SlideShare a Scribd company logo
1 of 29
Trail Bridge Capacity Development in Ethiopia Presenter: Markus Ischer Country Programme Director Helvetas Ethiopia October 11, 2010, Tunis, Tunisia HELVETAS
Outline of Presentation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1. Ethiopia at a glance (World Bank, UNDP) Surface Area 1,1 mio km 2 Population (2008)  85.2 Mio HDI-Rank (2008)  105 out of 109 Population below poverty line below 2$ per day (2007) 78% Literacy rate, adult (2009)  43% Access to potable water (2006)    42% GNI per capita (2008)  280 US$ Average distance to all weather road (2009) 11.8 km Average travel time of rural households (2005) 4 to 6 hrs/day
2 .  Crossing problems in rural Ethiopia
 
Sebara Dildey bridge – crossing blue Nil, ET
Timeline Activity 2003-2006 Pilot projects, 13 TB built, mainly in Oromia Region December 2007 Exposure visit by Helvetas Ethiopia & 3 ERA Officials to Nepal  March 2008 Fact finding mission by Helvetas Nepal & Helvetas Ethiopia in Oromia, Amhara & Tigray Regions May 2008 Signing of Cooperation Agreement between ERA & Helvetas Ethiopia December 2008 14 Ethiopian personnel trained in Nepal on trail bridge technology (management level) June 2009 Project implementation agreement signed  between HET and 3 RRAs for the construction of 9 bridges November 2009 – March 2010 Construction of 9 bridges, in three different regions April – September 2010 Preparation 6 TB in Tigray (D-type) and 4 TB in Gambella region (2 N-type, 2 D-type) Present  status 10 trail bridges ready for construction. 3.  Milestones in  trail bridge projects development
4. Helvetas Ethiopia Trail Bridge Project ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
5. Approaches ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
6. Partnership with ERA / RRA’s  ,[object Object],[object Object]
7. South – south collaboration - principles ,[object Object],[object Object],[object Object],[object Object]
8. Achievements ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
9. Bridges constructed Steel Truss Bridge Numbers: 2 Location: Yem Woreda, SNNPR Span: 24m / 28m
…… .. N-Type  Trail Bridges Numbers: 2 Location: Atsbi Womberta Woreda, Tigray Span: 96 m, 112 m
………… . Trail Bridges D-Type Numbers: 18 Location: various regions Span: average 90 m
10. Cost Summary (by bridge type) Cost type category D-Type, Span 85 mt US$ N-Type, Span 85 mt US$ 1. Preparatory work:  feasibility study, survey, design / cost estimate 4’000 5’000 2. Construction, materials:  cables, bulldog grips, steel parts, cement, tools, transportation 40’000 50’000 3. Construction, labors:  skilled, unskilled, foremen, driver, running cost 9’000 18’000 4. Capacity Building:  south – south collab-oration, social organization support, trainings etc 18’000 23’000 5. Management:  coordination, supervision, monitoring (main office Addis Ababa) 18’000 25’000 Cost/m D-Type:  1’047 N-Type:  1’424 Total 89’000 121’000
11. Challenges ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
12. Experiences gained
……… .
……… .
……… .
……… .
……… .
……… .
……… .
……… . Land dispute
13. Trail bridges – under preparation
…… . Gambella Region: 2 N-Type / 2 D-type Tigray Region: 6 D-Type Construction period: October 15. 2010 – end of February 2011
Thank you for your attention!

More Related Content

What's hot

TRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIESTRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIEStp jayamohan
 
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERINGALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERINGEduHUBOnline
 
Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )Ahmad Ali Miftah
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)sharda university
 
History of roads
History of roadsHistory of roads
History of roadskarthick s
 
CORRIDOR-PLANNING-in-Transportation
CORRIDOR-PLANNING-in-TransportationCORRIDOR-PLANNING-in-Transportation
CORRIDOR-PLANNING-in-TransportationRennieMaeBChua
 
Land-use transport planning
Land-use transport planning Land-use transport planning
Land-use transport planning Bhavik A Shah
 
Chapter 3 geometric design
Chapter 3 geometric  designChapter 3 geometric  design
Chapter 3 geometric designBashaFayissa1
 
Urban transportation planning africa
Urban transportation planning  africaUrban transportation planning  africa
Urban transportation planning africaSteven Apell (Ph.D)
 
Road networks (m.eng civil)
Road networks (m.eng civil)Road networks (m.eng civil)
Road networks (m.eng civil)Ibrahim Lawal
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its typeYash Patel
 
Cordon line survey
Cordon line surveyCordon line survey
Cordon line surveyNilgabs1
 
Traffic Intersection Points Of Conflict
Traffic Intersection Points Of ConflictTraffic Intersection Points Of Conflict
Traffic Intersection Points Of ConflictTHECITYALLIANCE
 
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah) Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah) Hossam Shafiq I
 
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)RAMPRASAD KUMAWAT
 

What's hot (20)

Ppt rcc road design
Ppt rcc road designPpt rcc road design
Ppt rcc road design
 
TRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIESTRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIES
 
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERINGALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
 
Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
 
History of roads
History of roadsHistory of roads
History of roads
 
CORRIDOR-PLANNING-in-Transportation
CORRIDOR-PLANNING-in-TransportationCORRIDOR-PLANNING-in-Transportation
CORRIDOR-PLANNING-in-Transportation
 
Land-use transport planning
Land-use transport planning Land-use transport planning
Land-use transport planning
 
Chapter 3 geometric design
Chapter 3 geometric  designChapter 3 geometric  design
Chapter 3 geometric design
 
Urban transportation planning africa
Urban transportation planning  africaUrban transportation planning  africa
Urban transportation planning africa
 
Road networks (m.eng civil)
Road networks (m.eng civil)Road networks (m.eng civil)
Road networks (m.eng civil)
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
 
Types of parking studies
Types of parking studiesTypes of parking studies
Types of parking studies
 
Cordon line survey
Cordon line surveyCordon line survey
Cordon line survey
 
Traffic Intersection Points Of Conflict
Traffic Intersection Points Of ConflictTraffic Intersection Points Of Conflict
Traffic Intersection Points Of Conflict
 
Network analysis
Network analysisNetwork analysis
Network analysis
 
Road network
Road networkRoad network
Road network
 
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah) Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
 
04 transport modelling
04 transport modelling04 transport modelling
04 transport modelling
 
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)
 

Similar to Helvetas Ethiopia trail bridge experience

SCIE Forum - Interreg
 SCIE Forum - Interreg SCIE Forum - Interreg
SCIE Forum - InterregSCIE
 
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...tejcagampang
 
Why Labor Based Technology in Nepal
Why Labor Based Technology in NepalWhy Labor Based Technology in Nepal
Why Labor Based Technology in NepalManoj Neupane
 
Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...European Commission
 
EuroVelo and Ukraine
EuroVelo and UkraineEuroVelo and Ukraine
EuroVelo and Ukrainevelotransport
 
Présentation Christian Salletmaier - EMICT Forum 2011
Présentation Christian Salletmaier - EMICT Forum 2011Présentation Christian Salletmaier - EMICT Forum 2011
Présentation Christian Salletmaier - EMICT Forum 2011EMICTForum
 
Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010Morten Meyer
 
"Building a transport system for a sustainable society" Jesmond Library Talk ...
"Building a transport system for a sustainable society" Jesmond Library Talk ..."Building a transport system for a sustainable society" Jesmond Library Talk ...
"Building a transport system for a sustainable society" Jesmond Library Talk ...Northumbria University
 
Mahmoud Resume English
Mahmoud Resume EnglishMahmoud Resume English
Mahmoud Resume Englishmahmoudfem
 

Similar to Helvetas Ethiopia trail bridge experience (20)

SCIE Forum - Interreg
 SCIE Forum - Interreg SCIE Forum - Interreg
SCIE Forum - Interreg
 
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
 
CV_Kelemenis
CV_KelemenisCV_Kelemenis
CV_Kelemenis
 
Summary of the strategic initiative logistics
Summary of the strategic initiative logisticsSummary of the strategic initiative logistics
Summary of the strategic initiative logistics
 
81-CS
81-CS81-CS
81-CS
 
NMT City Wide
NMT City Wide NMT City Wide
NMT City Wide
 
Why Labor Based Technology in Nepal
Why Labor Based Technology in NepalWhy Labor Based Technology in Nepal
Why Labor Based Technology in Nepal
 
EOSC-Pillar
EOSC-PillarEOSC-Pillar
EOSC-Pillar
 
Ws B 2 I.Tartaglia
Ws B 2 I.TartagliaWs B 2 I.Tartaglia
Ws B 2 I.Tartaglia
 
Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...
 
Fiona McLean
Fiona McLeanFiona McLean
Fiona McLean
 
Fiona McLean
Fiona McLeanFiona McLean
Fiona McLean
 
EuroVelo and Ukraine
EuroVelo and UkraineEuroVelo and Ukraine
EuroVelo and Ukraine
 
Ahmed's CV- May, 2015
Ahmed's CV- May, 2015Ahmed's CV- May, 2015
Ahmed's CV- May, 2015
 
ISMED PPD: Assessment Report
ISMED PPD: Assessment ReportISMED PPD: Assessment Report
ISMED PPD: Assessment Report
 
Présentation Christian Salletmaier - EMICT Forum 2011
Présentation Christian Salletmaier - EMICT Forum 2011Présentation Christian Salletmaier - EMICT Forum 2011
Présentation Christian Salletmaier - EMICT Forum 2011
 
Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010
 
"Building a transport system for a sustainable society" Jesmond Library Talk ...
"Building a transport system for a sustainable society" Jesmond Library Talk ..."Building a transport system for a sustainable society" Jesmond Library Talk ...
"Building a transport system for a sustainable society" Jesmond Library Talk ...
 
Mahmoud Resume English
Mahmoud Resume EnglishMahmoud Resume English
Mahmoud Resume English
 
Curriculum Vitae_EU FORMAT_RAILWAY
Curriculum Vitae_EU FORMAT_RAILWAYCurriculum Vitae_EU FORMAT_RAILWAY
Curriculum Vitae_EU FORMAT_RAILWAY
 

Recently uploaded

Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...apidays
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 

Recently uploaded (20)

Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 

Helvetas Ethiopia trail bridge experience

  • 1. Trail Bridge Capacity Development in Ethiopia Presenter: Markus Ischer Country Programme Director Helvetas Ethiopia October 11, 2010, Tunis, Tunisia HELVETAS
  • 2.
  • 3. 1. Ethiopia at a glance (World Bank, UNDP) Surface Area 1,1 mio km 2 Population (2008) 85.2 Mio HDI-Rank (2008) 105 out of 109 Population below poverty line below 2$ per day (2007) 78% Literacy rate, adult (2009) 43% Access to potable water (2006) 42% GNI per capita (2008) 280 US$ Average distance to all weather road (2009) 11.8 km Average travel time of rural households (2005) 4 to 6 hrs/day
  • 4. 2 . Crossing problems in rural Ethiopia
  • 5.  
  • 6. Sebara Dildey bridge – crossing blue Nil, ET
  • 7. Timeline Activity 2003-2006 Pilot projects, 13 TB built, mainly in Oromia Region December 2007 Exposure visit by Helvetas Ethiopia & 3 ERA Officials to Nepal March 2008 Fact finding mission by Helvetas Nepal & Helvetas Ethiopia in Oromia, Amhara & Tigray Regions May 2008 Signing of Cooperation Agreement between ERA & Helvetas Ethiopia December 2008 14 Ethiopian personnel trained in Nepal on trail bridge technology (management level) June 2009 Project implementation agreement signed between HET and 3 RRAs for the construction of 9 bridges November 2009 – March 2010 Construction of 9 bridges, in three different regions April – September 2010 Preparation 6 TB in Tigray (D-type) and 4 TB in Gambella region (2 N-type, 2 D-type) Present status 10 trail bridges ready for construction. 3. Milestones in trail bridge projects development
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. 9. Bridges constructed Steel Truss Bridge Numbers: 2 Location: Yem Woreda, SNNPR Span: 24m / 28m
  • 14. …… .. N-Type Trail Bridges Numbers: 2 Location: Atsbi Womberta Woreda, Tigray Span: 96 m, 112 m
  • 15. ………… . Trail Bridges D-Type Numbers: 18 Location: various regions Span: average 90 m
  • 16. 10. Cost Summary (by bridge type) Cost type category D-Type, Span 85 mt US$ N-Type, Span 85 mt US$ 1. Preparatory work: feasibility study, survey, design / cost estimate 4’000 5’000 2. Construction, materials: cables, bulldog grips, steel parts, cement, tools, transportation 40’000 50’000 3. Construction, labors: skilled, unskilled, foremen, driver, running cost 9’000 18’000 4. Capacity Building: south – south collab-oration, social organization support, trainings etc 18’000 23’000 5. Management: coordination, supervision, monitoring (main office Addis Ababa) 18’000 25’000 Cost/m D-Type: 1’047 N-Type: 1’424 Total 89’000 121’000
  • 17.
  • 26. ……… . Land dispute
  • 27. 13. Trail bridges – under preparation
  • 28. …… . Gambella Region: 2 N-Type / 2 D-type Tigray Region: 6 D-Type Construction period: October 15. 2010 – end of February 2011
  • 29. Thank you for your attention!