Minor Project Report 
On 
“A Case Study on Construction of 3-Row Hume Pipe Culvert on 
Dhoba khedi to Dhaniya khedi ,Block- Sanchi, Distt. Raisen (M.P)” 
A Dissertation submitted in partial fulfillment of 
the requirement for the award of degree of 
Bachelor of Engineering 
In 
CIVIL ENGINEERING 
By 
NEPAL VERMA (0115CE123D01) 
JAI YADAV (0115CE111023) 
S.M MASHOOD (0115CE111058) 
ROHAN SHARMA (0115CE111039) 
ABHAY P.S YADAV (0115CE111002) 
Guided by Prof. Sandeep K Shrivastava 
NRI INSTITUTE OF INFORMATION 
SCIENCE & TECHNOLOGY 
BHOPAL (M.P.) 
Department of Civil Engineering
CERTIFICATE 
This is to certify that the project report entitled. “A Case Study on 
Construction of 3-Row Hume Pipe Culvert on Dhobakhedi to 
Dhaniyakhedi , Block-Sanchi , Distt Raisen , M.P.”submitted by 
NEPAL VERMA, JAI YADAV, S.M MASHOOD, ROHAN SHARMA 
&ABHAY PRATAP SINGH YADAV in partial fulfillments for the 
requirements for the award of the Degree of Bachelor of Engineering to 
the NRI Institute of Science and Technology, Bhopal. This record is a 
bona fide work carried out by them under my guidance and supervision. 
The results embodied in this project report have not been submitted to 
any other university / Institute for the awarded of any Degree 
Prof. Sandeep K Shrivastava Mr. J.P.Nanda Dr. S.C.Kapoor 
Project Guide Head Of Department Director 
Civil Engineering Civil Engineering NIIST,Bhopal 
Dr.Monika Vishwakarma 
Principal 
(NIIST,Bhopal) 
DECLARATION
We hereby declare that the work presented in this project titled 
“A Case Study on Construction of 3-Row Hume pipe 
Culvert on Dhobakhedi to Dhaniyakhedi ,Block-Sanchi 
,Distt -Raisen , M.P.” submitted towards completion of minor-project 
in Seventh Semester of B.Tech (CIVIL 
ENGINEERING) at the NRI Institute of Science and Technology, 
Bhopal affiliated to RGPV, Bhopal is authenticate work and had 
not been submitted to any University or Institute for any award 
Place: Bhopal 
Date: 5/11/2014 
NEPAL VERMA (0115CE123D01) 
JAI YADAV (0115CE111023) 
S.M MASHOOD (0115CE111058) 
ROHAN SHARMA (0115CE111039) 
ABHAY P S YADAV (0115CE111002) 
ACKNOWLEDGEMENT
We placed on record and warmly acknowledge the 
continuous encouragement, invaluable supervision, Prof. 
Sandeep K Shrivastava Department of Civil Engineering, NRI 
Institute of Science and Technology, Bhopal in bringing this 
report to a success full completion. 
We are greatfull to Mr.J.P. Nanda , HOD of Civil 
Engineering Department, for permitting us to make use of the 
facilities available in the department to carry out the project 
successfully. Last but not the least we express our since thanks 
to all of our friends who have patiently extended all sorts of help 
for accomplishing this under taking. 
Finally we extend our gratefulness to one and all 
who are directly or indirectly involved in the success full 
completion of the project work. 
NEPAL VERMA (0115CE123D01) 
JAI YADAV (0115CE111023) 
S.M MASHOOD (0115CE111058) 
ROHAN SHARMA (0115CE111039) 
ABHAY P S YADAV (0115CE111002)
INDEX 
INTRODUCTION 
DEFINITION 
CLASSIFICATION OF BRIDGE BASED ON 
STREAM WIDTH 
TYPES OF CULVERT 
CULVERT DESIGN ITEMS 
CULVERTS DESIGNING STEP 
TECHNICAL REPORT 
DRAWING OF THREE ROW HP CULVERT 
ESTIMATION & COSTING 
CONCLUSION
3-Row 1-Meter Dia Hume Pipe Culvert
INTRODUCTION 
CULVERT : Culverts are structures used to convey runoff from one 
side of the road to another and are usually covered with embankment 
and composed of structural material around the entire perimeter, 
although some are supported on spread footings with the streambed 
serving as the bottom of the culvert. For economy and hydraulic 
efficiency, culvert should be designed to operate with the inlet 
submerged during the flood flows , if conditions permit. Cross-drain 
are those culverts and pipes that are used to convey runoff from one 
side of highway to another 
ESTIMATION: For all engineering works it is required to know 
beforehand the probable cost of construction know as the estimated 
cost. If the estimated cost is grater then the money available, then 
attempts are made to reduced the cost by reducing the work or 
changing the specification. From this the importance of estimate for 
engineers may be understood. In preparing in estimate, the quantities 
of different items of work are calculated by simple mensuration 
method and from these quantities the cost is calculated. The subject 
of estimating is simple, nothing much to understand, but knowledge 
of drawing is essential. One who understand and can read drawing 
may find out the dimension- length, breath, & height etc. 
In preparing an estimate one has to go in to details of each 
items, big or small, nothing can be left or missed. 
Accuracy in estimate is very important, if estimate is 
exceeded is becomes a very difficult problem for engineers to 
explain to account for and arrange for the additional money. 
Inaccuracy in preparing estimate, omission of items, change in 
designs improper rates etc.
DEFINITION 
Backwater : Constriction of flow causes a rise in the normal water 
surface elevation upstream of the constriction. The magnitude of the rise, 
in feet, is called backwater. 
Barrel control: Barrel control for culvert hydraulics exists when the rise 
of headwater at the culvert inlet is greater than the rise from inlet or outlet 
control. This rise in headwater from barrel control can be a combination 
of barrel roughness, length, and restriction. Barrel control is rarely the 
control of headwater. Since the head loss due to roughness in the barrel 
is normally not as great as inlet head loss, the effect of barrel roughness is 
included as part of outlet control. 
Critical depth :Critical depth can best be illustrated as the depth of 
water at the culvert outlet under outlet control at which water flows are 
not influenced by backwater forces. Critical depth is the depth at which 
specific energy of a given flow rate is at a minimum. For a given 
discharge and cross-section geometry, there is only one critical depth 
Energy grade line : The energy grade line represents the total energy 
at any point along the culvert barrel. 
Free outlets : Free outlets are outlets with a tailwater equal to or lower 
than critical depth. For culverts having free outlets, lowering of the 
tailwater has no effect on the discharge or the backwater profile upstream 
of the tailwater. 
Headwater : The vertical distance from the culvert invert (flow line) at 
the culvert entrance to the water surface elevation of the upstream 
channel. 
Hydraulic grade line : The hydraulic grade line is the depth to 
which water would rise invertical tubes connected to the sides of a culvert 
barrel. In a full flow, the energy grade line and the hydraulic grade line 
are parallel lines separated by the velocity head, except at the inlet and 
the outlet.
Improved inlets : Flared, improved, or tapered inlets indicate a 
special entrance condition that decreases the amount of energy needed to 
pass the flow through the inlet and, thus increases the capacity of culverts 
at the inlet. 
Inlet control : With inlet control, the cross-sectional area of the 
culvert barrel, inlet geometry, and the amount of headwater or ponding at 
the entrance are the controlling design factors. 
Invert : Invert refers to the inside bottom of the culvert. 
Normal flow : Normal flow occurs in the channel reach when the 
discharge, velocity, and depth of flow do not change throughout the 
reach. The water surface profile and channel bottom slope will be 
parallel. This type of flow will be approximated in a culvert operating on 
a steep slope, provided the 
culvert is sufficiently long. 
Outlet control : Outlet control involves the additional considerations 
over inlet control of the elevation of the tailwater, slope, roughness, and 
length of the culvert. 
Steep and mild slope:A steep-slope culvert operation is where the 
computed critical depth is greater than the computed uniform depth. A 
mild-slope culvert operation is where critical depth is less than uniform. 
Submerged inlets : Submerged inlets are those inlets having a 
headwater greater than 1.2 times the diameter of the culvert or barrel 
height. 
Submerged outlets : Partially submerged outlets are outlets with 
tailwater that is higher than critical depth and lower than the height of the 
culvert. Submerged outlets are outlets having tailwater elevation higher 
that the soffit (crown) of the culvert. 
Tailwater :The water depth from the culvert invert at the outlet to the 
water surface in the outlet swale or channel. 
Uniform flow : Uniform flow is flow in a prismatic channel of 
constant cross-section having a constant discharge, velocity, and depth of 
flow throughout the reach. This type of flow will exist in a culvert 
operating on a steep slope, provided the culvert is sufficiently long.
Classification of Bridge Based on 
Stream Width 
· If Stream width is upto 10meter => Culvert 
· If Stream width is upto 10-30meter => Minor 
Bridge 
· If Stream Width is above 30meter => Major 
Bridge
Types of culvert 
· Hume Pipe Culvert 
· Box Culvert 
· Arch Culvert 
· Slab Culvert
# Hume Pipe Culvert 
Hume Pipe Culverts provide low clearance, 
openings suitable for large waterways, and are 
more aesthetic. They may also provide a greater 
hydraulic advantage to fishes at low flows and 
require less road fill.
Minor Project Report  On Construction of  Pipe Culvert
# Box Culvert 
Box culverts are used to transmit water during brief 
runoff periods. These are usually used by wildlife 
because they remain dry most of the year. They can 
have an artificial floor such as concrete. Box 
culverts generally provide more room for wildlife 
passage than large pipe culverts. Box culverts are 
usually made up of Reinforced Concrete (RCC
Minor Project Report  On Construction of  Pipe Culvert
# Arch Culvert 
A pipe arch culvert is a round culvert reshaped to 
allow a lower profile while maintaining flow 
characteristics. It is good for installations with 
shallow cover. 
Materials used for arch culverts are RCC, 
Corrugated Metal or Stone Masonry.
Minor Project Report  On Construction of  Pipe Culvert
# Slab Culvert 
Slab culvert are used where the total load acting on 
it very large. In this case a slab culvert is used. 
It has a very large load carrying capacity as 
compared to pipe and box culvert
Culvert Design Items 
The following should be considered for all culvert designs where 
applicable: 
1. Engineering aspects 
a. flood frequency 
b. velocity limitations 
c. buoyancy protection 
2. Site criteria 
a. length and slope 
b. debris and siltation control 
c. culvert barrel bends 
d. ice buildup 
3. Design limitations 
a. headwater limitations(see Section 2A-1) 
b. tailwater conditions 
c. storage –temporary or permanent 
4. Design options 
a. culvert inlets 
b. inlets with headwalls 
c. wingwalls and aprons 
d. improved inlets 
e. material selection 
f. culvert skews 
g. culvert sizes and shapes 
h. twin pipe separations (vertical and horizontal) 
i. culvert clearances 
5. Related designs 
a. weep holes 
b. outlet protection 
c. erosion and sediment control 
d. environmental considerations
e. facewall 
Culvert Designing Step 
1. Determine the Horizontal Distance 
2. Determine the Required Pipe Size 
3. Determine the Energy Loss Gradient 
• 
With the full pipe flow impending, the 
energy loss gradient can be estimated by 
the Manning equation for open-channel flow 
4. Determine the Critical Slope 
• 
For critical flow, the Froude number is equal to unity: 
•
For circular pipes, the following definitions apply: 
D 
5. Determine the Minimum Upstream Pipe Slope 
6. Determine the Downstream Pipe Slope 
7. Determine the Pipe Lengths 
8. Specify Inlet and Outlet Types 
9. Specify Collar Placement and Size
TECHNICAL REPORT of a 
CaseStudy on A Construction of Hume Pipe Culvert 
1 Name of Work :- A Case Study on C D Works on Gravel 
Road Dhoba Khedi To Dhaniya Khedi 
2 Village :- Dhobakhedi 
3 Gram Panchayat :- Chirholi 2 
4 Janpad Panchayat :- Sanchi 
5 Estimate Cost :- 6.10 Lakh 
6 Technical Sanction :- E.E.R.E.S Raisen 
9 Administration Sanction :- Collector Raisen 
10 Specification :- As per Estimate 
11 Provision :- Three Row Hose Pipe Culvert 
12 Rate :- Government of MP Panchayat & Rural 
Development RES SOR inforce From 
12April2014
Drawing of Three Row HP Culvert
ESTIMATION & COSTING 
Detailed Estimation : 
Detailed estimate is an accurate estimate and consists 
of working out the quantities of each item of works, and working the 
cost. The dimensions, length, breadth and height of each item are 
taken out correctly from drawing and quantities of each item are 
calculated, and abstracting and billing are done. 
The detailed estimate is prepared in two stages: 
Details of measurement and calculation of quantities. 
The details of measurements of each item of work are taken 
out correctly from plan and drawing and quantities under each item 
are calculated in a tabular form named as details of measurement 
form. 
Abstract of estimated cost: 
The cost of each item of work is calculated in a tabular 
form the quantities already computed and total cost is worked out in 
abstract estimate form. The rates of different items of work are taken 
as per schedule of rates or current workable rates for finished item of 
work. 
.
CONCLUSION 
• Use culverts as wide as stream width 
• Use same gradient as stream channel 
• Use same alignment as stream channel 
• Single large culvert is better for debris 
passage than several small ones 
• Flared ends improve efficiency

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavement
 
Cross Drainage Works
Cross Drainage WorksCross Drainage Works
Cross Drainage Works
 
Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
Box culverts
Box culvertsBox culverts
Box culverts
 
Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
 
Road drainage
Road drainageRoad drainage
Road drainage
 
Canal Fall
Canal FallCanal Fall
Canal Fall
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Unit 1
Unit 1Unit 1
Unit 1
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 
Pile load test
Pile load testPile load test
Pile load test
 
Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge Construction
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundation
 
Cross section of road
Cross section of roadCross section of road
Cross section of road
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
M.tech thesis
M.tech thesisM.tech thesis
M.tech thesis
 
Training report of road construction
Training report of road constructionTraining report of road construction
Training report of road construction
 

Ähnlich wie Minor Project Report On Construction of Pipe Culvert

CH6 Water Passages.pptx
CH6 Water Passages.pptxCH6 Water Passages.pptx
CH6 Water Passages.pptxDawit Girma
 
Presentation on notches and weirs
Presentation on notches and weirsPresentation on notches and weirs
Presentation on notches and weirssush_vyas
 
Mini Project Final (1) (1) (1).pptx
Mini Project Final (1) (1) (1).pptxMini Project Final (1) (1) (1).pptx
Mini Project Final (1) (1) (1).pptxpavankumar936548
 
Critical review of stilling basin models for pipe outlet works
Critical review of stilling basin models for pipe outlet worksCritical review of stilling basin models for pipe outlet works
Critical review of stilling basin models for pipe outlet workseSAT Publishing House
 
Chapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdfChapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdfAbdanurJihad
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERINGVATSAL PATEL
 
Report of Project spillways (1)
Report of Project spillways (1)Report of Project spillways (1)
Report of Project spillways (1)Pawan Singh
 
07 Open Channels.ppt
07 Open Channels.ppt07 Open Channels.ppt
07 Open Channels.pptzaid519176
 
Variable Headmeter
Variable HeadmeterVariable Headmeter
Variable HeadmeterShivang258
 
Effect of inclined hump on the turbulence intensities
Effect of inclined hump on the turbulence intensitiesEffect of inclined hump on the turbulence intensities
Effect of inclined hump on the turbulence intensitieseSAT Publishing House
 
13. Canal Outlets & other Head Regulators.pdf
13. Canal Outlets & other Head Regulators.pdf13. Canal Outlets & other Head Regulators.pdf
13. Canal Outlets & other Head Regulators.pdfMuhammadAjmal326519
 

Ähnlich wie Minor Project Report On Construction of Pipe Culvert (20)

sewage layy out lec
sewage layy out lecsewage layy out lec
sewage layy out lec
 
subsea
subseasubsea
subsea
 
CH6 Water Passages.pptx
CH6 Water Passages.pptxCH6 Water Passages.pptx
CH6 Water Passages.pptx
 
Presentation on notches and weirs
Presentation on notches and weirsPresentation on notches and weirs
Presentation on notches and weirs
 
Hydraulicdesignofsewer
HydraulicdesignofsewerHydraulicdesignofsewer
Hydraulicdesignofsewer
 
Mini Project Final (1) (1) (1).pptx
Mini Project Final (1) (1) (1).pptxMini Project Final (1) (1) (1).pptx
Mini Project Final (1) (1) (1).pptx
 
Critical review of stilling basin models for pipe outlet works
Critical review of stilling basin models for pipe outlet worksCritical review of stilling basin models for pipe outlet works
Critical review of stilling basin models for pipe outlet works
 
4 spillways
4 spillways4 spillways
4 spillways
 
Chapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdfChapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdf
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Lecture 1.pptx
Lecture 1.pptxLecture 1.pptx
Lecture 1.pptx
 
14. Cross Drainage Works.pdf
14. Cross Drainage Works.pdf14. Cross Drainage Works.pdf
14. Cross Drainage Works.pdf
 
Report of Project spillways (1)
Report of Project spillways (1)Report of Project spillways (1)
Report of Project spillways (1)
 
07 Open Channels.ppt
07 Open Channels.ppt07 Open Channels.ppt
07 Open Channels.ppt
 
Weirs
  Weirs     Weirs
Weirs
 
Problem solving
Problem solvingProblem solving
Problem solving
 
wheel
wheelwheel
wheel
 
Variable Headmeter
Variable HeadmeterVariable Headmeter
Variable Headmeter
 
Effect of inclined hump on the turbulence intensities
Effect of inclined hump on the turbulence intensitiesEffect of inclined hump on the turbulence intensities
Effect of inclined hump on the turbulence intensities
 
13. Canal Outlets & other Head Regulators.pdf
13. Canal Outlets & other Head Regulators.pdf13. Canal Outlets & other Head Regulators.pdf
13. Canal Outlets & other Head Regulators.pdf
 

Kürzlich hochgeladen

me3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Ame3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Akarthi keyan
 
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfRenewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfodunowoeminence2019
 
Oracle_PLSQL_basic_tutorial_with_workon_Exercises.ppt
Oracle_PLSQL_basic_tutorial_with_workon_Exercises.pptOracle_PLSQL_basic_tutorial_with_workon_Exercises.ppt
Oracle_PLSQL_basic_tutorial_with_workon_Exercises.pptDheerajKashnyal
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Projectreemakb03
 
Carbohydrates principles of biochemistry
Carbohydrates principles of biochemistryCarbohydrates principles of biochemistry
Carbohydrates principles of biochemistryKomakeTature
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxKISHAN KUMAR
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfJulia Kaye
 
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....santhyamuthu1
 
How to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfHow to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfRedhwan Qasem Shaddad
 
Basic Principle of Electrochemical Sensor
Basic Principle of  Electrochemical SensorBasic Principle of  Electrochemical Sensor
Basic Principle of Electrochemical SensorTanvir Moin
 
cme397 surface engineering unit 5 part A questions and answers
cme397 surface engineering unit 5 part A questions and answerscme397 surface engineering unit 5 part A questions and answers
cme397 surface engineering unit 5 part A questions and answerskarthi keyan
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging systemgokuldongala
 
Technical Management of cement industry.pdf
Technical Management of cement industry.pdfTechnical Management of cement industry.pdf
Technical Management of cement industry.pdfMadan Karki
 
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide LaboratoryBahzad5
 
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecGuardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecTrupti Shiralkar, CISSP
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Sean Meyn
 
cloud computing notes for anna university syllabus
cloud computing notes for anna university syllabuscloud computing notes for anna university syllabus
cloud computing notes for anna university syllabusViolet Violet
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsYusuf Yıldız
 
A Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationA Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationMohsinKhanA
 
News web APP using NEWS API for web platform to enhancing user experience
News web APP using NEWS API for web platform to enhancing user experienceNews web APP using NEWS API for web platform to enhancing user experience
News web APP using NEWS API for web platform to enhancing user experienceAkashJha84
 

Kürzlich hochgeladen (20)

me3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Ame3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part A
 
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfRenewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
 
Oracle_PLSQL_basic_tutorial_with_workon_Exercises.ppt
Oracle_PLSQL_basic_tutorial_with_workon_Exercises.pptOracle_PLSQL_basic_tutorial_with_workon_Exercises.ppt
Oracle_PLSQL_basic_tutorial_with_workon_Exercises.ppt
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Project
 
Carbohydrates principles of biochemistry
Carbohydrates principles of biochemistryCarbohydrates principles of biochemistry
Carbohydrates principles of biochemistry
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptx
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
 
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
 
How to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfHow to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdf
 
Basic Principle of Electrochemical Sensor
Basic Principle of  Electrochemical SensorBasic Principle of  Electrochemical Sensor
Basic Principle of Electrochemical Sensor
 
cme397 surface engineering unit 5 part A questions and answers
cme397 surface engineering unit 5 part A questions and answerscme397 surface engineering unit 5 part A questions and answers
cme397 surface engineering unit 5 part A questions and answers
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging system
 
Technical Management of cement industry.pdf
Technical Management of cement industry.pdfTechnical Management of cement industry.pdf
Technical Management of cement industry.pdf
 
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
 
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecGuardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
 
cloud computing notes for anna university syllabus
cloud computing notes for anna university syllabuscloud computing notes for anna university syllabus
cloud computing notes for anna university syllabus
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovations
 
A Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationA Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software Simulation
 
News web APP using NEWS API for web platform to enhancing user experience
News web APP using NEWS API for web platform to enhancing user experienceNews web APP using NEWS API for web platform to enhancing user experience
News web APP using NEWS API for web platform to enhancing user experience
 

Minor Project Report On Construction of Pipe Culvert

  • 1. Minor Project Report On “A Case Study on Construction of 3-Row Hume Pipe Culvert on Dhoba khedi to Dhaniya khedi ,Block- Sanchi, Distt. Raisen (M.P)” A Dissertation submitted in partial fulfillment of the requirement for the award of degree of Bachelor of Engineering In CIVIL ENGINEERING By NEPAL VERMA (0115CE123D01) JAI YADAV (0115CE111023) S.M MASHOOD (0115CE111058) ROHAN SHARMA (0115CE111039) ABHAY P.S YADAV (0115CE111002) Guided by Prof. Sandeep K Shrivastava NRI INSTITUTE OF INFORMATION SCIENCE & TECHNOLOGY BHOPAL (M.P.) Department of Civil Engineering
  • 2. CERTIFICATE This is to certify that the project report entitled. “A Case Study on Construction of 3-Row Hume Pipe Culvert on Dhobakhedi to Dhaniyakhedi , Block-Sanchi , Distt Raisen , M.P.”submitted by NEPAL VERMA, JAI YADAV, S.M MASHOOD, ROHAN SHARMA &ABHAY PRATAP SINGH YADAV in partial fulfillments for the requirements for the award of the Degree of Bachelor of Engineering to the NRI Institute of Science and Technology, Bhopal. This record is a bona fide work carried out by them under my guidance and supervision. The results embodied in this project report have not been submitted to any other university / Institute for the awarded of any Degree Prof. Sandeep K Shrivastava Mr. J.P.Nanda Dr. S.C.Kapoor Project Guide Head Of Department Director Civil Engineering Civil Engineering NIIST,Bhopal Dr.Monika Vishwakarma Principal (NIIST,Bhopal) DECLARATION
  • 3. We hereby declare that the work presented in this project titled “A Case Study on Construction of 3-Row Hume pipe Culvert on Dhobakhedi to Dhaniyakhedi ,Block-Sanchi ,Distt -Raisen , M.P.” submitted towards completion of minor-project in Seventh Semester of B.Tech (CIVIL ENGINEERING) at the NRI Institute of Science and Technology, Bhopal affiliated to RGPV, Bhopal is authenticate work and had not been submitted to any University or Institute for any award Place: Bhopal Date: 5/11/2014 NEPAL VERMA (0115CE123D01) JAI YADAV (0115CE111023) S.M MASHOOD (0115CE111058) ROHAN SHARMA (0115CE111039) ABHAY P S YADAV (0115CE111002) ACKNOWLEDGEMENT
  • 4. We placed on record and warmly acknowledge the continuous encouragement, invaluable supervision, Prof. Sandeep K Shrivastava Department of Civil Engineering, NRI Institute of Science and Technology, Bhopal in bringing this report to a success full completion. We are greatfull to Mr.J.P. Nanda , HOD of Civil Engineering Department, for permitting us to make use of the facilities available in the department to carry out the project successfully. Last but not the least we express our since thanks to all of our friends who have patiently extended all sorts of help for accomplishing this under taking. Finally we extend our gratefulness to one and all who are directly or indirectly involved in the success full completion of the project work. NEPAL VERMA (0115CE123D01) JAI YADAV (0115CE111023) S.M MASHOOD (0115CE111058) ROHAN SHARMA (0115CE111039) ABHAY P S YADAV (0115CE111002)
  • 5. INDEX INTRODUCTION DEFINITION CLASSIFICATION OF BRIDGE BASED ON STREAM WIDTH TYPES OF CULVERT CULVERT DESIGN ITEMS CULVERTS DESIGNING STEP TECHNICAL REPORT DRAWING OF THREE ROW HP CULVERT ESTIMATION & COSTING CONCLUSION
  • 6. 3-Row 1-Meter Dia Hume Pipe Culvert
  • 7. INTRODUCTION CULVERT : Culverts are structures used to convey runoff from one side of the road to another and are usually covered with embankment and composed of structural material around the entire perimeter, although some are supported on spread footings with the streambed serving as the bottom of the culvert. For economy and hydraulic efficiency, culvert should be designed to operate with the inlet submerged during the flood flows , if conditions permit. Cross-drain are those culverts and pipes that are used to convey runoff from one side of highway to another ESTIMATION: For all engineering works it is required to know beforehand the probable cost of construction know as the estimated cost. If the estimated cost is grater then the money available, then attempts are made to reduced the cost by reducing the work or changing the specification. From this the importance of estimate for engineers may be understood. In preparing in estimate, the quantities of different items of work are calculated by simple mensuration method and from these quantities the cost is calculated. The subject of estimating is simple, nothing much to understand, but knowledge of drawing is essential. One who understand and can read drawing may find out the dimension- length, breath, & height etc. In preparing an estimate one has to go in to details of each items, big or small, nothing can be left or missed. Accuracy in estimate is very important, if estimate is exceeded is becomes a very difficult problem for engineers to explain to account for and arrange for the additional money. Inaccuracy in preparing estimate, omission of items, change in designs improper rates etc.
  • 8. DEFINITION Backwater : Constriction of flow causes a rise in the normal water surface elevation upstream of the constriction. The magnitude of the rise, in feet, is called backwater. Barrel control: Barrel control for culvert hydraulics exists when the rise of headwater at the culvert inlet is greater than the rise from inlet or outlet control. This rise in headwater from barrel control can be a combination of barrel roughness, length, and restriction. Barrel control is rarely the control of headwater. Since the head loss due to roughness in the barrel is normally not as great as inlet head loss, the effect of barrel roughness is included as part of outlet control. Critical depth :Critical depth can best be illustrated as the depth of water at the culvert outlet under outlet control at which water flows are not influenced by backwater forces. Critical depth is the depth at which specific energy of a given flow rate is at a minimum. For a given discharge and cross-section geometry, there is only one critical depth Energy grade line : The energy grade line represents the total energy at any point along the culvert barrel. Free outlets : Free outlets are outlets with a tailwater equal to or lower than critical depth. For culverts having free outlets, lowering of the tailwater has no effect on the discharge or the backwater profile upstream of the tailwater. Headwater : The vertical distance from the culvert invert (flow line) at the culvert entrance to the water surface elevation of the upstream channel. Hydraulic grade line : The hydraulic grade line is the depth to which water would rise invertical tubes connected to the sides of a culvert barrel. In a full flow, the energy grade line and the hydraulic grade line are parallel lines separated by the velocity head, except at the inlet and the outlet.
  • 9. Improved inlets : Flared, improved, or tapered inlets indicate a special entrance condition that decreases the amount of energy needed to pass the flow through the inlet and, thus increases the capacity of culverts at the inlet. Inlet control : With inlet control, the cross-sectional area of the culvert barrel, inlet geometry, and the amount of headwater or ponding at the entrance are the controlling design factors. Invert : Invert refers to the inside bottom of the culvert. Normal flow : Normal flow occurs in the channel reach when the discharge, velocity, and depth of flow do not change throughout the reach. The water surface profile and channel bottom slope will be parallel. This type of flow will be approximated in a culvert operating on a steep slope, provided the culvert is sufficiently long. Outlet control : Outlet control involves the additional considerations over inlet control of the elevation of the tailwater, slope, roughness, and length of the culvert. Steep and mild slope:A steep-slope culvert operation is where the computed critical depth is greater than the computed uniform depth. A mild-slope culvert operation is where critical depth is less than uniform. Submerged inlets : Submerged inlets are those inlets having a headwater greater than 1.2 times the diameter of the culvert or barrel height. Submerged outlets : Partially submerged outlets are outlets with tailwater that is higher than critical depth and lower than the height of the culvert. Submerged outlets are outlets having tailwater elevation higher that the soffit (crown) of the culvert. Tailwater :The water depth from the culvert invert at the outlet to the water surface in the outlet swale or channel. Uniform flow : Uniform flow is flow in a prismatic channel of constant cross-section having a constant discharge, velocity, and depth of flow throughout the reach. This type of flow will exist in a culvert operating on a steep slope, provided the culvert is sufficiently long.
  • 10. Classification of Bridge Based on Stream Width · If Stream width is upto 10meter => Culvert · If Stream width is upto 10-30meter => Minor Bridge · If Stream Width is above 30meter => Major Bridge
  • 11. Types of culvert · Hume Pipe Culvert · Box Culvert · Arch Culvert · Slab Culvert
  • 12. # Hume Pipe Culvert Hume Pipe Culverts provide low clearance, openings suitable for large waterways, and are more aesthetic. They may also provide a greater hydraulic advantage to fishes at low flows and require less road fill.
  • 14. # Box Culvert Box culverts are used to transmit water during brief runoff periods. These are usually used by wildlife because they remain dry most of the year. They can have an artificial floor such as concrete. Box culverts generally provide more room for wildlife passage than large pipe culverts. Box culverts are usually made up of Reinforced Concrete (RCC
  • 16. # Arch Culvert A pipe arch culvert is a round culvert reshaped to allow a lower profile while maintaining flow characteristics. It is good for installations with shallow cover. Materials used for arch culverts are RCC, Corrugated Metal or Stone Masonry.
  • 18. # Slab Culvert Slab culvert are used where the total load acting on it very large. In this case a slab culvert is used. It has a very large load carrying capacity as compared to pipe and box culvert
  • 19. Culvert Design Items The following should be considered for all culvert designs where applicable: 1. Engineering aspects a. flood frequency b. velocity limitations c. buoyancy protection 2. Site criteria a. length and slope b. debris and siltation control c. culvert barrel bends d. ice buildup 3. Design limitations a. headwater limitations(see Section 2A-1) b. tailwater conditions c. storage –temporary or permanent 4. Design options a. culvert inlets b. inlets with headwalls c. wingwalls and aprons d. improved inlets e. material selection f. culvert skews g. culvert sizes and shapes h. twin pipe separations (vertical and horizontal) i. culvert clearances 5. Related designs a. weep holes b. outlet protection c. erosion and sediment control d. environmental considerations
  • 20. e. facewall Culvert Designing Step 1. Determine the Horizontal Distance 2. Determine the Required Pipe Size 3. Determine the Energy Loss Gradient • With the full pipe flow impending, the energy loss gradient can be estimated by the Manning equation for open-channel flow 4. Determine the Critical Slope • For critical flow, the Froude number is equal to unity: •
  • 21. For circular pipes, the following definitions apply: D 5. Determine the Minimum Upstream Pipe Slope 6. Determine the Downstream Pipe Slope 7. Determine the Pipe Lengths 8. Specify Inlet and Outlet Types 9. Specify Collar Placement and Size
  • 22. TECHNICAL REPORT of a CaseStudy on A Construction of Hume Pipe Culvert 1 Name of Work :- A Case Study on C D Works on Gravel Road Dhoba Khedi To Dhaniya Khedi 2 Village :- Dhobakhedi 3 Gram Panchayat :- Chirholi 2 4 Janpad Panchayat :- Sanchi 5 Estimate Cost :- 6.10 Lakh 6 Technical Sanction :- E.E.R.E.S Raisen 9 Administration Sanction :- Collector Raisen 10 Specification :- As per Estimate 11 Provision :- Three Row Hose Pipe Culvert 12 Rate :- Government of MP Panchayat & Rural Development RES SOR inforce From 12April2014
  • 23. Drawing of Three Row HP Culvert
  • 24. ESTIMATION & COSTING Detailed Estimation : Detailed estimate is an accurate estimate and consists of working out the quantities of each item of works, and working the cost. The dimensions, length, breadth and height of each item are taken out correctly from drawing and quantities of each item are calculated, and abstracting and billing are done. The detailed estimate is prepared in two stages: Details of measurement and calculation of quantities. The details of measurements of each item of work are taken out correctly from plan and drawing and quantities under each item are calculated in a tabular form named as details of measurement form. Abstract of estimated cost: The cost of each item of work is calculated in a tabular form the quantities already computed and total cost is worked out in abstract estimate form. The rates of different items of work are taken as per schedule of rates or current workable rates for finished item of work. .
  • 25. CONCLUSION • Use culverts as wide as stream width • Use same gradient as stream channel • Use same alignment as stream channel • Single large culvert is better for debris passage than several small ones • Flared ends improve efficiency