Suche senden
Hochladen
Bayern Monachium
•
0 gefällt mir
•
524 views
P
Patryk Ziółek
Folgen
Melden
Teilen
Melden
Teilen
1 von 18
Jetzt herunterladen
Downloaden Sie, um offline zu lesen
Empfohlen
Key kpi
Key kpi
remaphemiller
7th Kuwait Info Security Forum 2015
Dr. Almerindo Graziano - log maturity-compressed
Dr. Almerindo Graziano - log maturity-compressed
promediakw
6
Lr4n
Lr4n
shymanska
Doug Leitch, P.Eng & Glenn Smith, CET provide an introduction to the use of soil-steel structures for haul road grade separations, mine portals, reclaim stacker tunnels, manway escape tunnels and underground raise bore. Discussion centres on design considerations and common practices, and will present project case studies from some of the world’s largest miners. Discussion Topics: - Mine Haul Road Bridges – Important Considerations for Today's Mining Trucks - Reclaim and Stockpile Tunnel Design – Cost Saving Strategies - Important Considerations in the Selection of a Portal - Retaining Wall Systems for Underground Applications What You’ll Learn: - Design parameters to consider for heavy mining equipment The effect of seismic activity in design - Life expectancy and the importance of life cycle costing in mining projects - On-site installation procedures for various solutions Intended Audience: - Mining Engineers - Consulting Structural Engineers - Geotechnical Engineers - Mining Contractors - Mine Managers Speaker: Doug Leitch, P. Eng Position: Manager International Sales Company: Armtec Drainage Solutions Doug has extensive experience in the civil and mining engineering field. In his 25+ years with Armtec he has been involved in the design, and specification of an array of drainage and structural projects and has managed some of Armtec’s largest mining projects in almost twenty countries on six different continents. Doug has been involved in international business for 10 years, is a member of Professional Engineers of Ontario and holds a Bachelor of Science in Engineering from the University of Guelph, Guelph, Ontario. Speaker: Glenn Smith, CET Position: Sales Supervisor, Atlantic Company: Armtec Drainage Solutions Glenn has worked for Armtec for over 15 years and has been involved with the specification of Armtec’s engineered products throughout Atlantic Canada. He has supervised the installation of numerous large scale Multi-Plate, Bridge-Plate and Bin-Wall projects throughout the region. Glenn is a certified engineering technologist and a member of the Association of Engineering Technicians and Technologists of Newfoundland and Labrador.
Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for Mining
Agata Woźniak
GSCPC GIS Digital Submittal Ordinance
Digital submittal
Digital submittal
gscplanning
Free kpi
Free kpi
remaphemiller
Emprendimiento
Presentación emprendimiento ing. procesos
Presentación emprendimiento ing. procesos
Helmer Fernandez
Методичні вказівки до виконання практичних робіт з курсу "Металообробне обладнання"
методичка пр2 1
методичка пр2 1
shymanska
Empfohlen
Key kpi
Key kpi
remaphemiller
7th Kuwait Info Security Forum 2015
Dr. Almerindo Graziano - log maturity-compressed
Dr. Almerindo Graziano - log maturity-compressed
promediakw
6
Lr4n
Lr4n
shymanska
Doug Leitch, P.Eng & Glenn Smith, CET provide an introduction to the use of soil-steel structures for haul road grade separations, mine portals, reclaim stacker tunnels, manway escape tunnels and underground raise bore. Discussion centres on design considerations and common practices, and will present project case studies from some of the world’s largest miners. Discussion Topics: - Mine Haul Road Bridges – Important Considerations for Today's Mining Trucks - Reclaim and Stockpile Tunnel Design – Cost Saving Strategies - Important Considerations in the Selection of a Portal - Retaining Wall Systems for Underground Applications What You’ll Learn: - Design parameters to consider for heavy mining equipment The effect of seismic activity in design - Life expectancy and the importance of life cycle costing in mining projects - On-site installation procedures for various solutions Intended Audience: - Mining Engineers - Consulting Structural Engineers - Geotechnical Engineers - Mining Contractors - Mine Managers Speaker: Doug Leitch, P. Eng Position: Manager International Sales Company: Armtec Drainage Solutions Doug has extensive experience in the civil and mining engineering field. In his 25+ years with Armtec he has been involved in the design, and specification of an array of drainage and structural projects and has managed some of Armtec’s largest mining projects in almost twenty countries on six different continents. Doug has been involved in international business for 10 years, is a member of Professional Engineers of Ontario and holds a Bachelor of Science in Engineering from the University of Guelph, Guelph, Ontario. Speaker: Glenn Smith, CET Position: Sales Supervisor, Atlantic Company: Armtec Drainage Solutions Glenn has worked for Armtec for over 15 years and has been involved with the specification of Armtec’s engineered products throughout Atlantic Canada. He has supervised the installation of numerous large scale Multi-Plate, Bridge-Plate and Bin-Wall projects throughout the region. Glenn is a certified engineering technologist and a member of the Association of Engineering Technicians and Technologists of Newfoundland and Labrador.
Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for Mining
Agata Woźniak
GSCPC GIS Digital Submittal Ordinance
Digital submittal
Digital submittal
gscplanning
Free kpi
Free kpi
remaphemiller
Emprendimiento
Presentación emprendimiento ing. procesos
Presentación emprendimiento ing. procesos
Helmer Fernandez
Методичні вказівки до виконання практичних робіт з курсу "Металообробне обладнання"
методичка пр2 1
методичка пр2 1
shymanska
PPP project
PPP Project
PPP Project
yairancp
Gsm kpi
Gsm kpi
remaphemiller
Selected highlights from this years IRMSummit Europe in Dublin. Contains links and further information to each highlighted topic. Most background pictures by Ludovic Poitou.
IRMSummit Europe 2014 - Selected Highlights
IRMSummit Europe 2014 - Selected Highlights
twh4slide
Lr2n
Lr2n
shymanska
Untitled Presentation
Untitled Presentation
الطب الطبيعي والعلاج الطبيعي
GSCPC PDR Presentation
PDR Presentation
PDR Presentation
gscplanning
The purpose of the project is to study the production of 1-Tetradecene through processing and refining process method and to perform energy balance, material balance and design the equipments involved in this process. We used chemcad chemstation software for process simulation and determining the phase envelope graph. We created a component, 1-octacosene in component database of chemcad simulation software.
Production of 1-Tetradecene at 100 tons per year
Production of 1-Tetradecene at 100 tons per year
aman_hb
Comp plan kick off meeting notes 1 26 2016
Comp plan kick off meeting notes 1 26 2016
Comp plan kick off meeting notes 1 26 2016
gscplanning
2014 2nd me cloud conference trust in the cloud v01
2014 2nd me cloud conference trust in the cloud v01
promediakw
Trans
Trans sys intro_cxoverview_v1 abdallah khayat
Trans sys intro_cxoverview_v1 abdallah khayat
promediakw
Kpi ceo
Kpi ceo
remaphemiller
Weitere ähnliche Inhalte
Andere mochten auch
PPP project
PPP Project
PPP Project
yairancp
Gsm kpi
Gsm kpi
remaphemiller
Selected highlights from this years IRMSummit Europe in Dublin. Contains links and further information to each highlighted topic. Most background pictures by Ludovic Poitou.
IRMSummit Europe 2014 - Selected Highlights
IRMSummit Europe 2014 - Selected Highlights
twh4slide
Lr2n
Lr2n
shymanska
Untitled Presentation
Untitled Presentation
الطب الطبيعي والعلاج الطبيعي
GSCPC PDR Presentation
PDR Presentation
PDR Presentation
gscplanning
The purpose of the project is to study the production of 1-Tetradecene through processing and refining process method and to perform energy balance, material balance and design the equipments involved in this process. We used chemcad chemstation software for process simulation and determining the phase envelope graph. We created a component, 1-octacosene in component database of chemcad simulation software.
Production of 1-Tetradecene at 100 tons per year
Production of 1-Tetradecene at 100 tons per year
aman_hb
Comp plan kick off meeting notes 1 26 2016
Comp plan kick off meeting notes 1 26 2016
Comp plan kick off meeting notes 1 26 2016
gscplanning
2014 2nd me cloud conference trust in the cloud v01
2014 2nd me cloud conference trust in the cloud v01
promediakw
Trans
Trans sys intro_cxoverview_v1 abdallah khayat
Trans sys intro_cxoverview_v1 abdallah khayat
promediakw
Kpi ceo
Kpi ceo
remaphemiller
Andere mochten auch
(11)
PPP Project
PPP Project
Gsm kpi
Gsm kpi
IRMSummit Europe 2014 - Selected Highlights
IRMSummit Europe 2014 - Selected Highlights
Lr2n
Lr2n
Untitled Presentation
Untitled Presentation
PDR Presentation
PDR Presentation
Production of 1-Tetradecene at 100 tons per year
Production of 1-Tetradecene at 100 tons per year
Comp plan kick off meeting notes 1 26 2016
Comp plan kick off meeting notes 1 26 2016
2014 2nd me cloud conference trust in the cloud v01
2014 2nd me cloud conference trust in the cloud v01
Trans sys intro_cxoverview_v1 abdallah khayat
Trans sys intro_cxoverview_v1 abdallah khayat
Kpi ceo
Kpi ceo
Bayern Monachium
1.
Fußball-Club Bayern München
2.
Struktur
1. Geschichte 2. Das Team 3. über den Club
3.
Geschichte
• 24 Mal gewann die Meisterschaft in Deutschland, 17 Mal gewann den DFB-Pokal. • wurde im 27. Februar 1900 festgelegt
4.
Robert Lewandowski
Sturm. Rückennummer 9.
5.
Franck Ribery
Mittelfeld. Rückennummer 7
6.
Arjen Robben
Mittelfeld. Rückennummer 10
7.
Manuel Neuer
Torwart. Rückennummer 7
8.
Mario Götze
Mittelfeld. Rückennummer 19
9.
Schweinsteiger Mittelfeld.
Rückennummer 31
10.
Philip Lahm
Mittelfeld. Rückennummer 21
11.
Boateng Defender.
Rückennummer 17
12.
Alaba Defender.
Rückennummer 27
13.
Badstuber Defender.
Rückennummer 27
14.
Rafinha Defender.
Rückennummer 13
15.
Maskottchen Bär
Berni
16.
Stadion Allianz
Arena
17.
aktuelle Trainer
Josep Guardiola
18.
Bar chart
Data point: 42 Data point: 76
Jetzt herunterladen