SlideShare ist ein Scribd-Unternehmen logo
1 von 9
Downloaden Sie, um offline zu lesen
Approval Standard

                             for




                                                              om
Post-Indicator-Valve-Assembly

                                                  .c
            Class Number 1111         a         se
                                   gb
                            in
                in
             tra




                     Revised March 1973
        re
        .fi
      w
     w
    w




          ©2002 FM Global Technologies LLC. All rights reserved.
Foreword


FM Approvals are intended to verify that the products and services described will meet stated conditions of
performance, safety and quality useful to the ends of property conservation. The purpose of FM Approval
Standards is to present the criteria for FM Approval of various types of products and services, as guidance for
FM Approvals personnel, manufacturers, users and authorities having jurisdiction.

Products submitted for Approval shall demonstrate that they meet the intent of the Approval Standard, and that
quality control in manufacturing and/or applications shall ensure a consistently uniform and reliable product or
service. FM Approval Standards strive to be performance-oriented and to facilitate technological development.




                                                                     om
For examining equipment, materials and services, FM Approval Standards:




                                                            .c
      a) must be useful to the ends of property conservation by preventing, limiting or not causing damage
         under the conditions stated by the Approval listing; and




                                                          se
      b) must be readily identifiable.

                                                   a
Continuance of Approval and Listing depends on compliance with the Approval agreement, satisfactory
                                                gb
performance in the field, on successful re-examinations of equipment, materials, and services as appropriate, and
on periodic follow-up audits of the manufacturing facility or service/application.
                                           in

FM Global Technologies LLC reserves the right in its sole judgement to change or revise its standards, criteria,
                                  in


methods, or procedures.
                               tra
                          re
                     .fi
             w
            w
        w
TABLE OF CONTENTS

I INTRODUCTION ....................................................................................................................................................................... 1
II GENERAL REQUIREMENTS ................................................................................................................................................. 1
    2.1 Glossary .............................................................................................................................................................................. 1
    2.2 Instructional Manual ........................................................................................................................................................... 1
    2.3 Marketing ............................................................................................................................................................................ 1
    2.4 Markings ............................................................................................................................................................................. 1
    2.5 Sizes .................................................................................................................................................................................... 2
    2.6 Rated Working Pressure ..................................................................................................................................................... 2
    2.7 Factory Tests ....................................................................................................................................................................... 2
III DESIGN ...................................................................................................................................................................................... 2
    3.1 Waterway ............................................................................................................................................................................ 2




                                                                                                                           om
    3.2 Orientation .......................................................................................................................................................................... 2
    3.3 Visibility .............................................................................................................................................................................. 2
    3.4 Design Factors of Safety .................................................................................................................................................... 3




                                                                                                           .c
    3.5 Water Hammer .................................................................................................................................................................... 3




                                                                                                         se
    3.6 Operation ............................................................................................................................................................................. 3
    3.7 Ease of Operation ............................................................................................................................................................... 3
    3.8 Serviceability ...................................................................................................................................................................... 3
                                                                                           a
    3.9 Impact Resistance (Shock Loading) .................................................................................................................................. 3
                                                                                        gb
    3.10 Friction Loss ..................................................................................................................................................................... 3
    3.11 Locking ............................................................................................................................................................................. 4
    3.12 Seat Leakage ..................................................................................................................................................................... 4
                                                                                in

    3.13 Materials ........................................................................................................................................................................... 4
                                                               in


    3.14 Post Design ....................................................................................................................................................................... 4
                                                            tra



IV TESTS ......................................................................................................................................................................................... 4
    4.1 General ................................................................................................................................................................................ 4
    4.2 Visibility .............................................................................................................................................................................. 4
                                                   re




    4.3 Water Hammer .................................................................................................................................................................... 5
    4.4 Loss of Power Transmission Control ................................................................................................................................. 5
                                           .fi




    4.5 Hydrostatic Test .................................................................................................................................................................. 5
    4.6 Seat Leakage ....................................................................................................................................................................... 5
                             w




    4.5 Impact Resistance ............................................................................................................................................................... 5
                            w




    4.8 Durability ............................................................................................................................................................................ 5
    4.9 Friction Loss ....................................................................................................................................................................... 6
                     w




    4.10 Stem Seal .......................................................................................................................................................................... 6
    4.11 Other .................................................................................................................................................................................. 6
March 1973                                                                                                      1111


I INTRODUCTION
   1.1 A Post-Indicator-Valve-Assembly is used for the control of water flow to a fire protection system. The
       assembly consists of an underground valve with an above grade operator-indicator. This standard is intended
       for complete valve/post-indicator assemblies and does not apply to gate valves.

   1.2 FM Approval is based on examination and tests of production samples, inspection of the manufacturing and
       quality control facilities, and satisfactory field experience. The following items are carefully evaluated in the
       course of an examination: functional suitability, operational reliability, adequacy of design and workman-
       ship, uniformity and dependability of production, effectiveness of quality control and availability of replace-
       ment parts and service.

   1.3 The requirements of the standard are intended as guidelines reflecting current FM Approval tests and
       practices. Items which do not precisely conform to these requirements may be Approved if shown to perform
       as well as or superior to Approved items and the intent of this standard. In the same way items that do




                                                                           om
       conform to each of these written requirements may not be approved if other considerations seriously affect
       the performance of the product.




                                                                 .c
                                                       a       se
                                                    gb
II GENERAL REQUIREMENTS
                                                in

2.1 Glossary
                                      in
                                   tra



   A Post-Indicator-Valve-Assembly consists of a valve, a post, an indicator, a power train, a power-transmission
   and an operator. The valve is the direct flow controller. The post is the housing for the power train and the support
   for the indicator and the power transmission. The indicator is the visual display of the valve position. The power
                              re




   train is the linkage between the valve and the power transmission. The power transmission controls the speed at
   which the valve is opened and closed and the ease of manipulation. The operator is the connection between the
                         .fi




   motivating power and power transmission; this is the part handled by the person manipulating the valve.
                 w
                w




2.2 Instructional Manual
           w




   An instruction manual shall accompany each assembly. It shall include a caution notice: ‘‘All replacement parts
   must be obtained from manufacturer to assure correct orientation between indicator and valve.’’


2.3 Marketing

   Post-Indicator-Valve-Assembly shall be marketed as a complete packaged unit.


2.4 Markings

   A corrosion-resistant nameplate permanently fastened to the assembly abovegrade shall indicate the manufac-
   turer’s name or trademark, rated working pressure, valve size, type or model number, and year of manufacture.
   All or part of this marking may be cast in raised letters on the assembly (above grade).




                                                                                             FM APPROVALS             1
1111                                                                                                  March 1973



2.5 Sizes

    Standard sizes are: 4, 5, 6, 8, 10, 12, 14, 16, 18, 20 and 24 in. NPS. Other sizes may be approved if there is a
    demonstrated need for them and they meet the requirements stated herein.


2.6 Rated Working Pressure

    Post-Indicator-Valve-Assemblies shall have a minimum rated working pressure of 175 psig.


2.7 Factory Tests

    All valves shall be tested before leaving the factory to at least 110% of rated working pressure for seat and body
    leakage. The pressure shall be held for at least one minute and no noticeable seat and body leakage shall occur.




                                                                                      om
                                                                             .c
                                                                           se
III DESIGN
                                                                   a
                                                                gb
3.1 Waterway
                                                            in
                                                   in


    When in the wide open position, the valve may provide either a single or multiple waterway. The total area of
    the waterway shall be not less than 60% of the nominal pipe area.
                                                tra
                                          re




3.2 Orientation
                                     .fi




    All parts concerned with orientation shall go together in a unique manner to maintain a single correct orientation
    between valve and indicator.
                             w
                            w




    A readily available section of weakness shall be provided at the beginning of the power transmission or power
    train. A second, but stronger, section of weakness shall be concealed within the assembly. Both shall fracture
                        w




    upon application of a force less than that required to deform the power train permanently. These fractures shall
    leave the true indication unaffected, and make it obvious that something is wrong and needs attention.


3.3 Visibility

    The indicator shall be of such size and shape that an informed observer when standing at either of two points
    90° apart and 300 ft. away will be able to tell whether the valve is open. The indicator shall not depend on
    lettering to show the observer that the valve is open.

    An arrow showing direction to open plus the word ‘‘OPEN’’ shall be provided on the assembly and be readily
    visible to a person operating the valve. The arrow and letters shall be large enough for easy reading by a person
    with normal vision standing 3 ft. from valve.




2     FM APPROVALS
March 1973                                                                                                    1111


3.4 Design Factors of Safety

    The stresses applied to any part under normal conditions, except sections of intentional weakness, shall not
    exceed 20% of the ultimate strength of the material in tension, compression, or shear.


3.5 Water Hammer

    When the valve is closed as rapidly as possible, no water hammer shall occur. (See 4.3)


3.6 Operation

    If rotary motion is employed to operate the valve, the direction to open shall be counter-clockwise. The operator
    shall be removable.




                                                                          om
3.7 Ease of Operation




                                                                 .c
                                                               se
    The valve shall be designed to operate easily by hand without tools after standing idle for five years. The
    operating torque or leverage resulting from a force of 60 lb. applied at the normal operating point shall be ample
    to operate the valve but less than that required to shear the first weakness section in the power train.
                                                       a
                                                    gb
    The length of the post shall be such that the operator is at a reasonable height above grade after the valve is
    installed.
                                               in
                                      in


3.8 Serviceability
                                   tra



    The arrangement of parts shall make it difficult for unauthorized personnel to tamper with the unit. Replacement
    of parts by qualified personnel shall be easy.
                              re
                         .fi




3.9 Impact Resistance (Shock Loading)
                 w




    Exposed parts shall have sufficient strength to resist the normal abuse expected in service.
                w




    Impacts sufficiently hard to do serious damage shall result in a fracture above grade before any other part fails
            w




    and the valve shall remain intact.


3.10 Friction Loss

    The loss in pressure through the valve shall not exceed 5.0 psig at flows that will produce a velocity of 20 ft.
    per sec. in the pipe of the nominal diameter of the valve.




                                                                                           FM APPROVALS             3
1111                                                                                                   March 1973



3.11 Locking

    Suitable means shall be provided for locking the valve in the wide open position. It shall be designed so that the
    lock must be removed to close the valve or to remove any indicator parts.


3.12 Seat Leakage

    Valves shall give a tight shut off at water pressures up to the rated working pressure.


3.13 Materials

    All materials used in the construction of the assembly shall be suitable for the intended application.




                                                                                       om
    Materials used in the construction of parts above grade shall have good resistance to weathering. Valve parts
    exposed to water shall have good resistance to corrosion.




                                                                             .c
3.14 Post Design




                                                                           se
    The post shall be designed so that ground frost will not lift the post and separate the power train from the valve.
                                                                    a
                                                                 gb
    Means shall be provided to drain water which may enter the post.
                                                            in
                                                   in
                                                tra




IV TESTS
                                          re
                                      .fi




4.1 General
                              w
                             w




    Conformance with these requirements may be determined by tests, calculations or both at the discretion of
    FM Approvals.
                        w




4.2 Visibility

    A new production assembly will be observed outdoors with the target placed in a favorable position against a
    contrasting background. Observation will be made during daylight hours by an observer having previous
    knowledge of the correct relationship between indicator and valve position. Valve position shall be obvious to
    the observer(s).




4     FM APPROVALS
March 1973                                                                                                     1111


4.3 Water Hammer

    Water hammer is a series of pressure pulsations caused by rapidly stopping a flow of liquid in a pipe. The severity
    of this condition depends on several factors including how quickly the flow is stopped. To ensure that no water
    hammer occurs, the valve will be rapidly closed from the fully open position. This operation must take at least
    5.0 sec. under a no-flow condition. For valves manipulated with a rotating operator, rapid operation will be
    defined as two revolutions per second. For valves using other actuation methods, similar requirements shall
    apply.


4.4 Loss of Power Transmission Control

    One or more strategic parts will be removed from the power train to be sure that the valve stays in position or
    moves to the wide open position.




                                                                           om
4.5 Hydrostatic Test




                                                                 .c
    The valve body shall be hydrostatically tested for five minutes at 700 psig or 400% rated working pressure,
    whichever is greater. There shall be no deformation, rupture or cracking as a result of this test.



                                                        a      se
4.6 Seat Leakage
                                                     gb
    The valve shall be tested for seat leakage at the rated working pressure. Leakage shall not exceed a rate of 1 ft.
                                                in

    oz. per hour, regardless of size. At 110% of rated working pressure leakage shall not exceed 1 ft. oz. per hour
    per inch of nominal valve size.
                                       in
                                    tra



4.5 Impact Resistance
                              re




    With the Post-Indicator-Valve-Assembly held rigidly, a horizontal load will be applied to the post until it
    fractures. The load may be applied at any suitable distance above the intended section of weakness. As a result
                         .fi




    of this test, other assembly members may be ruptured or permanently deformed, but no permanent deformation
    or rupture shall occur in the valve which would allow serious water leakage or impairment of sprinkler
                  w




    protection.
                 w




    The indicator will be tested by dropping a 5 lb., 2 in. diameter, cylindrical steel weight from a height of 10 ft.
            w




    onto the indicator. The indicator will be placed in the most unfavorable position with respect to the weight. No
    fracture or breakage shall occur.


4.8 Durability

    Post-Indicator-Valve-Assembly will be opened and closed at least 1000 times under representative pressures and
    flows. It shall operate properly in all respects following this test.




                                                                                            FM APPROVALS             5
1111                                                                                                    March 1973



4.9 Friction Loss

    A representative sample of each valve size shall be flow-tested with the valve in the wide open position to
    measure friction loss. If friction loss data is available from the manufacturer, it may not be necessary to test each
    valve size. Results shall be within the limits stated in Para. 3.10.


4.10 Stem Seal

    A representative sample will be pressurized to the rated working pressure for five minutes with the valve partially
    open. No leakage shall occur past the stem seal as a result of this test.

    The stem seal assembly shall be subjected to a temperature of 120°F for seventy-two hours and then pressurized
    to the rated working pressure for five minutes. No leakage shall occur past the stem seal as a result of this test.




                                                                                        om
4.11 Other




                                                                               .c
    Other tests may be necessary at the discretion of FM Approvals.




                                                                     a       se
                                                                  gb
                                                             in
                                                    in
                                                 tra
                                           re
                                      .fi
                              w
                             w
                        w




6     FM APPROVALS

Weitere ähnliche Inhalte

Was ist angesagt?

Imetco Architectural Binder Digital Compressed
Imetco Architectural Binder   Digital CompressedImetco Architectural Binder   Digital Compressed
Imetco Architectural Binder Digital CompressedAmy Stokes
 
Fiat kobelco t17 telehandlers service repair manual
Fiat kobelco t17 telehandlers service repair manualFiat kobelco t17 telehandlers service repair manual
Fiat kobelco t17 telehandlers service repair manualfujdjffjjskkemem
 
Sterilemax operation
Sterilemax operationSterilemax operation
Sterilemax operationceoyk
 
AMD "Advanced Synchronization Facility" Proposal
AMD "Advanced Synchronization Facility" Proposal AMD "Advanced Synchronization Facility" Proposal
AMD "Advanced Synchronization Facility" Proposal Alexey Ivanov
 
Yanmar sv100 excavator service repair manual
Yanmar sv100 excavator service repair manualYanmar sv100 excavator service repair manual
Yanmar sv100 excavator service repair manualufjjsejfkskemme
 
Caulobacter crescentus Surface Adherence As A Developmental Process A Ph D T...
Caulobacter crescentus Surface Adherence As A Developmental Process  A Ph D T...Caulobacter crescentus Surface Adherence As A Developmental Process  A Ph D T...
Caulobacter crescentus Surface Adherence As A Developmental Process A Ph D T...asslev
 
G+ meter manual ingles baja resolucion
G+ meter manual ingles baja resolucionG+ meter manual ingles baja resolucion
G+ meter manual ingles baja resolucionJavier Ciria
 
Case tx170 telescopic handler service repair manual
Case tx170 telescopic handler service repair manualCase tx170 telescopic handler service repair manual
Case tx170 telescopic handler service repair manualfjjskefksmm
 

Was ist angesagt? (9)

Imetco Architectural Binder Digital Compressed
Imetco Architectural Binder   Digital CompressedImetco Architectural Binder   Digital Compressed
Imetco Architectural Binder Digital Compressed
 
Fiat kobelco t17 telehandlers service repair manual
Fiat kobelco t17 telehandlers service repair manualFiat kobelco t17 telehandlers service repair manual
Fiat kobelco t17 telehandlers service repair manual
 
Pt asme sec v art -6
Pt asme sec v art -6Pt asme sec v art -6
Pt asme sec v art -6
 
Sterilemax operation
Sterilemax operationSterilemax operation
Sterilemax operation
 
AMD "Advanced Synchronization Facility" Proposal
AMD "Advanced Synchronization Facility" Proposal AMD "Advanced Synchronization Facility" Proposal
AMD "Advanced Synchronization Facility" Proposal
 
Yanmar sv100 excavator service repair manual
Yanmar sv100 excavator service repair manualYanmar sv100 excavator service repair manual
Yanmar sv100 excavator service repair manual
 
Caulobacter crescentus Surface Adherence As A Developmental Process A Ph D T...
Caulobacter crescentus Surface Adherence As A Developmental Process  A Ph D T...Caulobacter crescentus Surface Adherence As A Developmental Process  A Ph D T...
Caulobacter crescentus Surface Adherence As A Developmental Process A Ph D T...
 
G+ meter manual ingles baja resolucion
G+ meter manual ingles baja resolucionG+ meter manual ingles baja resolucion
G+ meter manual ingles baja resolucion
 
Case tx170 telescopic handler service repair manual
Case tx170 telescopic handler service repair manualCase tx170 telescopic handler service repair manual
Case tx170 telescopic handler service repair manual
 

Andere mochten auch

Spares, Acessories and Ancillaries Of Oxygen Plant
Spares, Acessories and Ancillaries Of Oxygen PlantSpares, Acessories and Ancillaries Of Oxygen Plant
Spares, Acessories and Ancillaries Of Oxygen PlantCRYO CORP
 
Spares for compressor
Spares for compressorSpares for compressor
Spares for compressorCRYO CORP
 
Spares, Acessories and Ancillaries Of Oxygen Plant
Spares, Acessories and Ancillaries Of Oxygen PlantSpares, Acessories and Ancillaries Of Oxygen Plant
Spares, Acessories and Ancillaries Of Oxygen PlantCRYO CORP
 
mechanical valves
 mechanical valves mechanical valves
mechanical valvesvinay sharma
 
Classification of valves
Classification of valvesClassification of valves
Classification of valvesGanesh Murugan
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valvesAmol Dudhate
 
Valves and Types of Valces
Valves and Types of Valces  Valves and Types of Valces
Valves and Types of Valces FARRUKH SHEHZAD
 
Pneumatic valves
Pneumatic valvesPneumatic valves
Pneumatic valvesWaqar Aziz
 
Relief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsRelief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsSHIVAJI CHOUDHURY
 
Valves presentation
Valves presentationValves presentation
Valves presentationmohdalaamri
 

Andere mochten auch (15)

Spares, Acessories and Ancillaries Of Oxygen Plant
Spares, Acessories and Ancillaries Of Oxygen PlantSpares, Acessories and Ancillaries Of Oxygen Plant
Spares, Acessories and Ancillaries Of Oxygen Plant
 
Spares for compressor
Spares for compressorSpares for compressor
Spares for compressor
 
Spares, Acessories and Ancillaries Of Oxygen Plant
Spares, Acessories and Ancillaries Of Oxygen PlantSpares, Acessories and Ancillaries Of Oxygen Plant
Spares, Acessories and Ancillaries Of Oxygen Plant
 
mechanical valves
 mechanical valves mechanical valves
mechanical valves
 
Classification of valves
Classification of valvesClassification of valves
Classification of valves
 
Chapter 03
Chapter 03Chapter 03
Chapter 03
 
Valves
Valves Valves
Valves
 
Valves ppt
Valves pptValves ppt
Valves ppt
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
 
Valves and Types of Valces
Valves and Types of Valces  Valves and Types of Valces
Valves and Types of Valces
 
Safety valves
Safety valvesSafety valves
Safety valves
 
Control Valves
Control ValvesControl Valves
Control Valves
 
Pneumatic valves
Pneumatic valvesPneumatic valves
Pneumatic valves
 
Relief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsRelief and safety valves for thermal power plants
Relief and safety valves for thermal power plants
 
Valves presentation
Valves presentationValves presentation
Valves presentation
 

Ähnlich wie Post-Indicator-Valve-Assembly Approval Standard

Approve standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversApprove standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversWiroj Kaewkan
 
350209_NGU-2000 BB (799020).pdf
350209_NGU-2000 BB (799020).pdf350209_NGU-2000 BB (799020).pdf
350209_NGU-2000 BB (799020).pdfGerson37561
 
KTA, Pinjaman Tanpa Jaminan, Dana Pinjaman Tanpa Jaminan
KTA, Pinjaman Tanpa Jaminan, Dana Pinjaman Tanpa JaminanKTA, Pinjaman Tanpa Jaminan, Dana Pinjaman Tanpa Jaminan
KTA, Pinjaman Tanpa Jaminan, Dana Pinjaman Tanpa JaminanPinjamanTanpaJaminan
 
1640 99 004 6 18.04.2011 tattoo-star usermanual
1640 99 004 6 18.04.2011 tattoo-star usermanual1640 99 004 6 18.04.2011 tattoo-star usermanual
1640 99 004 6 18.04.2011 tattoo-star usermanualgalex85
 
Blomberg KWD2330X Service Manual.pdf
Blomberg KWD2330X Service Manual.pdfBlomberg KWD2330X Service Manual.pdf
Blomberg KWD2330X Service Manual.pdfssuser78bec11
 
Extract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance StudyExtract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance StudyTACook Consultants
 
Extract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance StudyExtract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance StudyMateus Siwek
 
Cub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualCub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualfusjejfskekem
 
Cub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualCub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualfiskefjskemem
 
Cub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualCub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualufjjdjkksekmd
 
Cub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manualCub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manualfhsejkdkmen
 
Cub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manualCub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manualfusjejfskekem
 
Cub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualCub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualfhsejkdkmen
 

Ähnlich wie Post-Indicator-Valve-Assembly Approval Standard (20)

Nfpa 1041
Nfpa 1041Nfpa 1041
Nfpa 1041
 
Nfpa 1140
Nfpa 1140Nfpa 1140
Nfpa 1140
 
Approve standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversApprove standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump drivers
 
Nfpa 1042
Nfpa 1042Nfpa 1042
Nfpa 1042
 
510 e10 PA.pdf
510 e10 PA.pdf510 e10 PA.pdf
510 e10 PA.pdf
 
350209_NGU-2000 BB (799020).pdf
350209_NGU-2000 BB (799020).pdf350209_NGU-2000 BB (799020).pdf
350209_NGU-2000 BB (799020).pdf
 
80_11_80001_CloudSpeed_1K_Product_Spec_v1
80_11_80001_CloudSpeed_1K_Product_Spec_v180_11_80001_CloudSpeed_1K_Product_Spec_v1
80_11_80001_CloudSpeed_1K_Product_Spec_v1
 
KTA, Pinjaman Tanpa Jaminan, Dana Pinjaman Tanpa Jaminan
KTA, Pinjaman Tanpa Jaminan, Dana Pinjaman Tanpa JaminanKTA, Pinjaman Tanpa Jaminan, Dana Pinjaman Tanpa Jaminan
KTA, Pinjaman Tanpa Jaminan, Dana Pinjaman Tanpa Jaminan
 
1640 99 004 6 18.04.2011 tattoo-star usermanual
1640 99 004 6 18.04.2011 tattoo-star usermanual1640 99 004 6 18.04.2011 tattoo-star usermanual
1640 99 004 6 18.04.2011 tattoo-star usermanual
 
Modu part 6_e-jan12
Modu part 6_e-jan12Modu part 6_e-jan12
Modu part 6_e-jan12
 
Blomberg KWD2330X Service Manual.pdf
Blomberg KWD2330X Service Manual.pdfBlomberg KWD2330X Service Manual.pdf
Blomberg KWD2330X Service Manual.pdf
 
DNV Liquified Gas Terminal
DNV Liquified Gas TerminalDNV Liquified Gas Terminal
DNV Liquified Gas Terminal
 
Extract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance StudyExtract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance Study
 
Extract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance StudyExtract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance Study
 
Cub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualCub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manual
 
Cub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualCub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manual
 
Cub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualCub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manual
 
Cub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manualCub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manual
 
Cub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manualCub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manual
 
Cub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manualCub cadet 8404 tractor service repair manual
Cub cadet 8404 tractor service repair manual
 

Mehr von Jianping Wong

Yang ming to_launch_japan_koreachinavietnam_service_kcv
Yang ming to_launch_japan_koreachinavietnam_service_kcvYang ming to_launch_japan_koreachinavietnam_service_kcv
Yang ming to_launch_japan_koreachinavietnam_service_kcvJianping Wong
 
Ym uasc and_cscl_merge_tp_services_for_winter_season
Ym uasc and_cscl_merge_tp_services_for_winter_seasonYm uasc and_cscl_merge_tp_services_for_winter_season
Ym uasc and_cscl_merge_tp_services_for_winter_seasonJianping Wong
 
Schneider logistics honors holland with 2013 ltl carrier of the year award
Schneider logistics honors holland with 2013 ltl carrier of the year awardSchneider logistics honors holland with 2013 ltl carrier of the year award
Schneider logistics honors holland with 2013 ltl carrier of the year awardJianping Wong
 
Reuse ny kcontainers_via_apcs_platform
Reuse ny kcontainers_via_apcs_platformReuse ny kcontainers_via_apcs_platform
Reuse ny kcontainers_via_apcs_platformJianping Wong
 
Nyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformNyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformJianping Wong
 
Seamless transitions are_they_possible
Seamless transitions are_they_possibleSeamless transitions are_they_possible
Seamless transitions are_they_possibleJianping Wong
 
521 announcement 29102013 interim financial report q3 2013
521  announcement 29102013  interim financial report q3 2013521  announcement 29102013  interim financial report q3 2013
521 announcement 29102013 interim financial report q3 2013Jianping Wong
 
Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Jianping Wong
 
Estes express lines announces general rate increase
Estes express lines announces general rate increaseEstes express lines announces general rate increase
Estes express lines announces general rate increaseJianping Wong
 
Top 10 popular express companies in us
Top 10 popular express companies in usTop 10 popular express companies in us
Top 10 popular express companies in usJianping Wong
 

Mehr von Jianping Wong (17)

Yang ming to_launch_japan_koreachinavietnam_service_kcv
Yang ming to_launch_japan_koreachinavietnam_service_kcvYang ming to_launch_japan_koreachinavietnam_service_kcv
Yang ming to_launch_japan_koreachinavietnam_service_kcv
 
Ym uasc and_cscl_merge_tp_services_for_winter_season
Ym uasc and_cscl_merge_tp_services_for_winter_seasonYm uasc and_cscl_merge_tp_services_for_winter_season
Ym uasc and_cscl_merge_tp_services_for_winter_season
 
Schneider logistics honors holland with 2013 ltl carrier of the year award
Schneider logistics honors holland with 2013 ltl carrier of the year awardSchneider logistics honors holland with 2013 ltl carrier of the year award
Schneider logistics honors holland with 2013 ltl carrier of the year award
 
Reuse ny kcontainers_via_apcs_platform
Reuse ny kcontainers_via_apcs_platformReuse ny kcontainers_via_apcs_platform
Reuse ny kcontainers_via_apcs_platform
 
Nyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformNyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platform
 
Seamless transitions are_they_possible
Seamless transitions are_they_possibleSeamless transitions are_they_possible
Seamless transitions are_they_possible
 
521 announcement 29102013 interim financial report q3 2013
521  announcement 29102013  interim financial report q3 2013521  announcement 29102013  interim financial report q3 2013
521 announcement 29102013 interim financial report q3 2013
 
Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72
 
Estes express lines announces general rate increase
Estes express lines announces general rate increaseEstes express lines announces general rate increase
Estes express lines announces general rate increase
 
Top 10 popular express companies in us
Top 10 popular express companies in usTop 10 popular express companies in us
Top 10 popular express companies in us
 
Nfpa 1055
Nfpa 1055Nfpa 1055
Nfpa 1055
 
Nfpa 1051
Nfpa 1051Nfpa 1051
Nfpa 1051
 
Nfpa 1032
Nfpa 1032Nfpa 1032
Nfpa 1032
 
Nfpa 1031
Nfpa 1031Nfpa 1031
Nfpa 1031
 
Nfpa 1021
Nfpa 1021Nfpa 1021
Nfpa 1021
 
Nfpa 1020
Nfpa 1020Nfpa 1020
Nfpa 1020
 
Nfpa 557
Nfpa 557Nfpa 557
Nfpa 557
 

Kürzlich hochgeladen

How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 

Kürzlich hochgeladen (20)

How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 

Post-Indicator-Valve-Assembly Approval Standard

  • 1. Approval Standard for om Post-Indicator-Valve-Assembly .c Class Number 1111 a se gb in in tra Revised March 1973 re .fi w w w ©2002 FM Global Technologies LLC. All rights reserved.
  • 2. Foreword FM Approvals are intended to verify that the products and services described will meet stated conditions of performance, safety and quality useful to the ends of property conservation. The purpose of FM Approval Standards is to present the criteria for FM Approval of various types of products and services, as guidance for FM Approvals personnel, manufacturers, users and authorities having jurisdiction. Products submitted for Approval shall demonstrate that they meet the intent of the Approval Standard, and that quality control in manufacturing and/or applications shall ensure a consistently uniform and reliable product or service. FM Approval Standards strive to be performance-oriented and to facilitate technological development. om For examining equipment, materials and services, FM Approval Standards: .c a) must be useful to the ends of property conservation by preventing, limiting or not causing damage under the conditions stated by the Approval listing; and se b) must be readily identifiable. a Continuance of Approval and Listing depends on compliance with the Approval agreement, satisfactory gb performance in the field, on successful re-examinations of equipment, materials, and services as appropriate, and on periodic follow-up audits of the manufacturing facility or service/application. in FM Global Technologies LLC reserves the right in its sole judgement to change or revise its standards, criteria, in methods, or procedures. tra re .fi w w w
  • 3. TABLE OF CONTENTS I INTRODUCTION ....................................................................................................................................................................... 1 II GENERAL REQUIREMENTS ................................................................................................................................................. 1 2.1 Glossary .............................................................................................................................................................................. 1 2.2 Instructional Manual ........................................................................................................................................................... 1 2.3 Marketing ............................................................................................................................................................................ 1 2.4 Markings ............................................................................................................................................................................. 1 2.5 Sizes .................................................................................................................................................................................... 2 2.6 Rated Working Pressure ..................................................................................................................................................... 2 2.7 Factory Tests ....................................................................................................................................................................... 2 III DESIGN ...................................................................................................................................................................................... 2 3.1 Waterway ............................................................................................................................................................................ 2 om 3.2 Orientation .......................................................................................................................................................................... 2 3.3 Visibility .............................................................................................................................................................................. 2 3.4 Design Factors of Safety .................................................................................................................................................... 3 .c 3.5 Water Hammer .................................................................................................................................................................... 3 se 3.6 Operation ............................................................................................................................................................................. 3 3.7 Ease of Operation ............................................................................................................................................................... 3 3.8 Serviceability ...................................................................................................................................................................... 3 a 3.9 Impact Resistance (Shock Loading) .................................................................................................................................. 3 gb 3.10 Friction Loss ..................................................................................................................................................................... 3 3.11 Locking ............................................................................................................................................................................. 4 3.12 Seat Leakage ..................................................................................................................................................................... 4 in 3.13 Materials ........................................................................................................................................................................... 4 in 3.14 Post Design ....................................................................................................................................................................... 4 tra IV TESTS ......................................................................................................................................................................................... 4 4.1 General ................................................................................................................................................................................ 4 4.2 Visibility .............................................................................................................................................................................. 4 re 4.3 Water Hammer .................................................................................................................................................................... 5 4.4 Loss of Power Transmission Control ................................................................................................................................. 5 .fi 4.5 Hydrostatic Test .................................................................................................................................................................. 5 4.6 Seat Leakage ....................................................................................................................................................................... 5 w 4.5 Impact Resistance ............................................................................................................................................................... 5 w 4.8 Durability ............................................................................................................................................................................ 5 4.9 Friction Loss ....................................................................................................................................................................... 6 w 4.10 Stem Seal .......................................................................................................................................................................... 6 4.11 Other .................................................................................................................................................................................. 6
  • 4. March 1973 1111 I INTRODUCTION 1.1 A Post-Indicator-Valve-Assembly is used for the control of water flow to a fire protection system. The assembly consists of an underground valve with an above grade operator-indicator. This standard is intended for complete valve/post-indicator assemblies and does not apply to gate valves. 1.2 FM Approval is based on examination and tests of production samples, inspection of the manufacturing and quality control facilities, and satisfactory field experience. The following items are carefully evaluated in the course of an examination: functional suitability, operational reliability, adequacy of design and workman- ship, uniformity and dependability of production, effectiveness of quality control and availability of replace- ment parts and service. 1.3 The requirements of the standard are intended as guidelines reflecting current FM Approval tests and practices. Items which do not precisely conform to these requirements may be Approved if shown to perform as well as or superior to Approved items and the intent of this standard. In the same way items that do om conform to each of these written requirements may not be approved if other considerations seriously affect the performance of the product. .c a se gb II GENERAL REQUIREMENTS in 2.1 Glossary in tra A Post-Indicator-Valve-Assembly consists of a valve, a post, an indicator, a power train, a power-transmission and an operator. The valve is the direct flow controller. The post is the housing for the power train and the support for the indicator and the power transmission. The indicator is the visual display of the valve position. The power re train is the linkage between the valve and the power transmission. The power transmission controls the speed at which the valve is opened and closed and the ease of manipulation. The operator is the connection between the .fi motivating power and power transmission; this is the part handled by the person manipulating the valve. w w 2.2 Instructional Manual w An instruction manual shall accompany each assembly. It shall include a caution notice: ‘‘All replacement parts must be obtained from manufacturer to assure correct orientation between indicator and valve.’’ 2.3 Marketing Post-Indicator-Valve-Assembly shall be marketed as a complete packaged unit. 2.4 Markings A corrosion-resistant nameplate permanently fastened to the assembly abovegrade shall indicate the manufac- turer’s name or trademark, rated working pressure, valve size, type or model number, and year of manufacture. All or part of this marking may be cast in raised letters on the assembly (above grade). FM APPROVALS 1
  • 5. 1111 March 1973 2.5 Sizes Standard sizes are: 4, 5, 6, 8, 10, 12, 14, 16, 18, 20 and 24 in. NPS. Other sizes may be approved if there is a demonstrated need for them and they meet the requirements stated herein. 2.6 Rated Working Pressure Post-Indicator-Valve-Assemblies shall have a minimum rated working pressure of 175 psig. 2.7 Factory Tests All valves shall be tested before leaving the factory to at least 110% of rated working pressure for seat and body leakage. The pressure shall be held for at least one minute and no noticeable seat and body leakage shall occur. om .c se III DESIGN a gb 3.1 Waterway in in When in the wide open position, the valve may provide either a single or multiple waterway. The total area of the waterway shall be not less than 60% of the nominal pipe area. tra re 3.2 Orientation .fi All parts concerned with orientation shall go together in a unique manner to maintain a single correct orientation between valve and indicator. w w A readily available section of weakness shall be provided at the beginning of the power transmission or power train. A second, but stronger, section of weakness shall be concealed within the assembly. Both shall fracture w upon application of a force less than that required to deform the power train permanently. These fractures shall leave the true indication unaffected, and make it obvious that something is wrong and needs attention. 3.3 Visibility The indicator shall be of such size and shape that an informed observer when standing at either of two points 90° apart and 300 ft. away will be able to tell whether the valve is open. The indicator shall not depend on lettering to show the observer that the valve is open. An arrow showing direction to open plus the word ‘‘OPEN’’ shall be provided on the assembly and be readily visible to a person operating the valve. The arrow and letters shall be large enough for easy reading by a person with normal vision standing 3 ft. from valve. 2 FM APPROVALS
  • 6. March 1973 1111 3.4 Design Factors of Safety The stresses applied to any part under normal conditions, except sections of intentional weakness, shall not exceed 20% of the ultimate strength of the material in tension, compression, or shear. 3.5 Water Hammer When the valve is closed as rapidly as possible, no water hammer shall occur. (See 4.3) 3.6 Operation If rotary motion is employed to operate the valve, the direction to open shall be counter-clockwise. The operator shall be removable. om 3.7 Ease of Operation .c se The valve shall be designed to operate easily by hand without tools after standing idle for five years. The operating torque or leverage resulting from a force of 60 lb. applied at the normal operating point shall be ample to operate the valve but less than that required to shear the first weakness section in the power train. a gb The length of the post shall be such that the operator is at a reasonable height above grade after the valve is installed. in in 3.8 Serviceability tra The arrangement of parts shall make it difficult for unauthorized personnel to tamper with the unit. Replacement of parts by qualified personnel shall be easy. re .fi 3.9 Impact Resistance (Shock Loading) w Exposed parts shall have sufficient strength to resist the normal abuse expected in service. w Impacts sufficiently hard to do serious damage shall result in a fracture above grade before any other part fails w and the valve shall remain intact. 3.10 Friction Loss The loss in pressure through the valve shall not exceed 5.0 psig at flows that will produce a velocity of 20 ft. per sec. in the pipe of the nominal diameter of the valve. FM APPROVALS 3
  • 7. 1111 March 1973 3.11 Locking Suitable means shall be provided for locking the valve in the wide open position. It shall be designed so that the lock must be removed to close the valve or to remove any indicator parts. 3.12 Seat Leakage Valves shall give a tight shut off at water pressures up to the rated working pressure. 3.13 Materials All materials used in the construction of the assembly shall be suitable for the intended application. om Materials used in the construction of parts above grade shall have good resistance to weathering. Valve parts exposed to water shall have good resistance to corrosion. .c 3.14 Post Design se The post shall be designed so that ground frost will not lift the post and separate the power train from the valve. a gb Means shall be provided to drain water which may enter the post. in in tra IV TESTS re .fi 4.1 General w w Conformance with these requirements may be determined by tests, calculations or both at the discretion of FM Approvals. w 4.2 Visibility A new production assembly will be observed outdoors with the target placed in a favorable position against a contrasting background. Observation will be made during daylight hours by an observer having previous knowledge of the correct relationship between indicator and valve position. Valve position shall be obvious to the observer(s). 4 FM APPROVALS
  • 8. March 1973 1111 4.3 Water Hammer Water hammer is a series of pressure pulsations caused by rapidly stopping a flow of liquid in a pipe. The severity of this condition depends on several factors including how quickly the flow is stopped. To ensure that no water hammer occurs, the valve will be rapidly closed from the fully open position. This operation must take at least 5.0 sec. under a no-flow condition. For valves manipulated with a rotating operator, rapid operation will be defined as two revolutions per second. For valves using other actuation methods, similar requirements shall apply. 4.4 Loss of Power Transmission Control One or more strategic parts will be removed from the power train to be sure that the valve stays in position or moves to the wide open position. om 4.5 Hydrostatic Test .c The valve body shall be hydrostatically tested for five minutes at 700 psig or 400% rated working pressure, whichever is greater. There shall be no deformation, rupture or cracking as a result of this test. a se 4.6 Seat Leakage gb The valve shall be tested for seat leakage at the rated working pressure. Leakage shall not exceed a rate of 1 ft. in oz. per hour, regardless of size. At 110% of rated working pressure leakage shall not exceed 1 ft. oz. per hour per inch of nominal valve size. in tra 4.5 Impact Resistance re With the Post-Indicator-Valve-Assembly held rigidly, a horizontal load will be applied to the post until it fractures. The load may be applied at any suitable distance above the intended section of weakness. As a result .fi of this test, other assembly members may be ruptured or permanently deformed, but no permanent deformation or rupture shall occur in the valve which would allow serious water leakage or impairment of sprinkler w protection. w The indicator will be tested by dropping a 5 lb., 2 in. diameter, cylindrical steel weight from a height of 10 ft. w onto the indicator. The indicator will be placed in the most unfavorable position with respect to the weight. No fracture or breakage shall occur. 4.8 Durability Post-Indicator-Valve-Assembly will be opened and closed at least 1000 times under representative pressures and flows. It shall operate properly in all respects following this test. FM APPROVALS 5
  • 9. 1111 March 1973 4.9 Friction Loss A representative sample of each valve size shall be flow-tested with the valve in the wide open position to measure friction loss. If friction loss data is available from the manufacturer, it may not be necessary to test each valve size. Results shall be within the limits stated in Para. 3.10. 4.10 Stem Seal A representative sample will be pressurized to the rated working pressure for five minutes with the valve partially open. No leakage shall occur past the stem seal as a result of this test. The stem seal assembly shall be subjected to a temperature of 120°F for seventy-two hours and then pressurized to the rated working pressure for five minutes. No leakage shall occur past the stem seal as a result of this test. om 4.11 Other .c Other tests may be necessary at the discretion of FM Approvals. a se gb in in tra re .fi w w w 6 FM APPROVALS