SlideShare a Scribd company logo
1 of 11
Download to read offline
ROUTINE WORK MANAGEMENT
IMPLEMENTATION ā€“ KUMBA IRON ORE

Group 3

Martin Butler




                                  1
CONTENTS


ā€¢ Physical Asset Management

ā€¢ Planning Problem

ā€¢ Resources Allocation Problem

ā€¢ Routine work management process

ā€¢ Solution

ā€¢ Pros and cons

ā€¢ Consideration for future projects




                                      2
PHYSICAL ASSET MANAGEMENT



                                                Maintenance Strategy
                                                    100%
            Maintenance Process Reengineering                          Organization / Human Resources
                                                     80%

                                                     60%
                    Reliability Analysis                                      Information Technology
                                                     40%

                                                     20%
                                                                                 Performance Measures /
    Autonomous Maintenance and TPM                    0%
                                                                                      Benchmarking



                                                                              Routine Work Management (Planning
                   Maintenance Tactics
                                                                                        & Scheduling)

                                                                       Shutdown (SD) & Turnaround (TA)
                       Contractor Management
                                                                                Management
                                                Materials Management




                            Overall         Team Assessment                   Pwc Benchmark



                                                                                                                  3
PLANNING PROBLEM

 SAP PM module ineffective with regards to planning and scheduling

 Difficult to plan a task in detail with different operations on one work
order

  Unrealistic controls and measure that need to be completed for routine
tasks

 Feedback received from maintenance personnel will be manipulated
due to unrealistic work process




                                                                            4
RESOURCES ALLOCATION PROBLEM


  SAP PM Function not able to calculate available man hours for a
  specific period

  Therefore not able to allocate available resources to planned tasks

  Managers therefore not able to optimize available resources

  Difficult to determine the optimal FTE per equipment




                                                                        5
ROUTINE WORK MANAGEMENT PROCESS   1 Identifying
                                  2 Planning
                                  3 Scheduling
                                  4 Allocation
                                  5 Executing
                                  6 Analysis




                                           6
THE SOLUTION

 Develop a add-on system to calculate and allocate resources

 Maintenance Managers must be able to calculate man hours available

 Available hours need to be allocated to scheduled tasks

 Measure planned vs unplanned task execution

 Improve on maintenance processes continuously

 Improve the OEE

 Assist Management to evaluate the utilization of resources




                                                                      7
ADDITIONAL SYSTEM




                    3
PROS
 Visibility on effectiveness of maintenance resource utilization

 Resources could be allocated to different areas

 Best practice with regards to planning and scheduling of resources

CONS
 Future upgrades on SAP will not include RWM add on

 SAP cannot utilize info for reporting on other functions

 Back-up and support needed from IT department and not from SAP




                                                                      9
CONSIDERATION FOR FUTURE PROJECTS


 Rather include ERP system specialist during development

 Ensure further development and upgrades

 BI system to be considered to ensure accurate reporting

  More focus on continuous improvement with regards to planning of
tasks




                                                                     10
THANK YOU
ANY QUESTIONS?   11

More Related Content

Similar to Group 3 O&I Final

CBS IM56 March 2011
CBS IM56 March 2011CBS IM56 March 2011
CBS IM56 March 2011
mcschlichter
Ā 
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula GomesBalanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Paula Gomes
Ā 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
Leanleaders.org
Ā 
Mpower 2012
Mpower 2012Mpower 2012
Mpower 2012
nick4bes
Ā 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
Leanleaders.org
Ā 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
NASAPMC
Ā 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarie
NASAPMC
Ā 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.k
NASAPMC
Ā 
Alchemus pcms ver1
Alchemus pcms ver1Alchemus pcms ver1
Alchemus pcms ver1
alchemussales
Ā 

Similar to Group 3 O&I Final (20)

TTG Interview
TTG InterviewTTG Interview
TTG Interview
Ā 
Process Documentation
Process DocumentationProcess Documentation
Process Documentation
Ā 
CBS IM56 March 2011
CBS IM56 March 2011CBS IM56 March 2011
CBS IM56 March 2011
Ā 
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula GomesBalanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Ā 
Maintenance performance analysis_en_v1
Maintenance performance analysis_en_v1Maintenance performance analysis_en_v1
Maintenance performance analysis_en_v1
Ā 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio Management
Ā 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
Ā 
Sap plant maintenance
Sap plant maintenanceSap plant maintenance
Sap plant maintenance
Ā 
Mpower 2012
Mpower 2012Mpower 2012
Mpower 2012
Ā 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
Ā 
Building Capability 2012 - Workforce Planning
Building Capability 2012 - Workforce PlanningBuilding Capability 2012 - Workforce Planning
Building Capability 2012 - Workforce Planning
Ā 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
Ā 
Tool Box Talk - World Class Maintenance Edited
Tool Box Talk - World Class Maintenance   EditedTool Box Talk - World Class Maintenance   Edited
Tool Box Talk - World Class Maintenance Edited
Ā 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarie
Ā 
01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up
Ā 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting Capabilities
Ā 
Project management best practices
Project management best practicesProject management best practices
Project management best practices
Ā 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.k
Ā 
Alchemus pcms ver1
Alchemus pcms ver1Alchemus pcms ver1
Alchemus pcms ver1
Ā 
Avoid Month End Panic PAC Webinar - Apr 28 2011
Avoid Month End Panic PAC Webinar - Apr 28 2011Avoid Month End Panic PAC Webinar - Apr 28 2011
Avoid Month End Panic PAC Webinar - Apr 28 2011
Ā 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(ā˜Žļø+971_581248768%)**%*]'#abortion pills for sale in dubai@
Ā 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
Ā 

Recently uploaded (20)

Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Ā 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
Ā 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
Ā 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
Ā 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
Ā 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
Ā 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
Ā 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Ā 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
Ā 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
Ā 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
Ā 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
Ā 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Ā 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Ā 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Ā 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Ā 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
Ā 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
Ā 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
Ā 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
Ā 

Group 3 O&I Final

  • 1. ROUTINE WORK MANAGEMENT IMPLEMENTATION ā€“ KUMBA IRON ORE Group 3 Martin Butler 1
  • 2. CONTENTS ā€¢ Physical Asset Management ā€¢ Planning Problem ā€¢ Resources Allocation Problem ā€¢ Routine work management process ā€¢ Solution ā€¢ Pros and cons ā€¢ Consideration for future projects 2
  • 3. PHYSICAL ASSET MANAGEMENT Maintenance Strategy 100% Maintenance Process Reengineering Organization / Human Resources 80% 60% Reliability Analysis Information Technology 40% 20% Performance Measures / Autonomous Maintenance and TPM 0% Benchmarking Routine Work Management (Planning Maintenance Tactics & Scheduling) Shutdown (SD) & Turnaround (TA) Contractor Management Management Materials Management Overall Team Assessment Pwc Benchmark 3
  • 4. PLANNING PROBLEM SAP PM module ineffective with regards to planning and scheduling Difficult to plan a task in detail with different operations on one work order Unrealistic controls and measure that need to be completed for routine tasks Feedback received from maintenance personnel will be manipulated due to unrealistic work process 4
  • 5. RESOURCES ALLOCATION PROBLEM SAP PM Function not able to calculate available man hours for a specific period Therefore not able to allocate available resources to planned tasks Managers therefore not able to optimize available resources Difficult to determine the optimal FTE per equipment 5
  • 6. ROUTINE WORK MANAGEMENT PROCESS 1 Identifying 2 Planning 3 Scheduling 4 Allocation 5 Executing 6 Analysis 6
  • 7. THE SOLUTION Develop a add-on system to calculate and allocate resources Maintenance Managers must be able to calculate man hours available Available hours need to be allocated to scheduled tasks Measure planned vs unplanned task execution Improve on maintenance processes continuously Improve the OEE Assist Management to evaluate the utilization of resources 7
  • 9. PROS Visibility on effectiveness of maintenance resource utilization Resources could be allocated to different areas Best practice with regards to planning and scheduling of resources CONS Future upgrades on SAP will not include RWM add on SAP cannot utilize info for reporting on other functions Back-up and support needed from IT department and not from SAP 9
  • 10. CONSIDERATION FOR FUTURE PROJECTS Rather include ERP system specialist during development Ensure further development and upgrades BI system to be considered to ensure accurate reporting More focus on continuous improvement with regards to planning of tasks 10