The 7 Things I Know About Cyber Security After 25 Years | April 2024
Operation Maintenance Training Simulator (OMTS)
1.
2.
3.
4.
5.
6.
7. How to Roll Out OMTS in Your Organization Slide 7 Company Confidential, Virtual Logic Systems Pvt. Ltd. Proof of Concept or a Pilot Program – Sub - System of an Equipment Mid Term Project – All System and Sub-System of a Product Long-Term Project – Entire Product line in one division Long Term Program – Entire product line across all divisions Time Line - 6 to 8 weeks Time Line - 6 to 9 Months Time Line - 1 to 2 Years Time Line - 2 to 3 Years