SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
QSB1514 – Construction Technology 1
Singapore Gold Sand Marina Bay Hotel
April Semester 2013
Group Assignment: Group 4
Submission Date: 26th June 2013
Name Student ID Marks
Yam Yih Hwan 0305861
Tan Jia Jia 0307766
Yo Kai Sen 0310563
Teoh Tze Yoong 0314756
Background Information of Singapore Gold Sand Marina Bay Hotel
Singapore Gold Sand Marina Bay Hotel (MBS) is an Integrated Resort fronting Marina Bay
in Singapore, which operated under Las Vegas Sands Corp. (Chua, 2011)MBS is designed by
Canadian Architect named Moshe Safdie with Local Executive Architects Aedas, Pte, Ltd. In
additional, Arup Group Limited is selected as the Structural Engineering for this project whereas
the landscape of this building is designed by Peter Walker & Partners. The entire project area
used is 845,000m2
and the site area used is 154,938m2
. The estimated budget on this project is
USD $5.7 billion. (Safdie Architects, 2010)
MBS began operations on 27 April 2010, and officially opened on 23 June. MBS
comprises of three towers with 55-storey high topped by a 12,400m2
SkyPark. As for the Art
Science Museum, it is shaped like a lotus flower. (Chua, 2011) On top of its three towers, the
Marina Bay Sands was designed as a curious boat-shape and it is placed at the gateway to
Singapore's harbor with strong and highly iconic structure. (Apavisa, n.d.)
(Layout of Singapore Gold Sand Marina Bay Hotel)
Furthermore, MBS offers luxury hotel, casino, retail mall, convention facilities and
entertainment venues including theatres, nightclubs and a museum. It has 2,560 luxury rooms
across three 55-storey hotel towers, totaling 265,683 m2
. (Safdie Architects, 2010) As we know,
Marina Bay Sands is one of the biggest hotelslocated in Singapore; it’s covering 12,400 m2
, and is
over 200 meters altitude. It has a 150 meters infinity-edged swimming pool at 250 meters high
which overlook the view of Singapore skyline. There is a botanical garden which linked on top of
the three 200m high hotels of marina bays where you can find 250 types of tree and 650 species
of plants. (Apavisa, n.d.)
MBS is one of the most complex designs ever built; it is a slopping tower which its angle
as steep as 26 degrees and connecting legs at Level 23 to form a single building. The “Hanging
Gardens” provides a magnificent backdrop which the visitors can overlook the upcoming Gardens
by the Bay. (YourSingapore, 2012)
Structure & Materials used on Singapore Gold Sand Marina Bay Hotel
Shear walls are used as primary vertical and transverse structural system for all three
towers. (McCafferty, 2011) Additional of concrete core walls located within both legs of each
towers restrain the hotel in the longitudinal direction and help prevent out-of-plane buckling of the
narrow shear walls within both legs of the towers. (McCafferty, 2011) Post-tensioned 8-inch Flat
slabs span directly between the shear walls. (McCafferty, 2011) The flat slab scheme also
provides flexibility in the hotel room layout, to hold a relatively tight 9-foot 10-inch typical floor-to-
floor height, and accommodates flexibility of building services distribution and coordination
throughout each floor. (McCafferty, 2011)
(Diagram of Hotel Components)
At level 23, where the story-height steel trusses are located, mechanical floors connected
the legs of the towerto withstand the large shear forces that occur where these meet above the
central atrium. (McCafferty, 2011) The base slab at ground floor level is post-tensioned to resist
the horizontal thrusts produced by the inclined legs. (McCafferty, 2011) Each tower slab form is
also slightly changed in relation to its pair, to increase the slenderness of the buildings, resulting
in the appearance of six towers, instead of three. (Safdie, 2011) There is an energy efficient
double-glazed unit suspended at the edge of the slab and is resting on a frame. (Safdie, 2011)
Perpendicular to the façade, glass fins were installed to provide shading. (Safdie, 2011) In
order to allow it to radiate out in elevation, the glass fins are suspended out of the horizontal stack
joint. (Safdie, 2011) The glass fins are supported by a 3-sided aluminium frame, with the exposed
forward edge, the sun light is been catch, as well as reflections of the façade, to create a specials
effect. (Safdie, 2011) A 30%-reflective glass is used as the fins and to provide shading for the
façade up to 20% of all solar gain. (Safdie, 2011) The belly of the SkyPark is made of more than
9,000 silver-painted metal-composite panels, the panels encloses the mega trusses which bridge
the buildings at level 55, as well as a multitude of back of house spaces. (Safdie, 2011) Material
that mainly used to build Marina Bay Hotel are aluminium and steels as the structural frame and
reinforcement and as well as for the design. (Safdie, 2011)
The material to build the façade of the hotel was carefully chosen to ensure that the
building has a higher Envelope Thermal Transfer Value than the standard. (Mike, 2012)
Whenever possible during the hotel’s construction, the engineers try to use green materials
utilizing recycled products under Singapore’s Green Labeling Scheme – such as drainage cells,
timber decking, drywall partitions and fire-rated doors. (Mike, 2012)
Industrialized Building Systems (IBS) implemented in Singapore Gold Sand Marina Bay Hotel
Industrialized Building Systems, generally known as IBS throughout Malaysia. In
worldwide, IBS is also known as Pre-fabricated/Pre-fab Construction, Modern Method of
Construction (MMC) and Off-site Construction.Industrialized Building Systems is a method of
construction which uses techniques such as mass production of industrial components in a
controlled environment, and latertransported to construction site for further assembly onto specific
buildings. Each and every one of the pre-cast concrete and pre-fabricated timber/steel structures
are customized and standardized making it more efficient and able to maintain it’s persistent in
quality and quantity. Such pre-cast concrete and pre-fabricated timber/steel structures are
particularly useful for high rise buildings or mass housing estates whereas similar structure can be
replicated.
In the construction of MBS, the foundations system used for the three towers was barrette
piles with a number of bored piles for lighter loaded elements of the structures.Piles are driven
into the soil for transferring loads and prevent deformation. Concrete piles are also used as pre-
cast beams to be placed in the structure of the building for the purpose on supporting the building
loadings.
(Foundation of Singapore Gold Sand Marina Bay Hotel)
Furthermore,pre-cast reinforced concrete shear walls, vary from thickness of 28 inches at
the base of the tower to 20 inches of higher floor levels, and are located within 33-foor centres for
each of the three towers. Shear walls are used as primary vertical and transverse structural
system for all three towers.
(Shear walls of three towers)
On top of the MBS is where the SkyPark located. Steel structure for the SkyParkwas pre-
fabricated off-site in 14 primary segments. Then, truck the pre-fabricated steel structure to site
and lift them into place for assembly onto the top of the tower. The bridging sections extending
between adjacent towers each consist of three 400-ton bridge trusses that were pre-assembled at
grade. Totalof 7,000 tons steelwork was erected into the SkyPark to maintain and support its
weight.
(Primary Pre-Fabricated steelsegments)
Advantages of Industrialized Building Systems (IBS)
During the construction, Industrialized Building Systems (IBS) able to increase the
construction speed of MBS by providing pre-cast and pre-fabricatedcomponents. As compared to
normal build, it is much fasteras it doesn’t required labours to construct it step by step. There are
factories that provide pre-cast/pre-fabricated components, saving up time andspeed up the
process of construction. Industrialized Building Systems componentsonly work at the site,
therefore pre-cast/pre-fabricated components must be brought over to site for further assembly. It
also provides flexibility in the design of pre-cast element so that different systems
may produce their own unique pre-fabrication construction methods.
(Fabrication The podium roofs)(Fabrication Sand SkyPark)
Besides that, Industrialized Building Systems also helped to save up costs on the
construction of MBS. WithinIndustrialized Building Systems, there is aluminum, steel, timber and
other materials of formwork that can be reused while pouring the concrete. By using these
systems, itcan reduce the numbers of labours. For examples, the needs for skilled workers, bar-
benders and carpenters can be reduced.
Furthermore, Industrialized Building Systems allowed the construction of MBSto build in a
moreeco-friendly environment. The usagesof timber formwork will be lesser down andwastage of
construction materials can be reducedwhile usingIndustrialized Building Systems in the
construction. The system helps to increase the safety and neatness conditionof site. The systems
also help to avoid the delay on construction works affected by weather. Due to the components of
Industrialized Building Systems, the effects of weather on construction operation became lesser.
In conclusion, Industrialized Building Systems able to save up time, cost, and provide a
more eco-friendly environment during the construction of MBS.
References:
Background Information of Singapore Gold Sand Marina Bay Hotel
1. Chua, A. (2011). Marina Bay Sands. SingaporeInfopedia. Retrieved from
http://infopedia.nl.sg/articles/SIP_1607_2011-11-01.html
2. “Marina Bay Sands / Safdie Architects” (2010, 26 July). ArchDaily. Accessed 23 June2013.
Retrieved fromhttp://www.archdaily.com/70186
3. YourSingapore. (2012). Marina Bay Sands® Hotel and Sands SkyPark®. Retrieved from
http://www.yoursingapore.com/content/traveller/en/browse/see-and-do/arts-and-
entertainment/architecture/sky-park.html
4. Apavisa. (n.d.). SKYPARK, MARINA BAY SANDS – SINGAPORE. Retrieved from
http://www.apavisa.com/en/proyecto-skypark-marina-bay-sands-singapore/
References:
Structure & Materials used on Singapore Gold Sand Marina Bay Hotel
1. Safdie, M. (2011, March). "Marina Bay Sand, Singapore." Council on Tall Building and
Urban Habitat.Retrieved June 22, 2013, from
http://www.ctbuh.org/TallBuildings/FeaturedTallBuildings/ArchiveJournal/MarinaBaySands
/tabid/1766/language/en-US/Default.aspx
2. McCafferty, P. S. & Brodkin, D. & Farnsworth, D. & Scott, D. (2011). Engineering an Icon –
The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June
22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273
3. Mike, W. (2012, March 13). In Marina Bay Sands: Singapore’s Top Eco-Friendly
Hotel.Argophilia Travel News. Retrieved June 25, 2013, from
http://www.argophilia.com/news/marina-bay-sands-ecological-moves/25349/
References:
Industrialized Building Systems (IBS) implemented inSingapore Gold Sand Marina Bay Hotel
1. Industrialised Building System (IBS). (n.d.). Retrieved June 22, 2013, from Wikipedia:
http://en.wikipedia.org/wiki/Industrialised_Building_System_(IBS)
2. Copyright © Kimlun Corporation Berhad (867077-X). (n.d.). Industrialised Building
Systems (IBS). Retrieved June 22, 2013, from
http://www.kimlun.com/industrial_building_systems.html
3. Soletanche-Bachy Group. (2007). Marina bay sands.Retrieved June 22, 2013,
fromhttp://www.bachy-soletanche.com/SBF/sitev4_uk.nsf/technique/marina-bay-sands
4. McCafferty, P.S.&Brodkin, D.&Farnsworth, D. & Scott, D. (2011). Engineering an Icon–
The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June
22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273
References:
Advantages of Industrialized Building Systems (IBS)
1. Incik. Mohd Nazli. (2011, March 28). Engineer Thinking..; Advantages of industrialised
building system (IBS). Retrieved from http://inginiur.blogspot.com/2011/03/advantages-of-
industrialised-building.html
2. Yong, E. (2011, May 7). Eric Yong’s Blog;The Advantages & Disadvantages of the
Industrialized Building Systems (IBS). Retrieved from
http://eforericyong.blogspot.com/2011/07/advantages-disadvantages-of.html
3. Juan Maier, B. M. (2012). The Marina Bay Sands Special Issue; the Arup Journal.
Retrieved from www.arup.com/Publications/~/media/Files/.../Arup_Journal_1_2012.ashx

More Related Content

What's hot

Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
Ar. Md Shahroz Alam
 
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiDesign, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Ar. Md Shahroz Alam
 

What's hot (20)

case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
 
World trade centre,bahrain
World trade centre,bahrainWorld trade centre,bahrain
World trade centre,bahrain
 
Report of cayan tower
Report of cayan towerReport of cayan tower
Report of cayan tower
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
CANTON TOWER.pdf
CANTON TOWER.pdfCANTON TOWER.pdf
CANTON TOWER.pdf
 
BURJ AL ARAB
BURJ AL ARABBURJ AL ARAB
BURJ AL ARAB
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiDesign, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
 
Supertech supernova
Supertech supernovaSupertech supernova
Supertech supernova
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
Architecture Design Project Report
Architecture Design Project ReportArchitecture Design Project Report
Architecture Design Project Report
 
TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
JOHN HANCOCK CENTER
JOHN HANCOCK CENTERJOHN HANCOCK CENTER
JOHN HANCOCK CENTER
 
National mosque malaysia
National mosque malaysiaNational mosque malaysia
National mosque malaysia
 
Beijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptxBeijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptx
 
The Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldThe Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the world
 

Similar to Construction technology i singapore gold sand marina bay hotel

CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
Yap Xin
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
Chin Tze Wei
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherif
hlksd
 

Similar to Construction technology i singapore gold sand marina bay hotel (20)

CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
Skyscrapers
SkyscrapersSkyscrapers
Skyscrapers
 
Internship report
Internship reportInternship report
Internship report
 
Btech
BtechBtech
Btech
 
Chhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingChhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal Building
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
 
Table formwork
Table formwork Table formwork
Table formwork
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...
 
Seismic Study of Building with Roof Top Telecommunication Towers
Seismic Study of Building with Roof Top Telecommunication TowersSeismic Study of Building with Roof Top Telecommunication Towers
Seismic Study of Building with Roof Top Telecommunication Towers
 
Aldar Headqaurter
Aldar Headqaurter  Aldar Headqaurter
Aldar Headqaurter
 
IRJET- A Review of Seismic Analysis of Shear Wall Optimization for Multi-...
IRJET-  	  A Review of Seismic Analysis of Shear Wall Optimization for Multi-...IRJET-  	  A Review of Seismic Analysis of Shear Wall Optimization for Multi-...
IRJET- A Review of Seismic Analysis of Shear Wall Optimization for Multi-...
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
Site report
Site reportSite report
Site report
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherif
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherif
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 

More from 마 이환

Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
마 이환
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines
마 이환
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)
마 이환
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)
마 이환
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd
마 이환
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices
마 이환
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
마 이환
 

More from 마 이환 (20)

Measurement V
Measurement VMeasurement V
Measurement V
 
Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)
 
Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)
 
Internal memo
Internal memoInternal memo
Internal memo
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 

Recently uploaded

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 

Recently uploaded (20)

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 

Construction technology i singapore gold sand marina bay hotel

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB1514 – Construction Technology 1 Singapore Gold Sand Marina Bay Hotel April Semester 2013 Group Assignment: Group 4 Submission Date: 26th June 2013 Name Student ID Marks Yam Yih Hwan 0305861 Tan Jia Jia 0307766 Yo Kai Sen 0310563 Teoh Tze Yoong 0314756
  • 2. Background Information of Singapore Gold Sand Marina Bay Hotel Singapore Gold Sand Marina Bay Hotel (MBS) is an Integrated Resort fronting Marina Bay in Singapore, which operated under Las Vegas Sands Corp. (Chua, 2011)MBS is designed by Canadian Architect named Moshe Safdie with Local Executive Architects Aedas, Pte, Ltd. In additional, Arup Group Limited is selected as the Structural Engineering for this project whereas the landscape of this building is designed by Peter Walker & Partners. The entire project area used is 845,000m2 and the site area used is 154,938m2 . The estimated budget on this project is USD $5.7 billion. (Safdie Architects, 2010) MBS began operations on 27 April 2010, and officially opened on 23 June. MBS comprises of three towers with 55-storey high topped by a 12,400m2 SkyPark. As for the Art Science Museum, it is shaped like a lotus flower. (Chua, 2011) On top of its three towers, the Marina Bay Sands was designed as a curious boat-shape and it is placed at the gateway to Singapore's harbor with strong and highly iconic structure. (Apavisa, n.d.) (Layout of Singapore Gold Sand Marina Bay Hotel)
  • 3. Furthermore, MBS offers luxury hotel, casino, retail mall, convention facilities and entertainment venues including theatres, nightclubs and a museum. It has 2,560 luxury rooms across three 55-storey hotel towers, totaling 265,683 m2 . (Safdie Architects, 2010) As we know, Marina Bay Sands is one of the biggest hotelslocated in Singapore; it’s covering 12,400 m2 , and is over 200 meters altitude. It has a 150 meters infinity-edged swimming pool at 250 meters high which overlook the view of Singapore skyline. There is a botanical garden which linked on top of the three 200m high hotels of marina bays where you can find 250 types of tree and 650 species of plants. (Apavisa, n.d.) MBS is one of the most complex designs ever built; it is a slopping tower which its angle as steep as 26 degrees and connecting legs at Level 23 to form a single building. The “Hanging Gardens” provides a magnificent backdrop which the visitors can overlook the upcoming Gardens by the Bay. (YourSingapore, 2012) Structure & Materials used on Singapore Gold Sand Marina Bay Hotel Shear walls are used as primary vertical and transverse structural system for all three towers. (McCafferty, 2011) Additional of concrete core walls located within both legs of each towers restrain the hotel in the longitudinal direction and help prevent out-of-plane buckling of the narrow shear walls within both legs of the towers. (McCafferty, 2011) Post-tensioned 8-inch Flat slabs span directly between the shear walls. (McCafferty, 2011) The flat slab scheme also provides flexibility in the hotel room layout, to hold a relatively tight 9-foot 10-inch typical floor-to- floor height, and accommodates flexibility of building services distribution and coordination throughout each floor. (McCafferty, 2011) (Diagram of Hotel Components)
  • 4. At level 23, where the story-height steel trusses are located, mechanical floors connected the legs of the towerto withstand the large shear forces that occur where these meet above the central atrium. (McCafferty, 2011) The base slab at ground floor level is post-tensioned to resist the horizontal thrusts produced by the inclined legs. (McCafferty, 2011) Each tower slab form is also slightly changed in relation to its pair, to increase the slenderness of the buildings, resulting in the appearance of six towers, instead of three. (Safdie, 2011) There is an energy efficient double-glazed unit suspended at the edge of the slab and is resting on a frame. (Safdie, 2011) Perpendicular to the façade, glass fins were installed to provide shading. (Safdie, 2011) In order to allow it to radiate out in elevation, the glass fins are suspended out of the horizontal stack joint. (Safdie, 2011) The glass fins are supported by a 3-sided aluminium frame, with the exposed forward edge, the sun light is been catch, as well as reflections of the façade, to create a specials effect. (Safdie, 2011) A 30%-reflective glass is used as the fins and to provide shading for the façade up to 20% of all solar gain. (Safdie, 2011) The belly of the SkyPark is made of more than 9,000 silver-painted metal-composite panels, the panels encloses the mega trusses which bridge the buildings at level 55, as well as a multitude of back of house spaces. (Safdie, 2011) Material that mainly used to build Marina Bay Hotel are aluminium and steels as the structural frame and reinforcement and as well as for the design. (Safdie, 2011) The material to build the façade of the hotel was carefully chosen to ensure that the building has a higher Envelope Thermal Transfer Value than the standard. (Mike, 2012) Whenever possible during the hotel’s construction, the engineers try to use green materials utilizing recycled products under Singapore’s Green Labeling Scheme – such as drainage cells, timber decking, drywall partitions and fire-rated doors. (Mike, 2012) Industrialized Building Systems (IBS) implemented in Singapore Gold Sand Marina Bay Hotel Industrialized Building Systems, generally known as IBS throughout Malaysia. In worldwide, IBS is also known as Pre-fabricated/Pre-fab Construction, Modern Method of Construction (MMC) and Off-site Construction.Industrialized Building Systems is a method of construction which uses techniques such as mass production of industrial components in a controlled environment, and latertransported to construction site for further assembly onto specific buildings. Each and every one of the pre-cast concrete and pre-fabricated timber/steel structures are customized and standardized making it more efficient and able to maintain it’s persistent in quality and quantity. Such pre-cast concrete and pre-fabricated timber/steel structures are particularly useful for high rise buildings or mass housing estates whereas similar structure can be replicated. In the construction of MBS, the foundations system used for the three towers was barrette piles with a number of bored piles for lighter loaded elements of the structures.Piles are driven into the soil for transferring loads and prevent deformation. Concrete piles are also used as pre-
  • 5. cast beams to be placed in the structure of the building for the purpose on supporting the building loadings. (Foundation of Singapore Gold Sand Marina Bay Hotel) Furthermore,pre-cast reinforced concrete shear walls, vary from thickness of 28 inches at the base of the tower to 20 inches of higher floor levels, and are located within 33-foor centres for each of the three towers. Shear walls are used as primary vertical and transverse structural system for all three towers. (Shear walls of three towers)
  • 6. On top of the MBS is where the SkyPark located. Steel structure for the SkyParkwas pre- fabricated off-site in 14 primary segments. Then, truck the pre-fabricated steel structure to site and lift them into place for assembly onto the top of the tower. The bridging sections extending between adjacent towers each consist of three 400-ton bridge trusses that were pre-assembled at grade. Totalof 7,000 tons steelwork was erected into the SkyPark to maintain and support its weight. (Primary Pre-Fabricated steelsegments) Advantages of Industrialized Building Systems (IBS) During the construction, Industrialized Building Systems (IBS) able to increase the construction speed of MBS by providing pre-cast and pre-fabricatedcomponents. As compared to normal build, it is much fasteras it doesn’t required labours to construct it step by step. There are factories that provide pre-cast/pre-fabricated components, saving up time andspeed up the process of construction. Industrialized Building Systems componentsonly work at the site, therefore pre-cast/pre-fabricated components must be brought over to site for further assembly. It also provides flexibility in the design of pre-cast element so that different systems may produce their own unique pre-fabrication construction methods. (Fabrication The podium roofs)(Fabrication Sand SkyPark)
  • 7. Besides that, Industrialized Building Systems also helped to save up costs on the construction of MBS. WithinIndustrialized Building Systems, there is aluminum, steel, timber and other materials of formwork that can be reused while pouring the concrete. By using these systems, itcan reduce the numbers of labours. For examples, the needs for skilled workers, bar- benders and carpenters can be reduced. Furthermore, Industrialized Building Systems allowed the construction of MBSto build in a moreeco-friendly environment. The usagesof timber formwork will be lesser down andwastage of construction materials can be reducedwhile usingIndustrialized Building Systems in the construction. The system helps to increase the safety and neatness conditionof site. The systems also help to avoid the delay on construction works affected by weather. Due to the components of Industrialized Building Systems, the effects of weather on construction operation became lesser. In conclusion, Industrialized Building Systems able to save up time, cost, and provide a more eco-friendly environment during the construction of MBS.
  • 8. References: Background Information of Singapore Gold Sand Marina Bay Hotel 1. Chua, A. (2011). Marina Bay Sands. SingaporeInfopedia. Retrieved from http://infopedia.nl.sg/articles/SIP_1607_2011-11-01.html 2. “Marina Bay Sands / Safdie Architects” (2010, 26 July). ArchDaily. Accessed 23 June2013. Retrieved fromhttp://www.archdaily.com/70186 3. YourSingapore. (2012). Marina Bay Sands® Hotel and Sands SkyPark®. Retrieved from http://www.yoursingapore.com/content/traveller/en/browse/see-and-do/arts-and- entertainment/architecture/sky-park.html 4. Apavisa. (n.d.). SKYPARK, MARINA BAY SANDS – SINGAPORE. Retrieved from http://www.apavisa.com/en/proyecto-skypark-marina-bay-sands-singapore/ References: Structure & Materials used on Singapore Gold Sand Marina Bay Hotel 1. Safdie, M. (2011, March). "Marina Bay Sand, Singapore." Council on Tall Building and Urban Habitat.Retrieved June 22, 2013, from http://www.ctbuh.org/TallBuildings/FeaturedTallBuildings/ArchiveJournal/MarinaBaySands /tabid/1766/language/en-US/Default.aspx 2. McCafferty, P. S. & Brodkin, D. & Farnsworth, D. & Scott, D. (2011). Engineering an Icon – The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June 22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273 3. Mike, W. (2012, March 13). In Marina Bay Sands: Singapore’s Top Eco-Friendly Hotel.Argophilia Travel News. Retrieved June 25, 2013, from http://www.argophilia.com/news/marina-bay-sands-ecological-moves/25349/ References: Industrialized Building Systems (IBS) implemented inSingapore Gold Sand Marina Bay Hotel 1. Industrialised Building System (IBS). (n.d.). Retrieved June 22, 2013, from Wikipedia: http://en.wikipedia.org/wiki/Industrialised_Building_System_(IBS) 2. Copyright © Kimlun Corporation Berhad (867077-X). (n.d.). Industrialised Building Systems (IBS). Retrieved June 22, 2013, from http://www.kimlun.com/industrial_building_systems.html 3. Soletanche-Bachy Group. (2007). Marina bay sands.Retrieved June 22, 2013, fromhttp://www.bachy-soletanche.com/SBF/sitev4_uk.nsf/technique/marina-bay-sands 4. McCafferty, P.S.&Brodkin, D.&Farnsworth, D. & Scott, D. (2011). Engineering an Icon– The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June 22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273
  • 9. References: Advantages of Industrialized Building Systems (IBS) 1. Incik. Mohd Nazli. (2011, March 28). Engineer Thinking..; Advantages of industrialised building system (IBS). Retrieved from http://inginiur.blogspot.com/2011/03/advantages-of- industrialised-building.html 2. Yong, E. (2011, May 7). Eric Yong’s Blog;The Advantages & Disadvantages of the Industrialized Building Systems (IBS). Retrieved from http://eforericyong.blogspot.com/2011/07/advantages-disadvantages-of.html 3. Juan Maier, B. M. (2012). The Marina Bay Sands Special Issue; the Arup Journal. Retrieved from www.arup.com/Publications/~/media/Files/.../Arup_Journal_1_2012.ashx