Nebraska
Long-Term Stewardship Site Highlights
Hallam Nuclear Power Facility (page 3)
Major Activities- groundwater monitoring
Site Size -7.3 hectares (18 acres)
Start/End Years- 1998/past 2070
Estimated Average Annual Cost FY2006- $46,000
Hallam Nuclear
Power Facility
Table of Contents
Table of Contents
Hallam Nuclear Power Facility ............................................................. 3
Nebraska 1
National Defense Authorization Act (NDAA) Long-Term Stewardship Report
Nebraska 2
Hallam Nuclem· Powe1· Facility
HALLAM NUCLEAR POWER FACILITY
1.0 SITE SUMMARY
1.1 Site Description and Mission
The Hallam Nuclear Power Facility is a former sodium-
cooled, graphite-moderated nuclear reactor. It was built
and operated by the U.S. Atomic Energy Commission
(AEC), the predecessor agency of the U.S. Department
of Energy (DOE), between 1962 and 1964. The reactor
was decommissioned and dismantled in 1969. The
facility is located on a small portion of the 260-hectare
(640-acre) site of the Sheldon Power Station in
Lancaster County, Nebraska, approximately 30
kilometers (19 miles) south of Lincoln, on land owned
by the Nebraska Public Power District.
The current mission of the Hallam Nuclear Power
Facility is to perform long-term stewardship activities,
LONG-TERM STEWARDSHIP HIGHLIGHTS
Major Long-Term Stewardship Activities -
groundwater monitoring
Total Site Area- 7.3 hectares (18 acres)
Estimated Volume ofResidual Contaminants-
facilities unknown
Long-Term Stewardship Start-End Years- 1998-past
2070
Average Annual Long-Term Stewardship Cost FY
2000-2006-$46,000
Landlord- U.S. Department of Energy, Grand
Junction Office
including monitoring of the groundwater. The AEC operated the 240-megawatt thermal reactor as a
demonstration facility from 1962 until 1964. In 1965, the ABC terminated its agreement with the Nebraska
Public Power District (then known as Consumers Public Power District) to operate the reactor facility. The
Nebraska Public Power District dismantled and decommissioned the reactor from 1967 through 1969. In 1971,
the AEC retired the facility.
1.2 Site Cleanup and Accomplishments
The Nebraska Public Power District dismantled and decommissioned the reactor core and removed most of the
radioactive materials from the site; however, some radioactive materials were entombed in place. All potential
contaminants at the site are contained within the entombment structure in Area 1 (reactor vessel and vessel
containment structures), Area 2 (Fuel Storage Pit 3 thimbles), or Area 3 (moderator element storage cells). These
contaminants include nickel-63, cobalt-60, iron-55, manganese-54, samarium-151, cesium-137, strontium-90,
and tritium. The contaminants within the structure consist of activation products in the stainless steel reactor
vessel and its internals. Lesser amounts of activation products are dispersed in the carbon steel thermal shield
and guard vessel surrounding the reactor vessel and in the compartment liner itself.
The core and most ofthe radioactive materials, including all ofthe bulk sodium, were removed from the site. The
residual sodium reacted with steam to form sodium hydroxide, removing the potential for hydrogen formation
at a later date should water leak into the facility. The reactor vessel and surrounding guard vessel, which use
double-walled piping, as well as most of the reactor vessel internals, remain within the compartment. Fuel
Storage Pit 3 contains a number ofstainless steel thimbles formerly used to store spent fuel elements. The storage
pool was drained, and the thimbles now contain process tubes, control rod tubes, dummy elements, and a spent
neutron source. To prevent leaks, closures and dust covers for each thimble have been welded in place and the
interspace has been filled with expanding concrete.
Storage Area 3 consists of 12 storage cells containing three canistered moderator elements that experienced
cladding failures during reactor operation. A number of parts such as pumps, valves, and segments ofpiping are
stored in these cells. The moderator cells were sealed by welding the plug casings to the cell liners and filling
Nebraska 3
National Defense Authorization Act (NDAA) Long-Term Stewardship Report
@ Groundwater Monitoring Well
0.05
Miles
Sewage
Treatment
Plant
0.1
To Lincoln, NE
(-19 miles)
Hallam Nuclear Power Facility
the space above the plugs with expanding concrete.
I
;
1 1' 'Iii
I ~
' ;;
I re
' i
I <!
j !
' ~
I n:
I f, o
I
r
I
l
r
i
i
I
The basement level of the facility contained radioactive waste disposal equipment, all of which has either been
removed or decontaminated, as appropriate. All reactor compartments have been sealed, and the surface of the
below-grade concrete structure was covered with sand, a waterproof polyvinyl membrane, and a covering of
earth. The cover was sloped for proper drainage, and drain tile was installed at the periphery. Above-grade
structures have been weatherproofed by a layer ofpolyvinyl and a protective cover ofconcrete. All that remains
above ground is the sealed concrete intermediate heat exchangerbuilding. Total radioactivity was 300,000curies
at the time of closure. By 2000, the activity level will have decayed to approximately 15,000 curies.
There is no known soil or groundwater contamination at the Hallam Nuclear Power Facility and no evidence of
contamination being released from the site.
2.0 SITE-WIDE LONG-TERM STEWARDSHIP
2.1 Long-Term Stewardship Activities
Although the Nebraska Public Power District owns the property, DOE currently has the responsibility to perform
long-term stewardship activities for the entombed reactor structure at the Hallam Nuclear Power Facility. Long-
term stewardship responsibility was transferred to the DOE Grand Junction Office in 1998. The former reactor
site is now a 0.6 hectare (1.4 acre) grass-covered mound with a heat exchanger building. The installation of a
shallow groundwater monitoring system was completed in 1995 and is used as part of the surveillance program
for the entombed reactor. Groundwater monitoring is conducted annually and will continue indefinitely. Site
records are kept in permanent storage at the DOE Grand Junction Office in Colorado. The types ofrecords kept
include characterization data, decommissioning design information, decommissioning report, annual inspection
Nebraska 4
Hallam Nuclear Power Facility
reports, and groundwater monitoring results. In addition, the Nebraska Public Power District will control access
to the site due to contaminated buried materials.
2.2 Specific Long-Term Stewardship Activities
Groundwater
Although there is no known groundwater contamination at
the site, groundwater monitoring is conducted annually to
ensure the stability of the entombed reactor. Water level
STAKEHOLDER INTERACTION
Community interaction at the site has been
minimal to date. DOE sends a copy of the site's
annual inspection report to the State of Nebraska
and the Nebraska Public Power District.
measurements are obtained from all19 DOE wells. Samples for analysis are obtained from 17 ofthe DOE wells.
The samples are analyzed for gross alpha, gross beta, tritium, gamma spectrometry, and nickel-63. The annual
monitoring and surveillance report discusses the results of the groundwater monitoring and summarizes the
physical condition of the site. This report also discusses the need for follow-up inspections, monitoring, or
maintenance actions, should any be necessary.
Facilities
The reactor is entombed onsite. Access to the property is restricted, as entry can only be made through the
secured property of an operating power plant where the site is located. Potential contaminants remain within the
entombed reactor; however, DOE does not conduct any active monitoring of this area.
2.3 Regulatory Regime
Long-term stewardship activities at the Hallam Nuclear Power Facility is governed by several requirements in
the following regulations: the Atomic Energy Act of1954, as amended; EPA Groundwater Protection Standards;
and the National Environmental Policy Act of1969, as amended.
2.4 ASSUMPTIONS AND UNCERTAINTIES
DOE's Grand Junction Office plans to evaluate the monitoring program and may decrease the sampling
frequency and the number of sampling locations. However, for the purpose of this report, groundwater
monitoring is assumed to continue indefinitely. Because the site is already performing long-term stewardship
activities, these activities are well known and are not expected to change dramatically. Site surveillance and
maintenance will be required past 2070.
3.0 ESTIMATED LONG-TERM STEWARDSHIP COSTS
The following table shows the estimated costs oflong-term stewardship activities for the Hallam Nuclear Power
Facility. Because the site is already conducting long-term stewardship activities, costs are based on actual costs.
The costs below include repairs to the roof and walls of the concrete structure in fiscal year (FY) 2001. These
cost estimates reflect the current site agreements and monitoring frequencies. Thus, if the frequency and the
number of sampling locations decrease, the costs will decrease.
Nebraska 5
National Defense Authorization Act (NOAA) Long-Term Stewardship Report
Site Long-Term Stewardship Costs (Constant Year 2000 Dollars)
Year(s) Amo.unt Year(s) Amount Year(s) Amount
FY 2000 $44,000 FY 2008 $30,500 FY 2036-2040 $208,100
FY2001 $125,700 FY2009 $30,500 FY 2041-2045 $160,000
FY2002 $30,700 FY 2010 $30,500 FY 2046-2050 $160,100
FY 2003 $29,600 FY 2011-2015 $146,100 FY 2051-2055 $160,000
FY 2004 $30,000 FY 2016-2020 $187,700 FY 2056-2060 $208,100
FY 2005 $30,300 FY 2021-2025 $149,700 FY 2061-2065 $160,000
FY2006 $30,700 FY 2026-2030 $158,400 FY 2066-2070 $160,100
FY 2007 $30,500 FY 2031-2035 $160,000
4.0 FUTURE USES
The site is within an electrical generating power station owned by Nebraska Public Power District, which
maintains security for the site. The facility will remain under controlled access due to contaminated materials.
No drilling or other intrusive activities are allowed on the property. For any future inquiries, county land title
records have been annotated regarding the presence of the decommissioned facility.
For more information about the Hallam Nuclear Power Facility, contact:
Art Kleinrath, Long-Term Surveillance and Maintenance Program Manager
U.S. Department of Energy, Grand Junction Office
2597 B3/4 Road, Grand Junction, CO 81503
Phone: 970-248-6037
or visit the Internet website at http://www.doegjpo.com
Nebraska 6

More Related Content

What's hot

Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsAndrea Drabicki
 
Swim Drink Fish Canada submission for relicensing written hearing for the Del...
Swim Drink Fish Canada submission for relicensing written hearing for the Del...Swim Drink Fish Canada submission for relicensing written hearing for the Del...
Swim Drink Fish Canada submission for relicensing written hearing for the Del...LOWaterkeeper
 
Independent Review of Hydrological Issues: Deloro Mine Site
Independent Review of Hydrological Issues: Deloro Mine SiteIndependent Review of Hydrological Issues: Deloro Mine Site
Independent Review of Hydrological Issues: Deloro Mine SiteLOWaterkeeper
 
Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]
Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]
Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]Iwl Pcu
 
THE USE OF AIRBORNE EM CONDUCTIVITY TO LOCATE CONTAMINANT FLOW PATHS AT THE S...
THE USE OF AIRBORNE EM CONDUCTIVITY TO LOCATE CONTAMINANT FLOW PATHS AT THE S...THE USE OF AIRBORNE EM CONDUCTIVITY TO LOCATE CONTAMINANT FLOW PATHS AT THE S...
THE USE OF AIRBORNE EM CONDUCTIVITY TO LOCATE CONTAMINANT FLOW PATHS AT THE S...Brett Johnson
 
NY FSGEIS "Findings Statement" that Temporarily Bans Fracking
NY FSGEIS "Findings Statement" that Temporarily Bans FrackingNY FSGEIS "Findings Statement" that Temporarily Bans Fracking
NY FSGEIS "Findings Statement" that Temporarily Bans FrackingMarcellus Drilling News
 
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...Lakeland Resources Inc. (TSXv: LK)
 

What's hot (14)

Mississippi
MississippiMississippi
Mississippi
 
Alaska
AlaskaAlaska
Alaska
 
Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation Recommendaitons
 
Swim Drink Fish Canada submission for relicensing written hearing for the Del...
Swim Drink Fish Canada submission for relicensing written hearing for the Del...Swim Drink Fish Canada submission for relicensing written hearing for the Del...
Swim Drink Fish Canada submission for relicensing written hearing for the Del...
 
Independent Review of Hydrological Issues: Deloro Mine Site
Independent Review of Hydrological Issues: Deloro Mine SiteIndependent Review of Hydrological Issues: Deloro Mine Site
Independent Review of Hydrological Issues: Deloro Mine Site
 
Newsletter 12 04
Newsletter 12 04Newsletter 12 04
Newsletter 12 04
 
Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]
Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]
Lake Manzala Engineered Wetland, Port Said, Egypt [IWC4 Presentation]
 
WST-WSTWS-EM11803
WST-WSTWS-EM11803WST-WSTWS-EM11803
WST-WSTWS-EM11803
 
THE USE OF AIRBORNE EM CONDUCTIVITY TO LOCATE CONTAMINANT FLOW PATHS AT THE S...
THE USE OF AIRBORNE EM CONDUCTIVITY TO LOCATE CONTAMINANT FLOW PATHS AT THE S...THE USE OF AIRBORNE EM CONDUCTIVITY TO LOCATE CONTAMINANT FLOW PATHS AT THE S...
THE USE OF AIRBORNE EM CONDUCTIVITY TO LOCATE CONTAMINANT FLOW PATHS AT THE S...
 
Equinox Oil Spill
Equinox Oil SpillEquinox Oil Spill
Equinox Oil Spill
 
NY FSGEIS "Findings Statement" that Temporarily Bans Fracking
NY FSGEIS "Findings Statement" that Temporarily Bans FrackingNY FSGEIS "Findings Statement" that Temporarily Bans Fracking
NY FSGEIS "Findings Statement" that Temporarily Bans Fracking
 
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
 
News Release: Completion of Drill Program at Eldor
News Release: Completion of Drill Program at EldorNews Release: Completion of Drill Program at Eldor
News Release: Completion of Drill Program at Eldor
 
Small dams
Small damsSmall dams
Small dams
 

Viewers also liked

Elr rad waste article werner
Elr rad waste article wernerElr rad waste article werner
Elr rad waste article wernerJim Werner
 
Report to congress vol.1 jan 01
Report to congress vol.1 jan 01Report to congress vol.1 jan 01
Report to congress vol.1 jan 01Jim Werner
 
Backa pita ku_varijacije
Backa pita ku_varijacijeBacka pita ku_varijacije
Backa pita ku_varijacijePACE Kiprovska
 
Democamp Munich 2013: Are you still manually coding UIs?
Democamp Munich 2013: Are you still manually coding UIs?Democamp Munich 2013: Are you still manually coding UIs?
Democamp Munich 2013: Are you still manually coding UIs?Maximilian Kögel
 
ビッグデータはバズワードか? (Cloudian Summit 2012)
ビッグデータはバズワードか? (Cloudian Summit 2012)ビッグデータはバズワードか? (Cloudian Summit 2012)
ビッグデータはバズワードか? (Cloudian Summit 2012)CLOUDIAN KK
 
I miss my best friends !
I miss my best friends !I miss my best friends !
I miss my best friends !miistyxoxo
 
คณิตศาสตร์
คณิตศาสตร์คณิตศาสตร์
คณิตศาสตร์Pim Jazz
 
[Brandna]Vol3no2 Preview
[Brandna]Vol3no2 Preview[Brandna]Vol3no2 Preview
[Brandna]Vol3no2 Previewfredyutama
 
Open data in comune di udine
Open data in comune di udineOpen data in comune di udine
Open data in comune di udinePaolo Coppola
 
Importanza delle competenze digitali
Importanza delle competenze digitaliImportanza delle competenze digitali
Importanza delle competenze digitaliPaolo Coppola
 
AWS SDK for Python and CLOUDIAN HyperStore
AWS SDK for Python and CLOUDIAN HyperStoreAWS SDK for Python and CLOUDIAN HyperStore
AWS SDK for Python and CLOUDIAN HyperStoreCLOUDIAN KK
 
プレゼン資料の心構え
プレゼン資料の心構えプレゼン資料の心構え
プレゼン資料の心構えsenakamura
 
A Brandcalled | Fredy Utama | Update
A Brandcalled | Fredy Utama | UpdateA Brandcalled | Fredy Utama | Update
A Brandcalled | Fredy Utama | Updatefredyutama
 
Project 1 Pensacola
Project 1 PensacolaProject 1 Pensacola
Project 1 Pensacola1pensacola
 

Viewers also liked (20)

Elr rad waste article werner
Elr rad waste article wernerElr rad waste article werner
Elr rad waste article werner
 
Report to congress vol.1 jan 01
Report to congress vol.1 jan 01Report to congress vol.1 jan 01
Report to congress vol.1 jan 01
 
Backa pita ku_varijacije
Backa pita ku_varijacijeBacka pita ku_varijacije
Backa pita ku_varijacije
 
Democamp Munich 2013: Are you still manually coding UIs?
Democamp Munich 2013: Are you still manually coding UIs?Democamp Munich 2013: Are you still manually coding UIs?
Democamp Munich 2013: Are you still manually coding UIs?
 
Mengenal software geogebra
Mengenal software geogebraMengenal software geogebra
Mengenal software geogebra
 
ビッグデータはバズワードか? (Cloudian Summit 2012)
ビッグデータはバズワードか? (Cloudian Summit 2012)ビッグデータはバズワードか? (Cloudian Summit 2012)
ビッグデータはバズワードか? (Cloudian Summit 2012)
 
I miss my best friends !
I miss my best friends !I miss my best friends !
I miss my best friends !
 
คณิตศาสตร์
คณิตศาสตร์คณิตศาสตร์
คณิตศาสตร์
 
Jobmatching udine
Jobmatching udineJobmatching udine
Jobmatching udine
 
Maryland
MarylandMaryland
Maryland
 
[Brandna]Vol3no2 Preview
[Brandna]Vol3no2 Preview[Brandna]Vol3no2 Preview
[Brandna]Vol3no2 Preview
 
Open data in comune di udine
Open data in comune di udineOpen data in comune di udine
Open data in comune di udine
 
Tennessee
TennesseeTennessee
Tennessee
 
Importanza delle competenze digitali
Importanza delle competenze digitaliImportanza delle competenze digitali
Importanza delle competenze digitali
 
Alaska
AlaskaAlaska
Alaska
 
Opendata
OpendataOpendata
Opendata
 
AWS SDK for Python and CLOUDIAN HyperStore
AWS SDK for Python and CLOUDIAN HyperStoreAWS SDK for Python and CLOUDIAN HyperStore
AWS SDK for Python and CLOUDIAN HyperStore
 
プレゼン資料の心構え
プレゼン資料の心構えプレゼン資料の心構え
プレゼン資料の心構え
 
A Brandcalled | Fredy Utama | Update
A Brandcalled | Fredy Utama | UpdateA Brandcalled | Fredy Utama | Update
A Brandcalled | Fredy Utama | Update
 
Project 1 Pensacola
Project 1 PensacolaProject 1 Pensacola
Project 1 Pensacola
 

Similar to Nebraska

Similar to Nebraska (20)

Idaho
IdahoIdaho
Idaho
 
Oregon
OregonOregon
Oregon
 
Oregon
OregonOregon
Oregon
 
Idaho
IdahoIdaho
Idaho
 
South dakota
South dakotaSouth dakota
South dakota
 
Texas
TexasTexas
Texas
 
Illinois
IllinoisIllinois
Illinois
 
South dakota
South dakotaSouth dakota
South dakota
 
Utah
UtahUtah
Utah
 
Pennsylvania
PennsylvaniaPennsylvania
Pennsylvania
 
Kentucky
KentuckyKentucky
Kentucky
 
South carolina ndaa summary vol 2
South carolina ndaa summary vol 2South carolina ndaa summary vol 2
South carolina ndaa summary vol 2
 
South carolina ndaa summary vol 2
South carolina ndaa summary vol 2South carolina ndaa summary vol 2
South carolina ndaa summary vol 2
 
Illinois
IllinoisIllinois
Illinois
 
South carolina
South carolinaSouth carolina
South carolina
 
West virginia
West virginiaWest virginia
West virginia
 
South carolina ndaa summary vol 2
South carolina ndaa summary vol 2South carolina ndaa summary vol 2
South carolina ndaa summary vol 2
 
New mexico
New mexicoNew mexico
New mexico
 
Pennsylvania
PennsylvaniaPennsylvania
Pennsylvania
 
New mexico
New mexicoNew mexico
New mexico
 

More from Jim Werner

Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean AirWerner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean AirJim Werner
 
EPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 FinalEPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 FinalJim Werner
 
ELR Rad Waste Article Werner
ELR Rad Waste Article WernerELR Rad Waste Article Werner
ELR Rad Waste Article WernerJim Werner
 
From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999Jim Werner
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaaJim Werner
 
Crpt 106hrpt301
Crpt 106hrpt301Crpt 106hrpt301
Crpt 106hrpt301Jim Werner
 

More from Jim Werner (20)

Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean AirWerner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
 
EPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 FinalEPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 Final
 
ELR Rad Waste Article Werner
ELR Rad Waste Article WernerELR Rad Waste Article Werner
ELR Rad Waste Article Werner
 
From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999
 
cover
covercover
cover
 
Wyoming
WyomingWyoming
Wyoming
 
Washington
WashingtonWashington
Washington
 
Utah
UtahUtah
Utah
 
Puerto rico
Puerto ricoPuerto rico
Puerto rico
 
Ohio
OhioOhio
Ohio
 
New jersey
New jerseyNew jersey
New jersey
 
Nevada
NevadaNevada
Nevada
 
Missouri
MissouriMissouri
Missouri
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaa
 
Mississippi
MississippiMississippi
Mississippi
 
Mass
MassMass
Mass
 
Maryland
MarylandMaryland
Maryland
 
Iowa
IowaIowa
Iowa
 
Florida
FloridaFlorida
Florida
 
Crpt 106hrpt301
Crpt 106hrpt301Crpt 106hrpt301
Crpt 106hrpt301
 

Nebraska

  • 1. Nebraska Long-Term Stewardship Site Highlights Hallam Nuclear Power Facility (page 3) Major Activities- groundwater monitoring Site Size -7.3 hectares (18 acres) Start/End Years- 1998/past 2070 Estimated Average Annual Cost FY2006- $46,000 Hallam Nuclear Power Facility
  • 2.
  • 3. Table of Contents Table of Contents Hallam Nuclear Power Facility ............................................................. 3 Nebraska 1
  • 4. National Defense Authorization Act (NDAA) Long-Term Stewardship Report Nebraska 2
  • 5. Hallam Nuclem· Powe1· Facility HALLAM NUCLEAR POWER FACILITY 1.0 SITE SUMMARY 1.1 Site Description and Mission The Hallam Nuclear Power Facility is a former sodium- cooled, graphite-moderated nuclear reactor. It was built and operated by the U.S. Atomic Energy Commission (AEC), the predecessor agency of the U.S. Department of Energy (DOE), between 1962 and 1964. The reactor was decommissioned and dismantled in 1969. The facility is located on a small portion of the 260-hectare (640-acre) site of the Sheldon Power Station in Lancaster County, Nebraska, approximately 30 kilometers (19 miles) south of Lincoln, on land owned by the Nebraska Public Power District. The current mission of the Hallam Nuclear Power Facility is to perform long-term stewardship activities, LONG-TERM STEWARDSHIP HIGHLIGHTS Major Long-Term Stewardship Activities - groundwater monitoring Total Site Area- 7.3 hectares (18 acres) Estimated Volume ofResidual Contaminants- facilities unknown Long-Term Stewardship Start-End Years- 1998-past 2070 Average Annual Long-Term Stewardship Cost FY 2000-2006-$46,000 Landlord- U.S. Department of Energy, Grand Junction Office including monitoring of the groundwater. The AEC operated the 240-megawatt thermal reactor as a demonstration facility from 1962 until 1964. In 1965, the ABC terminated its agreement with the Nebraska Public Power District (then known as Consumers Public Power District) to operate the reactor facility. The Nebraska Public Power District dismantled and decommissioned the reactor from 1967 through 1969. In 1971, the AEC retired the facility. 1.2 Site Cleanup and Accomplishments The Nebraska Public Power District dismantled and decommissioned the reactor core and removed most of the radioactive materials from the site; however, some radioactive materials were entombed in place. All potential contaminants at the site are contained within the entombment structure in Area 1 (reactor vessel and vessel containment structures), Area 2 (Fuel Storage Pit 3 thimbles), or Area 3 (moderator element storage cells). These contaminants include nickel-63, cobalt-60, iron-55, manganese-54, samarium-151, cesium-137, strontium-90, and tritium. The contaminants within the structure consist of activation products in the stainless steel reactor vessel and its internals. Lesser amounts of activation products are dispersed in the carbon steel thermal shield and guard vessel surrounding the reactor vessel and in the compartment liner itself. The core and most ofthe radioactive materials, including all ofthe bulk sodium, were removed from the site. The residual sodium reacted with steam to form sodium hydroxide, removing the potential for hydrogen formation at a later date should water leak into the facility. The reactor vessel and surrounding guard vessel, which use double-walled piping, as well as most of the reactor vessel internals, remain within the compartment. Fuel Storage Pit 3 contains a number ofstainless steel thimbles formerly used to store spent fuel elements. The storage pool was drained, and the thimbles now contain process tubes, control rod tubes, dummy elements, and a spent neutron source. To prevent leaks, closures and dust covers for each thimble have been welded in place and the interspace has been filled with expanding concrete. Storage Area 3 consists of 12 storage cells containing three canistered moderator elements that experienced cladding failures during reactor operation. A number of parts such as pumps, valves, and segments ofpiping are stored in these cells. The moderator cells were sealed by welding the plug casings to the cell liners and filling Nebraska 3
  • 6. National Defense Authorization Act (NDAA) Long-Term Stewardship Report @ Groundwater Monitoring Well 0.05 Miles Sewage Treatment Plant 0.1 To Lincoln, NE (-19 miles) Hallam Nuclear Power Facility the space above the plugs with expanding concrete. I ; 1 1' 'Iii I ~ ' ;; I re ' i I <! j ! ' ~ I n: I f, o I r I l r i i I The basement level of the facility contained radioactive waste disposal equipment, all of which has either been removed or decontaminated, as appropriate. All reactor compartments have been sealed, and the surface of the below-grade concrete structure was covered with sand, a waterproof polyvinyl membrane, and a covering of earth. The cover was sloped for proper drainage, and drain tile was installed at the periphery. Above-grade structures have been weatherproofed by a layer ofpolyvinyl and a protective cover ofconcrete. All that remains above ground is the sealed concrete intermediate heat exchangerbuilding. Total radioactivity was 300,000curies at the time of closure. By 2000, the activity level will have decayed to approximately 15,000 curies. There is no known soil or groundwater contamination at the Hallam Nuclear Power Facility and no evidence of contamination being released from the site. 2.0 SITE-WIDE LONG-TERM STEWARDSHIP 2.1 Long-Term Stewardship Activities Although the Nebraska Public Power District owns the property, DOE currently has the responsibility to perform long-term stewardship activities for the entombed reactor structure at the Hallam Nuclear Power Facility. Long- term stewardship responsibility was transferred to the DOE Grand Junction Office in 1998. The former reactor site is now a 0.6 hectare (1.4 acre) grass-covered mound with a heat exchanger building. The installation of a shallow groundwater monitoring system was completed in 1995 and is used as part of the surveillance program for the entombed reactor. Groundwater monitoring is conducted annually and will continue indefinitely. Site records are kept in permanent storage at the DOE Grand Junction Office in Colorado. The types ofrecords kept include characterization data, decommissioning design information, decommissioning report, annual inspection Nebraska 4
  • 7. Hallam Nuclear Power Facility reports, and groundwater monitoring results. In addition, the Nebraska Public Power District will control access to the site due to contaminated buried materials. 2.2 Specific Long-Term Stewardship Activities Groundwater Although there is no known groundwater contamination at the site, groundwater monitoring is conducted annually to ensure the stability of the entombed reactor. Water level STAKEHOLDER INTERACTION Community interaction at the site has been minimal to date. DOE sends a copy of the site's annual inspection report to the State of Nebraska and the Nebraska Public Power District. measurements are obtained from all19 DOE wells. Samples for analysis are obtained from 17 ofthe DOE wells. The samples are analyzed for gross alpha, gross beta, tritium, gamma spectrometry, and nickel-63. The annual monitoring and surveillance report discusses the results of the groundwater monitoring and summarizes the physical condition of the site. This report also discusses the need for follow-up inspections, monitoring, or maintenance actions, should any be necessary. Facilities The reactor is entombed onsite. Access to the property is restricted, as entry can only be made through the secured property of an operating power plant where the site is located. Potential contaminants remain within the entombed reactor; however, DOE does not conduct any active monitoring of this area. 2.3 Regulatory Regime Long-term stewardship activities at the Hallam Nuclear Power Facility is governed by several requirements in the following regulations: the Atomic Energy Act of1954, as amended; EPA Groundwater Protection Standards; and the National Environmental Policy Act of1969, as amended. 2.4 ASSUMPTIONS AND UNCERTAINTIES DOE's Grand Junction Office plans to evaluate the monitoring program and may decrease the sampling frequency and the number of sampling locations. However, for the purpose of this report, groundwater monitoring is assumed to continue indefinitely. Because the site is already performing long-term stewardship activities, these activities are well known and are not expected to change dramatically. Site surveillance and maintenance will be required past 2070. 3.0 ESTIMATED LONG-TERM STEWARDSHIP COSTS The following table shows the estimated costs oflong-term stewardship activities for the Hallam Nuclear Power Facility. Because the site is already conducting long-term stewardship activities, costs are based on actual costs. The costs below include repairs to the roof and walls of the concrete structure in fiscal year (FY) 2001. These cost estimates reflect the current site agreements and monitoring frequencies. Thus, if the frequency and the number of sampling locations decrease, the costs will decrease. Nebraska 5
  • 8. National Defense Authorization Act (NOAA) Long-Term Stewardship Report Site Long-Term Stewardship Costs (Constant Year 2000 Dollars) Year(s) Amo.unt Year(s) Amount Year(s) Amount FY 2000 $44,000 FY 2008 $30,500 FY 2036-2040 $208,100 FY2001 $125,700 FY2009 $30,500 FY 2041-2045 $160,000 FY2002 $30,700 FY 2010 $30,500 FY 2046-2050 $160,100 FY 2003 $29,600 FY 2011-2015 $146,100 FY 2051-2055 $160,000 FY 2004 $30,000 FY 2016-2020 $187,700 FY 2056-2060 $208,100 FY 2005 $30,300 FY 2021-2025 $149,700 FY 2061-2065 $160,000 FY2006 $30,700 FY 2026-2030 $158,400 FY 2066-2070 $160,100 FY 2007 $30,500 FY 2031-2035 $160,000 4.0 FUTURE USES The site is within an electrical generating power station owned by Nebraska Public Power District, which maintains security for the site. The facility will remain under controlled access due to contaminated materials. No drilling or other intrusive activities are allowed on the property. For any future inquiries, county land title records have been annotated regarding the presence of the decommissioned facility. For more information about the Hallam Nuclear Power Facility, contact: Art Kleinrath, Long-Term Surveillance and Maintenance Program Manager U.S. Department of Energy, Grand Junction Office 2597 B3/4 Road, Grand Junction, CO 81503 Phone: 970-248-6037 or visit the Internet website at http://www.doegjpo.com Nebraska 6