COST CENTER ACCOUNTING
                           COST CENTER ACCOUNTING
                        END USER TRAINING DOCUMENTS


KP06 - KP06 - Primary Cost Planning on Cost Centers

Functionality

Planning functions start in the cost center accounting module with Primary cost planning.
Primary costs are expenses such as Salaries & wages, power and fuel, engineering
services, traveling expenses, miscellaneous expenses.

Scenario

This transaction is used to post planned primary costs to cost centers.

Requirements

Check whether you have selected the correct planner profile through transaction code
KP04.

       Menu Path                 Accounting  Controlling  Cost Center Accounting 
                                 Planning  Cost and Activity Inputs  KP06 - Change
       Transaction Code          KP06



1.   Double Click on KP06 – Change




                                                                          Page 1 of 8
COST CENTER ACCOUNTING
                 COST CENTER ACCOUNTING
              END USER TRAINING DOCUMENTS




2.   Select




                                            Page 2 of 8
COST CENTER ACCOUNTING
                 COST CENTER ACCOUNTING
              END USER TRAINING DOCUMENTS




3.   Select




                                            Page 3 of 8
COST CENTER ACCOUNTING
                           COST CENTER ACCOUNTING
                        END USER TRAINING DOCUMENTS




4.   Update the following fields:

           Field Name            Field Description                     Values
      Version             Three-digit number which           0
                          represents the version of the
                          forecast parameters as defined
                          in the forecast profile
      From Period         Number identifying a fiscal        1
                          month
      To Period           Number identifying a fiscal        12
                          month
      Fiscal Year         Period, 12 months as a rule, for   2006
                          which the company is to create
                          its inventory and balance sheet.
      Cost center         Cost Center                        9119000
      Cost element        Cost element from                  420003
      Cost element        Cost element to                    470000




                                                                                Page 4 of 8
COST CENTER ACCOUNTING
                          COST CENTER ACCOUNTING
                       END USER TRAINING DOCUMENTS




5.   Click Enter   .




                                                     Page 5 of 8
COST CENTER ACCOUNTING
                              COST CENTER ACCOUNTING
                           END USER TRAINING DOCUMENTS


Note: The Free and Form based radio buttons at the bottom of the screen affect the layout of the
screen on the next page.
Free will provide additional columns for any other cost elements that may require plan values.
Form-based will limit the selection of cost elements to the values in the group.


6.    Click Overview Button        .
7.   Update the following:-




                                                                               Page 6 of 8
COST CENTER ACCOUNTING
                          COST CENTER ACCOUNTING
                       END USER TRAINING DOCUMENTS




8.   Click the Enter   button to Validate the entries.




                                                         Page 7 of 8
COST CENTER ACCOUNTING
                             COST CENTER ACCOUNTING
                          END USER TRAINING DOCUMENTS


      Note: The following buttons can be used to expedite the capture of plan values
      against the cost center. To update values per period, click on the Period
      button. Within this screen the             button can be used to uplift values by
      percentage or amount as required. Be sure to first select the relevant periods
      before using this function.

9.     Click Save     to save your data.




10.    The message bar displays “Changed data has been posted”




                                                                         Page 8 of 8

Weitere ähnliche Inhalte

Was ist angesagt?

ck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instructionck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instruction
Pepa Pencheva
 
Internal Orders Detailed config
Internal Orders Detailed configInternal Orders Detailed config
Internal Orders Detailed config
Imran M Arab
 
Copa configuration
Copa configurationCopa configuration
Copa configuration
Mithun Roy
 
SAP Controlling overview
SAP Controlling overviewSAP Controlling overview
SAP Controlling overview
Mohamed Hani
 
Kb61 Reposting Line Items
Kb61 Reposting Line ItemsKb61 Reposting Line Items
Kb61 Reposting Line Items
whocanbe1
 
Kb11 N Manual Reposting Of Costs
Kb11 N Manual Reposting Of CostsKb11 N Manual Reposting Of Costs
Kb11 N Manual Reposting Of Costs
whocanbe1
 
Down payment request from sd side
Down payment request from sd sideDown payment request from sd side
Down payment request from sd side
Gopi Ponnala
 

Was ist angesagt? (20)

ck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instructionck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instruction
 
Sap auc internal orders as investment measures
Sap auc internal orders as investment measuresSap auc internal orders as investment measures
Sap auc internal orders as investment measures
 
Profit center-accounting
Profit center-accountingProfit center-accounting
Profit center-accounting
 
Internal Orders Detailed config
Internal Orders Detailed configInternal Orders Detailed config
Internal Orders Detailed config
 
80467542 asset-closing-in-sap-fico
80467542 asset-closing-in-sap-fico80467542 asset-closing-in-sap-fico
80467542 asset-closing-in-sap-fico
 
Copa configuration
Copa configurationCopa configuration
Copa configuration
 
Important Interview questions in SAP CO
Important Interview questions in SAP COImportant Interview questions in SAP CO
Important Interview questions in SAP CO
 
Fi payment advice functional spec.
Fi payment advice functional spec.Fi payment advice functional spec.
Fi payment advice functional spec.
 
Asset accounting
Asset accountingAsset accounting
Asset accounting
 
SAP Controlling overview
SAP Controlling overviewSAP Controlling overview
SAP Controlling overview
 
Product costing in SAP - a primer
Product costing in SAP - a primerProduct costing in SAP - a primer
Product costing in SAP - a primer
 
55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap
 
Copa implementation
Copa implementationCopa implementation
Copa implementation
 
A Guide for pi sheet
A Guide for pi sheetA Guide for pi sheet
A Guide for pi sheet
 
Kb61 Reposting Line Items
Kb61 Reposting Line ItemsKb61 Reposting Line Items
Kb61 Reposting Line Items
 
SAP FICO - Why SAP uses Internal Orders?
SAP FICO - Why SAP uses Internal Orders?SAP FICO - Why SAP uses Internal Orders?
SAP FICO - Why SAP uses Internal Orders?
 
Kb11 N Manual Reposting Of Costs
Kb11 N Manual Reposting Of CostsKb11 N Manual Reposting Of Costs
Kb11 N Manual Reposting Of Costs
 
Down payment request from sd side
Down payment request from sd sideDown payment request from sd side
Down payment request from sd side
 
SAP CONTROLLING
SAP CONTROLLINGSAP CONTROLLING
SAP CONTROLLING
 
SAP Asset Accounting
SAP Asset Accounting SAP Asset Accounting
SAP Asset Accounting
 

Ähnlich wie Kp06 Primary Cost Planning

Ka06 Create Secondary Cost Element
Ka06 Create Secondary Cost ElementKa06 Create Secondary Cost Element
Ka06 Create Secondary Cost Element
whocanbe1
 
Ka06 Create Secondary Cost Element New
Ka06 Create Secondary Cost Element NewKa06 Create Secondary Cost Element New
Ka06 Create Secondary Cost Element New
whocanbe1
 
Ks01 Create Cost Center
Ks01 Create Cost CenterKs01 Create Cost Center
Ks01 Create Cost Center
whocanbe1
 
Ksub Execute Plan Cost Assessment
Ksub Execute Plan Cost AssessmentKsub Execute Plan Cost Assessment
Ksub Execute Plan Cost Assessment
whocanbe1
 
Kl01 Create Activity Type
Kl01 Create Activity TypeKl01 Create Activity Type
Kl01 Create Activity Type
whocanbe1
 
Ks02 Change Cost Center
Ks02 Change Cost CenterKs02 Change Cost Center
Ks02 Change Cost Center
whocanbe1
 
ACC 207 Final Project Guidelines and RubricOverviewThe final p.docx
ACC 207 Final Project Guidelines and RubricOverviewThe final p.docxACC 207 Final Project Guidelines and RubricOverviewThe final p.docx
ACC 207 Final Project Guidelines and RubricOverviewThe final p.docx
rhetttrevannion
 
Bba402 management accounting
Bba402 management accountingBba402 management accounting
Bba402 management accounting
smumbahelp
 

Ähnlich wie Kp06 Primary Cost Planning (20)

Ka06 Create Secondary Cost Element
Ka06 Create Secondary Cost ElementKa06 Create Secondary Cost Element
Ka06 Create Secondary Cost Element
 
Ka06 Create Secondary Cost Element New
Ka06 Create Secondary Cost Element NewKa06 Create Secondary Cost Element New
Ka06 Create Secondary Cost Element New
 
Ks01 Create Cost Center
Ks01 Create Cost CenterKs01 Create Cost Center
Ks01 Create Cost Center
 
Ksub Execute Plan Cost Assessment
Ksub Execute Plan Cost AssessmentKsub Execute Plan Cost Assessment
Ksub Execute Plan Cost Assessment
 
Kl01 Create Activity Type
Kl01 Create Activity TypeKl01 Create Activity Type
Kl01 Create Activity Type
 
Ks02 Change Cost Center
Ks02 Change Cost CenterKs02 Change Cost Center
Ks02 Change Cost Center
 
Workshop on tally- Cost Centre
Workshop on tally- Cost CentreWorkshop on tally- Cost Centre
Workshop on tally- Cost Centre
 
Caclubindia.com sap cofi for beginners
Caclubindia.com sap cofi for beginnersCaclubindia.com sap cofi for beginners
Caclubindia.com sap cofi for beginners
 
Kalc co reconciliation with fi
Kalc co reconciliation with fiKalc co reconciliation with fi
Kalc co reconciliation with fi
 
Ap daily procdure
Ap daily procdureAp daily procdure
Ap daily procdure
 
ACC 207 Final Project Guidelines and RubricOverviewThe final p.docx
ACC 207 Final Project Guidelines and RubricOverviewThe final p.docxACC 207 Final Project Guidelines and RubricOverviewThe final p.docx
ACC 207 Final Project Guidelines and RubricOverviewThe final p.docx
 
SAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accountingSAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accounting
 
Introduction of Cost Accounting
Introduction of Cost AccountingIntroduction of Cost Accounting
Introduction of Cost Accounting
 
Project on Cost Accounting Standards.
Project on Cost Accounting Standards.Project on Cost Accounting Standards.
Project on Cost Accounting Standards.
 
J54_S4CLD2108_BPD_EN_US.docx
J54_S4CLD2108_BPD_EN_US.docxJ54_S4CLD2108_BPD_EN_US.docx
J54_S4CLD2108_BPD_EN_US.docx
 
F.05 -_foreign_currency_valuation
F.05  -_foreign_currency_valuationF.05  -_foreign_currency_valuation
F.05 -_foreign_currency_valuation
 
Bba402 management accounting
Bba402 management accountingBba402 management accounting
Bba402 management accounting
 
Asset accounting config steps
Asset accounting config stepsAsset accounting config steps
Asset accounting config steps
 
Asset accounting config steps
Asset accounting config stepsAsset accounting config steps
Asset accounting config steps
 
Cost Accoounting, Managerial Accounting, Financial Accounting
Cost Accoounting, Managerial Accounting, Financial AccountingCost Accoounting, Managerial Accounting, Financial Accounting
Cost Accoounting, Managerial Accounting, Financial Accounting
 

Kürzlich hochgeladen

Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Kürzlich hochgeladen (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 

Kp06 Primary Cost Planning

  • 1. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS KP06 - KP06 - Primary Cost Planning on Cost Centers Functionality Planning functions start in the cost center accounting module with Primary cost planning. Primary costs are expenses such as Salaries & wages, power and fuel, engineering services, traveling expenses, miscellaneous expenses. Scenario This transaction is used to post planned primary costs to cost centers. Requirements Check whether you have selected the correct planner profile through transaction code KP04. Menu Path Accounting  Controlling  Cost Center Accounting  Planning  Cost and Activity Inputs  KP06 - Change Transaction Code KP06 1. Double Click on KP06 – Change Page 1 of 8
  • 2. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS 2. Select Page 2 of 8
  • 3. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS 3. Select Page 3 of 8
  • 4. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS 4. Update the following fields: Field Name Field Description Values Version Three-digit number which 0 represents the version of the forecast parameters as defined in the forecast profile From Period Number identifying a fiscal 1 month To Period Number identifying a fiscal 12 month Fiscal Year Period, 12 months as a rule, for 2006 which the company is to create its inventory and balance sheet. Cost center Cost Center 9119000 Cost element Cost element from 420003 Cost element Cost element to 470000 Page 4 of 8
  • 5. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS 5. Click Enter . Page 5 of 8
  • 6. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS Note: The Free and Form based radio buttons at the bottom of the screen affect the layout of the screen on the next page. Free will provide additional columns for any other cost elements that may require plan values. Form-based will limit the selection of cost elements to the values in the group. 6. Click Overview Button . 7. Update the following:- Page 6 of 8
  • 7. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS 8. Click the Enter button to Validate the entries. Page 7 of 8
  • 8. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS Note: The following buttons can be used to expedite the capture of plan values against the cost center. To update values per period, click on the Period button. Within this screen the button can be used to uplift values by percentage or amount as required. Be sure to first select the relevant periods before using this function. 9. Click Save to save your data. 10. The message bar displays “Changed data has been posted” Page 8 of 8