Salmon Site

Long-Term Stewardship Site Highlights

Salmon Site (page 3)
Major Activities- groundwater monitoring; enforcing restrictions for access to and use of the subsurface
Site Size- 595 hectares (1 ,470 acres)
Start/End Years- 2003/in perpetuity
Estimated Average Annual Cost FY 2000-2006- $60,000
Table of Contents

Table of Contents

Salmon Site ............................................................................ 3

Mississippi

I
National Defense Authodzation Act (NOAA) Long-Tenn Stewardship Report

Mississippi

2
Salmon Site

SALMON SITE
1.0

SITE SUMMARY

1.1

Site Description and Mission

The Salmon Site covers approximately 595 hectares
LONG-TERM STEWARDSHIP HIGHLIGHTS
(1,470 acres) and is located 34 kilometers (21 miles)
southwest of Hattiesburg, Mississippi. The U.S. Atomic
Major Long-Term Stewardship Activities Energy Commission (AEC), later known as the
groundwater monitoring; enforcing restrictions for
Department of Energy (DOE), used the site for two
access to and use of the subsurface
nuclear test detonations, Salmon and Sterling, to
Total Site Area- 595 hectares (1,470 acres)
Estimated Volume of Residual Contaminantsevaluate the seismic response of salt deposits to nuclear
unknown
explosives. AEC conducted the first test, Salmon, at a
Long-Term Stewardship Start-End Years- 2003-in
depth of 828 meters (2,717 feet) in the Tatum Salt
perpetuity
Dome in October 1964. AEC detonated the second test,
Average Annual Long-Term Stewardship Cost FY
known as Sterling, in the Salmon cavity in December
2000-2006- $60,000
1966. The Salmon Site was also the location for two
Landlord- U.S. Department of Energy
non-nuclear gas detonations used for seismic
decoupling studies in the Vela Uniform Program. The
non-nuclear gas detonations, Diode Tube in February 1969 and Humid Water in April1970, consisted of two
methane-oxygen explosions conducted in the Salmon/Sterling cavity. These two detonations did not result in
additional contamination of the site.
The Salmon Site is currently owned by DOE. DOE's mission at the site is to complete surface remediation and
continue long-term stewardship activities of the residual subsurface contamination in the test cavity. DOE
anticipates transferring the site surface to the State of Mississippi after final closure of the subsurface is
completed in 2003. At that time, DOE anticipates that the surface area at the site will be established as a
demonstration forest and wildlife refuge.

1.2

Site Cleanup and Accomplishments

DOE has developed site remediation plans and completed site characterization, modeling, and risk assessments
for both the surface and subsurface areas. In October 1999, DOE initiated final site closure negotiations with the
State of Mississippi. In addition, DOE has signed a Memorandum of Understanding with Lamar County that
provides approximately $2 million to extend a drinking water system to residences in the vicinity of the site. This
water system is expected to eliminate potential receptors for groundwater contamination. DOE expects to
complete all remediation activities at the site by 2003.
AEC' s underground detonations at the site resulted in contamination of subsurface areas and groundwater. The
potential contaminants of concern for the subsurface are mixed fission products, including plutonium, uranium,
and tritium. During cleanup activities conducted at the site in 1972, AEC injected radioactively contaminated
soils and water into the test cavity. The injection wells were then sealed with concrete and bentonite when the
site was decommissioned. DOE does not plan to remediate subsurface contamination because of the lack of
feasible technologies for removing subsurface contamination. However, DOE will use characterization and
modeling data to define the areas that will require institutional controls. Negotiations with the State of
Mississippi on final site closure criteria were initiated in 1999, and DOE expects all subsurface closure work will
be completed by 2003.

Mississippi

3
National Defense Authorization Act (NOAA) Long-Term Stewardship Report

Potential surface contamination at the site resulted from drilling operations after the first test was conducted.
Contaminants of concern include tritium and diesel fuel in abandoned mud pits, shallow disposal areas, and bum
pits. In 1972, AEC initiated cleanup of surface contamination by excavating soils, decommissioning facilities,
and disposing of wastes. In 1977, DOE conducted an additional sampling program, with more than 170
exploratory borings, and extensive soil and groundwater sampling. The results of the study showed that tritium
contamination was left in the shallow mud pits during the 1972 site cleanup. As a result of this contamination,
a plume of tritium extends northwest from the surface-ground-zero mud pits. DOE provided the site remedial
investigation report to the State of Mississippi for review and State approval was received in May 2000. The
State will make a decision on DOE's closure plans based on its review of the documentation. Assuming that the
State accepts the current DOE plan, the surface contamination will be left in place to naturally decay to levels
that will allow the site to be transferred to the State for use as a demonstration forest and wildlife refuge
(approximately 10 years).

0

10

Miles

Salmon Site

2.0

SITE-WIDE LONG-TERM STEWARDSHIP

2.1

Long-Term Stewardship Activities

DOE expects that the subsurface will be closed and that DOE activities at the site will consist solely oflong-term
stewardship activities beginning in 2003. DOE will not maintain an active presence at this site but will be
responsible for monitoring and maintaining institutional controls over subsurface contamination. Final long-term
stewardship requirements for the subsurface will be negotiated with the State of Mississippi. Periodic monitoring
will be conducted to ensure that there is no contaminant migration from the test cavity to the groundwater. DOE
does not anticipate that any long-term stewardship activities associated with the remediated surface
Mississippi

4
Salmon Site

contamination will be necessary once the existing levels of contamination have either attenuated or decayed to
agreed upon concentration levels, which is estimated to take approximately 10 years.
DOE maintains the project-specific records at the Nevada Operations Office in Las Vegas. These records include
corrective action investigation work plans and reports; corrective action decision documents; health assessments;
risk assessments; information submitted by the public; National Environmental Policy Act documents; and the
Public Involvement Plan. The DOE Public Reading Facility and the Nevada Division of Environmental
Protection Administrative Record are provided with copies of these documents. Upon the completion of the
project, all DOE project files will be transferred to controlled storage at the Nevada Operations Office. Records
are retained according to DOE records retention procedures.

2.2

Specific Long-Term Stewardship Activities

Groundwater
A monument has been placed at the site to mark the location of the test cavity. DOE will maintain institutional
controls over the subsurface in perpetuity to prevent access to the test cavity, groundwater, and associated
subsurface contamination. Institutional controls will include restricting surface intrusions on the site. DOE will
continue to conduct annual groundwater monitoring at the site for at least 100 years after closure of the
subsurface in 2003. DOE estimates that repair or replacement of groundwater monitoring wells will be required
every 25 years. At the end of the post-closure groundwater monitoring period in 2103, assuming State regulatory
agency approval, the monitoring wells will be plugged and abandoned in place in accordance with State
regulations.

2.3

Regulatory Regime

In accordance with applicable regulatory drivers listed below, DOE is responsible for identifying the nature and
extent of contamination, determining potential risk to the public and the environment, and performing the
necessary corrective actions in compliance with guidelines and requirements under federal regulatory drivers,
as well as the state-specific regulatory drivers associated with the site location. These responsibilities are
delegated to the DOE Office of Environmental Management.

Resource Conservation and Recovery Act CRCRA): RCRA was the first comprehensive Federal effort to deal
with solid and hazardous waste. RCRA regulates the generation, transportation, treatment, storage, and disposal
of hazardous waste. At the Salmon Site, RCRA is enforced to protect human health and the environment;
conserve energy and natural resources; reduce the amount of generated waste; and ensure that wastes are
managed in an environmentally sound manner.
Comprehensive Environmental Response. Compensation. and Liability Act CCERCLA): CERCLA supplies a
system for identifying and providing corrective action to sites where hazardous substances have been released
into any part of the air, water, groundwater, or land. Provisions of CERCLA include a National Contingency
Plan, which establishes procedures for corrective action for hazardous substance releases. Salmon is not
regulated under CERCLA; however, the regulations are useful as developmental guidelines.
In addition to federal regulations, DOE must comply with State regulatory requirements. In most cases, State
of Mississippi requirements are based on federal guidelines; however, in specific cases they may be more detailed
and stringent than federal regulations.

Nuclear Regulatory Commission (NRC): NRC regulations establish "free release" criteria. The State of
Mississippi is not regulated under the NRC; however, the regulations are used as developmental guidelines.
Mississippi

5
National Defense Authorization Act (NDAA) Long-Tenn Stewardship Report

2.4

Assumptions and Uncertainties

DOE assumes that the State of Mississippi will approve the proposed surface restoration plan. Current land use
designations and subsurface intrusion restrictions will continue into the foreseeable future. DOE will reevaluate
and modify the subsurface restrictions, as appropriate, as part of the assessment and/or corrective action
activities.
DOE does not plan to remove subsurface contamination in and around the test cavities. However, DOE will
develop subsurface models to define the contaminant boundary and refine the existing subsurface intrusion
restrictions, if necessary. Post-closure monitoring will be conducted, as agreed upon in the site closure reports
for the subsurface, in order to detect changes in the subsurface conditions. The schedule for groundwater
monitoring after closure of the subsurface will be defined in the subsurface closure report. DOE assumes that
groundwater monitoring will continue annually after subsurface closure is finalized in 2003 and that monitoring
will be performed for 100 years (2003-2103).
3.0

ESTIMATED LONG-TERM STEWARDSHIP COSTS

The cost profile in the table below applies to the entire Salmon site. The major long-term stewardship costs are
for monitoring activities, data analysis, and repair and replacement of monitoring wells. The spikes in cost are
a result of costs associated with repairing or replacing monitoring wells, which are assumed to require
maintenance every 25 years.
The long-term stewardship costs for the Salmon Site remain roughly constant at $40,000 annually through FY
2010. The higher costs in FY 2000 are associated with the new Real Estate Operations Permit (RE-OP)
requirements. The cost increase in 2008 is the result of a periodic review and analysis of the data to evaluate and
possibly refine the monitoring strategy. This review and analysis will occur every five years throughout the postclosure monitoring period (2003-2103). DOE projects that the total post-2070 (2071-2103) costs will be
approximately $6.8 million dollars.

Site Long" Term Stewardship Costs (Constant Ye~l- ~OOODollan)
Year(s)

Amount

Year(s)

Amount

Year(s)

Amount

FY 2000

$180,000

FY 2008

$113,000

FY 2036-2040

$272,000

FY 2001

$40,000

FY 2009

$40,000

FY 2041-2045

$272,000

FY 2002

$40,000

FY 2010

$40,000

FY 2046-2050

$273,000

FY 2003

$40,000

FY 2011-2015

$272,000

FY 2051-2055

$2,772,000

FY 2004

$40,000

FY 2016-2020

$272,000

FY 2056-2060

$272,000

FY 2005

$40,000

FY 2021-2025

$272,000

FY 2061-2065

$272,000

FY 2006

$40,000

FY 2026-2030

$2,772,000

FY 2066-2070

$272,000

FY 2007

$40,000

FY 2031-2035

$272,000

PostFY 2070

$6,800,000

4.0

FUTURE USES

Public Law 104-201 (the National Defense Authorization Act of Fiscal Year 1997, Section 2851 (b), September
1996) allows DOE to transfer the site to the State of Mississippi. It is anticipated that the Salmon Site will be
Mississippi

6
Salmon Site

used as a demonstration forest and wildlife refuge. If the State accepts the property, agreements will be enacted
for the transfer. The agreements will be completed prior to the completion of the closure activities and will be
predicated on the final agreed upon surface closure criteria and future land use determinations. The anticipated
end state for the Salmon Site will allow for future surface use at the site with an NRC designation of "no
radiological restrictions." DOE will continue to restrict access to the test cavities, subsurface soil, and
groundwater through the use of deed restrictions in perpetuity.

For additional information about the Salmon Site, please contact:
Monica Sanchez
U.S. Department of Energy, Nevada Operations Office
Environmental Restoration Division
232 Energy Way
North Las Vegas, NV 89030-4199
Phone: 702-295-0160
sanchezm@ nv .doe. gov

Mississippi

7
Mississippi

Weitere ähnliche Inhalte

Was ist angesagt?

PortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_StatementPortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_StatementDebbie Kilbane Fawcett
 
Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsAndrea Drabicki
 
Off site koppers soil fact sheet 9-10_2010 - print ready
Off site koppers soil fact sheet 9-10_2010 - print readyOff site koppers soil fact sheet 9-10_2010 - print ready
Off site koppers soil fact sheet 9-10_2010 - print readyProtect Gainesville's Citizens
 
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communitiesecowatchers
 
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway Authority
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway AuthorityPositive Declaration for Pilgrim Pipeline from NY DEC & Thruway Authority
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway AuthorityMarcellus Drilling News
 
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+LandersLessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+LandersKris Esterson
 
Duke Study: Methane contamination of drinking water accompanying gas-well dri...
Duke Study: Methane contamination of drinking water accompanying gas-well dri...Duke Study: Methane contamination of drinking water accompanying gas-well dri...
Duke Study: Methane contamination of drinking water accompanying gas-well dri...Marcellus Drilling News
 
Dewey Loeffel Landfill EPA Superfund SIte Factsheet
Dewey Loeffel Landfill EPA Superfund SIte Factsheet  Dewey Loeffel Landfill EPA Superfund SIte Factsheet
Dewey Loeffel Landfill EPA Superfund SIte Factsheet Vaaltje Rough Notes
 

Was ist angesagt? (15)

PortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_StatementPortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_Statement
 
Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation Recommendaitons
 
Off site koppers soil fact sheet 9-10_2010 - print ready
Off site koppers soil fact sheet 9-10_2010 - print readyOff site koppers soil fact sheet 9-10_2010 - print ready
Off site koppers soil fact sheet 9-10_2010 - print ready
 
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
 
West virginia
West virginiaWest virginia
West virginia
 
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway Authority
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway AuthorityPositive Declaration for Pilgrim Pipeline from NY DEC & Thruway Authority
Positive Declaration for Pilgrim Pipeline from NY DEC & Thruway Authority
 
Texas
TexasTexas
Texas
 
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+LandersLessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
 
WST-WSTWS-EM11803
WST-WSTWS-EM11803WST-WSTWS-EM11803
WST-WSTWS-EM11803
 
Duke Study: Methane contamination of drinking water accompanying gas-well dri...
Duke Study: Methane contamination of drinking water accompanying gas-well dri...Duke Study: Methane contamination of drinking water accompanying gas-well dri...
Duke Study: Methane contamination of drinking water accompanying gas-well dri...
 
Aoc sediment update_part2
Aoc sediment update_part2Aoc sediment update_part2
Aoc sediment update_part2
 
Scenic Hudson Sea Level Rise Mapper - Part 1
Scenic Hudson Sea Level Rise Mapper - Part 1Scenic Hudson Sea Level Rise Mapper - Part 1
Scenic Hudson Sea Level Rise Mapper - Part 1
 
Dewey Loeffel Landfill EPA Superfund SIte Factsheet
Dewey Loeffel Landfill EPA Superfund SIte Factsheet  Dewey Loeffel Landfill EPA Superfund SIte Factsheet
Dewey Loeffel Landfill EPA Superfund SIte Factsheet
 
Oregon
OregonOregon
Oregon
 
Developing a Web-based Forecasting Tool for Nutrient Management
Developing a Web-based Forecasting Tool for Nutrient ManagementDeveloping a Web-based Forecasting Tool for Nutrient Management
Developing a Web-based Forecasting Tool for Nutrient Management
 

Andere mochten auch

ELR Rad Waste Article Werner
ELR Rad Waste Article WernerELR Rad Waste Article Werner
ELR Rad Waste Article WernerJim Werner
 
Bf conference april 27 jim werner final no time
Bf conference april 27 jim werner final no timeBf conference april 27 jim werner final no time
Bf conference april 27 jim werner final no timeJim Werner
 
Tpp meningkatkan mutu pendidikan
Tpp  meningkatkan mutu pendidikanTpp  meningkatkan mutu pendidikan
Tpp meningkatkan mutu pendidikanrosid tamami tamami
 
A glass of milk
A glass of milkA glass of milk
A glass of milksuminch
 
Aaa1 doe lts report congress vol1
Aaa1 doe lts report congress vol1Aaa1 doe lts report congress vol1
Aaa1 doe lts report congress vol1Jim Werner
 
Oxygen Cloud at cloudian seminar 2012
Oxygen Cloud at cloudian seminar 2012Oxygen Cloud at cloudian seminar 2012
Oxygen Cloud at cloudian seminar 2012CLOUDIAN KK
 
Docker三種の神器 +α
Docker三種の神器 +αDocker三種の神器 +α
Docker三種の神器 +αKunio Ozawa
 
Nicolai werner nscc summer 2013
Nicolai werner nscc summer 2013Nicolai werner nscc summer 2013
Nicolai werner nscc summer 2013Jim Werner
 
EMFStore Model Repository @ Modeling Symposium ECE 2013
EMFStore Model Repository @ Modeling Symposium ECE 2013EMFStore Model Repository @ Modeling Symposium ECE 2013
EMFStore Model Repository @ Modeling Symposium ECE 2013Maximilian Kögel
 
Final presentation pearson
Final presentation pearsonFinal presentation pearson
Final presentation pearsonnycylith
 
Turski kuvar-Lahmacun
 Turski kuvar-Lahmacun Turski kuvar-Lahmacun
Turski kuvar-LahmacunPACE Kiprovska
 
Importanza delle competenze digitali
Importanza delle competenze digitali Importanza delle competenze digitali
Importanza delle competenze digitali Paolo Coppola
 
Prokop na kineski nacin
Prokop na kineski nacinProkop na kineski nacin
Prokop na kineski nacinPACE Kiprovska
 
Digital collaborative accounting
Digital collaborative accounting Digital collaborative accounting
Digital collaborative accounting Nirmal Ghorawat
 

Andere mochten auch (20)

Opendata
OpendataOpendata
Opendata
 
ELR Rad Waste Article Werner
ELR Rad Waste Article WernerELR Rad Waste Article Werner
ELR Rad Waste Article Werner
 
Bf conference april 27 jim werner final no time
Bf conference april 27 jim werner final no timeBf conference april 27 jim werner final no time
Bf conference april 27 jim werner final no time
 
Tpp meningkatkan mutu pendidikan
Tpp  meningkatkan mutu pendidikanTpp  meningkatkan mutu pendidikan
Tpp meningkatkan mutu pendidikan
 
Ohio
OhioOhio
Ohio
 
A glass of milk
A glass of milkA glass of milk
A glass of milk
 
Aaa1 doe lts report congress vol1
Aaa1 doe lts report congress vol1Aaa1 doe lts report congress vol1
Aaa1 doe lts report congress vol1
 
Oxygen Cloud at cloudian seminar 2012
Oxygen Cloud at cloudian seminar 2012Oxygen Cloud at cloudian seminar 2012
Oxygen Cloud at cloudian seminar 2012
 
JUTARNJI VICEVI
JUTARNJI VICEVIJUTARNJI VICEVI
JUTARNJI VICEVI
 
Docker三種の神器 +α
Docker三種の神器 +αDocker三種の神器 +α
Docker三種の神器 +α
 
Nicolai werner nscc summer 2013
Nicolai werner nscc summer 2013Nicolai werner nscc summer 2013
Nicolai werner nscc summer 2013
 
Agriculture
AgricultureAgriculture
Agriculture
 
Mengenal software geogebra
Mengenal software geogebraMengenal software geogebra
Mengenal software geogebra
 
EMFStore Model Repository @ Modeling Symposium ECE 2013
EMFStore Model Repository @ Modeling Symposium ECE 2013EMFStore Model Repository @ Modeling Symposium ECE 2013
EMFStore Model Repository @ Modeling Symposium ECE 2013
 
Final presentation pearson
Final presentation pearsonFinal presentation pearson
Final presentation pearson
 
Blog
BlogBlog
Blog
 
Turski kuvar-Lahmacun
 Turski kuvar-Lahmacun Turski kuvar-Lahmacun
Turski kuvar-Lahmacun
 
Importanza delle competenze digitali
Importanza delle competenze digitali Importanza delle competenze digitali
Importanza delle competenze digitali
 
Prokop na kineski nacin
Prokop na kineski nacinProkop na kineski nacin
Prokop na kineski nacin
 
Digital collaborative accounting
Digital collaborative accounting Digital collaborative accounting
Digital collaborative accounting
 

Ähnlich wie Mississippi

Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaaJim Werner
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaaJim Werner
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaaJim Werner
 
RECOMMENDATIONS FOR ENVIRONMENTAL MONITORING AROUND DEEP-SEA MINING SITES
RECOMMENDATIONS FOR ENVIRONMENTAL MONITORING AROUND DEEP-SEA MINING SITESRECOMMENDATIONS FOR ENVIRONMENTAL MONITORING AROUND DEEP-SEA MINING SITES
RECOMMENDATIONS FOR ENVIRONMENTAL MONITORING AROUND DEEP-SEA MINING SITESiQHub
 
South carolina
South carolinaSouth carolina
South carolinaJim Werner
 
Mms csl nabfinal 2002 ld
Mms csl nabfinal 2002 ldMms csl nabfinal 2002 ld
Mms csl nabfinal 2002 ldcnxsolutions
 

Ähnlich wie Mississippi (20)

Mississippi
MississippiMississippi
Mississippi
 
Alaska
AlaskaAlaska
Alaska
 
Nevada
NevadaNevada
Nevada
 
Pennsylvania
PennsylvaniaPennsylvania
Pennsylvania
 
Oregon
OregonOregon
Oregon
 
Kentucky
KentuckyKentucky
Kentucky
 
West virginia
West virginiaWest virginia
West virginia
 
Missouri
MissouriMissouri
Missouri
 
Missouri
MissouriMissouri
Missouri
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaa
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaa
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaa
 
Texas
TexasTexas
Texas
 
South dakota
South dakotaSouth dakota
South dakota
 
RECOMMENDATIONS FOR ENVIRONMENTAL MONITORING AROUND DEEP-SEA MINING SITES
RECOMMENDATIONS FOR ENVIRONMENTAL MONITORING AROUND DEEP-SEA MINING SITESRECOMMENDATIONS FOR ENVIRONMENTAL MONITORING AROUND DEEP-SEA MINING SITES
RECOMMENDATIONS FOR ENVIRONMENTAL MONITORING AROUND DEEP-SEA MINING SITES
 
South dakota
South dakotaSouth dakota
South dakota
 
Idaho
IdahoIdaho
Idaho
 
South carolina
South carolinaSouth carolina
South carolina
 
Mms csl nabfinal 2002 ld
Mms csl nabfinal 2002 ldMms csl nabfinal 2002 ld
Mms csl nabfinal 2002 ld
 
Coastline
CoastlineCoastline
Coastline
 

Mehr von Jim Werner

Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean AirWerner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean AirJim Werner
 
EPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 FinalEPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 FinalJim Werner
 
From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999Jim Werner
 
South carolina ndaa summary vol 2
South carolina ndaa summary vol 2South carolina ndaa summary vol 2
South carolina ndaa summary vol 2Jim Werner
 

Mehr von Jim Werner (19)

Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean AirWerner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
 
EPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 FinalEPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 Final
 
From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999
 
cover
covercover
cover
 
Wyoming
WyomingWyoming
Wyoming
 
Washington
WashingtonWashington
Washington
 
Utah
UtahUtah
Utah
 
Tennessee
TennesseeTennessee
Tennessee
 
South carolina ndaa summary vol 2
South carolina ndaa summary vol 2South carolina ndaa summary vol 2
South carolina ndaa summary vol 2
 
Puerto rico
Puerto ricoPuerto rico
Puerto rico
 
Ohio
OhioOhio
Ohio
 
New jersey
New jerseyNew jersey
New jersey
 
New mexico
New mexicoNew mexico
New mexico
 
Nebraska
NebraskaNebraska
Nebraska
 
Mass
MassMass
Mass
 
Maryland
MarylandMaryland
Maryland
 
Iowa
IowaIowa
Iowa
 
Illinois
IllinoisIllinois
Illinois
 
Florida
FloridaFlorida
Florida
 

Kürzlich hochgeladen

Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
Infrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsInfrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsYoss Cohen
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Kaya Weers
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesThousandEyes
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integrationmarketing932765
 
React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...Karmanjay Verma
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Jeffrey Haguewood
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesManik S Magar
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
A Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxA Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxAna-Maria Mihalceanu
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024TopCSSGallery
 
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...JET Technology Labs White Paper for Virtualized Security and Encryption Techn...
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...amber724300
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...panagenda
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
WomenInAutomation2024: AI and Automation for eveyone
WomenInAutomation2024: AI and Automation for eveyoneWomenInAutomation2024: AI and Automation for eveyone
WomenInAutomation2024: AI and Automation for eveyoneUiPathCommunity
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 

Kürzlich hochgeladen (20)

Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
How Tech Giants Cut Corners to Harvest Data for A.I.
How Tech Giants Cut Corners to Harvest Data for A.I.How Tech Giants Cut Corners to Harvest Data for A.I.
How Tech Giants Cut Corners to Harvest Data for A.I.
 
Infrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsInfrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platforms
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
 
React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
A Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxA Glance At The Java Performance Toolbox
A Glance At The Java Performance Toolbox
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024
 
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...JET Technology Labs White Paper for Virtualized Security and Encryption Techn...
JET Technology Labs White Paper for Virtualized Security and Encryption Techn...
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
WomenInAutomation2024: AI and Automation for eveyone
WomenInAutomation2024: AI and Automation for eveyoneWomenInAutomation2024: AI and Automation for eveyone
WomenInAutomation2024: AI and Automation for eveyone
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 

Mississippi

  • 1. Mississippi Salmon Site Long-Term Stewardship Site Highlights Salmon Site (page 3) Major Activities- groundwater monitoring; enforcing restrictions for access to and use of the subsurface Site Size- 595 hectares (1 ,470 acres) Start/End Years- 2003/in perpetuity Estimated Average Annual Cost FY 2000-2006- $60,000
  • 2.
  • 3. Table of Contents Table of Contents Salmon Site ............................................................................ 3 Mississippi I
  • 4. National Defense Authodzation Act (NOAA) Long-Tenn Stewardship Report Mississippi 2
  • 5. Salmon Site SALMON SITE 1.0 SITE SUMMARY 1.1 Site Description and Mission The Salmon Site covers approximately 595 hectares LONG-TERM STEWARDSHIP HIGHLIGHTS (1,470 acres) and is located 34 kilometers (21 miles) southwest of Hattiesburg, Mississippi. The U.S. Atomic Major Long-Term Stewardship Activities Energy Commission (AEC), later known as the groundwater monitoring; enforcing restrictions for Department of Energy (DOE), used the site for two access to and use of the subsurface nuclear test detonations, Salmon and Sterling, to Total Site Area- 595 hectares (1,470 acres) Estimated Volume of Residual Contaminantsevaluate the seismic response of salt deposits to nuclear unknown explosives. AEC conducted the first test, Salmon, at a Long-Term Stewardship Start-End Years- 2003-in depth of 828 meters (2,717 feet) in the Tatum Salt perpetuity Dome in October 1964. AEC detonated the second test, Average Annual Long-Term Stewardship Cost FY known as Sterling, in the Salmon cavity in December 2000-2006- $60,000 1966. The Salmon Site was also the location for two Landlord- U.S. Department of Energy non-nuclear gas detonations used for seismic decoupling studies in the Vela Uniform Program. The non-nuclear gas detonations, Diode Tube in February 1969 and Humid Water in April1970, consisted of two methane-oxygen explosions conducted in the Salmon/Sterling cavity. These two detonations did not result in additional contamination of the site. The Salmon Site is currently owned by DOE. DOE's mission at the site is to complete surface remediation and continue long-term stewardship activities of the residual subsurface contamination in the test cavity. DOE anticipates transferring the site surface to the State of Mississippi after final closure of the subsurface is completed in 2003. At that time, DOE anticipates that the surface area at the site will be established as a demonstration forest and wildlife refuge. 1.2 Site Cleanup and Accomplishments DOE has developed site remediation plans and completed site characterization, modeling, and risk assessments for both the surface and subsurface areas. In October 1999, DOE initiated final site closure negotiations with the State of Mississippi. In addition, DOE has signed a Memorandum of Understanding with Lamar County that provides approximately $2 million to extend a drinking water system to residences in the vicinity of the site. This water system is expected to eliminate potential receptors for groundwater contamination. DOE expects to complete all remediation activities at the site by 2003. AEC' s underground detonations at the site resulted in contamination of subsurface areas and groundwater. The potential contaminants of concern for the subsurface are mixed fission products, including plutonium, uranium, and tritium. During cleanup activities conducted at the site in 1972, AEC injected radioactively contaminated soils and water into the test cavity. The injection wells were then sealed with concrete and bentonite when the site was decommissioned. DOE does not plan to remediate subsurface contamination because of the lack of feasible technologies for removing subsurface contamination. However, DOE will use characterization and modeling data to define the areas that will require institutional controls. Negotiations with the State of Mississippi on final site closure criteria were initiated in 1999, and DOE expects all subsurface closure work will be completed by 2003. Mississippi 3
  • 6. National Defense Authorization Act (NOAA) Long-Term Stewardship Report Potential surface contamination at the site resulted from drilling operations after the first test was conducted. Contaminants of concern include tritium and diesel fuel in abandoned mud pits, shallow disposal areas, and bum pits. In 1972, AEC initiated cleanup of surface contamination by excavating soils, decommissioning facilities, and disposing of wastes. In 1977, DOE conducted an additional sampling program, with more than 170 exploratory borings, and extensive soil and groundwater sampling. The results of the study showed that tritium contamination was left in the shallow mud pits during the 1972 site cleanup. As a result of this contamination, a plume of tritium extends northwest from the surface-ground-zero mud pits. DOE provided the site remedial investigation report to the State of Mississippi for review and State approval was received in May 2000. The State will make a decision on DOE's closure plans based on its review of the documentation. Assuming that the State accepts the current DOE plan, the surface contamination will be left in place to naturally decay to levels that will allow the site to be transferred to the State for use as a demonstration forest and wildlife refuge (approximately 10 years). 0 10 Miles Salmon Site 2.0 SITE-WIDE LONG-TERM STEWARDSHIP 2.1 Long-Term Stewardship Activities DOE expects that the subsurface will be closed and that DOE activities at the site will consist solely oflong-term stewardship activities beginning in 2003. DOE will not maintain an active presence at this site but will be responsible for monitoring and maintaining institutional controls over subsurface contamination. Final long-term stewardship requirements for the subsurface will be negotiated with the State of Mississippi. Periodic monitoring will be conducted to ensure that there is no contaminant migration from the test cavity to the groundwater. DOE does not anticipate that any long-term stewardship activities associated with the remediated surface Mississippi 4
  • 7. Salmon Site contamination will be necessary once the existing levels of contamination have either attenuated or decayed to agreed upon concentration levels, which is estimated to take approximately 10 years. DOE maintains the project-specific records at the Nevada Operations Office in Las Vegas. These records include corrective action investigation work plans and reports; corrective action decision documents; health assessments; risk assessments; information submitted by the public; National Environmental Policy Act documents; and the Public Involvement Plan. The DOE Public Reading Facility and the Nevada Division of Environmental Protection Administrative Record are provided with copies of these documents. Upon the completion of the project, all DOE project files will be transferred to controlled storage at the Nevada Operations Office. Records are retained according to DOE records retention procedures. 2.2 Specific Long-Term Stewardship Activities Groundwater A monument has been placed at the site to mark the location of the test cavity. DOE will maintain institutional controls over the subsurface in perpetuity to prevent access to the test cavity, groundwater, and associated subsurface contamination. Institutional controls will include restricting surface intrusions on the site. DOE will continue to conduct annual groundwater monitoring at the site for at least 100 years after closure of the subsurface in 2003. DOE estimates that repair or replacement of groundwater monitoring wells will be required every 25 years. At the end of the post-closure groundwater monitoring period in 2103, assuming State regulatory agency approval, the monitoring wells will be plugged and abandoned in place in accordance with State regulations. 2.3 Regulatory Regime In accordance with applicable regulatory drivers listed below, DOE is responsible for identifying the nature and extent of contamination, determining potential risk to the public and the environment, and performing the necessary corrective actions in compliance with guidelines and requirements under federal regulatory drivers, as well as the state-specific regulatory drivers associated with the site location. These responsibilities are delegated to the DOE Office of Environmental Management. Resource Conservation and Recovery Act CRCRA): RCRA was the first comprehensive Federal effort to deal with solid and hazardous waste. RCRA regulates the generation, transportation, treatment, storage, and disposal of hazardous waste. At the Salmon Site, RCRA is enforced to protect human health and the environment; conserve energy and natural resources; reduce the amount of generated waste; and ensure that wastes are managed in an environmentally sound manner. Comprehensive Environmental Response. Compensation. and Liability Act CCERCLA): CERCLA supplies a system for identifying and providing corrective action to sites where hazardous substances have been released into any part of the air, water, groundwater, or land. Provisions of CERCLA include a National Contingency Plan, which establishes procedures for corrective action for hazardous substance releases. Salmon is not regulated under CERCLA; however, the regulations are useful as developmental guidelines. In addition to federal regulations, DOE must comply with State regulatory requirements. In most cases, State of Mississippi requirements are based on federal guidelines; however, in specific cases they may be more detailed and stringent than federal regulations. Nuclear Regulatory Commission (NRC): NRC regulations establish "free release" criteria. The State of Mississippi is not regulated under the NRC; however, the regulations are used as developmental guidelines. Mississippi 5
  • 8. National Defense Authorization Act (NDAA) Long-Tenn Stewardship Report 2.4 Assumptions and Uncertainties DOE assumes that the State of Mississippi will approve the proposed surface restoration plan. Current land use designations and subsurface intrusion restrictions will continue into the foreseeable future. DOE will reevaluate and modify the subsurface restrictions, as appropriate, as part of the assessment and/or corrective action activities. DOE does not plan to remove subsurface contamination in and around the test cavities. However, DOE will develop subsurface models to define the contaminant boundary and refine the existing subsurface intrusion restrictions, if necessary. Post-closure monitoring will be conducted, as agreed upon in the site closure reports for the subsurface, in order to detect changes in the subsurface conditions. The schedule for groundwater monitoring after closure of the subsurface will be defined in the subsurface closure report. DOE assumes that groundwater monitoring will continue annually after subsurface closure is finalized in 2003 and that monitoring will be performed for 100 years (2003-2103). 3.0 ESTIMATED LONG-TERM STEWARDSHIP COSTS The cost profile in the table below applies to the entire Salmon site. The major long-term stewardship costs are for monitoring activities, data analysis, and repair and replacement of monitoring wells. The spikes in cost are a result of costs associated with repairing or replacing monitoring wells, which are assumed to require maintenance every 25 years. The long-term stewardship costs for the Salmon Site remain roughly constant at $40,000 annually through FY 2010. The higher costs in FY 2000 are associated with the new Real Estate Operations Permit (RE-OP) requirements. The cost increase in 2008 is the result of a periodic review and analysis of the data to evaluate and possibly refine the monitoring strategy. This review and analysis will occur every five years throughout the postclosure monitoring period (2003-2103). DOE projects that the total post-2070 (2071-2103) costs will be approximately $6.8 million dollars. Site Long" Term Stewardship Costs (Constant Ye~l- ~OOODollan) Year(s) Amount Year(s) Amount Year(s) Amount FY 2000 $180,000 FY 2008 $113,000 FY 2036-2040 $272,000 FY 2001 $40,000 FY 2009 $40,000 FY 2041-2045 $272,000 FY 2002 $40,000 FY 2010 $40,000 FY 2046-2050 $273,000 FY 2003 $40,000 FY 2011-2015 $272,000 FY 2051-2055 $2,772,000 FY 2004 $40,000 FY 2016-2020 $272,000 FY 2056-2060 $272,000 FY 2005 $40,000 FY 2021-2025 $272,000 FY 2061-2065 $272,000 FY 2006 $40,000 FY 2026-2030 $2,772,000 FY 2066-2070 $272,000 FY 2007 $40,000 FY 2031-2035 $272,000 PostFY 2070 $6,800,000 4.0 FUTURE USES Public Law 104-201 (the National Defense Authorization Act of Fiscal Year 1997, Section 2851 (b), September 1996) allows DOE to transfer the site to the State of Mississippi. It is anticipated that the Salmon Site will be Mississippi 6
  • 9. Salmon Site used as a demonstration forest and wildlife refuge. If the State accepts the property, agreements will be enacted for the transfer. The agreements will be completed prior to the completion of the closure activities and will be predicated on the final agreed upon surface closure criteria and future land use determinations. The anticipated end state for the Salmon Site will allow for future surface use at the site with an NRC designation of "no radiological restrictions." DOE will continue to restrict access to the test cavities, subsurface soil, and groundwater through the use of deed restrictions in perpetuity. For additional information about the Salmon Site, please contact: Monica Sanchez U.S. Department of Energy, Nevada Operations Office Environmental Restoration Division 232 Energy Way North Las Vegas, NV 89030-4199 Phone: 702-295-0160 sanchezm@ nv .doe. gov Mississippi 7