1. East Delta WTP
WTP Water Hammer - Damage Sphere
Checking the water hammer vessel water rise andnot go down so that
mean sphere damaged and to Checked
page 1/12
2. East Delta WTP
WTP Water Hammer - Damage Sphere
Sphere Welding Carck and fll with water
page 2/12
3. East Delta WTP
WTP Water Hammer - Damage Sphere
Sphere Welding Carck and fll with water
page 3/12
4. East Delta WTP
Spare Parts
No new for Spare parts
page 4/12
5. East Delta WTP
Flash Mixer Dry Run damage
Dry Run damage because of twisted a round the mixer
page 5/12
6. East Delta WTP
Flash Mixer Dry Run damage
They assembly the switch but not connected yet
page 6/12
7. East Delta WTP
Filter 03,04 Refill with New Filter Media
The empty 03 and refill 04
page 7/12
8. East Delta WTP
Filter 03,04 Refill with New Filter Media
The empty 03 and refill 04
page 8/12
9. East Delta WTP
Chlorine
Sherkia CO take Drum valve to mainten , till now not installed
page 9/12
10. East Delta WTP
Thickener
Thickener empty or full and pipe blocked and pumps stopped
page 10/12
11. Regular Check
No Unit Activates
Intake 1- Checking Raw Water Pump pressure,temprature,power and gland packing leakage.
1
2- Checking water hammer system working or not.
2 Distribution Shift Checking flow, pressure, chlorine dosing and float fix or not.
Chlarifier Checking sludge pumping units, cleaning and greasing of knife,air pressure, bridge and mixers.
3
4 Thickener Checking pump pressure, pipeline blocking and thickener level.
Filters 1- Checking backwash , backwash waste ,boosters and dewatering.
5 2- Air system ,compressors,dryer,pressure,…,etc.
3- Checking filters flow , levels , backwash tank level.
6 Under Ground Reservoir Checking rediusal chlorine smaple plan and tanks levels
Treated Water Pump 1- Checking pump priming system.
Station 2- Checking Treated Water Pump pressure,temprature,power and mechanical seal leakage.
7
3- Checking water hammer system working or not.
4- Checking measurement devices.
Chlorine 1- Checking drums, vacuum units , changeover unit and piping.
8 2- Checking dosing cabient, dosing , feeding pressure.
3- checking Caustic Soda Pump.
Chemical 1- Checking dosing pumps, strianers, pressure , flow and piping.
9
2- Checking Tanks levels and cleaning.
10 Evaporation ponds 1- Checking air pressure , cleaning and greasing of knife.
Activites and Remarks for week
No Unit Remaks
1 Intake
2 Distribution Shaft
3 Clarifier
1- Fixing of the flash mixer dry run was bad and cause damage to it.
3 Thickener 1- Thickener empty or full and piping blocked and pumps stopped
4 Filters 1- Filter 03,04 Refill with New Filter Media
2- Backwash pumps was stopped because someone played by button.
3- Backwash pump 42 coupling extension handed over to AC till install new H-Shape rubber
5 Chlorine
1- Sherkia CO take Drum valve to mainten , till now not installed
2- General cleaning of drum store
7 Chemical 1- Plastic fall in tanks during filling.
Central dewatering
8
Station
9 Evaporation ponds 1-opened valve closed and operation shloud from panel.
10 Under Ground Reservoir Rediusal Chlorine sample pump not working.
Treated Water Pump Water hammer maintenance
11
Station