 What   is just-in-time manufacturing
Jit is philosophy of manufacturing based on
 planned elimination of all waste and continuous
 improvement of productivity it encompasses the
 successful execution of all manufacturing
 activities required to produce a final product from
 design engineering to delivery and including all
 the states of conversion from raw material
 onward.
The philosophy of JIT can be traced back to Henry
 Ford, but formalized JIT originated in Japan as the
 Toyota Production System. W. Edwards Deming’s
 lesson of variability reduction was a huge influence.

JIT is a long-term approach to process improvement. It uses
timeliness as a lever to lower costs, improve quality and improve
responsiveness. However, JIT requires enormous commitment. It
took Toyota more than 25 years to get right!

           The focus of JIT is to improve the
          system of production by eliminating
                 all forms of WASTE.
 Eliminating  wastes
 Total quality management
 Parallel processing
 Jit purchasing
 E-commerce and JIT purchasing
 Reducing inventories through setup
  reduction
 working towards repetitive manufacturing
Traditional
 Goal: maximize production by minimizing disruptions
 Management Assumption: we can sell what we make




JIT
 Goal: Produce salable goods as quickly and efficiently as
  possible
 Management Assumption: we make what we can sell
Just-in-Time Principles
Traditional Manufacturing     Just-in-Time Manufacturing

Increases inventory to        Reduces inventory
protect against process
problems

Increases lead time to        Reduces lead time
protect against uncertainty

Disregards setup time         Reduces setup time
as an improvement priority
Traditional Manufacturing   Just-in-Time Manufacturing

Emphasizes work of          Emphasizes team-
individuals, following      oriented employee
manager instructions        involvement

Emphasizes push             Emphasizes pull
manufacturing               manufacturing

Tolerates defects           Emphasizes zero
                            defects




                                                         8
 Stabilize production schedule
 Increase production capacity of
  manufacturing
 Improve the product quality
 Cross train worker
 Reduce equipment breakdowns through
  preventive maintenance
 Develop long term relationship that avoid
  interruption to the material flows
                  just in time by ravindra   2/22/2009
                                                         9
The main benefits of JIT are listed below.
 Set up times are significantly reduced in the factory. Cutting down the set up time
  to be more productive will allow the company to improve their bottom line to look more
  efficient and focus time spent on other areas that may need improvement.
 The flows of goods from warehouse to shelves are improved. Having employees
  focused on specific areas of the system will allow them to process goods faster instead
  of having them vulnerable to fatigue from doing too many jobs at once and simplifies
  the tasks at hand. Small or individual piece lot sizes reduce lot delay inventories which
  simplifies inventory flow and its management.
 Employees who possess multiple skills are utilized more efficiently. Having
  employees trained to work on different parts of the inventory cycle system will allow
  companies to use workers in situations where they are needed when there is a
  shortage of workers and a high demand for a particular product.
   Better consistency of scheduling and consistency of employee work hours. If
    there is no demand for a product at the time, workers don’t have to be working. This
    can save the company money by not having to pay workers for a job not completed or
    could have them focus on other jobs around the warehouse that would not necessarily
    be done on a normal day.
   Increased emphasis on supplier relationships. No company wants a break in their
    inventory system that would create a shortage of supplies while not having inventory
    sit on shelves. Having a trusting supplier relationship means that you can rely on
    goods being there when you need them in order to satisfy the company and keep the
    company name in good standing with the public.
   Supplies continue around the clock keeping workers productive and businesses
    focused on turnover. Having management focused on meeting deadlines will make
    employees work hard to meet the company goals to see benefits in terms of job
    satisfaction, promotion or even higher pay.
Step 1: Awareness

      The goal of JIT is to eliminate waste in all its forms.
      The assumption of JIT is that we cannot sell everything we make. Thus, we
       must produce salable goods (low cost, high quality, etc...) quickly.
      Operation = Motion (Waste) + Work (Added Value)
      Motion alone is a waste that adds cost (counting things, moving boxes,
       transporting goods, preparation time, waiting, producing defects, over
       production, handling materials, switching things on)
      Inventory decouples individual operations and thereby creates waste (non-
       value-added motion) to buffer the operations against the effect of a different
       form of waste (long setups, poor material handling procedures, production of
       defects, etc.)
      For real improvement, we must ask "why" when we encounter any form of
       waste.
Step 2: Workplace Improvement (the 5 S’s)

       Seiri: Proper arrangement (sort through and sort out, identify what you
        need, discard what you do not need )
       Seiton: Orderliness (assign a separate location for all essential items)
       Seiso: Cleanliness (keep the workplace spotless at all times)
       Seiketsu: Cleanup (maintain equipment and tools)
       Shitsuke: Discipline (stick to the rules scrupulously)
Step 3: Flow Manufacturing (one piece at a time)



      Place the machines in process sequence
      Design a cellular (U-shaped) layout
      Make one piece at a time in the cell
      Produce according to the cycle time
      Have the operators work standing up and walking
      Use slower, dedicated machines that are smaller and less expensive
just in time manufacturing

Weitere ähnliche Inhalte

Was ist angesagt?

JUST IN TIME CONCEPT
JUST IN TIME CONCEPTJUST IN TIME CONCEPT
JUST IN TIME CONCEPT09Bhupesh47
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &ganessh04
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory managementiWriteEssays
 
just in time management
just in time managementjust in time management
just in time managementumesh yadav
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturingravindra sharma
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, leanNishit Patel
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)Manoj Subedi
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhusashi prabhu
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)Arunnima B S
 
Just in time
Just in timeJust in time
Just in timeasmokase
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTnishu tyagi
 
Just In Time production system
Just In Time production systemJust In Time production system
Just In Time production systemMohamed EL-Sayed
 
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'amJust in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'amMd. Moazzem Hossain
 
Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan Pareek, PMP
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturingshahroze11
 

Was ist angesagt? (20)

JUST IN TIME CONCEPT
JUST IN TIME CONCEPTJUST IN TIME CONCEPT
JUST IN TIME CONCEPT
 
Just in time
Just in timeJust in time
Just in time
 
Just in time concept
Just in time conceptJust in time concept
Just in time concept
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory management
 
just in time management
just in time managementjust in time management
just in time management
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, lean
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
JIT for manufacturing ppt
JIT for manufacturing pptJIT for manufacturing ppt
JIT for manufacturing ppt
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
 
Just in time
Just in timeJust in time
Just in time
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPT
 
Just In Time production system
Just In Time production systemJust In Time production system
Just In Time production system
 
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'amJust in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
 
Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmt
 
Just in time
Just in timeJust in time
Just in time
 
Jit
JitJit
Jit
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturing
 

Andere mochten auch

Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing pptSwati Luthra
 
JIT (Just In Time Manufacturing)
JIT (Just In Time Manufacturing)JIT (Just In Time Manufacturing)
JIT (Just In Time Manufacturing)Hitesh Sharma
 
Just In Time Manufacturing Process
Just In Time Manufacturing ProcessJust In Time Manufacturing Process
Just In Time Manufacturing ProcessBoricha Jaydeep
 
Connect Executive Search
Connect Executive Search  Connect Executive Search
Connect Executive Search Dina Hassan
 
Voxxed Days Thessaloniki 2016 - Keynote - JDK 9 : Big Changes To Make Java Sm...
Voxxed Days Thessaloniki 2016 - Keynote - JDK 9 : Big Changes To Make Java Sm...Voxxed Days Thessaloniki 2016 - Keynote - JDK 9 : Big Changes To Make Java Sm...
Voxxed Days Thessaloniki 2016 - Keynote - JDK 9 : Big Changes To Make Java Sm...Voxxed Days Thessaloniki
 
συναντηση υπουργειου εθνικης αμυνης
συναντηση υπουργειου εθνικης αμυνηςσυναντηση υπουργειου εθνικης αμυνης
συναντηση υπουργειου εθνικης αμυνηςATHANASIOS KAVVADAS
 
BioConference Live Genetics 2013
BioConference Live Genetics 2013BioConference Live Genetics 2013
BioConference Live Genetics 2013LabRoots, Inc.
 
A Salesforce Admin's Compass to Dreamforce
A Salesforce Admin's Compass to DreamforceA Salesforce Admin's Compass to Dreamforce
A Salesforce Admin's Compass to DreamforceSalesforce Admins
 
Social media nonprofitcenter0913
Social media nonprofitcenter0913Social media nonprofitcenter0913
Social media nonprofitcenter0913Jan Hirabayashi
 
Unleashing People Potential
Unleashing People PotentialUnleashing People Potential
Unleashing People PotentialAnand Desai
 
Para entender un poco más la virtualidad
Para entender un poco más la virtualidadPara entender un poco más la virtualidad
Para entender un poco más la virtualidadSilvina Molina
 
CATALOGO ESCLAVAS
CATALOGO ESCLAVASCATALOGO ESCLAVAS
CATALOGO ESCLAVASjoyas_plata
 
Downlight for commercial lighting application
Downlight for commercial lighting application Downlight for commercial lighting application
Downlight for commercial lighting application Ladislav Varga
 
Silicon valley and the search for immortality — the future of healthcare
Silicon valley and the search for immortality — the future of healthcareSilicon valley and the search for immortality — the future of healthcare
Silicon valley and the search for immortality — the future of healthcareYogesh Malik
 
Grafico diario del dax perfomance index para el 08 08-2012
Grafico diario del dax perfomance index para el 08 08-2012Grafico diario del dax perfomance index para el 08 08-2012
Grafico diario del dax perfomance index para el 08 08-2012Experiencia Trading
 

Andere mochten auch (20)

Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
JIT (Just In Time Manufacturing)
JIT (Just In Time Manufacturing)JIT (Just In Time Manufacturing)
JIT (Just In Time Manufacturing)
 
Just In Time Manufacturing Process
Just In Time Manufacturing ProcessJust In Time Manufacturing Process
Just In Time Manufacturing Process
 
Connect Executive Search
Connect Executive Search  Connect Executive Search
Connect Executive Search
 
Satellite networks
Satellite networksSatellite networks
Satellite networks
 
Voxxed Days Thessaloniki 2016 - Keynote - JDK 9 : Big Changes To Make Java Sm...
Voxxed Days Thessaloniki 2016 - Keynote - JDK 9 : Big Changes To Make Java Sm...Voxxed Days Thessaloniki 2016 - Keynote - JDK 9 : Big Changes To Make Java Sm...
Voxxed Days Thessaloniki 2016 - Keynote - JDK 9 : Big Changes To Make Java Sm...
 
Practica 5
Practica 5Practica 5
Practica 5
 
συναντηση υπουργειου εθνικης αμυνης
συναντηση υπουργειου εθνικης αμυνηςσυναντηση υπουργειου εθνικης αμυνης
συναντηση υπουργειου εθνικης αμυνης
 
BioConference Live Genetics 2013
BioConference Live Genetics 2013BioConference Live Genetics 2013
BioConference Live Genetics 2013
 
A Salesforce Admin's Compass to Dreamforce
A Salesforce Admin's Compass to DreamforceA Salesforce Admin's Compass to Dreamforce
A Salesforce Admin's Compass to Dreamforce
 
cert
certcert
cert
 
Slamit 7, an ERASMUS+ Course
Slamit 7, an ERASMUS+ Course Slamit 7, an ERASMUS+ Course
Slamit 7, an ERASMUS+ Course
 
Book secrets of success of IIIT model
Book secrets of success of IIIT modelBook secrets of success of IIIT model
Book secrets of success of IIIT model
 
Social media nonprofitcenter0913
Social media nonprofitcenter0913Social media nonprofitcenter0913
Social media nonprofitcenter0913
 
Unleashing People Potential
Unleashing People PotentialUnleashing People Potential
Unleashing People Potential
 
Para entender un poco más la virtualidad
Para entender un poco más la virtualidadPara entender un poco más la virtualidad
Para entender un poco más la virtualidad
 
CATALOGO ESCLAVAS
CATALOGO ESCLAVASCATALOGO ESCLAVAS
CATALOGO ESCLAVAS
 
Downlight for commercial lighting application
Downlight for commercial lighting application Downlight for commercial lighting application
Downlight for commercial lighting application
 
Silicon valley and the search for immortality — the future of healthcare
Silicon valley and the search for immortality — the future of healthcareSilicon valley and the search for immortality — the future of healthcare
Silicon valley and the search for immortality — the future of healthcare
 
Grafico diario del dax perfomance index para el 08 08-2012
Grafico diario del dax perfomance index para el 08 08-2012Grafico diario del dax perfomance index para el 08 08-2012
Grafico diario del dax perfomance index para el 08 08-2012
 

Ähnlich wie just in time manufacturing

Just In Time
Just In TimeJust In Time
Just In Timedvyvjy
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Exampleshekhar619
 
just in time approace literature view
just in time approace literature viewjust in time approace literature view
just in time approace literature viewAnqur Rauth
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jitKusum Parmar
 
just in time approace
just in  time approacejust in  time approace
just in time approaceAnqur Rauth
 
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'amJust in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'amMd. Moazzem Hossain
 
Presentation (Inventory).ppt
Presentation (Inventory).pptPresentation (Inventory).ppt
Presentation (Inventory).pptRakibIslam94
 
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...Md.Nazrul Islam
 
Lean production by Saiful Alam_050817
Lean production by Saiful Alam_050817Lean production by Saiful Alam_050817
Lean production by Saiful Alam_050817Saiful Alam ✔️
 
Just In Time Analysis
Just In Time AnalysisJust In Time Analysis
Just In Time AnalysisAshim Roy
 
Module 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptxModule 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptxArunJyothi19
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in TimeMusfiqur Rahman
 

Ähnlich wie just in time manufacturing (20)

Just In Time
Just In TimeJust In Time
Just In Time
 
Just in Time (JIT)
Just in Time (JIT)Just in Time (JIT)
Just in Time (JIT)
 
Just in time
Just in timeJust in time
Just in time
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Example
 
Chapter.1 just in time
Chapter.1 just in timeChapter.1 just in time
Chapter.1 just in time
 
just in time approace literature view
just in time approace literature viewjust in time approace literature view
just in time approace literature view
 
Just to-time (jit)
Just to-time (jit)Just to-time (jit)
Just to-time (jit)
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
 
just in time approace
just in  time approacejust in  time approace
just in time approace
 
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'amJust in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
 
Presentation (Inventory).ppt
Presentation (Inventory).pptPresentation (Inventory).ppt
Presentation (Inventory).ppt
 
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
 
Lean production by Saiful Alam_050817
Lean production by Saiful Alam_050817Lean production by Saiful Alam_050817
Lean production by Saiful Alam_050817
 
Just In Time Analysis
Just In Time AnalysisJust In Time Analysis
Just In Time Analysis
 
Module 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptxModule 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptx
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
BASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURINGBASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURING
 
Jit report
Jit reportJit report
Jit report
 
JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
Jit
JitJit
Jit
 

Kürzlich hochgeladen

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 

Kürzlich hochgeladen (20)

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 

just in time manufacturing

  • 1. TALIB KHAN VIVEK GAUR MBA ALIGARH MUSLIM UNIVERSITY MALAPPURAM CENTRE Just Time manufacturing In
  • 2.  Introduction  Just-in-time manufacturing philosophy  Elements of just in time manufacturing  Benefits of Jit manufacturing  Manufacturing JIT implementation  conclusion
  • 3.  What is just-in-time manufacturing Jit is philosophy of manufacturing based on planned elimination of all waste and continuous improvement of productivity it encompasses the successful execution of all manufacturing activities required to produce a final product from design engineering to delivery and including all the states of conversion from raw material onward.
  • 4. The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson of variability reduction was a huge influence. JIT is a long-term approach to process improvement. It uses timeliness as a lever to lower costs, improve quality and improve responsiveness. However, JIT requires enormous commitment. It took Toyota more than 25 years to get right! The focus of JIT is to improve the system of production by eliminating all forms of WASTE.
  • 5.  Eliminating wastes  Total quality management  Parallel processing  Jit purchasing  E-commerce and JIT purchasing  Reducing inventories through setup reduction  working towards repetitive manufacturing
  • 6. Traditional  Goal: maximize production by minimizing disruptions  Management Assumption: we can sell what we make JIT  Goal: Produce salable goods as quickly and efficiently as possible  Management Assumption: we make what we can sell
  • 7. Just-in-Time Principles Traditional Manufacturing Just-in-Time Manufacturing Increases inventory to Reduces inventory protect against process problems Increases lead time to Reduces lead time protect against uncertainty Disregards setup time Reduces setup time as an improvement priority
  • 8. Traditional Manufacturing Just-in-Time Manufacturing Emphasizes work of Emphasizes team- individuals, following oriented employee manager instructions involvement Emphasizes push Emphasizes pull manufacturing manufacturing Tolerates defects Emphasizes zero defects 8
  • 9.  Stabilize production schedule  Increase production capacity of manufacturing  Improve the product quality  Cross train worker  Reduce equipment breakdowns through preventive maintenance  Develop long term relationship that avoid interruption to the material flows just in time by ravindra 2/22/2009 9
  • 10. The main benefits of JIT are listed below.  Set up times are significantly reduced in the factory. Cutting down the set up time to be more productive will allow the company to improve their bottom line to look more efficient and focus time spent on other areas that may need improvement.  The flows of goods from warehouse to shelves are improved. Having employees focused on specific areas of the system will allow them to process goods faster instead of having them vulnerable to fatigue from doing too many jobs at once and simplifies the tasks at hand. Small or individual piece lot sizes reduce lot delay inventories which simplifies inventory flow and its management.  Employees who possess multiple skills are utilized more efficiently. Having employees trained to work on different parts of the inventory cycle system will allow companies to use workers in situations where they are needed when there is a shortage of workers and a high demand for a particular product.
  • 11. Better consistency of scheduling and consistency of employee work hours. If there is no demand for a product at the time, workers don’t have to be working. This can save the company money by not having to pay workers for a job not completed or could have them focus on other jobs around the warehouse that would not necessarily be done on a normal day.  Increased emphasis on supplier relationships. No company wants a break in their inventory system that would create a shortage of supplies while not having inventory sit on shelves. Having a trusting supplier relationship means that you can rely on goods being there when you need them in order to satisfy the company and keep the company name in good standing with the public.  Supplies continue around the clock keeping workers productive and businesses focused on turnover. Having management focused on meeting deadlines will make employees work hard to meet the company goals to see benefits in terms of job satisfaction, promotion or even higher pay.
  • 12. Step 1: Awareness  The goal of JIT is to eliminate waste in all its forms.  The assumption of JIT is that we cannot sell everything we make. Thus, we must produce salable goods (low cost, high quality, etc...) quickly.  Operation = Motion (Waste) + Work (Added Value)  Motion alone is a waste that adds cost (counting things, moving boxes, transporting goods, preparation time, waiting, producing defects, over production, handling materials, switching things on)  Inventory decouples individual operations and thereby creates waste (non- value-added motion) to buffer the operations against the effect of a different form of waste (long setups, poor material handling procedures, production of defects, etc.)  For real improvement, we must ask "why" when we encounter any form of waste.
  • 13. Step 2: Workplace Improvement (the 5 S’s)  Seiri: Proper arrangement (sort through and sort out, identify what you need, discard what you do not need )  Seiton: Orderliness (assign a separate location for all essential items)  Seiso: Cleanliness (keep the workplace spotless at all times)  Seiketsu: Cleanup (maintain equipment and tools)  Shitsuke: Discipline (stick to the rules scrupulously)
  • 14. Step 3: Flow Manufacturing (one piece at a time)  Place the machines in process sequence  Design a cellular (U-shaped) layout  Make one piece at a time in the cell  Produce according to the cycle time  Have the operators work standing up and walking  Use slower, dedicated machines that are smaller and less expensive