Egmont Otterman 2017 09-15 Cape Town
1. Converting Waste to Energy.
Improving Social and
Environmental Resilience.
Going Zero to Landfill.
2. NEW HORIZONS WASTE TO ENERGY
Collectively, com m unities
are increasing earth’s waste
burden.
There is also a growing
need for energy
consum ption.
And we create a circular econom y which
offsets the collective carbon footprint and
the com m u n it y’s reliance on finite,
expensive fossil fuels.
Add a state-of-
the-art biogas
plant.
Which converts non-
hazardous waste into
clean, environmentally-
considerate, low-carbon
energy.
Provides an
alternative energy
resource.
Using the latest technology disrupt waste management in South
Africa.
3. Client truck unload mixed Municipal Solid
Waste(MSW) and Wet Trade Waste (WTW)
in the main tipping hall. At a separate
entrance, trucks deliver and dump pure
organic waste (POW)
Pow is loaded into an organic press which
separates organics from solid waste and
liquefies the organic material
The organic material is pumped into the
suspension buffer tank and after analysis,
pumped into the digesters, where it is digested by
bacteria to produce biogas through anaerobic
digestions. The biogas, captured at the top of the
digester, is pumped to the biogas upgrade plant
The biogas is cleaned dried and
then enters the separation plant for
separation into Biomethane (CBM)
and Co2
Liquid CO2 is pumped into storage tans
and collected by tanker trucks, while
Biomethane is compressed odorized
and stored into tank trailers, which are
collected regularly
ORGANIC
EXTRUDER
PRESS
SUSPENSION BUFFER TANK
CBM
BIOGAS
POW
4. Client truck unload mixed Municipal Solid
Waste(MSW) and Wet Trade Waste (WTW) in
the main tipping hall. At a separate entrance,
trucks deliver and dump pure organic waste
(POW)
Pow is loaded into an organic press which
separates organics from solid waste and
liquefies the organic material
The organic material is pumped into the suspension
buffer tank and after analysis, pumped into the
digesters, where it is digested by bacteria to produce
biogas through anaerobic digestions. The biogas,
captured at the top of the digester, is pumped to the
biogas upgrade plant
The digestate, from the digester, is sent to a
centrigue to separate and solid and liquid
material and solid as an organic fertilizer
POW
ORGANIC
EXTRUDER
PRESS
SUSPENSION BUFFER TANK
ANEROBIC DIGESTER
DIGESTATE
CENTRIFUGE
FERTILISER
5. MSW WTW
Client truck unload mixed Municipal
Solid Waste(MSW) and Wet Trade
Waste (WTW) in the main tipping hall. At
a separate entrance, trucks deliver and
dump pure organic waste (POW)
BULK WASTE SORTING ROLLER SCREEN
RECYCALBE SORTING PLATFORM
ANEROBIC DIGESTER
ORGANIC EXTRUDER PRESS
SUSPENSION BUFFER TANK
MSW and WTW are loaded
onto conveyor belts,
undesired material is
removed ,plastic bags are
mechanically opened and
the waste is separated by
size
Larger items are transported to the
manual sorting platform, for waste
pickers to extract as much recyclable
waste as possible
Smaller items are transported to main
press after metal items have been
removed/ The press squeezes any
organic material out of waste
6. MSW WTW
Client truck unload mixed Municipal
Solid Waste(MSW) and Wet Trade
Waste (WTW) in the main tipping hall. At
a separate entrance, trucks deliver and
dump pure organic waste (POW)
BULK WASTE SORTING ROLLER SCREEN
ORGANIC EXTRUDER PRESS
MSW and WTW are loaded
onto conveyor belts,
undesired material is
removed ,plastic bags are
mechanically opened and
the waste is separated by
size
Smaller items are transported to main
press after metal items have been
removed/ The press squeezes any
organic material out of waste
SCREEN
FINES & HEAVY FRACTION WRAPPERBALER
After mechanical
separation, the RDF is
baled and wrapped for
dispatch
7. 2 Days
BUFFER
BIOGAS
Biogas to upgrade plant
(1,250 Nm3/hr)
Sludge from
press
Compost
Centrate
Recirculate
Spent digestate Separator
BIOGAS PROCESS
17-25 Days
DIGESTER
9. Planning a WtE project
• Resource
• Detailed resource assessment. Building a WtE plant is like planning
a mine.
• Contracting
• Municipal Contracting limitations
• Private Resource Contracting
• Technology Choices
• Do not limit the tech choices
• Energy Flows
• Environmental
• SA Environmental Legislation is complex