1. SWOT ANALYSIS
STRENGTH
•Large workforce
•Diversity in experience
•Young & energetic
WEAKNESS
•Limited workspace/workplace
•Limited facilities & equipment
•Poor hindsight
•Poor communication
•Less experience
•Lack coordination
•Inadequate supervision
•Lack of competence and skill
•Low productivity
•Slow payment of completed works
•Unrealistic contract duration
OPPORTUNITIES
•Utilization of the latest construction
technology method
THREAT
•Desakan from the top
•Defects in design
•Changes in drawings and specification
•Mistake in design
•Incomplete drawing
•Slow verification/inspection of completed works
•Late valuation work
•Late preparation of interim valuation
•Late issue of instruction
•Delay of work approval
•Poor site management/coordination
•Poor site management/supervision
•Unsuitable construction method
•Construction mistakes
•Inadequate experience
•Defective of works
•Poor sub-contractor works
•Improper planning