SlideShare a Scribd company logo
1 of 28
Role of HOST ENTITY in GCDP
Ensuring AIESEC
Support to EP
including
accommodation,
support, logistics,
travel etc!
JD Alignment
between EP and the
project/NGO along
with the right
expectation setting
Effective
Integration of EP
into the city,
culture etc!
START UP LC
0-10 Realisations LCVP Comm/
Marketing
Member 1 Member 2
KPI:
• Number of EP’s Raised
(that fit the right Matchable EP Profiles)
• # of Leads/ Registrations from each strategy
• Increased Conversation Rate from Sign up to Raise
NOTE:
• Marketing team has 1-3 members (including LCVP)
• Marketing Team needs to focus on establishing their
market penetration for just 1 Programme
(oGIP/oGCDP) and just 1-2 Sub-products/ Issues
under this programme
10 to 40
Realisations
30 to 70+
Raised
50 to 150+
Sign ups
(Ideally, Sign up to
Raise Conversion rate
is greater than 30%)
Sample Backwards Planning:
This means that recruitment
activities must be focused
enough to get this number of
registrations from the right
target market
Based on Statistics, how
many Raises do you nee to
get this many
realisations?
Based on Statistics, how
many Sign-ups do you nee
to get this many raises?
STARTHERE
WHY?
Right
number of
People to
Deliver high
volume QUALITY
Experiences
Clear JD
and KPI for
members working
on delivery
Growing in Exchange means
we NEED to have enough
People to MANAGE
experiences for high quality.
This is the most important!
HOW?
STEP 1:
Plan for Capacity
for Quality
STEP 2:
Structure, JD and
KPI in different LC
Volumes in iGIP
STEP 1: Plan for Capacity for Summer
Use the TM Planning tool to plan
iGCDP
STEP 1: Plan for Capacity for Summer
Here enter
number of
interns/EPs one
member can
deliver Eg: 1
member – 3 EPs
iGCDP
STEP 1: Plan for Capacity for Summer
That number from
slide 2 will multiply
with Re goal you enter
for the quarter so you
know how many
members are needed
for delivery in each
programme
iGCDP
GCDP Clustering for LC
iGCDP
Beginner 0-25 X RE
Intermediate 25-100 X RE
Advanced 100-200 X RE
Mature +200 X RE
STEP 2: Create structures for quality delivery
Structures by
Volume of
Realizations the LC
does
Customize your
structures for the
fruit peak if needed
STEP 2: An LC that has planned between 0-25 in 2014
Basic Consideration:
• As start up, LC manage the basic process of iGCDP
delivery
• There is no need to manage iGCDP as a project yet -
in general experience delivery will be TN based
• Member Efficiency: 0-4 X / member
Number of members: Use TM Planning tool to determine
Job Description:
• Selling and raising, matching, and realizing
• Incoming preparation seminar
• Experience Co-delivery
VP
Member Member Member
∞
Ra-Ma-Re
STEP 2: An LC that has planned between 0-25 in 2014
JD for Delivery
0 Supporting Eps through the match process (especially for visa) and at realization
0 Delivery through fulfilling all exchange minimums
0 Very important: Airport pick up, Logistics, Supporting Accommodation of EPs , Integration of EPs, Ensuring alignment
between EP and company
0 FAST firefighting on NPS in case of any EP issues/complaints
0 Showcasing promoter EP stories
0 During sales process ensure there is clear understanding of JD so that there is no issue in JD alignment at the realized
stage
Recommendation: Even though most detractor issues/comments are at
realized stage, by taking the right actions (through the right JD) during raise
and match, the level of issues at the realized stage can be decreased!
STEP 2: KPI within the structure
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
For a Team - % of Promoters/Total Realizations of the team
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
STEP 2: An LC that has planned between 25-100 in 2014
VP
OCP OCP OCP
∞
Ra-Ma-Re
∞
Ra-Ma-Re
∞
Ra-Ma-Re
Number of members: Use TM Planning framework
Job Description:
• Selling and raising, matching, and realizing
• Project concept development and execution
• Incoming preparation seminar
• Experience Co-delivery (country-country partnership management)
• LCs have more capacity in project management
• Project concept will be centralized Nationally
(National project implementation in LCs)
• Start to have the needs of event/project
management
STEP 2: JD within the structure
JD of Delivery members in the team
During Raising period During Matching period During Realization
• Ensure clear and high
quality JD in a specific
issue segment and for a
specific national project
• Clear expectation
setting with NGO about
role of EP, salary etc.
• Visa Support (The key
issue is Eps want MORE
and ACCURATE
information about the
process and documents
related to visa)
• As soon as matches are
confirmed start working
on accommodation
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
STEP 2: JD within the structure
JD of Delivery members in the team
Who is a trainee buddy? – An LC member (doesn’t need to be
only from the iGIP team) who is responsible for meeting and
communicating with the EP regularly, who support the delivery
team in the EP Pick up, integration etc
Having trainee buddy makes the job of a delivery team simpler
and also allows members to have a great experience interacting
with Eps
At this stage, make sure you are firefighting fast on NPS incase
EP has a comment/issue
During Realization
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
• Induction meeting with
EP and company
STEP 2: JD within the structure
Synergy of members in the team
- Since each team is working on projects and is responsible
for the whole exchange process, the synergy between the 3
teams and members within the team has to be very good:
1. Each member is responsible for the right raise and
expectation setting with NGO
2. There is/are specific member working on ensuring the visa
information and process
3. There are 2-3 members working on accommodation while
the others are working on airport pick up, logistics, trainee
buddy etc.
Each member is
responsible for
his/her raised and
matched EPs
Big tasks needed
for all Eps like
accommodation etc
are done by specific
members
STEP 2: KPI within the structure for delivery members in the
team
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
STEP 2: Ideal duration of teams
Makes sense for teams
to be for 3-4 months –
This gives members
time to deliver the
Realization effectively
It is important to MAKE
SURE that once the
team duration ends the
same members are
communicating and
supporting Eps and this
is still part of their role
iGCDP EPs generally are in the LC for 6-8 weeks so even if a members term
ends, he/she can continue being responsible for his/her realization
STEP 2: An LC that has planned between 100-200 in 2014
VP
OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local)
Number of members: Use TM Planning Framework
Job Description:
• Selling and raising, matching, and realizing
• Project concept development and execution
• Project brand management
• Incoming preparation seminar
• Experience Co-delivery (LC-LC partnership management)
Basic Consideration:
• LC is considered to have the capacity in
understanding Project management concept
and put into implementation
• LC has capacity in innovate a project based
on issue
• Member Efficiency: 4-6 X /member
STEP 2: JD within the structure
JD of Delivery members in the team
• The JD is very similar to LCs doing 25-100
The 2 key differences are:
1. Since the volume is more in this case, LC can start working on outsourcing some
services to make processes more efficient
2. This LC structure is working on local projects as well as national projects
implementation so make sure the local project delivery is very well planned
STEP 2: JD within the structure
JD of Delivery members in the team
During Raising period During Matching period During Realization
• Ensure clear and high
quality JD in a specific
issue segment and for a
specific national project
• Clear expectation
setting with NGO about
role of EP, salary etc.
• Visa Support (The key
issue is Eps want MORE
and ACCURATE
information about the
process and documents
related to visa)
• As soon as matches are
confirmed start working
on accommodation
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
STEP 2: JD within the structure
JD of Delivery members in the team
Who is a trainee buddy? – An LC member (doesn’t need to be
only from the iGIP team) who is responsible for meeting and
communicating with the EP regularly, who support the delivery
team in the EP Pick up, integration etc
Having trainee buddy makes the job of a delivery team simpler
and also allows members to have a great experience interacting
with Eps
At this stage, make sure you are firefighting fast on NPS incase
EP has a comment/issue
During Realization
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
• Induction meeting with
EP and company
STEP 2: An LC that has planned 200+ in 2014
VP
OCP OCP OCP OCP Mid. Manager
• With high volume of iGCDP delivery, Project team need to be
really focus on Customer experience
• Prevent the tendency of non- innovative JDs
• Account management and Customer loyalty for Organization
management (TN Takers, Learning partners, etc)
• Multi stakeholders and another level of accommodation
management
• Every team does all Raise – Match – Realize process (5-
6 members)
• Full responsibility in managing Inner-Outer journey of
EP
• Have other separate team/person managing
stakeholders or other process outside exchange
process delivery
• Example JD for Middle Management person:
• Customer Loyalty for Organization (partner
relation management)
• Accommodation management (home stay
program)
VP
OCP OCP OCP OCP Mid. Manager
STEP 2: An LC that has planned 200+ in 2014
STEP 2: JD within the structure
The middle manager in the structure and his/her team manage EXPERIENCE DELIVERY
Middle Manager and team
Account
Managers
- Market research
- Selling and marketing
- CRM
- Re-Raising
Hosting
- Managing “Hosting
Program” Product
- Managing Allocation
Process to
accommodation and
host families
- Managing EP
Reception and
Accommodation
STEP 2: JD within the structure
0 The OCP teams are very involved with EP Preparation (virtually), EP Integration into
project and delivery of inner-outer journey but the Middle manager team is focused on
accommodation, host family (Hosting Programme Product) and Reception activities –
this is the division of JD between both teams
0 This means there has to be good synergy between teams and alignment of exchange
timeline
0 In case of high volume LCs, it is important for the whole LC to support EP Integration and
EP Reception to deliver high quality experiences!
STEP 2: KPI within the structure for delivery members in the
team
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC

More Related Content

What's hot

oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline Management
AIESEC
 
oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions
AIESEC
 
Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1
AIESEC
 
iGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsiGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projects
AIESEC
 
Tier 1 IXP for oGIP
Tier 1 IXP for oGIPTier 1 IXP for oGIP
Tier 1 IXP for oGIP
AIESEC
 
Optimized Learning and Development
Optimized Learning and Development Optimized Learning and Development
Optimized Learning and Development
AIESEC
 
iGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DiGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&D
AIESEC
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementation
AIESEC
 
iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&D
AIESEC
 
Balance quality experience delivery in GIP and GCDP during peaks
Balance quality experience delivery in GIP and GCDP during peaksBalance quality experience delivery in GIP and GCDP during peaks
Balance quality experience delivery in GIP and GCDP during peaks
AIESEC
 
Balancing growth in both OGX programmes
Balancing growth in both OGX programmesBalancing growth in both OGX programmes
Balancing growth in both OGX programmes
AIESEC
 
Tier 4 - Introduction to iGCDP Operations
Tier 4 - Introduction to iGCDP OperationsTier 4 - Introduction to iGCDP Operations
Tier 4 - Introduction to iGCDP Operations
AIESEC
 
GCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueGCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issue
Firnando Buenayre
 
Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement
maggie4667
 
AIESEC | Italy 1415 | MC | Fall Winter Peak Bible
AIESEC | Italy 1415 | MC | Fall Winter Peak BibleAIESEC | Italy 1415 | MC | Fall Winter Peak Bible
AIESEC | Italy 1415 | MC | Fall Winter Peak Bible
Guiscardo Urso
 

What's hot (20)

oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline Management
 
oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions
 
Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1
 
iGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsiGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projects
 
Tier 1 IXP for oGIP
Tier 1 IXP for oGIPTier 1 IXP for oGIP
Tier 1 IXP for oGIP
 
Optimized Learning and Development
Optimized Learning and Development Optimized Learning and Development
Optimized Learning and Development
 
iGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DiGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&D
 
IXP
IXPIXP
IXP
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementation
 
iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&D
 
Balance quality experience delivery in GIP and GCDP during peaks
Balance quality experience delivery in GIP and GCDP during peaksBalance quality experience delivery in GIP and GCDP during peaks
Balance quality experience delivery in GIP and GCDP during peaks
 
Balancing growth in both OGX programmes
Balancing growth in both OGX programmesBalancing growth in both OGX programmes
Balancing growth in both OGX programmes
 
Tier 4 - Introduction to iGCDP Operations
Tier 4 - Introduction to iGCDP OperationsTier 4 - Introduction to iGCDP Operations
Tier 4 - Introduction to iGCDP Operations
 
GCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueGCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issue
 
iGCDP (L&D)
iGCDP (L&D)iGCDP (L&D)
iGCDP (L&D)
 
AIESEC Marketing OGX Structures
AIESEC Marketing OGX StructuresAIESEC Marketing OGX Structures
AIESEC Marketing OGX Structures
 
Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement
 
Pipeline Management
Pipeline ManagementPipeline Management
Pipeline Management
 
AIESEC | Italy 1415 | MC | Fall Winter Peak Bible
AIESEC | Italy 1415 | MC | Fall Winter Peak BibleAIESEC | Italy 1415 | MC | Fall Winter Peak Bible
AIESEC | Italy 1415 | MC | Fall Winter Peak Bible
 
GCDP
GCDPGCDP
GCDP
 

Similar to Capacity and structures for high quality iGCDP

oGCDP Capacity Quality Delivery
oGCDP Capacity Quality DeliveryoGCDP Capacity Quality Delivery
oGCDP Capacity Quality Delivery
Firnando Buenayre
 
oGIP Capacity Quality Delivery
oGIP Capacity Quality DeliveryoGIP Capacity Quality Delivery
oGIP Capacity Quality Delivery
Firnando Buenayre
 
iGIP capacity for Quality Delivery
iGIP capacity for Quality DeliveryiGIP capacity for Quality Delivery
iGIP capacity for Quality Delivery
Firnando Buenayre
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergy
AIESEC
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&D
AIESEC
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline Management
AIESEC
 
Co delivery framework checklist
Co delivery framework checklistCo delivery framework checklist
Co delivery framework checklist
Sophia Fan
 
National project OCP|OC information and application booklet
National project OCP|OC information and application bookletNational project OCP|OC information and application booklet
National project OCP|OC information and application booklet
Anastasiia Isakii
 
YGIP_AIESECDU 2013 Audit
YGIP_AIESECDU  2013 AuditYGIP_AIESECDU  2013 Audit
YGIP_AIESECDU 2013 Audit
Aakash Malhotra
 
Co delivery tier 1,2,3
Co delivery tier 1,2,3Co delivery tier 1,2,3
Co delivery tier 1,2,3
AIESEC
 
GIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration IssueGIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration Issue
Firnando Buenayre
 
oGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performanceoGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performance
AIESEC
 

Similar to Capacity and structures for high quality iGCDP (20)

oGCDP Capacity Quality Delivery
oGCDP Capacity Quality DeliveryoGCDP Capacity Quality Delivery
oGCDP Capacity Quality Delivery
 
oGIP Capacity Quality Delivery
oGIP Capacity Quality DeliveryoGIP Capacity Quality Delivery
oGIP Capacity Quality Delivery
 
iGIP capacity for Quality Delivery
iGIP capacity for Quality DeliveryiGIP capacity for Quality Delivery
iGIP capacity for Quality Delivery
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergy
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&D
 
TD Area Plan
TD Area PlanTD Area Plan
TD Area Plan
 
Codelivery strategy
Codelivery strategyCodelivery strategy
Codelivery strategy
 
AIESEC Vietnam | Talent planning for dummies
AIESEC Vietnam | Talent planning for dummiesAIESEC Vietnam | Talent planning for dummies
AIESEC Vietnam | Talent planning for dummies
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline Management
 
TM Structures
TM StructuresTM Structures
TM Structures
 
Co delivery framework checklist
Co delivery framework checklistCo delivery framework checklist
Co delivery framework checklist
 
Excel: AIESEC India
Excel: AIESEC IndiaExcel: AIESEC India
Excel: AIESEC India
 
National project OCP|OC information and application booklet
National project OCP|OC information and application bookletNational project OCP|OC information and application booklet
National project OCP|OC information and application booklet
 
YGIP_AIESECDU 2013 Audit
YGIP_AIESECDU  2013 AuditYGIP_AIESECDU  2013 Audit
YGIP_AIESECDU 2013 Audit
 
Co delivery tier 1,2,3
Co delivery tier 1,2,3Co delivery tier 1,2,3
Co delivery tier 1,2,3
 
GIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration IssueGIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration Issue
 
NSC output
NSC outputNSC output
NSC output
 
oGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performanceoGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performance
 
Associate membership aiesec india
Associate membership   aiesec indiaAssociate membership   aiesec india
Associate membership aiesec india
 
2014 Winter National Award Application SYSU GIPi
2014 Winter National Award Application SYSU GIPi2014 Winter National Award Application SYSU GIPi
2014 Winter National Award Application SYSU GIPi
 

More from AIESEC

More from AIESEC (20)

AI 1718 plan presentation
AI 1718 plan presentationAI 1718 plan presentation
AI 1718 plan presentation
 
The AIESECer Survey March 2017
The AIESECer Survey March 2017The AIESECer Survey March 2017
The AIESECer Survey March 2017
 
GET: Induction Guideline
GET: Induction GuidelineGET: Induction Guideline
GET: Induction Guideline
 
GET: Membership Selection
GET: Membership SelectionGET: Membership Selection
GET: Membership Selection
 
GET: Membership Planning
GET: Membership PlanningGET: Membership Planning
GET: Membership Planning
 
APLS-IR guide for LCP
APLS-IR guide for LCP APLS-IR guide for LCP
APLS-IR guide for LCP
 
APLS-Clarity of what
APLS-Clarity of whatAPLS-Clarity of what
APLS-Clarity of what
 
APLS-iGV product session
APLS-iGV product sessionAPLS-iGV product session
APLS-iGV product session
 
APLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LCAPLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LC
 
The ultimate lcp wisdom book
The ultimate lcp wisdom bookThe ultimate lcp wisdom book
The ultimate lcp wisdom book
 
Planning planning framework odm
Planning  planning framework odmPlanning  planning framework odm
Planning planning framework odm
 
Building culture of_success
Building culture of_successBuilding culture of_success
Building culture of_success
 
Building sales driven_culture
Building sales driven_cultureBuilding sales driven_culture
Building sales driven_culture
 
Our role as p
Our role as pOur role as p
Our role as p
 
P tips for planning
P tips for planningP tips for planning
P tips for planning
 
Role of lcp
Role of lcpRole of lcp
Role of lcp
 
Building culture of excellence+recognition
Building culture of excellence+recognitionBuilding culture of excellence+recognition
Building culture of excellence+recognition
 
[Tm]forming teams
[Tm]forming teams[Tm]forming teams
[Tm]forming teams
 
Building working culture
Building working cultureBuilding working culture
Building working culture
 
Building high performance_culture_rockefeller
Building high performance_culture_rockefellerBuilding high performance_culture_rockefeller
Building high performance_culture_rockefeller
 

Recently uploaded

Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 

Recently uploaded (15)

Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 

Capacity and structures for high quality iGCDP

  • 1.
  • 2. Role of HOST ENTITY in GCDP Ensuring AIESEC Support to EP including accommodation, support, logistics, travel etc! JD Alignment between EP and the project/NGO along with the right expectation setting Effective Integration of EP into the city, culture etc!
  • 3. START UP LC 0-10 Realisations LCVP Comm/ Marketing Member 1 Member 2 KPI: • Number of EP’s Raised (that fit the right Matchable EP Profiles) • # of Leads/ Registrations from each strategy • Increased Conversation Rate from Sign up to Raise NOTE: • Marketing team has 1-3 members (including LCVP) • Marketing Team needs to focus on establishing their market penetration for just 1 Programme (oGIP/oGCDP) and just 1-2 Sub-products/ Issues under this programme 10 to 40 Realisations 30 to 70+ Raised 50 to 150+ Sign ups (Ideally, Sign up to Raise Conversion rate is greater than 30%) Sample Backwards Planning: This means that recruitment activities must be focused enough to get this number of registrations from the right target market Based on Statistics, how many Raises do you nee to get this many realisations? Based on Statistics, how many Sign-ups do you nee to get this many raises? STARTHERE
  • 4. WHY? Right number of People to Deliver high volume QUALITY Experiences Clear JD and KPI for members working on delivery Growing in Exchange means we NEED to have enough People to MANAGE experiences for high quality. This is the most important!
  • 5. HOW? STEP 1: Plan for Capacity for Quality STEP 2: Structure, JD and KPI in different LC Volumes in iGIP
  • 6. STEP 1: Plan for Capacity for Summer Use the TM Planning tool to plan iGCDP
  • 7. STEP 1: Plan for Capacity for Summer Here enter number of interns/EPs one member can deliver Eg: 1 member – 3 EPs iGCDP
  • 8. STEP 1: Plan for Capacity for Summer That number from slide 2 will multiply with Re goal you enter for the quarter so you know how many members are needed for delivery in each programme iGCDP
  • 9. GCDP Clustering for LC iGCDP Beginner 0-25 X RE Intermediate 25-100 X RE Advanced 100-200 X RE Mature +200 X RE
  • 10. STEP 2: Create structures for quality delivery Structures by Volume of Realizations the LC does Customize your structures for the fruit peak if needed
  • 11. STEP 2: An LC that has planned between 0-25 in 2014 Basic Consideration: • As start up, LC manage the basic process of iGCDP delivery • There is no need to manage iGCDP as a project yet - in general experience delivery will be TN based • Member Efficiency: 0-4 X / member Number of members: Use TM Planning tool to determine Job Description: • Selling and raising, matching, and realizing • Incoming preparation seminar • Experience Co-delivery VP Member Member Member ∞ Ra-Ma-Re
  • 12. STEP 2: An LC that has planned between 0-25 in 2014 JD for Delivery 0 Supporting Eps through the match process (especially for visa) and at realization 0 Delivery through fulfilling all exchange minimums 0 Very important: Airport pick up, Logistics, Supporting Accommodation of EPs , Integration of EPs, Ensuring alignment between EP and company 0 FAST firefighting on NPS in case of any EP issues/complaints 0 Showcasing promoter EP stories 0 During sales process ensure there is clear understanding of JD so that there is no issue in JD alignment at the realized stage Recommendation: Even though most detractor issues/comments are at realized stage, by taking the right actions (through the right JD) during raise and match, the level of issues at the realized stage can be decreased!
  • 13. STEP 2: KPI within the structure KPI 1: For a single member - % of Promoters/Total Realizations of the member For a Team - % of Promoters/Total Realizations of the team KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC
  • 14. STEP 2: An LC that has planned between 25-100 in 2014 VP OCP OCP OCP ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re Number of members: Use TM Planning framework Job Description: • Selling and raising, matching, and realizing • Project concept development and execution • Incoming preparation seminar • Experience Co-delivery (country-country partnership management) • LCs have more capacity in project management • Project concept will be centralized Nationally (National project implementation in LCs) • Start to have the needs of event/project management
  • 15. STEP 2: JD within the structure JD of Delivery members in the team During Raising period During Matching period During Realization • Ensure clear and high quality JD in a specific issue segment and for a specific national project • Clear expectation setting with NGO about role of EP, salary etc. • Visa Support (The key issue is Eps want MORE and ACCURATE information about the process and documents related to visa) • As soon as matches are confirmed start working on accommodation • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP
  • 16. STEP 2: JD within the structure JD of Delivery members in the team Who is a trainee buddy? – An LC member (doesn’t need to be only from the iGIP team) who is responsible for meeting and communicating with the EP regularly, who support the delivery team in the EP Pick up, integration etc Having trainee buddy makes the job of a delivery team simpler and also allows members to have a great experience interacting with Eps At this stage, make sure you are firefighting fast on NPS incase EP has a comment/issue During Realization • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP • Induction meeting with EP and company
  • 17. STEP 2: JD within the structure Synergy of members in the team - Since each team is working on projects and is responsible for the whole exchange process, the synergy between the 3 teams and members within the team has to be very good: 1. Each member is responsible for the right raise and expectation setting with NGO 2. There is/are specific member working on ensuring the visa information and process 3. There are 2-3 members working on accommodation while the others are working on airport pick up, logistics, trainee buddy etc. Each member is responsible for his/her raised and matched EPs Big tasks needed for all Eps like accommodation etc are done by specific members
  • 18. STEP 2: KPI within the structure for delivery members in the team KPI 1: For a single member - % of Promoters/Total Realizations of the member KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC
  • 19. STEP 2: Ideal duration of teams Makes sense for teams to be for 3-4 months – This gives members time to deliver the Realization effectively It is important to MAKE SURE that once the team duration ends the same members are communicating and supporting Eps and this is still part of their role iGCDP EPs generally are in the LC for 6-8 weeks so even if a members term ends, he/she can continue being responsible for his/her realization
  • 20. STEP 2: An LC that has planned between 100-200 in 2014 VP OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local) Number of members: Use TM Planning Framework Job Description: • Selling and raising, matching, and realizing • Project concept development and execution • Project brand management • Incoming preparation seminar • Experience Co-delivery (LC-LC partnership management) Basic Consideration: • LC is considered to have the capacity in understanding Project management concept and put into implementation • LC has capacity in innovate a project based on issue • Member Efficiency: 4-6 X /member
  • 21. STEP 2: JD within the structure JD of Delivery members in the team • The JD is very similar to LCs doing 25-100 The 2 key differences are: 1. Since the volume is more in this case, LC can start working on outsourcing some services to make processes more efficient 2. This LC structure is working on local projects as well as national projects implementation so make sure the local project delivery is very well planned
  • 22. STEP 2: JD within the structure JD of Delivery members in the team During Raising period During Matching period During Realization • Ensure clear and high quality JD in a specific issue segment and for a specific national project • Clear expectation setting with NGO about role of EP, salary etc. • Visa Support (The key issue is Eps want MORE and ACCURATE information about the process and documents related to visa) • As soon as matches are confirmed start working on accommodation • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP
  • 23. STEP 2: JD within the structure JD of Delivery members in the team Who is a trainee buddy? – An LC member (doesn’t need to be only from the iGIP team) who is responsible for meeting and communicating with the EP regularly, who support the delivery team in the EP Pick up, integration etc Having trainee buddy makes the job of a delivery team simpler and also allows members to have a great experience interacting with Eps At this stage, make sure you are firefighting fast on NPS incase EP has a comment/issue During Realization • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP • Induction meeting with EP and company
  • 24. STEP 2: An LC that has planned 200+ in 2014 VP OCP OCP OCP OCP Mid. Manager • With high volume of iGCDP delivery, Project team need to be really focus on Customer experience • Prevent the tendency of non- innovative JDs • Account management and Customer loyalty for Organization management (TN Takers, Learning partners, etc) • Multi stakeholders and another level of accommodation management
  • 25. • Every team does all Raise – Match – Realize process (5- 6 members) • Full responsibility in managing Inner-Outer journey of EP • Have other separate team/person managing stakeholders or other process outside exchange process delivery • Example JD for Middle Management person: • Customer Loyalty for Organization (partner relation management) • Accommodation management (home stay program) VP OCP OCP OCP OCP Mid. Manager STEP 2: An LC that has planned 200+ in 2014
  • 26. STEP 2: JD within the structure The middle manager in the structure and his/her team manage EXPERIENCE DELIVERY Middle Manager and team Account Managers - Market research - Selling and marketing - CRM - Re-Raising Hosting - Managing “Hosting Program” Product - Managing Allocation Process to accommodation and host families - Managing EP Reception and Accommodation
  • 27. STEP 2: JD within the structure 0 The OCP teams are very involved with EP Preparation (virtually), EP Integration into project and delivery of inner-outer journey but the Middle manager team is focused on accommodation, host family (Hosting Programme Product) and Reception activities – this is the division of JD between both teams 0 This means there has to be good synergy between teams and alignment of exchange timeline 0 In case of high volume LCs, it is important for the whole LC to support EP Integration and EP Reception to deliver high quality experiences!
  • 28. STEP 2: KPI within the structure for delivery members in the team KPI 1: For a single member - % of Promoters/Total Realizations of the member KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC