3. The Networking
Metaphor…
Cut Through vs Store
and Forward
Packet size
Optimize the
bottlenecks
Congestion
Avoidance
Prefer as few hops /
layers as possible
More?
4.
5.
6.
7. Focus on Value and Time
Make value flow
Eliminate waste that
slows down flow the
most
Manage Cycle Time
Quality drives Flow…
19. Summary – How to reduce Cycle Time
Even out the arrival of work
Minimize the number of things in process
Minimize the size of things in process
Limit work to capacity
Use pull scheduling
Build Quality In – Reduces variation and
Defect/Rework wastes/delays.
Improving flow ->
Improved Quality
Reduced Cost
20. Management Role
Design the system/process
Policies that can be
distributed for effective
Delegation/Empowerment
Manage the behaviour of
system/process
Find and Address Tough
Impediments
Whole-System Thinking
Beyond the
Functions/Silos…
21. Take Aways
Move to Feature-driven product development
Use Kanban system to improve key processes
Start managing Cycle Time and Work in
Progress
Limit WIP to catalyze improvements