Introduction
Place of training
Main substation
Classiffication of transformer
Parts of transformer
Transformer oil filteration s
NORTHERN COALFIELD LIMITED
It is subsidiary of coal India.
It was established in 1984 under the CCL. Its headquarter is singrau
NCL produced 70.02 million tons of coal in the year 2012-13.
NCL has following projects:-
Amlohri
Block-B
Bina
Dudhichua
Kakri
Khadia
Nigahi
Krishnashila
Jayant
Jhingurdah
INTRODUCTION
PLACE OF TRAINING
The place of training is Jhingurdah project in E&M department.
 E&M department has following area: -
 Main substation (33/11KV)
 Electrical and mechanical workshop
 West substation (11/6.6KV & 11/3.3KN)
 Coal handling plant
 Pumps plant
 I worked only three of them
 Main substation (33/11KV)
 Electrical workshop
 West substation (11/6.6KV & 11/3.3KN)
MAIN SUBSTATION
The supply (33/11KV) is from MPEB substation.
In this substation 05 MVA transformer are used to step
down the voltage 33KV to 11 KV.
Form this substation 11KV supply is transmitted to
following are:-
West substation
Colony
Field
CHP
TRANSFORMER
COMPONENTS OF TRANSFORMER
Core
Primary & secondary winding
Oil tank
Transformer oil
Oil inlet and outlet valve
Oil gauge/indicator
Primary and secondary terminal
Earth point
Data plate
Explosion vent
Conservator
Breather
Silica gel
Buchholz relay
Temperature gauge
Tapping switch
CLASSIFICATION OF TRANSFORMER
On the basis of output voltage
1. Step up 2.Step down
On the basis of core construction
1. Core type 2. Shell type
On the basis of no. of phase
1. Single phase 2. Three phase
On the basis of cooling system
1.Naturally cooled 2.Oil cooled
3.water cooled 4.forced air cooled
On the basis of output capacity
1.Auto transformer 2.Instrument transformer
 On the basis of commercial
1.Power transformer 2.Distribution transformer
TRANSFORMER USED IN SUBSTATION
 Current transformer
 It is step up transformer or current step down transformer.
 It convert 100-200A of primary to 1-2A of secondary.
 Potential transformer
 It is step down transformer.
 It convert 11-22KV into 50-100V.
TRANSFORMER OIL FILTRATION METHOD
Sub ststion
Sub ststion

More Related Content

What's hot

training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
Vocational training report
Vocational training reportVocational training report
Vocational training reportATUL RAJ
 
A presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noidaA presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noidaAshutosh Tripathi
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC pptkirbadh
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportAditya Shekhar
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipatpratikguptateddy
 
NTPC MECANICAL SUMMER REPORT
NTPC MECANICAL  SUMMER REPORTNTPC MECANICAL  SUMMER REPORT
NTPC MECANICAL SUMMER REPORTAnkur Pal
 
NOTABLE PROJECTS
NOTABLE PROJECTSNOTABLE PROJECTS
NOTABLE PROJECTSM.Essa Khan
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportRaj Sharma
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training reportsanjeevps12345
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC KantiTarun Kumar
 

What's hot (20)

training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 
A presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noidaA presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noida
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
NTPC MECANICAL SUMMER REPORT
NTPC MECANICAL  SUMMER REPORTNTPC MECANICAL  SUMMER REPORT
NTPC MECANICAL SUMMER REPORT
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
NOTABLE PROJECTS
NOTABLE PROJECTSNOTABLE PROJECTS
NOTABLE PROJECTS
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-report
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
NTPC Farakka
NTPC FarakkaNTPC Farakka
NTPC Farakka
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Manoj
ManojManoj
Manoj
 
project -2
project -2project -2
project -2
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 

Viewers also liked

Industrial training report (submitted by shaloo mishra)
Industrial training report (submitted by shaloo mishra)Industrial training report (submitted by shaloo mishra)
Industrial training report (submitted by shaloo mishra)Sajid Hussain
 
Western Coalfield Limited- Industrial Training Report
Western Coalfield Limited- Industrial Training ReportWestern Coalfield Limited- Industrial Training Report
Western Coalfield Limited- Industrial Training ReportSushant Kumar
 
Presentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpurPresentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpurShubham Sachan
 
NCL Singrauli project
NCL Singrauli projectNCL Singrauli project
NCL Singrauli projectVishal Singh
 
Transformers
TransformersTransformers
TransformersWicrm
 
Ncl summer training report
Ncl summer training reportNcl summer training report
Ncl summer training reportKundan Giri
 
central coalfeild limited
central coalfeild limitedcentral coalfeild limited
central coalfeild limitedsamohi
 
Rembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan SluijterRembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan SluijterGaleria Regina Oliveira
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)Prateek Agarwal
 

Viewers also liked (19)

TRANSFORMER PPT
TRANSFORMER PPT TRANSFORMER PPT
TRANSFORMER PPT
 
Industrial training report (submitted by shaloo mishra)
Industrial training report (submitted by shaloo mishra)Industrial training report (submitted by shaloo mishra)
Industrial training report (submitted by shaloo mishra)
 
Coal india wcl
Coal india wclCoal india wcl
Coal india wcl
 
Transformer 1
Transformer 1Transformer 1
Transformer 1
 
Western Coalfield Limited- Industrial Training Report
Western Coalfield Limited- Industrial Training ReportWestern Coalfield Limited- Industrial Training Report
Western Coalfield Limited- Industrial Training Report
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpurPresentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpur
 
Northern Coalfields Limited NCL
Northern Coalfields Limited NCLNorthern Coalfields Limited NCL
Northern Coalfields Limited NCL
 
NCL Singrauli project
NCL Singrauli projectNCL Singrauli project
NCL Singrauli project
 
Transformers
TransformersTransformers
Transformers
 
Ncl summer training report
Ncl summer training reportNcl summer training report
Ncl summer training report
 
central coalfeild limited
central coalfeild limitedcentral coalfeild limited
central coalfeild limited
 
Rembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan SluijterRembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan Sluijter
 
Coal india limited
Coal india limitedCoal india limited
Coal india limited
 
Summer training report
Summer training reportSummer training report
Summer training report
 
CSR of Coal India ltd.
CSR of Coal India ltd.CSR of Coal India ltd.
CSR of Coal India ltd.
 
Coal india ppt
Coal india pptCoal india ppt
Coal india ppt
 
Ashok Kumar Singh
Ashok Kumar SinghAshok Kumar Singh
Ashok Kumar Singh
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 

Similar to Sub ststion

Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal ComplexKumar Saurabh
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plantAbhinaw kapoor
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plantAbhinaw kapoor
 
PDB-presentation(1).pptx
PDB-presentation(1).pptxPDB-presentation(1).pptx
PDB-presentation(1).pptxSajibDas40
 
internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOCqazi faisal
 
Maintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINEMaintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINESAI SHARATH GAMPA
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)MUHAMMAD AZMAT ULLAH BAIG
 
INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)apurv rathore
 
Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorNAVAL KISHOR
 
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...RAHULKUMARSAW1
 

Similar to Sub ststion (20)

Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
Sourish bhattacharyya
Sourish bhattacharyyaSourish bhattacharyya
Sourish bhattacharyya
 
PDB-presentation(1).pptx
PDB-presentation(1).pptxPDB-presentation(1).pptx
PDB-presentation(1).pptx
 
internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOC
 
cv.doc 2016
cv.doc  2016cv.doc  2016
cv.doc 2016
 
Maintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINEMaintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINE
 
Power distribution
Power distribution Power distribution
Power distribution
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
bccl-presentation
bccl-presentationbccl-presentation
bccl-presentation
 
bhel.pptx
bhel.pptxbhel.pptx
bhel.pptx
 
LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)
 
INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)
 
CV
CVCV
CV
 
Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishor
 
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
 
Training chp
Training chpTraining chp
Training chp
 

Recently uploaded

Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualBalamuruganV28
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfragupathi90
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Lovely Professional University
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdfKamal Acharya
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...drjose256
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1T.D. Shashikala
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxRashidFaridChishti
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdfKamal Acharya
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AISheetal Jain
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
Introduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and ApplicationsIntroduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and ApplicationsKineticEngineeringCo
 
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...ShivamTiwari995432
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxalijaker017
 
Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemSampad Kar
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor banktawat puangthong
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfMadan Karki
 
Intelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsIntelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsSheetal Jain
 
AI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdfAI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdfmahaffeycheryld
 

Recently uploaded (20)

Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdf
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Introduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and ApplicationsIntroduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and Applications
 
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptx
 
Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating System
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
 
Intelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsIntelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent Acts
 
AI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdfAI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdf
 

Sub ststion

  • 1. NORTHERN COALFIELD LIMITED PRESENTED BY:- ANUJ KUMAR ELECTRICAL ENGINEERING B.TECH FINAL YEAR
  • 2. CONTENTS Introduction Place of training Main substation Classiffication of transformer Parts of transformer Transformer oil filteration s
  • 3. NORTHERN COALFIELD LIMITED It is subsidiary of coal India. It was established in 1984 under the CCL. Its headquarter is singrau NCL produced 70.02 million tons of coal in the year 2012-13. NCL has following projects:- Amlohri Block-B Bina Dudhichua Kakri Khadia Nigahi Krishnashila Jayant Jhingurdah INTRODUCTION
  • 4. PLACE OF TRAINING The place of training is Jhingurdah project in E&M department.  E&M department has following area: -  Main substation (33/11KV)  Electrical and mechanical workshop  West substation (11/6.6KV & 11/3.3KN)  Coal handling plant  Pumps plant  I worked only three of them  Main substation (33/11KV)  Electrical workshop  West substation (11/6.6KV & 11/3.3KN)
  • 5. MAIN SUBSTATION The supply (33/11KV) is from MPEB substation. In this substation 05 MVA transformer are used to step down the voltage 33KV to 11 KV. Form this substation 11KV supply is transmitted to following are:- West substation Colony Field CHP
  • 7. COMPONENTS OF TRANSFORMER Core Primary & secondary winding Oil tank Transformer oil Oil inlet and outlet valve Oil gauge/indicator Primary and secondary terminal Earth point Data plate Explosion vent Conservator Breather Silica gel Buchholz relay Temperature gauge Tapping switch
  • 8. CLASSIFICATION OF TRANSFORMER On the basis of output voltage 1. Step up 2.Step down On the basis of core construction 1. Core type 2. Shell type On the basis of no. of phase 1. Single phase 2. Three phase On the basis of cooling system 1.Naturally cooled 2.Oil cooled 3.water cooled 4.forced air cooled On the basis of output capacity 1.Auto transformer 2.Instrument transformer  On the basis of commercial 1.Power transformer 2.Distribution transformer
  • 9. TRANSFORMER USED IN SUBSTATION  Current transformer  It is step up transformer or current step down transformer.  It convert 100-200A of primary to 1-2A of secondary.  Potential transformer  It is step down transformer.  It convert 11-22KV into 50-100V.