What is Building service?
One of a crucial role in a building
Building service is responsible for the design of :
 Installation
 Operation
 Monitoring of the mechanical, electrical and public health systems
Safety,
Comfortable
Environmentally Friendly Operation
Influence the architecture of a building
Play a significant role on the sustainability and energy
demand of a building
Floor Plan
9 Escape Staircase
9 Hose Reel
5 Passenger’s Lift
6 Fireman’s Lift
2 Escalator (One-way)
18 CO2 Fire Extinguisher
9 Dry Powder Fire
Extinguisher
The Summit, Subang USJ
The Summit located at Subang Jaya, USJ
Purpose of choosing The Summit as our case study:
 Locate all services within the building
 Services in the building quite old
 Low maintenance
 The Summit used to be popular
place for youngster & families
 Less and less popular due to
the poor management of
the building
Why is building services so important?
Building services is ‘what makes a building alive’
Makes the building safe and alive
Without building services, we won’t have lighting, heat,
escalator, lift, acoustics, plumbing, power supply, the
security and safety system in a building
Without all this it will only be a cold, dark and
uninhabitable building
First impression of The Summit!
Safety system are spoiled and poorly maintained
Examples are the emergency phone and the fire escape
door which is allocated near the stairs
The environment in the building is dark and creepy
The population is lesser compared to other shopping
complex
How can The Summit attract more shoppers?
Improve the lighting to be more brighter
Add more interior decoration around to make the building
look more lively
Keep the services updated by maintaining it regularly
Natural vs. Mechanical
During our visit to The Summit,
we found out that both natural and
mechanical systems of ventilation
are implemented
In the washrooms, there are 3 openings of windows to provide ventilation.
There is also a fan blower inside, which is of the mechanical system.
Split Units
Air doors are installed at every
automatic sliding door at The Summit
 To prevent loss of cool air
 To prevent hot air from coming in
 Condensers are normally located around the basement level or the
rooftop.
Centralized System
In the main area or lobby of the building,
centralized system and
air-conditioning is installed.
With this system, fresh or
cold air is transfer through
ducting to various
part of the building.
Water Chiller System
The cooling tower is located
at the top of the building,
along with other services,
for examples;
 piping,
 split units &
 electrical distributor
Diffusers
Diffusers are where the air comes out and is
discharged into the rooms.
In The Summit, 3 types of diffusers:
 Linear Diffuser
It is used in open plan rooms and
it will hardly interfere with the
pattern of the ceiling.
Its direction of air discharge can be
changed to suit the room conditions.
It is suitable with high air velocity
and it has high induction slot
can have rapid decay of air velocity
and temperature.
Diffusers
 Cone Diffuser
Its shape can sometimes be square to match pattern of the ceiling
and its inner cone can be lowered or raised to result in different
flow pattern.
Diffusers
 Side Wall Inlet Diffuser
It is used when there is no false ceiling. For every inlet there will
be a grill.
The air discharge can be controlled by sets of louvers in vertical or
horizontal plane. The flow pattern can be varied according to room
size, velocity and aspect ratio.
Fire Protection
• Active fire protection
• Method requires mechanical, electric or electronic activation
• Manual or automatic fire protection system
• Eg. fire alarms, detectors, wet and dry risers, hose reels, carbon
dioxide fixed installation
• Passive fire protection
• An integral component of the structural fire protection and fire safety
in a building.
• Contain fires or preventing the fire from spreading
• Eg. fire-resistant walls, floors, and doors, etc.
Active Fire Protection
Fire Extinguisher
Intended for initial outbreak of fire
Four different types of fire extinguishers
Active Fire Protection
Hose Reel
Intended for occupant to use during early stage of fire
Located at every escape routes
19mm diameter
25m in length
Active Fire Protection
Sprinkler
Detect, control, extinguish fire
Warn the occupants of the occurrence of fire
Equipped with control valve to deliver the pressure of the
sprinkler water
Automatic fire alarm system Manual fire alarm system
Automatically initiates and
activates the alarm when it
detects fire
Eg. fire detection system
Provides an alarm to be
activated only when it is switch
on by someone
Eg. Manual call point
Active Fire Protection
Passive Fire Protection
Fire-resistant door
Mainly for fire escape doors
Should not be obstructed by any objects
Staircase Fireman Lift
Staircase were properly
designed
The dimension of the threads
and risers were constructed
consistently
No winders built
Length of the landing is not
less than the width
The fireman lift is indicated
Passive Fire Protection
Problems
The fire extinguishers were not
send for maintenance
Maintenance has to be done to
ensure that the extinguisher is
still functional
That the manual fire alarm is
‘not in use’.
Problems
The fire doors are not in good condition
For example, the quality is degraded, the doorknob is
missing, and the doors should always be closed and should
not be obstructed by any object.
Problems
Their voice communication systems are not in suitable
conditions and not maintenance were carried out.
Vertical Transportation Systems
Population of The Summit around 5000+-
Area of The Summit
 1.2 million square feet;
 it is a commercial building
 consists of 9 floors including basements
Only one bus stop in front of The Summit
The Summit poor in position of building in relation
to public transport services, which means it has low
passenger peaks during arrival hours.
Lift
The Summit used hydraulic
lifts
Total numbers of 5 passenger
and 6 fire’s man lifts on every
floor
Lift Car
• Capacity of the lift car is
20 passengers
• Lift entrances about 1160mm
wide with 2 pieces of doors
• 50 seconds for door closing
time with 1160mm width doors
• Passenger transfer time at
50 seconds in and out
Problems of the Lift
• 5 passenger and 6 fire’s man lifts
on every floor, but only
one passenger lift is working
• The Summit used hydraulic lifts, and
it supposed to be low vibration and
noise, but it causes a lot of vibration
and noise during the ride
• Less Maintenance
Escalator
• Two types of escalator:
• One way traffic of single bank
with interrupted traffic in
one direction on every floor
Escalator
Two-way traffic parallel located in the cinema
Electricity Supply Systems
The main switch boards are located around the building examples are at the rooftop,
at the ground floor and the basement parking
The pictures above show the different location of the main switch board
Electricity Supply Systems
Function of the main switch board:
 act as an assembly of switches and circuit protection devices
from which power is distributed
 It is totally enclosed,
sheet steel fabricated
 Distributes large incoming supply
into smaller, easily controlled parcel
Recommendation for Fire Protections
The Summit Recommendation
• Nearest fire hydrant is 51 meter
away.
• A good one should be 6 meter away.
• Not more than 30 m away from the
building.
• 19mm diameter hose reel. • 25mm diameter hose reel.
Recommendation for Fire Protections
• Hose reel length is 25 meter. • A good one should be 30 meter
length.
• Smoke detector system.
• The number of detectors should not
be less than 1 in 100m².
• Heat detector system.
• The number of detectors fitted
should not be less than 1 in 50m²
Recommendation for Vertical Transportation
The Summit Recommendation
Hydraulic Lift Electric Lift
• Speed is slower. • Speed is faster.
• The pump works against gravity to
push the car and its contents
upwards.
• Movement is depending on the
electrical power.
• Energy used to lift the elevator does
not get recovered on the trip going
down, it is completely lost.
• Do not use as much energy due to
the counterweight.
Case study: Presentation Slides

Weitere ähnliche Inhalte

Was ist angesagt?

Fire Safety on High Raise Buildings
Fire Safety on High Raise BuildingsFire Safety on High Raise Buildings
Fire Safety on High Raise BuildingsMohamed Anas
 
acoustic and viewing angle analysis of an auditorium building
acoustic and viewing angle analysis of an auditorium buildingacoustic and viewing angle analysis of an auditorium building
acoustic and viewing angle analysis of an auditorium buildingSaleh Ahmed
 
Vishnudas bhave auditorium, vashi - ACOUSTICS - AUDITORIUM - MUMBAI
Vishnudas bhave auditorium, vashi - ACOUSTICS - AUDITORIUM - MUMBAIVishnudas bhave auditorium, vashi - ACOUSTICS - AUDITORIUM - MUMBAI
Vishnudas bhave auditorium, vashi - ACOUSTICS - AUDITORIUM - MUMBAIDijo Mathews
 
Fire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case studyFire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case studyIrene Devakirubai
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsAarti Rani
 
Chapter 07-High-Rise Building Fires
Chapter 07-High-Rise Building FiresChapter 07-High-Rise Building Fires
Chapter 07-High-Rise Building Firessnoshoesam
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building MaterialsSorab Mishra
 
Building services & Standards For Institutional Building
Building services & Standards For Institutional BuildingBuilding services & Standards For Institutional Building
Building services & Standards For Institutional BuildingKashish Duggal
 
Case study- ATS Group housing
Case study- ATS Group housingCase study- ATS Group housing
Case study- ATS Group housingAyushi Agrawal
 
Auditorium Design (Case Study)
Auditorium Design (Case Study)Auditorium Design (Case Study)
Auditorium Design (Case Study)Mansi Pushpakar
 
Fire safety as per National Building Code-2016
Fire safety as per National Building Code-2016Fire safety as per National Building Code-2016
Fire safety as per National Building Code-2016Arpit Vyas
 
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT vk78512
 
curtain wall -skin of building
 curtain wall -skin of building curtain wall -skin of building
curtain wall -skin of buildingabidha karthu
 
Fire Prevention Measures for High Rise Buildings
Fire Prevention Measures for High Rise BuildingsFire Prevention Measures for High Rise Buildings
Fire Prevention Measures for High Rise BuildingsRanjeet Kumar
 
PVR cinemax Architectural Case study By Akash thottarath
PVR cinemax Architectural Case study By Akash thottarathPVR cinemax Architectural Case study By Akash thottarath
PVR cinemax Architectural Case study By Akash thottarathAkash Thottarath
 
Auditorium Literature Study & Design Considerations
Auditorium Literature Study & Design ConsiderationsAuditorium Literature Study & Design Considerations
Auditorium Literature Study & Design ConsiderationsVartika Sharma
 
Fire guidelines by nbc part 1
Fire guidelines by nbc part 1Fire guidelines by nbc part 1
Fire guidelines by nbc part 1R821992
 
Acoustic material market survey.pdf
Acoustic material market survey.pdfAcoustic material market survey.pdf
Acoustic material market survey.pdfNehaRanade2
 
Fire safety system of Building.
Fire safety system of Building.Fire safety system of Building.
Fire safety system of Building.Integrated Design
 

Was ist angesagt? (20)

Fire Safety on High Raise Buildings
Fire Safety on High Raise BuildingsFire Safety on High Raise Buildings
Fire Safety on High Raise Buildings
 
jamia polytechnique delhi
jamia polytechnique delhijamia polytechnique delhi
jamia polytechnique delhi
 
acoustic and viewing angle analysis of an auditorium building
acoustic and viewing angle analysis of an auditorium buildingacoustic and viewing angle analysis of an auditorium building
acoustic and viewing angle analysis of an auditorium building
 
Vishnudas bhave auditorium, vashi - ACOUSTICS - AUDITORIUM - MUMBAI
Vishnudas bhave auditorium, vashi - ACOUSTICS - AUDITORIUM - MUMBAIVishnudas bhave auditorium, vashi - ACOUSTICS - AUDITORIUM - MUMBAI
Vishnudas bhave auditorium, vashi - ACOUSTICS - AUDITORIUM - MUMBAI
 
Fire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case studyFire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case study
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildings
 
Chapter 07-High-Rise Building Fires
Chapter 07-High-Rise Building FiresChapter 07-High-Rise Building Fires
Chapter 07-High-Rise Building Fires
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building Materials
 
Building services & Standards For Institutional Building
Building services & Standards For Institutional BuildingBuilding services & Standards For Institutional Building
Building services & Standards For Institutional Building
 
Case study- ATS Group housing
Case study- ATS Group housingCase study- ATS Group housing
Case study- ATS Group housing
 
Auditorium Design (Case Study)
Auditorium Design (Case Study)Auditorium Design (Case Study)
Auditorium Design (Case Study)
 
Fire safety as per National Building Code-2016
Fire safety as per National Building Code-2016Fire safety as per National Building Code-2016
Fire safety as per National Building Code-2016
 
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
 
curtain wall -skin of building
 curtain wall -skin of building curtain wall -skin of building
curtain wall -skin of building
 
Fire Prevention Measures for High Rise Buildings
Fire Prevention Measures for High Rise BuildingsFire Prevention Measures for High Rise Buildings
Fire Prevention Measures for High Rise Buildings
 
PVR cinemax Architectural Case study By Akash thottarath
PVR cinemax Architectural Case study By Akash thottarathPVR cinemax Architectural Case study By Akash thottarath
PVR cinemax Architectural Case study By Akash thottarath
 
Auditorium Literature Study & Design Considerations
Auditorium Literature Study & Design ConsiderationsAuditorium Literature Study & Design Considerations
Auditorium Literature Study & Design Considerations
 
Fire guidelines by nbc part 1
Fire guidelines by nbc part 1Fire guidelines by nbc part 1
Fire guidelines by nbc part 1
 
Acoustic material market survey.pdf
Acoustic material market survey.pdfAcoustic material market survey.pdf
Acoustic material market survey.pdf
 
Fire safety system of Building.
Fire safety system of Building.Fire safety system of Building.
Fire safety system of Building.
 

Andere mochten auch

Case Study Report: The Summit
Case Study Report: The SummitCase Study Report: The Summit
Case Study Report: The Summit마 이환
 
Building Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportBuilding Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportJoyeeLee0131
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services ReportJoanne Yunn Tze
 
Shopping mall case study
Shopping mall case studyShopping mall case study
Shopping mall case studyankita20111994
 
Building Services Project 1 - Summit Mall
Building Services Project 1 - Summit MallBuilding Services Project 1 - Summit Mall
Building Services Project 1 - Summit MallAh Jun
 
Lift.escalator & moving walk
Lift.escalator & moving walkLift.escalator & moving walk
Lift.escalator & moving walkshamal das
 
BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTXinYee Khoo
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1Nur Zaas
 
Building services 2 assignment
Building services 2 assignmentBuilding services 2 assignment
Building services 2 assignmentShao Xun Sean Thun
 
Final building service (assignment)
Final   building service (assignment)Final   building service (assignment)
Final building service (assignment)Chee Lee
 
Scanner presentation
Scanner presentationScanner presentation
Scanner presentationAniket Menon
 
Building services report
Building services report Building services report
Building services report Soh Shing
 
Scanner
ScannerScanner
Scannerat1211
 
Case Study Presentation
Case Study PresentationCase Study Presentation
Case Study Presentationjeetlulla
 

Andere mochten auch (20)

Basics of Fire fighting
Basics of Fire fightingBasics of Fire fighting
Basics of Fire fighting
 
Case Study Report: The Summit
Case Study Report: The SummitCase Study Report: The Summit
Case Study Report: The Summit
 
Building Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportBuilding Service Project 2 Case Study Report
Building Service Project 2 Case Study Report
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services Report
 
Shopping mall case study
Shopping mall case studyShopping mall case study
Shopping mall case study
 
Building Services Project 1 - Summit Mall
Building Services Project 1 - Summit MallBuilding Services Project 1 - Summit Mall
Building Services Project 1 - Summit Mall
 
Lift.escalator & moving walk
Lift.escalator & moving walkLift.escalator & moving walk
Lift.escalator & moving walk
 
BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENT
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1
 
Building services 2 assignment
Building services 2 assignmentBuilding services 2 assignment
Building services 2 assignment
 
Final building service (assignment)
Final   building service (assignment)Final   building service (assignment)
Final building service (assignment)
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 
Working of scanner
Working of scannerWorking of scanner
Working of scanner
 
Scanner presentation
Scanner presentationScanner presentation
Scanner presentation
 
Building services report
Building services report Building services report
Building services report
 
Scanner
ScannerScanner
Scanner
 
Sony case study
Sony case studySony case study
Sony case study
 
Case Study Presentation
Case Study PresentationCase Study Presentation
Case Study Presentation
 
Presentation on building service
Presentation on building servicePresentation on building service
Presentation on building service
 
Jörg Bungart & Andrea Seeger
Jörg Bungart & Andrea SeegerJörg Bungart & Andrea Seeger
Jörg Bungart & Andrea Seeger
 

Ähnlich wie Case study: Presentation Slides

Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentationLee Chun Yee
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finaleTee Joanne
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2 Jeanne Hoo
 
Comcast technology center and parking study
Comcast technology center  and parking study Comcast technology center  and parking study
Comcast technology center and parking study ShuvoDipDatta
 
Building Services II Presentation Slides
Building Services II Presentation SlidesBuilding Services II Presentation Slides
Building Services II Presentation Slidesashleyyeap
 
Bs ii presentation slides
Bs ii   presentation slidesBs ii   presentation slides
Bs ii presentation slidesArissa Loh
 
Bs present yeahh!
Bs present yeahh!Bs present yeahh!
Bs present yeahh!Hasif Alias
 
Bserviceproject2
Bserviceproject2Bserviceproject2
Bserviceproject2Nge Chen
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services ReportAmos Tan
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsColt UK
 
FIRE SAFETY - Anoushka Aggarwal
FIRE SAFETY - Anoushka AggarwalFIRE SAFETY - Anoushka Aggarwal
FIRE SAFETY - Anoushka AggarwalANOUSHKAAggarwal
 
services
servicesservices
servicesarchar2
 
CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...Colt UK
 
BS2 group assignment
BS2 group assignment BS2 group assignment
BS2 group assignment jk tan
 
Bs powerpoint slides
Bs powerpoint slidesBs powerpoint slides
Bs powerpoint slideslohwenjun
 
bs slides
bs slidesbs slides
bs slideskellyxc
 

Ähnlich wie Case study: Presentation Slides (20)

Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentation
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finale
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
Comcast technology center and parking study
Comcast technology center  and parking study Comcast technology center  and parking study
Comcast technology center and parking study
 
Bs2 presentation
Bs2 presentation Bs2 presentation
Bs2 presentation
 
Building Services II Presentation Slides
Building Services II Presentation SlidesBuilding Services II Presentation Slides
Building Services II Presentation Slides
 
Bs ii presentation slides
Bs ii   presentation slidesBs ii   presentation slides
Bs ii presentation slides
 
Bs present yeahh!
Bs present yeahh!Bs present yeahh!
Bs present yeahh!
 
Building services
Building servicesBuilding services
Building services
 
Bserviceproject2
Bserviceproject2Bserviceproject2
Bserviceproject2
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services Report
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using Shafts
 
FIRE SAFETY - Anoushka Aggarwal
FIRE SAFETY - Anoushka AggarwalFIRE SAFETY - Anoushka Aggarwal
FIRE SAFETY - Anoushka Aggarwal
 
services
servicesservices
services
 
CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...
 
fire fitghing.pptx
fire fitghing.pptxfire fitghing.pptx
fire fitghing.pptx
 
BS2 group assignment
BS2 group assignment BS2 group assignment
BS2 group assignment
 
Bs powerpoint slides
Bs powerpoint slidesBs powerpoint slides
Bs powerpoint slides
 
bs slides
bs slidesbs slides
bs slides
 
Firefighting & HVAC.pdf
Firefighting & HVAC.pdfFirefighting & HVAC.pdf
Firefighting & HVAC.pdf
 

Mehr von 마 이환

Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)마 이환
 
Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)마 이환
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development마 이환
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)마 이환
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer마 이환
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment마 이환
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides마 이환
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations마 이환
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet마 이환
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report마 이환
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment마 이환
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides마 이환
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines마 이환
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)마 이환
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)마 이환
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd마 이환
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices마 이환
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment마 이환
 

Mehr von 마 이환 (20)

Measurement V
Measurement VMeasurement V
Measurement V
 
Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)
 
Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)
 
Internal memo
Internal memoInternal memo
Internal memo
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 

Kürzlich hochgeladen

Best VIP Call Girls Noida Sector 24 Call Me: 8700611579
Best VIP Call Girls Noida Sector 24 Call Me: 8700611579Best VIP Call Girls Noida Sector 24 Call Me: 8700611579
Best VIP Call Girls Noida Sector 24 Call Me: 8700611579diyaspanoida
 
Girls For Night in Islamabad | 03274100048 🔞
Girls For Night in Islamabad | 03274100048 🔞Girls For Night in Islamabad | 03274100048 🔞
Girls For Night in Islamabad | 03274100048 🔞Ifra Zohaib
 
Udupi Call girl service 6289102337 Udupi escort service
Udupi Call girl service 6289102337 Udupi escort serviceUdupi Call girl service 6289102337 Udupi escort service
Udupi Call girl service 6289102337 Udupi escort servicemaheshsingh64440
 
9999266834 Call Girls In Noida Sector 18 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 18 (Delhi) Call Girl Service9999266834 Call Girls In Noida Sector 18 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 18 (Delhi) Call Girl Servicenishacall1
 
RAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CALRAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CALNiteshKumar82226
 
Kolkata 💋 Call Girl 9748763073 Call Girls in Kolkata Escort service book now
Kolkata 💋 Call Girl 9748763073 Call Girls in Kolkata Escort service book nowKolkata 💋 Call Girl 9748763073 Call Girls in Kolkata Escort service book now
Kolkata 💋 Call Girl 9748763073 Call Girls in Kolkata Escort service book nowapshanarani255
 
Rajkot Call Girls Contact Number +919358341802 Call Girls In Rajkot
Rajkot Call Girls Contact Number +919358341802 Call Girls In RajkotRajkot Call Girls Contact Number +919358341802 Call Girls In Rajkot
Rajkot Call Girls Contact Number +919358341802 Call Girls In RajkotSivanyaPandeya
 
Call Girls in Karachi || 03274100048 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03274100048 || 50+ Hot Sexy Girls Available 24/7Call Girls in Karachi || 03274100048 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03274100048 || 50+ Hot Sexy Girls Available 24/7Sana Rajpoot
 
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...riyasharma00119
 
Book_ A Project based approach CHAPTER 1 summary.pptx
Book_ A Project based approach CHAPTER 1 summary.pptxBook_ A Project based approach CHAPTER 1 summary.pptx
Book_ A Project based approach CHAPTER 1 summary.pptxssuser8fd809
 
Call Girls In Lahore || 03274100048 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03274100048 ||Lahore Call Girl Available 24/7Call Girls In Lahore || 03274100048 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03274100048 ||Lahore Call Girl Available 24/7Sana Rajpoot
 
Lucknow ❣️ Call Girl 97487*63073 Call Girls in Lucknow Escort service book now
Lucknow ❣️  Call Girl 97487*63073 Call Girls in Lucknow Escort service book nowLucknow ❣️  Call Girl 97487*63073 Call Girls in Lucknow Escort service book now
Lucknow ❣️ Call Girl 97487*63073 Call Girls in Lucknow Escort service book nowapshanarani255
 
Radhika Call Girls In Jaipur 9358660226 Escorts service
Radhika Call Girls In Jaipur 9358660226 Escorts serviceRadhika Call Girls In Jaipur 9358660226 Escorts service
Radhika Call Girls In Jaipur 9358660226 Escorts servicerahul222jai
 
SURAT CALL GIRL 92628/71154 SURAT CALL G
SURAT CALL GIRL 92628/71154 SURAT CALL GSURAT CALL GIRL 92628/71154 SURAT CALL G
SURAT CALL GIRL 92628/71154 SURAT CALL GNiteshKumar82226
 
Varanasi Call Girl 78709*93772 Call Girls in Varanasi Escort service book now
Varanasi  Call Girl 78709*93772 Call Girls in Varanasi Escort service book nowVaranasi  Call Girl 78709*93772 Call Girls in Varanasi Escort service book now
Varanasi Call Girl 78709*93772 Call Girls in Varanasi Escort service book nowapshanarani255
 
Indore Call girl service 6289102337 indore escort service
Indore Call girl service 6289102337 indore escort serviceIndore Call girl service 6289102337 indore escort service
Indore Call girl service 6289102337 indore escort servicemaheshsingh64440
 
JAMNAGAR CALL GIRLS 92628/71154 JAMNAGAR
JAMNAGAR CALL GIRLS 92628/71154 JAMNAGARJAMNAGAR CALL GIRLS 92628/71154 JAMNAGAR
JAMNAGAR CALL GIRLS 92628/71154 JAMNAGARNiteshKumar82226
 
Bhopal Call girl service 6289102337 bhopal escort service
Bhopal Call girl service 6289102337 bhopal escort serviceBhopal Call girl service 6289102337 bhopal escort service
Bhopal Call girl service 6289102337 bhopal escort servicemaheshsingh64440
 
Call Girls | 😏💦 03274100048 | Call Girls Near Me
Call Girls | 😏💦 03274100048 | Call Girls Near MeCall Girls | 😏💦 03274100048 | Call Girls Near Me
Call Girls | 😏💦 03274100048 | Call Girls Near MeIfra Zohaib
 
Call Now ☎9870417354|| Call Girls in Gurgaon Sector 13 Escort Service Gurgaon...
Call Now ☎9870417354|| Call Girls in Gurgaon Sector 13 Escort Service Gurgaon...Call Now ☎9870417354|| Call Girls in Gurgaon Sector 13 Escort Service Gurgaon...
Call Now ☎9870417354|| Call Girls in Gurgaon Sector 13 Escort Service Gurgaon...riyadelhic riyadelhic
 

Kürzlich hochgeladen (20)

Best VIP Call Girls Noida Sector 24 Call Me: 8700611579
Best VIP Call Girls Noida Sector 24 Call Me: 8700611579Best VIP Call Girls Noida Sector 24 Call Me: 8700611579
Best VIP Call Girls Noida Sector 24 Call Me: 8700611579
 
Girls For Night in Islamabad | 03274100048 🔞
Girls For Night in Islamabad | 03274100048 🔞Girls For Night in Islamabad | 03274100048 🔞
Girls For Night in Islamabad | 03274100048 🔞
 
Udupi Call girl service 6289102337 Udupi escort service
Udupi Call girl service 6289102337 Udupi escort serviceUdupi Call girl service 6289102337 Udupi escort service
Udupi Call girl service 6289102337 Udupi escort service
 
9999266834 Call Girls In Noida Sector 18 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 18 (Delhi) Call Girl Service9999266834 Call Girls In Noida Sector 18 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 18 (Delhi) Call Girl Service
 
RAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CALRAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
 
Kolkata 💋 Call Girl 9748763073 Call Girls in Kolkata Escort service book now
Kolkata 💋 Call Girl 9748763073 Call Girls in Kolkata Escort service book nowKolkata 💋 Call Girl 9748763073 Call Girls in Kolkata Escort service book now
Kolkata 💋 Call Girl 9748763073 Call Girls in Kolkata Escort service book now
 
Rajkot Call Girls Contact Number +919358341802 Call Girls In Rajkot
Rajkot Call Girls Contact Number +919358341802 Call Girls In RajkotRajkot Call Girls Contact Number +919358341802 Call Girls In Rajkot
Rajkot Call Girls Contact Number +919358341802 Call Girls In Rajkot
 
Call Girls in Karachi || 03274100048 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03274100048 || 50+ Hot Sexy Girls Available 24/7Call Girls in Karachi || 03274100048 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03274100048 || 50+ Hot Sexy Girls Available 24/7
 
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
 
Book_ A Project based approach CHAPTER 1 summary.pptx
Book_ A Project based approach CHAPTER 1 summary.pptxBook_ A Project based approach CHAPTER 1 summary.pptx
Book_ A Project based approach CHAPTER 1 summary.pptx
 
Call Girls In Lahore || 03274100048 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03274100048 ||Lahore Call Girl Available 24/7Call Girls In Lahore || 03274100048 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03274100048 ||Lahore Call Girl Available 24/7
 
Lucknow ❣️ Call Girl 97487*63073 Call Girls in Lucknow Escort service book now
Lucknow ❣️  Call Girl 97487*63073 Call Girls in Lucknow Escort service book nowLucknow ❣️  Call Girl 97487*63073 Call Girls in Lucknow Escort service book now
Lucknow ❣️ Call Girl 97487*63073 Call Girls in Lucknow Escort service book now
 
Radhika Call Girls In Jaipur 9358660226 Escorts service
Radhika Call Girls In Jaipur 9358660226 Escorts serviceRadhika Call Girls In Jaipur 9358660226 Escorts service
Radhika Call Girls In Jaipur 9358660226 Escorts service
 
SURAT CALL GIRL 92628/71154 SURAT CALL G
SURAT CALL GIRL 92628/71154 SURAT CALL GSURAT CALL GIRL 92628/71154 SURAT CALL G
SURAT CALL GIRL 92628/71154 SURAT CALL G
 
Varanasi Call Girl 78709*93772 Call Girls in Varanasi Escort service book now
Varanasi  Call Girl 78709*93772 Call Girls in Varanasi Escort service book nowVaranasi  Call Girl 78709*93772 Call Girls in Varanasi Escort service book now
Varanasi Call Girl 78709*93772 Call Girls in Varanasi Escort service book now
 
Indore Call girl service 6289102337 indore escort service
Indore Call girl service 6289102337 indore escort serviceIndore Call girl service 6289102337 indore escort service
Indore Call girl service 6289102337 indore escort service
 
JAMNAGAR CALL GIRLS 92628/71154 JAMNAGAR
JAMNAGAR CALL GIRLS 92628/71154 JAMNAGARJAMNAGAR CALL GIRLS 92628/71154 JAMNAGAR
JAMNAGAR CALL GIRLS 92628/71154 JAMNAGAR
 
Bhopal Call girl service 6289102337 bhopal escort service
Bhopal Call girl service 6289102337 bhopal escort serviceBhopal Call girl service 6289102337 bhopal escort service
Bhopal Call girl service 6289102337 bhopal escort service
 
Call Girls | 😏💦 03274100048 | Call Girls Near Me
Call Girls | 😏💦 03274100048 | Call Girls Near MeCall Girls | 😏💦 03274100048 | Call Girls Near Me
Call Girls | 😏💦 03274100048 | Call Girls Near Me
 
Call Now ☎9870417354|| Call Girls in Gurgaon Sector 13 Escort Service Gurgaon...
Call Now ☎9870417354|| Call Girls in Gurgaon Sector 13 Escort Service Gurgaon...Call Now ☎9870417354|| Call Girls in Gurgaon Sector 13 Escort Service Gurgaon...
Call Now ☎9870417354|| Call Girls in Gurgaon Sector 13 Escort Service Gurgaon...
 

Case study: Presentation Slides

  • 1. Building Services II Case Study Presentation Name Student ID Yam Yih Hwan 0305861 Low Rong Tzuoo 0304924 Ng Jun Keat 0314368 Dixon Cheong 0310356 Adrian Ng Kar Chun 0314516 Wong Ha Shiong 0309640
  • 2. What is Building service? One of a crucial role in a building Building service is responsible for the design of :  Installation  Operation  Monitoring of the mechanical, electrical and public health systems Safety, Comfortable Environmentally Friendly Operation Influence the architecture of a building Play a significant role on the sustainability and energy demand of a building
  • 3. Floor Plan 9 Escape Staircase 9 Hose Reel 5 Passenger’s Lift 6 Fireman’s Lift 2 Escalator (One-way) 18 CO2 Fire Extinguisher 9 Dry Powder Fire Extinguisher
  • 4. The Summit, Subang USJ The Summit located at Subang Jaya, USJ Purpose of choosing The Summit as our case study:  Locate all services within the building  Services in the building quite old  Low maintenance  The Summit used to be popular place for youngster & families  Less and less popular due to the poor management of the building
  • 5. Why is building services so important? Building services is ‘what makes a building alive’ Makes the building safe and alive Without building services, we won’t have lighting, heat, escalator, lift, acoustics, plumbing, power supply, the security and safety system in a building Without all this it will only be a cold, dark and uninhabitable building
  • 6. First impression of The Summit! Safety system are spoiled and poorly maintained Examples are the emergency phone and the fire escape door which is allocated near the stairs The environment in the building is dark and creepy The population is lesser compared to other shopping complex
  • 7. How can The Summit attract more shoppers? Improve the lighting to be more brighter Add more interior decoration around to make the building look more lively Keep the services updated by maintaining it regularly
  • 8. Natural vs. Mechanical During our visit to The Summit, we found out that both natural and mechanical systems of ventilation are implemented In the washrooms, there are 3 openings of windows to provide ventilation. There is also a fan blower inside, which is of the mechanical system.
  • 9. Split Units Air doors are installed at every automatic sliding door at The Summit  To prevent loss of cool air  To prevent hot air from coming in  Condensers are normally located around the basement level or the rooftop.
  • 10. Centralized System In the main area or lobby of the building, centralized system and air-conditioning is installed. With this system, fresh or cold air is transfer through ducting to various part of the building.
  • 11. Water Chiller System The cooling tower is located at the top of the building, along with other services, for examples;  piping,  split units &  electrical distributor
  • 12. Diffusers Diffusers are where the air comes out and is discharged into the rooms. In The Summit, 3 types of diffusers:  Linear Diffuser It is used in open plan rooms and it will hardly interfere with the pattern of the ceiling. Its direction of air discharge can be changed to suit the room conditions. It is suitable with high air velocity and it has high induction slot can have rapid decay of air velocity and temperature.
  • 13. Diffusers  Cone Diffuser Its shape can sometimes be square to match pattern of the ceiling and its inner cone can be lowered or raised to result in different flow pattern.
  • 14. Diffusers  Side Wall Inlet Diffuser It is used when there is no false ceiling. For every inlet there will be a grill. The air discharge can be controlled by sets of louvers in vertical or horizontal plane. The flow pattern can be varied according to room size, velocity and aspect ratio.
  • 15. Fire Protection • Active fire protection • Method requires mechanical, electric or electronic activation • Manual or automatic fire protection system • Eg. fire alarms, detectors, wet and dry risers, hose reels, carbon dioxide fixed installation • Passive fire protection • An integral component of the structural fire protection and fire safety in a building. • Contain fires or preventing the fire from spreading • Eg. fire-resistant walls, floors, and doors, etc.
  • 16. Active Fire Protection Fire Extinguisher Intended for initial outbreak of fire Four different types of fire extinguishers
  • 17. Active Fire Protection Hose Reel Intended for occupant to use during early stage of fire Located at every escape routes 19mm diameter 25m in length
  • 18. Active Fire Protection Sprinkler Detect, control, extinguish fire Warn the occupants of the occurrence of fire Equipped with control valve to deliver the pressure of the sprinkler water
  • 19. Automatic fire alarm system Manual fire alarm system Automatically initiates and activates the alarm when it detects fire Eg. fire detection system Provides an alarm to be activated only when it is switch on by someone Eg. Manual call point Active Fire Protection
  • 20. Passive Fire Protection Fire-resistant door Mainly for fire escape doors Should not be obstructed by any objects
  • 21. Staircase Fireman Lift Staircase were properly designed The dimension of the threads and risers were constructed consistently No winders built Length of the landing is not less than the width The fireman lift is indicated Passive Fire Protection
  • 22. Problems The fire extinguishers were not send for maintenance Maintenance has to be done to ensure that the extinguisher is still functional That the manual fire alarm is ‘not in use’.
  • 23. Problems The fire doors are not in good condition For example, the quality is degraded, the doorknob is missing, and the doors should always be closed and should not be obstructed by any object.
  • 24. Problems Their voice communication systems are not in suitable conditions and not maintenance were carried out.
  • 25. Vertical Transportation Systems Population of The Summit around 5000+- Area of The Summit  1.2 million square feet;  it is a commercial building  consists of 9 floors including basements Only one bus stop in front of The Summit The Summit poor in position of building in relation to public transport services, which means it has low passenger peaks during arrival hours.
  • 26. Lift The Summit used hydraulic lifts Total numbers of 5 passenger and 6 fire’s man lifts on every floor
  • 27. Lift Car • Capacity of the lift car is 20 passengers • Lift entrances about 1160mm wide with 2 pieces of doors • 50 seconds for door closing time with 1160mm width doors • Passenger transfer time at 50 seconds in and out
  • 28. Problems of the Lift • 5 passenger and 6 fire’s man lifts on every floor, but only one passenger lift is working • The Summit used hydraulic lifts, and it supposed to be low vibration and noise, but it causes a lot of vibration and noise during the ride • Less Maintenance
  • 29. Escalator • Two types of escalator: • One way traffic of single bank with interrupted traffic in one direction on every floor
  • 30. Escalator Two-way traffic parallel located in the cinema
  • 31. Electricity Supply Systems The main switch boards are located around the building examples are at the rooftop, at the ground floor and the basement parking The pictures above show the different location of the main switch board
  • 32. Electricity Supply Systems Function of the main switch board:  act as an assembly of switches and circuit protection devices from which power is distributed  It is totally enclosed, sheet steel fabricated  Distributes large incoming supply into smaller, easily controlled parcel
  • 33. Recommendation for Fire Protections The Summit Recommendation • Nearest fire hydrant is 51 meter away. • A good one should be 6 meter away. • Not more than 30 m away from the building. • 19mm diameter hose reel. • 25mm diameter hose reel.
  • 34. Recommendation for Fire Protections • Hose reel length is 25 meter. • A good one should be 30 meter length. • Smoke detector system. • The number of detectors should not be less than 1 in 100m². • Heat detector system. • The number of detectors fitted should not be less than 1 in 50m²
  • 35. Recommendation for Vertical Transportation The Summit Recommendation Hydraulic Lift Electric Lift • Speed is slower. • Speed is faster. • The pump works against gravity to push the car and its contents upwards. • Movement is depending on the electrical power. • Energy used to lift the elevator does not get recovered on the trip going down, it is completely lost. • Do not use as much energy due to the counterweight.