPENTRY SHOP In this shop wooden fitting of pipes on walls, floors etc are done.
  • 10. Machines available/used in the carpentry shop of this plant: • Circular saw machine -2 • Body band saw machine -1 • Vertical band saw machine-2 • Planer machine-1
  • 11. CORROSION SHOP • Purpose: To repair corroded parts mainly head stock, coaching stock, sole bar and cross bar.
  • 12. C-schedule in corrosion shop DAY 1st : Cleaning with soap sol. & touch up damage part with primer. DAY 2nd : Spot putty. DAY 3rd : Flat with silicon carbide & finish coat with enamel. DAY 4th : Apply second coat of enamel. DAY 5th : Lettering with golden yellow color & miscellaneous work.
  • 13. PAINTING SHOP • Painting & External maintenance is done in this shop. • These are done in two schedule: • A-schedule(9 days): for maintenance • C-schedule(5 days): for final painting
  • 14. Painting done in this shop: • Side painting : Smoke grey paint • Under frame : Bituminous Paint • Internal painting : White enamel paint • End panel : Black enamel paint • Trolley : Bituminous paint • Roof : Aluminium paint
  • 15. TRIMMING SHOP • Final stages of basic rebuilding as assembly of seats, painting & stiching are completed. • Seats are repaired and reassembled.
  • 17. Works done in wagon shop: • Super structure attached to the under frame of a wagon is called ‘WAGON BODY’. • In this shop,the body,underframe of a Wagon are repaired. • Proper numbers of doors, pillers etc. are attached. • Wagon Air Brake Testing are done in this shop.
  • 18. WHEEL SHOP • New wheel undergo various operations for testing so wheel shop has various section • Axle passing section : Axle and tyre received from companies and reassembled. • Tyre section : Diameter of tyre reduced
  • 19. MILL WRIGHT SHOP • Millwright shop has three sections: • Machine maintenance section • Transport section • Compressor section
  • 20. • Maintenance section: All the machine parts are repaired.
  • 21. • Transportation Section: Transportation of goods are taken by some machine to reduce place and component transported from one place to another. • Compressor section: The screw type air compressor is a positive displacement machine of reciprocative type. .
  • 22. BOGIE IOH SHOP In this shop all the component of a bogie is fitted or welded and finally railway coaches is formed.
  • 23. COMPONENTS OF RAILWAY BOGIE: • Bogie Transom • Bogie Cylinder • Primary Suspension Coil • Motor Suspension Tube • Gear Box • Lifting Box
  • 24. • Neutral section switch detector • Secondary suspension air bag • Shock absorber • Axle box cover • Bogie bolster • Center pivot pin Shock absorber